This document contains a survey control sheet and related federal contract opportunity details. The survey control sheet provides state plane coordinate and geographic coordinate data for 11 survey control points located at two sites along South Fork Teton FSR 109 in Montana. The control points were established in August-September 2020 and adjusted in September 2020 using the Montana SPCS NAD83 2011 coordinate system and NAVD88 vertical datum. The related federal contract opportunity is solicitation number 69056721B000024 for MT FS ERFO 2018(1) - 73(1) Helena-Lewis & Clark 2018 Repairs, Phase 1 issued by the Department of Transportation Federal Highway Administration. No further details are provided on the opportunity requirements, response dates, or award information.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Information
| Information | |
| 1. | This file transfers the Survey Control point list (in Excel format) to an Excel plan sheet. Open the point list files in Excel. Select the tab at the bottom of the worksheet and drag it to this spreadsheet. It will become a new tab. Place the name of this tab in the "Data Location" block below. The Survey Control point list will appear. |
| 2. | If extra sheets are needed, copy the original plan sheet by holding the left mouse button on the worksheet's tab (below) and hold the <CTRL>key. A mini sheet with a plus sign should appear. Drag this and drop it to the desired location. |
| Common Sheet Information | |||
| Insert the following values. They will appear on every sheet. | |||
| State: | MT | Note: If there is more than one project number, use <ALT><ENTER> to insert page break for additional lines. | |
| Project: | FS ERFO 2018(1)-73(1) | ||
| NPS PMIS / |
Drawing No:
| Designed by: | WFLHD Survey | |||
| Date: | 1/1904 | |||
| Checked by: | WFLHD Survey | |||
| Date: | 1/1904 | |||
| First sheet #: | J.1 | 1.0 | ||
| Title block text: | SURVEY CONTROL | |||
| Show Totals? | TRUE | |||
| Data location: | Page 1 | Worksheet found | ||
| Data begins in col: | A | |||
| Min. rows/table | 5 | 3.0 | ||
| Base sheet name: | Sheet | 9 | rows w/data | OK - no spaces in data |
| Max. row/table | 40 | 11 | data rows | Warnings: Empty lines found within data set |
| 40 | rows/table | |||
| PROJECT :South Fork Teton FSR 109 MP 6.91 & 9.24 |
DATE OF FIELD WORK : August-September 2020 DATE OF FINAL ADJUSTMENT : September 2020
PROJECT UNITS : International Foot COORDINATE SYSTEM : Montana SPCS NAD83 2011
EPOCH DATE : 2010.0000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
| Sheet Names | |||||
| Input the names of the worksheets in the order you would like the sheets numbered. | |||||
| Worksheet Name | Sheet | Header row | Sheet Number | Notes | |
| Sheet | J.1 | 3 | 1 | OK | |
| Sheet (2) | Undefined | FALSE | 1 | ||
| Sheet (3) | Undefined | FALSE | 1 | ||
| Sheet (4) | Undefined | FALSE | 1 | ||
| Sheet (5) | Undefined | FALSE | 1 | ||
| Sheet (6) | Undefined | FALSE | 1 | ||
| Sheet (7) | Undefined | FALSE | 1 | ||
| Sheet (8) | Undefined | FALSE | 1 | ||
| Sheet (9) | Undefined | FALSE | 1 | ||
| Sheet (10) | Undefined | FALSE | 1 | ||
| Sheet (11) | Undefined | FALSE | 1 | ||
| Sheet (12) | Undefined | FALSE | 1 | ||
| Sheet (13) | Undefined | FALSE | 1 | ||
| Sheet (14) | Undefined | FALSE | 1 | ||
| Sheet (15) | Undefined | FALSE | 1 | ||
| Sheet (16) | Undefined | FALSE | 1 | ||
| Sheet (17) | Undefined | FALSE | 1 | ||
| Sheet (18) | Undefined | FALSE | 1 | ||
| Sheet (19) | Undefined | FALSE | 1 | ||
| Sheet (20) | Undefined | FALSE | 1 | ||
| Total Sheets: | 1 | 0 | sheets missing |
Revised: 15 June 2015
Sheet
| Sheet Information | ||||||||||||
| Sheet num: | J.1 | Filename | 0 | |||||||||
| Sheet name: | Sheet | C:\MyFiles\Projects_2021\Montana\New folder\[MT_FS_ERFO_2018(1)-72(1)_MP6.91_9.24_controlsheet.xlsx]Sheet | ||||||||||
| Reference: | Time | |||||||||||
| 19-Oct-2021 7:20 AM | ||||||||||||
| Begin Column: | A | B | C | D | E | F | G | H | I |
PROJECT :South Fork Teton FSR 109 MP 6.91 & 9.24 DATE OF FIELD WORK : August-September 2020 DATE OF FINAL ADJUSTMENT : September 2020 PROJECT UNITS : International Foot COORDINATE SYSTEM : Montana SPCS NAD83 2011
| STATE PLANE COORDINATES | GEO COORDINATES | ||||||||||||||
| 3.0 | POINT | ||||||||||||||
| NUMBER | NORTH | EAST | ELEVATION | LATITUDE | LONGITUDE | ELLIPSOID | |||||||||
| HEIGHT | COMBINED | ||||||||||||||
| FACTOR | DESCRIPTION | NOTE: | |||||||||||||
| MP 6.91 | 1. | To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points. | |||||||||||||
| 20101 | 1335248.151 | 1175737.089 | 5393.897 | 47°52'03.867736"N | 112°43'56.107412"W | 5351.035 | 0.9992487644 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 20102 | 1335413.719 | 1175493.507 | 5413.607 | 47°52'05.401862"N | 112°43'59.778871"W | 5370.753 | 0.9992479349 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 20103 | 1335549.436 | 1175218.556 | 5435.774 | 47°52'06.628684"N | 112°44'03.892220"W | 5392.929 | 0.9992469658 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 20104 | 1335585.007 | 1174911.377 | 5442.141 | 47°52'06.854366"N | 112°44'08.417442"W | 5399.308 | 0.9992466778 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 20105 | 1335619.498 | 1174615.377 | 5439.852 | 47°52'07.073905"N | 112°44'12.778120"W | 5397.031 | 0.9992468025 | 5/8" IR W/FHWA ALUM CAP | 2. | Survey control is available for these 2 sites only | |||||
| MP 9.24 | |||||||||||||||
| 20201 | 1331984.048 | 1165901.876 | 5648.341 | 47°51'27.636261"N | 112°46'18.300180"W | 5605.858 | 0.9992339856 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 20202 | 1331792.335 | 1165718.563 | 5649.506 | 47°51'25.669415"N | 112°46'20.869719"W | 5607.031 | 0.9992337884 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 20203 | 1331407.995 | 1165352.831 | 5659.581 | 47°51'21.727026"N | 112°46'25.994973"W | 5617.121 | 0.9992330241 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 20204 | 1331221.879 | 1165169.121 | 5666.600 | 47°51'19.815181"N | 112°46'28.573603"W | 5624.148 | 0.9992325517 | 5/8" IR W/FHWA ALUM CAP | |||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 | |||||||||
| 0 | 0.000 | 0.000 | 0.000 | 0 | 0 | 0 |
PROJECT :South Fork Teton FSR 109 MP 6.91 & 9.24 DATE OF FIELD WORK : August-September 2020 DATE OF FINAL ADJUSTMENT : September 2020
PROJECT UNITS : International Foot COORDINATE SYSTEM : Montana SPCS NAD83 2011
| STATE PLANE COORDINATES | GEO COORDINATES | |||||
| POINT | ||||||
| NUMBER | NORTH | EAST | ELEVATION | LATITUDE | LONGITUDE | ELLIPSOID |
| HEIGHT | COMBINED | |||||
| FACTOR | DESCRIPTION |
| 20101 | 1335248.151 | 1175737.089 | 5393.897 | 47°52'03.867736"N | 112°43'56.107412"W | 5351.035 | 0.99924876 | 5/8" IR W/FHWA ALUM CAP |
| 20102 | 1335413.719 | 1175493.507 | 5413.607 | 47°52'05.401862"N | 112°43'59.778871"W | 5370.753 | 0.99924793 | 5/8" IR W/FHWA ALUM CAP |
| 20103 | 1335549.436 | 1175218.556 | 5435.774 | 47°52'06.628684"N | 112°44'03.892220"W | 5392.929 | 0.99924697 | 5/8" IR W/FHWA ALUM CAP |
| 20104 | 1335585.007 | 1174911.377 | 5442.141 | 47°52'06.854366"N | 112°44'08.417442"W | 5399.308 | 0.99924668 | 5/8" IR W/FHWA ALUM CAP |
| 20105 | 1335619.498 | 1174615.377 | 5439.852 | 47°52'07.073905"N | 112°44'12.778120"W | 5397.031 | 0.99924680 | 5/8" IR W/FHWA ALUM CAP |
| 20201 | 1331984.048 | 1165901.876 | 5648.341 | 47°51'27.636261"N | 112°46'18.300180"W | 5605.858 | 0.99923399 | 5/8" IR W/FHWA ALUM CAP |
| 20202 | 1331792.335 | 1165718.563 | 5649.506 | 47°51'25.669415"N | 112°46'20.869719"W | 5607.031 | 0.99923379 | 5/8" IR W/FHWA ALUM CAP |
| 20203 | 1331407.995 | 1165352.831 | 5659.581 | 47°51'21.727026"N | 112°46'25.994973"W | 5617.121 | 0.99923302 | 5/8" IR W/FHWA ALUM CAP |
| 20204 | 1331221.879 | 1165169.121 | 5666.600 | 47°51'19.815181"N | 112°46'28.573603"W | 5624.148 | 0.99923255 | 5/8" IR W/FHWA ALUM CAP |