Mt_Talbert_Paving_Project_Bid Analysis_Comparison.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- BID# 2025-52 Mount Talbert Paving Project
- Solicitation number
- S-C01010-00013918
- Issued by
- Clackamas County, Oregon
About this file
The file is a bid tabulation and price comparison spreadsheet for the Mount Talbert Paving Project (Bid #2025-52) issued by Clackamas County, Oregon. The project involves roadway resurfacing across approximately 1.2 miles of twelve urban local roads, including SE 124th Ave, SE 125th Ave, and SE 126th Ave. Key deliverables include placing 4,700 tons of asphalt, completing 23,325 square yards of cold plane pavement removal, performing pavement repairs of varying depths, constructing one concrete curb ramp, and implementing temporary work zone traffic control measures. Electronic proposal submissions are due by June 11, 2025, at 2:00 PM Pacific Time, with an anticipated substantial completion date of September 12, 2025, and a final completion date of December 31, 2025.
The engineer's estimated project cost is $973,000.00, with prevailing wage rates applicable due to the project's compensation exceeding $50,000. The bid tabulation shows multiple contractors submitted bids, including Eagle-Elsner, Inc., KNL Industries, Inc., Knife River Corp., and Northwest North Santiam Paving, with total bid amounts ranging from $780,942.90 to $1,102,322.00. The county encourages participation from minority, women, and emerging small businesses and requires bidders to possess a valid Oregon Construction Contractors Board registration. Bidders must submit performance and payment bonds and comply with disadvantaged enterprise participation guidelines. The project will be funded through local county infrastructure budgets, with an emphasis on transparent, competitive bidding and inclusive contracting practices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice of Intent to Award 2025-52.pdf | ||
| BID 2025-52 Mt Talbert Paving.pdf | ||
| BID 2025-52 Submittal Sheet Apparent Low.pdf | ||
| JCB 79th-ECM-Bid Tabs-OregonBuys 6-20-2025.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Compare to Estimate Mt Talbert Paving Project Estimate vs. Low Bid
| Engineer's Estimate | KNL Industries, Inc. | Comparison (total price) | Average of the Bids | ||||||||
| Bid Item | Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Maximum | Minimum | Average Unit Price | Average Total | |
| 101 | EXTRA WORK DONE ON FORCE ACCOUNT BASIS | LS | 1 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 |
| 102 | MOBILIZATION | LS | 1 | $ 67,000.00 | $ 67,000.00 | $ 10,000.00 | $ 10,000.00 | $ 67,000.00 | $ 10,000.00 | $ 71,041.90 | $ 71,041.90 |
| 103 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 124TH AVE | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,000.00 | $ 5,000.00 | $ 3,000.00 | $ 5,232.50 | $ 5,232.50 |
| 104 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 125TH AVE | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,000.00 | $ 5,000.00 | $ 3,000.00 | $ 5,482.50 | $ 5,482.50 |
| 105 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE OPAL WAY | LS | 1 | $ 2,000.00 | $ 2,000.00 | $ 3,000.00 | $ 3,000.00 | $ 3,000.00 | $ 2,000.00 | $ 3,107.50 | $ 3,107.50 |
| 106 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE MATHER RD | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,107.50 | $ 3,107.50 |
| 107 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 126TH AVE | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,000.00 | $ 5,000.00 | $ 3,000.00 | $ 5,107.50 | $ 5,107.50 |
| 108 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE HURON ST | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,000.00 | $ 5,000.00 | $ 3,000.00 | $ 5,107.50 | $ 5,107.50 |
| 109 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 124TH PL | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 3,000.00 | $ 3,000.00 | $ 3,000.00 | $ 1,000.00 | $ 3,032.50 | $ 3,032.50 |
| 110 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 128TH AVE | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,000.00 | $ 5,000.00 | $ 3,000.00 | $ 5,107.50 | $ 5,107.50 |
| 111 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE SONOMA ST | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 2,500.00 | $ 2,500.00 | $ 2,500.00 | $ 1,000.00 | $ 2,907.50 | $ 2,907.50 |
| 112 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE DERRY LN | LS | 1 | $ 2,000.00 | $ 2,000.00 | $ 2,500.00 | $ 2,500.00 | $ 2,500.00 | $ 2,000.00 | $ 3,857.50 | $ 3,857.50 |
| 113 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE MARK KELLY CT | LS | 1 | $ 2,000.00 | $ 2,000.00 | $ 3,500.00 | $ 3,500.00 | $ 3,500.00 | $ 2,000.00 | $ 3,357.50 | $ 3,357.50 |
| 114 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE HAROLD CT | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 3,000.00 | $ 3,000.00 | $ 3,000.00 | $ 1,000.00 | $ 3,182.50 | $ 3,182.50 |
| 115 | TEMPORARY PROJECT INFORMATION SIGNS | SQFT | 150 | $ 50.00 | $ 7,500.00 | $ 35.00 | $ 5,250.00 | $ 7,500.00 | $ 5,250.00 | $ 30.78 | $ 4,616.25 |
| 116 | EROSION CONTROL PLAN | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,000.00 | $ 5,265.00 | $ 5,265.00 |
| 117 | POLLUTION CONTROL PLAN | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | $ 500.00 | $ 1,000.00 | $ 500.00 | $ 652.75 | $ 652.75 |
| 118 | CONSTRUCTION SURVEY WORK | LS | 1 | $ 8,000.00 | $ 8,000.00 | $ 1,000.00 | $ 1,000.00 | $ 8,000.00 | $ 1,000.00 | $ 5,895.00 | $ 5,895.00 |
| 119 | REMOVAL OF SURFACINGS FOR CURB RAMP CONSTRUCTION | SQTD | 100 | $ 17.00 | $ 1,700.00 | $ 25.00 | $ 2,500.00 | $ 2,500.00 | $ 1,700.00 | $ 28.20 | $ 2,820.00 |
| 120 | 12 INCH SUBGRADE STABILIZATION | SQYD | 250 | $ 44.00 | $ 11,000.00 | $ 50.00 | $ 12,500.00 | $ 12,500.00 | $ 11,000.00 | $ 61.00 | $ 15,250.00 |
| 121 | DRAINAGE CURBS | FOOT | 35 | $ 25.00 | $ 875.00 | $ 50.00 | $ 1,750.00 | $ 1,750.00 | $ 875.00 | $ 36.50 | $ 1,277.50 |
| 122 | MIONOR ADJUSTMENT OF MANHOLE - METHOD C | EACH | 1 | $ 500.00 | $ 500.00 | $ 2,500.00 | $ 2,500.00 | $ 2,500.00 | $ 500.00 | $ 3,320.00 | $ 3,320.00 |
| 123 | INSTALL MONUMENT BOXES | EACH | 1 | $ 1,000.00 | $ 1,000.00 | $ 750.00 | $ 750.00 | $ 1,000.00 | $ 750.00 | $ 1,280.00 | $ 1,280.00 |
| 124 | RECONDITION EXISTING ROADWAY | SQYD | 22,600 | $ 4.00 | $ 90,400.00 | $ 1.25 | $ 28,250.00 | $ 90,400.00 | $ 28,250.00 | $ 1.24 | $ 27,967.50 |
| 125 | COLD PLANE PAVEMENT REMOVAL, 1 1/2-2 INCHES DEEP | SQYD | 64 | $ 5.00 | $ 320.00 | $ 2.70 | $ 172.80 | $ 320.00 | $ 172.80 | $ 20.35 | $ 1,302.24 |
| 126 | COLD PLANE PAVEMENT REMOVAL, 1 1/2 INCHES DEEP | SQYD | 1,022 | $ 5.00 | $ 5,110.00 | $ 2.70 | $ 2,759.40 | $ 5,110.00 | $ 2,759.40 | $ 5.58 | $ 5,697.65 |
| 127 | COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEP | SQYD | 8,383 | $ 5.00 | $ 41,915.00 | $ 2.70 | $ 22,634.10 | $ 41,915.00 | $ 22,634.10 | $ 4.21 | $ 35,313.39 |
| 128 | COLD PLANE PAVEMENT REMOVAL, 3 INCHES DEEP | SQYD | 10,119 | $ 5.00 | $ 50,595.00 | $ 2.70 | $ 27,321.30 | $ 50,595.00 | $ 27,321.30 | $ 5.73 | $ 57,931.27 |
| 129 | COLD PLANE PAVEMENT REMOVAL, 4 INCHES DEEP | SQYD | 3,739 | $ 5.00 | $ 18,695.00 | $ 2.70 | $ 10,095.30 | $ 18,695.00 | $ 10,095.30 | $ 6.49 | $ 24,256.76 |
| 130 | AGGREGATE BASE, 3/4"-0 | TON | 20 | $ 98.00 | $ 1,960.00 | $ 100.00 | $ 2,000.00 | $ 2,000.00 | $ 1,960.00 | $ 95.00 | $ 1,900.00 |
| 131 | LEVEL 2, 1/2 INCH ACP MIXTURE | TON | 4,700 | $ 119.00 | $ 559,300.00 | $ 113.00 | $ 531,100.00 | $ 559,300.00 | $ 531,100.00 | $ 106.50 | $ 500,550.00 |
| 132 | 3 INCH ASPHALT CONCRETE PAVEMENT REPAIR | SQYD | 40 | $ 75.00 | $ 3,000.00 | $ 50.00 | $ 2,000.00 | $ 3,000.00 | $ 2,000.00 | $ 64.50 | $ 2,580.00 |
| 133 | 8 INCH ASPHALT CONCRETE PAVEMENT REPAIR | SQYD | 580 | $ 25.00 | $ 14,500.00 | $ 40.00 | $ 23,200.00 | $ 23,200.00 | $ 14,500.00 | $ 55.63 | $ 32,262.50 |
| 134 | EXTRA FOR SPOT GRIND AND INLAYS | SQYD | 500 | $ 13.00 | $ 6,500.00 | $ 15.00 | $ 7,500.00 | $ 7,500.00 | $ 6,500.00 | $ 17.75 | $ 8,875.00 |
| 135 | EXTRA FOR CURB RAMP ASPHALT PLUG | SQFT | 124 | $ 20.00 | $ 2,480.00 | $ 5.00 | $ 620.00 | $ 2,480.00 | $ 620.00 | $ 11.13 | $ 1,379.50 |
| 136 | CONCRETE CURB, CURB AND GUTTER | FOOT | 58 | $ 90.00 | $ 5,220.00 | $ 50.00 | $ 2,900.00 | $ 5,220.00 | $ 2,900.00 | $ 70.50 | $ 4,089.00 |
| 137 | CONCRETE WALKS | SQFT | 258 | $ 21.00 | $ 5,418.00 | $ 30.00 | $ 7,740.00 | $ 7,740.00 | $ 5,418.00 | $ 19.28 | $ 4,972.95 |
| 138 | EXTRA FOR NEW CURB RAMPS | EACH | 1 | $ 2,000.00 | $ 2,000.00 | $ 2,500.00 | $ 2,500.00 | $ 2,500.00 | $ 2,000.00 | $ 1,940.00 | $ 1,940.00 |
| 139 | TRUNCATED DOMES ON NEW SURFACES | SQFT | 28 | $ 42.00 | $ 1,176.00 | $ 50.00 | $ 1,400.00 | $ 1,400.00 | $ 1,176.00 | $ 36.75 | $ 1,029.00 |
| 140 | PAVEMENT BAR, TYPE B-HS | SQFT | 90 | $ 25.00 | $ 2,250.00 | $ 50.00 | $ 4,500.00 | $ 4,500.00 | $ 2,250.00 | $ 30.75 | $ 2,767.50 |
| 141 | REMOVE AND INSTALL EXISTING SIGNS ON EXISTING SIGN SUPPORTS | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 3,500.00 | $ 3,500.00 | $ 3,500.00 | $ 1,000.00 | $ 1,500.00 | $ 1,500.00 |
| 142 | REMOVE AND INSTALL EXISTING SIGNS ON NEW SIGN SUPPORTS | LS | 1 | $ 2,000.00 | $ 2,000.00 | $ 3,500.00 | $ 3,500.00 | $ 3,500.00 | $ 2,000.00 | $ 1,862.50 | $ 1,862.50 |
| 143 | ROADSIDE RESTORATION | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 3,000.00 | $ 3,000.00 | $ 3,000.00 | $ 1,000.00 | $ 2,500.00 | $ 2,500.00 |
| 144 | REMOVING AND REBUILDING FENCE | FOOT | 35 | $ 150.00 | $ 5,250.00 | $ 200.00 | $ 7,000.00 | $ 7,000.00 | $ 5,250.00 | $ 143.75 | $ 5,031.25 |
| Total | $ 972,664.00 | Total | $ 780,942.90 | Average Total | $ 895,716.42 |
Bid Tabs
| Mt Talbert Paving Project Bid Tabulations | |||||||||||||||
| Eagle-Elsner, Inc. | KNL Industries, Inc. | Knife River Corp. Northwest | North Santiam Paving | Low/High Analysis | Average of the Bids | ||||||||||
| Bid Item | Unit | Quantity | Unit Price | Total | Unit Price | Total | Unit Price | Total | Unit Price | Total | Low UP | High UP | Average Unit Price | Average Total | |
| 101 | EXTRA WORK DONE ON FORCE ACCOUNT BASIS | LS | 1 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 | $ 10,000.00 |
| 102 | MOBILIZATION | LS | 1 | $ 46,917.60 | $ 46,917.60 | $ 10,000.00 | $ 10,000.00 | $ 65,000.00 | $ 65,000.00 | $ 162,250.00 | $ 162,250.00 | $ 10,000.00 | $ 162,250.00 | $ 71,041.90 | $ 71,041.90 |
| 103 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 124TH AVE | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 10,000.00 | $ 10,000.00 | $ 2,930.00 | $ 10,000.00 | $ 5,232.50 | $ 5,232.50 |
| 104 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 125TH AVE | LS | 1 | $ 6,000.00 | $ 6,000.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 10,000.00 | $ 10,000.00 | $ 2,930.00 | $ 10,000.00 | $ 5,482.50 | $ 5,482.50 |
| 105 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE OPAL WAY | LS | 1 | $ 1,500.00 | $ 1,500.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 5,000.00 | $ 5,000.00 | $ 1,500.00 | $ 5,000.00 | $ 3,107.50 | $ 3,107.50 |
| 106 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE MATHER RD | LS | 1 | $ 1,500.00 | $ 1,500.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 5,000.00 | $ 5,000.00 | $ 1,500.00 | $ 5,000.00 | $ 3,107.50 | $ 3,107.50 |
| 107 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 126TH AVE | LS | 1 | $ 4,500.00 | $ 4,500.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 10,000.00 | $ 10,000.00 | $ 2,930.00 | $ 10,000.00 | $ 5,107.50 | $ 5,107.50 |
| 108 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE HURON ST | LS | 1 | $ 4,500.00 | $ 4,500.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 10,000.00 | $ 10,000.00 | $ 2,930.00 | $ 10,000.00 | $ 5,107.50 | $ 5,107.50 |
| 109 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 124TH PL | LS | 1 | $ 1,200.00 | $ 1,200.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 5,000.00 | $ 5,000.00 | $ 1,200.00 | $ 5,000.00 | $ 3,032.50 | $ 3,032.50 |
| 110 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE 128TH AVE | LS | 1 | $ 4,500.00 | $ 4,500.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 10,000.00 | $ 10,000.00 | $ 2,930.00 | $ 10,000.00 | $ 5,107.50 | $ 5,107.50 |
| 111 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE SONOMA ST | LS | 1 | $ 1,200.00 | $ 1,200.00 | $ 2,500.00 | $ 2,500.00 | $ 2,930.00 | $ 2,930.00 | $ 5,000.00 | $ 5,000.00 | $ 1,200.00 | $ 5,000.00 | $ 2,907.50 | $ 2,907.50 |
| 112 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE DERRY LN | LS | 1 | $ 5,000.00 | $ 5,000.00 | $ 2,500.00 | $ 2,500.00 | $ 2,930.00 | $ 2,930.00 | $ 5,000.00 | $ 5,000.00 | $ 2,500.00 | $ 5,000.00 | $ 3,857.50 | $ 3,857.50 |
| 113 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE MARK KELLY CT | LS | 1 | $ 2,000.00 | $ 2,000.00 | $ 3,500.00 | $ 3,500.00 | $ 2,930.00 | $ 2,930.00 | $ 5,000.00 | $ 5,000.00 | $ 2,000.00 | $ 5,000.00 | $ 3,357.50 | $ 3,357.50 |
| 114 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE HAROLD CT | LS | 1 | $ 1,800.00 | $ 1,800.00 | $ 3,000.00 | $ 3,000.00 | $ 2,930.00 | $ 2,930.00 | $ 5,000.00 | $ 5,000.00 | $ 1,800.00 | $ 5,000.00 | $ 3,182.50 | $ 3,182.50 |
| 115 | TEMPORARY PROJECT INFORMATION SIGNS | SQFT | 150 | $ 28.00 | $ 4,200.00 | $ 35.00 | $ 5,250.00 | $ 18.10 | $ 2,715.00 | $ 42.00 | $ 6,300.00 | $ 18.10 | $ 42.00 | $ 30.78 | $ 4,616.25 |
| 116 | EROSION CONTROL PLAN | LS | 1 | $ 9,500.00 | $ 9,500.00 | $ 5,000.00 | $ 5,000.00 | $ 2,560.00 | $ 2,560.00 | $ 4,000.00 | $ 4,000.00 | $ 2,560.00 | $ 9,500.00 | $ 5,265.00 | $ 5,265.00 |
| 117 | POLLUTION CONTROL PLAN | LS | 1 | $ 1,000.00 | $ 1,000.00 | $ 500.00 | $ 500.00 | $ 811.00 | $ 811.00 | $ 300.00 | $ 300.00 | $ 300.00 | $ 1,000.00 | $ 652.75 | $ 652.75 |
| 118 | CONSTRUCTION SURVEY WORK | LS | 1 | $ 9,000.00 | $ 9,000.00 | $ 1,000.00 | $ 1,000.00 | $ 6,330.00 | $ 6,330.00 | $ 7,250.00 | $ 7,250.00 | $ 1,000.00 | $ 9,000.00 | $ 5,895.00 | $ 5,895.00 |
| 119 | REMOVAL OF SURFACINGS FOR CURB RAMP CONSTRUCTION | SQTD | 100 | $ 25.00 | $ 2,500.00 | $ 25.00 | $ 2,500.00 | $ 31.80 | $ 3,180.00 | $ 31.00 | $ 3,100.00 | $ 25.00 | $ 31.80 | $ 28.20 | $ 2,820.00 |
| 120 | 12 INCH SUBGRADE STABILIZATION | SQYD | 250 | $ 45.00 | $ 11,250.00 | $ 50.00 | $ 12,500.00 | $ 84.00 | $ 21,000.00 | $ 65.00 | $ 16,250.00 | $ 45.00 | $ 84.00 | $ 61.00 | $ 15,250.00 |
| 121 | DRAINAGE CURBS | FOOT | 35 | $ 50.00 | $ 1,750.00 | $ 50.00 | $ 1,750.00 | $ 16.00 | $ 560.00 | $ 30.00 | $ 1,050.00 | $ 16.00 | $ 50.00 | $ 36.50 | $ 1,277.50 |
| 122 | MIONOR ADJUSTMENT OF MANHOLE - METHOD C | EACH | 1 | $ 4,000.00 | $ 4,000.00 | $ 2,500.00 | $ 2,500.00 | $ 3,780.00 | $ 3,780.00 | $ 3,000.00 | $ 3,000.00 | $ 2,500.00 | $ 4,000.00 | $ 3,320.00 | $ 3,320.00 |
| 123 | INSTALL MONUMENT BOXES | EACH | 1 | $ 1,000.00 | $ 1,000.00 | $ 750.00 | $ 750.00 | $ 2,620.00 | $ 2,620.00 | $ 750.00 | $ 750.00 | $ 750.00 | $ 2,620.00 | $ 1,280.00 | $ 1,280.00 |
| 124 | RECONDITION EXISTING ROADWAY | SQYD | 22,600 | $ 1.50 | $ 33,900.00 | $ 1.25 | $ 28,250.00 | $ 1.20 | $ 27,120.00 | $ 1.00 | $ 22,600.00 | $ 1.00 | $ 1.50 | $ 1.24 | $ 27,967.50 |
| 125 | COLD PLANE PAVEMENT REMOVAL, 1 1/2-2 INCHES DEEP | SQYD | 64 | $ 9.50 | $ 608.00 | $ 2.70 | $ 172.80 | $ 52.19 | $ 3,340.16 | $ 17.00 | $ 1,088.00 | $ 2.70 | $ 52.19 | $ 20.35 | $ 1,302.24 |
| 126 | COLD PLANE PAVEMENT REMOVAL, 1 1/2 INCHES DEEP | SQYD | 1,022 | $ 4.50 | $ 4,599.00 | $ 2.70 | $ 2,759.40 | $ 10.10 | $ 10,322.20 | $ 5.00 | $ 5,110.00 | $ 2.70 | $ 10.10 | $ 5.58 | $ 5,697.65 |
| 127 | COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEP | SQYD | 8,383 | $ 4.40 | $ 36,885.20 | $ 2.70 | $ 22,634.10 | $ 3.75 | $ 31,436.25 | $ 6.00 | $ 50,298.00 | $ 2.70 | $ 6.00 | $ 4.21 | $ 35,313.39 |
| 128 | COLD PLANE PAVEMENT REMOVAL, 3 INCHES DEEP | SQYD | 10,119 | $ 6.20 | $ 62,737.80 | $ 2.70 | $ 27,321.30 | $ 7.00 | $ 70,833.00 | $ 7.00 | $ 70,833.00 | $ 2.70 | $ 7.00 | $ 5.73 | $ 57,931.28 |
| 129 | COLD PLANE PAVEMENT REMOVAL, 4 INCHES DEEP | SQYD | 3,739 | $ 8.60 | $ 32,155.40 | $ 2.70 | $ 10,095.30 | $ 7.65 | $ 28,603.35 | $ 7.00 | $ 26,173.00 | $ 2.70 | $ 8.60 | $ 6.49 | $ 24,256.76 |
| 130 | AGGREGATE BASE, 3/4"-0 | TON | 20 | $ 85.00 | $ 1,700.00 | $ 100.00 | $ 2,000.00 | $ 100.00 | $ 2,000.00 | $ 95.00 | $ 1,900.00 | $ 85.00 | $ 100.00 | $ 95.00 | $ 1,900.00 |
| 131 | LEVEL 2, 1/2 INCH ACP MIXTURE | TON | 4,700 | $ 96.00 | $ 451,200.00 | $ 113.00 | $ 531,100.00 | $ 105.00 | $ 493,500.00 | $ 112.00 | $ 526,400.00 | $ 96.00 | $ 113.00 | $ 106.50 | $ 500,550.00 |
| 132 | 3 INCH ASPHALT CONCRETE PAVEMENT REPAIR | SQYD | 40 | $ 100.00 | $ 4,000.00 | $ 50.00 | $ 2,000.00 | $ 48.00 | $ 1,920.00 | $ 60.00 | $ 2,400.00 | $ 48.00 | $ 100.00 | $ 64.50 | $ 2,580.00 |
| 133 | 8 INCH ASPHALT CONCRETE PAVEMENT REPAIR | SQYD | 580 | $ 27.00 | $ 15,660.00 | $ 40.00 | $ 23,200.00 | $ 62.50 | $ 36,250.00 | $ 93.00 | $ 53,940.00 | $ 27.00 | $ 93.00 | $ 55.63 | $ 32,262.50 |
| 134 | EXTRA FOR SPOT GRIND AND INLAYS | SQYD | 500 | $ 9.00 | $ 4,500.00 | $ 15.00 | $ 7,500.00 | $ 17.00 | $ 8,500.00 | $ 30.00 | $ 15,000.00 | $ 9.00 | $ 30.00 | $ 17.75 | $ 8,875.00 |
| 135 | EXTRA FOR CURB RAMP ASPHALT PLUG | SQFT | 124 | $ 6.00 | $ 744.00 | $ 5.00 | $ 620.00 | $ 13.50 | $ 1,674.00 | $ 20.00 | $ 2,480.00 | $ 5.00 | $ 20.00 | $ 11.13 | $ 1,379.50 |
| 136 | CONCRETE CURB, CURB AND GUTTER | FOOT | 58 | $ 80.00 | $ 4,640.00 | $ 50.00 | $ 2,900.00 | $ 52.00 | $ 3,016.00 | $ 100.00 | $ 5,800.00 | $ 50.00 | $ 100.00 | $ 70.50 | $ 4,089.00 |
| 137 | CONCRETE WALKS | SQFT | 258 | $ 15.00 | $ 3,870.00 | $ 30.00 | $ 7,740.00 | $ 17.10 | $ 4,411.80 | $ 15.00 | $ 3,870.00 | $ 15.00 | $ 30.00 | $ 19.28 | $ 4,972.95 |
| 138 | EXTRA FOR NEW CURB RAMPS | EACH | 1 | $ 1,700.00 | $ 1,700.00 | $ 2,500.00 | $ 2,500.00 | $ 1,560.00 | $ 1,560.00 | $ 2,000.00 | $ 2,000.00 | $ 1,560.00 | $ 2,500.00 | $ 1,940.00 | $ 1,940.00 |
| 139 | TRUNCATED DOMES ON NEW SURFACES | SQFT | 28 | $ 32.00 | $ 896.00 | $ 50.00 | $ 1,400.00 | $ 30.00 | $ 840.00 | $ 35.00 | $ 980.00 | $ 30.00 | $ 50.00 | $ 36.75 | $ 1,029.00 |
| 140 | PAVEMENT BAR, TYPE B-HS | SQFT | 90 | $ 28.00 | $ 2,520.00 | $ 50.00 | $ 4,500.00 | $ 15.00 | $ 1,350.00 | $ 30.00 | $ 2,700.00 | $ 15.00 | $ 50.00 | $ 30.75 | $ 2,767.50 |
| 141 | REMOVE AND INSTALL EXISTING SIGNS ON EXISTING SIGN SUPPORTS | LS | 1 | $ 250.00 | $ 250.00 | $ 3,500.00 | $ 3,500.00 | $ 1,500.00 | $ 1,500.00 | $ 750.00 | $ 750.00 | $ 250.00 | $ 3,500.00 | $ 1,500.00 | $ 1,500.00 |
| 142 | REMOVE AND INSTALL EXISTING SIGNS ON NEW SIGN SUPPORTS | LS | 1 | $ 250.00 | $ 250.00 | $ 3,500.00 | $ 3,500.00 | $ 2,500.00 | $ 2,500.00 | $ 1,200.00 | $ 1,200.00 | $ 250.00 | $ 3,500.00 | $ 1,862.50 | $ 1,862.50 |
| 143 | ROADSIDE RESTORATION | LS | 1 | $ 1,800.00 | $ 1,800.00 | $ 3,000.00 | $ 3,000.00 | $ 2,200.00 | $ 2,200.00 | $ 3,000.00 | $ 3,000.00 | $ 1,800.00 | $ 3,000.00 | $ 2,500.00 | $ 2,500.00 |
| 144 | REMOVING AND REBUILDING FENCE | FOOT | 35 | $ 125.00 | $ 4,375.00 | $ 200.00 | $ 7,000.00 | $ 120.00 | $ 4,200.00 | $ 130.00 | $ 4,550.00 | $ 120.00 | $ 200.00 | $ 143.75 | $ 5,031.25 |
| Total | $ 808,808.00 | Total | $ 780,942.90 | Total | $ 890,792.76 | Total | $ 1,102,322.00 | Average | $ 895,716.42 |