This solicitation is for repairs to highways in Montana under Solicitation Number 69056721B000024 from the Department of Transportation Federal Highway Administration. The solicitation seeks bids for MT FS ERFO 2018(1) - 73(1) Helena-Lewis & Clark 2018 Repairs, Phase 1 as detailed in the attached plans and specifications document. Bids are due by the date listed in the solicitation for repairs and maintenance work on highways located in Lewis and Clark County, Montana during 2018. The work includes repairs, resurfacing, and other maintenance activities required to keep the roads in proper working condition.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

e (max)

V

ADT (2042)

ADT (2022)

0.060

25 MPH

<400

<400

Project Location

APPROVED:

DATE

Grading, base and drainage

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

TYPE OF CONSTRUCTION:

DESIGN DESIGNATION:

SPECIFICATION:

M.6

M.5

M.4

M.3

M.2

M.1

L.4

L.3

L.2

L.1

K.4

K.3

K.2

K.1

J.1

I.1

H.1

G.2

G.1

F.1

E.2

E.1

D.1

C.1

B.1-2

A.3

A.2

A.1

CONTROL SIGN INSTALLATION WOOD POSTS

STD. DRWG. 635-14, TEMP. TRAFFIC

SINGLE LANE CLOSURE LAYOUT (WITH STOP SIGN)

STD. DRWG. 635-8, TEMP. TRAFFIC CONTROL

SINGLE LANE CLOSURE LAYOUT (WITH FLAGGERS)

STD. DRWG. 635-6, TEMP. TRAFFIC CONTROL

ROAD CLOSURE LAYOUT (WITH FLAGGERS)

STD. DRWG. 635-5, TEMP. TRAFFIC CONTROL

TEMPORARY TRAFFIC CONTROL PLAN

QUANTITIES

TABULATION OF TEMPORARY TRAFFIC CONTROL

TREATMENT IN CUT SLOPES

STD. DRWG. 602-6, PIPE CULVERT INLET

CULVERT BEDDING

STD. DRWG. 602-3, METAL AND PLASTIC PIPE

COUPLING BAND

STD. DRWG. 602-2, METAL PIPE CULVERT

STD. DRWG. 602-1, METAL PIPE CULVERT

SWPPP SIGN

STD. DRWG. W157-21, FIBER ROLL

BERM METHODS

STD. DRWG. W157-17, TEMPORARY DIVERSION

STD. DRWG. W157-1, SILT FENCE

SURVEY CONTROL

FSR 235 MP 8.87

FSR 235 MP 8.20

FSR 109 MP 9.24 PLAN-PROFILE

FSR 109 MP 9.24 TYPICAL SECTION

FSR 109 MP 8.01

FSR 109 MP 6.91 PLAN-PROFILE

SECTION

FSR 109 MP 6.91 REINFORCED SOIL SLOPE TYPICAL

FSR 109 MP 6.12

FSR 108 MP 19.76

SUMMARY OF QUANTITIES

VICINITY MAPS

PLAN SYMBOLS AND ABBREVIATIONS

TITLE SHEET

M. TEMPORARY TRAFFIC CONTROL PLAN

L. DRAINAGE

K. EROSION CONTROL

C. - J. PROJECT SITES

B. SUMMARIES

A. GENERAL INFORMATION

INDEX TO SHEETS

D. ARENA

PROJECT MANAGER

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PLANS PREPARED BY

MONTANA

LEWIS & CLARK, TETON COUNTIES

HELENA-LEWIS & CLARK NATIONAL FOREST

PLANS FOR PROPOSED PROJECT

MT FS ERFO 2018(1)-73(1)

2018 REPAIRS, PHASE 1

HELENA-LEWIS & CLARK

APPROX. 0.3 MILE

SITE WORK - 7 LOCATIONS - TOTAL LENGTH =

Western Federal Lands Highway Division

Chief of Engineering, R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M on Federal Highway Projects, FP-14

Construction of Roads and Bridges

Standard Specifications for

SCALE IN MILES

5 10 15 205

N

MP 6.12

FSR 109

MP 6.91

FSR 109

MP 8.01

FSR 109

MP 9.24

FSR 109

MP 19.76

FSR 108

MP 8.87

FSR 235

MP 8.20

FSR 235

T E T O N

GREAT FALLS

Vaugn Eagle Black

PowerCordova

Fairfield

Lake

Freezeout

Choteau

Resorvoir

Pishkun

Reservoir

Creek

Willow

Reservoir

Nilan Augusta

Gilman

Simms Port Shaw

Sun River

Lake

Benton

Wildlife Refuge

National

Benton Lake

Sun River

Ulm

FOREST

NATIONAL

CLARK

LEWIS AND

C A S C A D E & C L A R K

H E L E N A - L E W I S

C H

O U

T E

A U

MONTANA KEY MAP

COLUMBIA

BRITISH

ALBERTA

SASKATCHEWAN

N O

R T

H D

A K

O T

A

S O

U T

H D

A K

O T

A

WYOMING

ID

A

H O

UNITED STATES

CANADA

PARK

NATIONAL

GLACIER

PARK

NATIONAL

YELLOWSTONE

WILDLIFE RANGE

NATIONAL

CHARLES M. RUSSELL

Lake

Flathead Elwell

Lake

M

Lake

Fort Peck

I SOS U IR

KALISPELL

MISSOULA

Anaconda

HELENA

BUTTE

BOZEMAN

Livingston

BILLINGS

City

Miles

Glendive

Point

Wolf Glasgow

HAVRE

Shelby

FALLS

GREAT

Lewistown

Dillon

RIV

ER

E N

O T

S

WOLLEY

R E

VIR

93 15

19189

MONTANA

:5

P

M

N o v e m b e r

T it le S h e e t

C

T W

E x p o r t\

M T

F S

E R

F O

\m t-e f g e n

.d g n

STATE PROJECT

NUMBER

SHEET

MT FS ERFO 2018(1)-73(1) A.1

WESTERN FEDERAL LANDS HIGHWAY DIVISION

DETAIL APPROVED FOR USE 11/2001

REVISED: 9/2005 1/2007 10/2009 10/2014

W101-1

AND ABBREVIATIONS

PLAN SYMBOLS

SEC.

EL. 1234.56

E

RIP

G G

W W

DI

T T

NO SCALE

- no symbol -wall face

N wall face

N

AND ABBREVIATIONS

PLAN SYMBOLS

T T

NO SCALE

- no symbol -wall face

N

AND ABBREVIATIONS

PLAN SYMBOLS

CP GPS

JH

36 31

6 1

36 31

6 1

SEC.

SEC.

EL. 1234.56

G

W W

DI

T T

NO SCALE

- no symbol -

CP GPS

JH

36 31

6 1

36 31

6 1

SEC.

CP GPS

JH

36 31

6 1

36 31

6 1

SEC.

SEC.

EL. 1234.56

G

W W

DI

G G

W W

DI

T T

NO SCALE

- no symbol -wall face

N

AND ABBREVIATIONS

PLAN SYMBOLS

CP GPS

JH

36 31

6 1

36 31

6 1

SEC.

SEC.

EL. 1234.56

CP GPS

JH

36 31

6 1

SEC.

EL. 1234.56

G

W W

DI

T T

NO SCALE

CP GPS

JH

36 31

6 1

SEC.

EL. 1234.56

G

W W

DI

T T

NO SCALE

- no symbol -wall face

AND ABBREVIATIONS

PLAN SYMBOLS

- no symbol -wall face

N

AND ABBREVIATIONS

PLAN SYMBOLS

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DETAIL

U.S. CUSTOMARY DETAIL

36 31

6 1

SEC.

36 31

6 1

SEC.

TP

BH

DIDIDIDIDIDI

:1

A

O c to b e r

P la n S y m b o ls

T W

E x p o r t\

M T

F S

E R

F O

\m t-e f g e n

.d g n

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) A.2

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e

E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east

NOTE:

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

Fiber Roll or Wattle

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

Fiber Roll or Wattle

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material

NOTE:

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

Fiber Roll or Wattle

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material

NOTE:

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material

NOTE:

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

Fiber Roll or Wattle

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material

NOTE:

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

NOTE:

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend 1.

Property Line w/Found Property Corner

Section Corner (Found, Projected)16

Section Line16

Section Corner (Found, Projected)4

Section Line4

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

Trail

Lake, Pond or Reservoir; Marshland

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

Fiber Roll or Wattle

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall

Spring or Seep

Material Source; Bore Hole; Test Pit

Section Line

Indian Reservation Boundary

Existing Roadway (Road, Paved, Gravel)

Section Corner (Found, Projected)

Large Creek or River

Spot Elevation; Coordinate Grid Tick

Above Ground Tank; Underground Tank

Treeline; Individual Trees

Boulder; Well; Satellite Dish; Grave

Cooking Grate; Garbage Can; Picnic Table

Flagpole; Fire Hydrant

Gas & Water Meter; Gas & Water Valve

Silt Fence

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

BLM Lands Boundary

Railroad

Intermittent Drainage or Small Creek

Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

bearing bridge balance point bench mark back brg.

br.

BP

BM

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line

M.P.

M.L.

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, EXISTING PROPOSED

Transition

Toe of Fill

Top of Cut

CL

North Arrow

Fence

Gate with Fence

Cattleguard

Guardrail

Retaining Wall

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Underdrain

Concrete Barrier

Slope Stake Limits

Pipe Culvert with Drop Inlet

Box Culvert

Delineators

Underground Utilities

Overhead/Above Ground Utilities

Signs (single, double post; portable)

Miscellaneous Utility Features

Building

Right-of-Way Line with Monument

Permanent Easement

Construction Easement

Riprap

Fiber Roll or Wattle

W west drwg(s).

dist.

diaph.

diag.

dia.

DHV

D exp. jt.

exc.

EW

ER

EQ or eq.

EP

emb.

elev.

El. 94.16 ft e E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge)

HW

hex.

hdwl.

high water hexagon headwall ftg.

ft3 ft2 flg.

fin.

footing cubic foot (feet) square foot flange finish jt.

ID

joint inside diameter

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

lam.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve

NC

N normal crown north

OHW

OG

OD

o. to o.

o. c.

ordinary high water original ground outside diameter out to out on center pvmt.

PT

PST

PSC

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sec.

SC

SADT

S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

monument minimum thousand gallon maximum material ordinary high water original ground outside diameter out to out on center ordinary high water original ground outside diameter out to out on center ordinary high water original ground outside diameter out to out on center ordinary high water original ground outside diameter out to out on center ordinary high water original ground outside diameter out to out on center

OHW

OG

OD

o. to o.

o. c.

OHW

OG

OD

o. to o.

o. c.

OHW

OG

OD

o. to o.

o. c.

OHW

OG

OD

o. to o.

o. c.

OHW

OG

OD

o. to o.

o. c.

SCALE IN MILES SCALE IN MILES

N

SCALE IN MILES

:1

O c to b e r

V ic in it y M a p s

T W

E x p o r t\

M T

F S

E R

F O

\m t-e f g e n

.d g n

VICINITY MAPS

STATE PROJECT

NUMBER

SHEET

MT FS ERFO 2018(1)-73(1) A.3

Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)

Poles (Power, Telephone, Joint Use, 0 01 2 31 1 2 3 41

36 31

MANAGEMENT AREA

STATE WILDLIFE

SUN RIVER

MANAGEMENT AREA

STATE WILDLIFE

WILLOW CREEK RESERVOIR

Augusta

MP 19.76

FSR 108

36 31

1 6

1 6

1 6

1 6

1 6

1 6

1 6

1 6

1 6

Augusta

Gillman

Airport

Augusta

Lake

Beale

Lake

Anderson Reservoir

Nilan

Lake

Anderson Reservoir

Nilan

PRESERVE

RIVER GATE

MP 8.87

FSR 235

MP 8.20

FSR 235

To Augusta

~20 miles

To Augusta

~23 miles

Sun River

Sun River

Reservoir

Creek

Willow

Wi llo w C re ek

Ros e

Crk

Creek

Creek

Shed

Cutrock

North Fork

W il lo w C re e k

Willow Creek

Little

N ForkWillow

C rk

Crk

Cutrock

Crk Shed

Will ow

C re ek

0 1 2 3 41

Lake

Glendora

Lakes

Reickoff

Lake

Burd Hill

ChoteauMANAGEMENT AREA

STATE WILDLIFE

EAR MOUNTAIN

S o u th F o r k

B e a r

G u lc h G u lc h

North Fork

Airport

STAKE BIRD PRESERVE

TETON-SPRING CREEK

Reservoir

Eureka

1 6

3136 36 31

1 6

36 31

1 6 1 6

36 31

36 31

Station

Gaging

Lonesome RidgeMP 9.24

FSR 109

MP 8.01

FSR 109

MP 6.91

FSR 109

MP 6.12

FSR 109

To Choteau

~28 miles

R ie r d o n

G r e e n G u lc h

Bellview Road

Sheet and Description

SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I -

FSR 108 MP

19.76

FSR 109 MP

6.12

FSR 109 MP

6.91

FSR 109 MP

8.01

FSR 109 MP

9.24

FSR 235 MP

8.20

FSR 235 MP

8.87 ALLOWANCE Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

A0060 15301-0010 CONTRACTOR QUALITY CONTROL

AND ASSURANCE LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15702-5000 SOIL EROSION CONTROL,

TEMPORARY DIVERSION BERM LPSM All ALL

A0140 15705-0100 SOIL EROSION CONTROL, SILT

FENCE LNFT 125 15 140

A0160 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 80 210 150 128 32 600

A0180 20301-1900 REMOVAL OF PIPE CULVERT (18") EACH 1 1 2

A0200 20401-0000 ROADWAY EXCAVATION CUYD 190 10 200

A0220 20402-0000 SUBEXCAVATION CUYD 137 13 150

A0240 20410-0000 SELECT BORROW CUYD 137 13 150

A0260 20420-0000 EMBANKMENT CONSTRUCTION CUYD 11 21 8 40

A0280 20435-1000 BACKFILL, SELECT GRANULAR CUYD 5 1 6

A0300 20701-0100 SEPARATION-STABILIZATION

GEOTEXTILE, CLASS 1, TYPE A

(NON-WOVEN) SQYD 256 44 300

A0320 20702-0300 GEOTEXTILE FILTER, CLASS 1,

TYPE C SQYD 184 367 49 600

A0340 20703-0000 GEOGRID (FACING) SQYD 448 52 500

A0360 20703-2000 GEOGRID, STABILIZATION SQYD 767 133 900

A0380 25101-0500 PLACED RIPRAP, METHOD A,

CLASS 5 CUYD 82 327 41 450

A0400 30201-2000 ROADWAY AGGREGATE, METHOD 2 CUYD 34 12 22 12 20 100

A0420 41801-2000 ASPHALT CONCRETE PAVEMENT

PATCH, TYPE 2 SQYD 9 1 10

A0440 60201-0800 24-INCH PIPE CULVERT LNFT 50 50 10 110

A0460 60203-0200 6-INCH SLOTTED DRAIN PIPE LNFT 115 5 120

A0480 60704-0000 CLEANING CULVERT IN PLACE EACH 3 3

A0500 61805-0000 RESET BARRIER (PRECAST

CONCRETE) LNFT 120 120

A0520 62201-0250 DUMP TRUCK, 10 CUBIC YARD

MINIMUM CAPACITY HOUR 10 20 30

MileStone: 100% Date Completed: In Progress Report Date: 11/08/21

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES

-N ov

-2

2:

P

M

Remarks and/or Determination of Estimated QuantityPay Item Description Unit

Estimated Quantities

C

TW

_E xp or t\ M

T

FS

E R

FO

8( 1)

-7 3(

1)

B .1

_m t-ef

1_

SO

Q .x ls m

]S he et

STATE PROJECT

B.1FS ERFO 2018(1)-73(1)MT

NUMBER

Sheet and Description

SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I -

FSR 108 MP

19.76

FSR 109 MP

6.12

FSR 109 MP

6.91

FSR 109 MP

8.01

FSR 109 MP

9.24

FSR 235 MP

8.20

FSR 235 MP

8.87 ALLOWANCE Bid Schedule

A0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT

MINIMUM RATED CAPACITY

BUCKET, 24-INCH WIDTH HOUR 10 20 30

A0560 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC

YARD MINIMUM CAPACITY WITH

THUMB ATTACHMENT HOUR 10 20 30

A0580 62301-0000 GENERAL LABOR HOUR 40 40

A0600 62502-0000 TURF ESTABLISHMENT SQYD 834 445 445 76 1,800

A0620 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

-N ov -2

2:

P M

MileStone: 100% Date Completed: In Progress Report Date: 11/08/21

C

TW

_E xp or t\ M

T

FS

E R

FO

8( 1)

-7 3(

1)

B .1

_m t-ef

1_

SO

Q .x ls m

]S he et

2)

SUMMARY OF QUANTITIES

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

STATE PROJECT

B.2FS ERFO 2018(1)-73(1)MT

NUMBER

4" compacted depth

Roadway aggregate, method 2 1 :1

1:3

(typ.)

Geogrid, stabilization

(Non-woven) geotextile class 1, type A

Separation-stablization

6-inch slotted drain pipe

Match existing crown

TYPICAL SECTION

FSR 109 MP 6.91

STA 12+60 to 13+75

C o n s tr u c ti o n l im it

S lo p e s ta k e l im it s

CL

Existing ground

C o n s tr u c ti o n l im it

S lo p e s ta k e l im it

[1][2]

3' Lap

(typ.)

Select borrow limit

Excavation

Soil erosion control, silt fence

1:3

Profile grade

1:3

Match existing crown

:1

(typ.)

(facing)

Geogrid

(precast concrete)

Reset barrier

Backfill, select granular

Extend top course lap to back of excavation.

[2] geogrid layer to prevent contact between the two layers.

between geogrid reinforcement lap and overlaying

Place a thin layer (3-inch nominal) of select borrow [1]

FOOTNOTE:

NO SCALE

9" typ.

16'-20'

5'Varies

5' Varies

8' typ.

limits Turf establishment

Turf establishment limits

:3

O c to b e r

F S

R

M P

.9

R e in fo rc e d

S o il S lo p e T y p ic a l

S e c ti n

T W

E x p o r t\

M T

F S

E R

F O

\m t-e f p ln

.d g n

TYPICAL SECTION

REINFORCED SOIL SLOPE

FSR 109 MP 6.91

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) E.1

Eq uip men t: L eic a T

S 1 5 t ota l st ati on s a nd Le ica gs

, G

S1 8 g nss

Out to

De sig n:M T_

FS

_E

RFO_2

8(1 )-7

2(1 )_mp6

.91 _su r.d gn

CP

CP

P

GPS

N

Profile grade

Existing ground

Line to be constructed

FSR 109 MP 6.91

BEGIN

(precast concrete)

Reset barrier

12+60 to 13+80

Slope stake limits

FSR 109 MP 6.91

END

silt fence

Soil erosion control, concrete barrier

Existing precast

S87 °30 '24

"E

S45°15'31"E

S54°19'04"E

N '5 "E

'147.47L =

'77.27T =

'200.00R =

(RT)42°14'53"Δ =

12+09.46PI

'79.06L = '39.61T = '500.00R =

(LT)09°03'33"Δ =

14+58.74PI

'355.70L = '202.10T = '300.00R =

(LT)67°56'02"Δ =

17+42.38PI

.1

T

.2

.9

PT

.6

.0

P O

B

.6

PO

E

6 1

10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00

5,410 5,410

5,420 5,420

5,430 5,430

-6.621%

-9.394%

.8

' VC50

18.03K =

'414.24SSD =

,4

.1

12+60

13+75

EL=5415.18'

E=1175494.760 N=1335428.027

EL=5,424.18'

E=1175412.419 N=1335508.268

:0

J a n u a ry

P la n

-P ro fi le c p w

-w o rk

\d \m t-e f1

(6 p ln p p .d g n

FSR 109 MP 6.91 PLAN-PROFILE

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) E.2

CL

Geotextile filter, class 1, type C

Existing ground

Placed riprap, method A, class 5

Profile grade construction

Embankment

TYPICAL SECTION

FSR 109 MP 9.24

STA 31+00 to 32+10

1V:5H

1V:2H

V :1

H

S lo p e s ta k e l im it s

C o n s tr u c ti o n l im it s

1V:2H

NO SCALE

14'

5'6'10' - 14'

2' min.

:1

O c to b e r

F S

R

M

P

.2 T y p ic a l

S e c ti

T W

E x p o r t\

M T

F S

E R

F O

\m t-e f p ln p p .d g n

TYPICAL SECTION

FSR 109 MP 9.24

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) G.1

PS

G

PS

N

Profile grade Existing ground

Line to be constructed

FSR 109 MP 9.24

BEGIN

FSR 109 MP 9.24

ENDSlope stake limit fiber roll

Soil erosion control, Placed riprap, method A, class 5

N43°38'04"E N51°34'24"E

'83.13L =

'41.63T =

'600.00R =

(RT)07°56'20"Δ =

31+85.21PI

.5

.7

.0

P

O B

.7

P

O

0 3 1 3

29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50

5,640 5,640

5,642 5,642

5,644 5,644

5,646 5,646

5,648 5,648

5,650 5,650

5,652 5,652

5,654 5,654

5,656 5,656

-0.614% +0.515%

.7

' VC50

44K =

'INFHLSD =

,6

.2

31+00

EL=5650.27

E=1165708.672 N=1331803.231

32+10

EL=5650.01

E=1165787.143 N=1331880.212

FSR 109 MP 9.24 PLAN-PROFILE

:1

O c to b e r

F S

R

M

P

.2 P la n -P ro fi le

T

W E x p o rt

\M T

F S

E R

F O

(1

(1 m t-e f1

(9 p ln p p .d g n

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) G.2

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

1.

20101 1335248.151 1175737.089 5393.897 47°52'03.867736"N 112°43'56.107412"W 5351.0349 0.999248764 5/8" IR W/FHWA ALUM CAP

20102 1335413.719 1175493.507 5413.607 47°52'05.401862"N 112°43'59.778871"W 5370.7528 0.999247935 5/8" IR W/FHWA ALUM CAP

20103 1335549.436 1175218.556 5435.774 47°52'06.628684"N 112°44'03.892220"W 5392.9294 0.999246966 5/8" IR W/FHWA ALUM CAP

20104 1335585.007 1174911.377 5442.141 47°52'06.854366"N 112°44'08.417442"W 5399.3084 0.999246678 5/8" IR W/FHWA ALUM CAP

20105 1335619.498 1174615.377 5439.852 47°52'07.073905"N 112°44'12.778120"W 5397.0309 0.999246802 5/8" IR W/FHWA ALUM CAP

20201 1331984.048 1165901.876 5648.341 47°51'27.636261"N 112°46'18.300180"W 5605.8584 0.999233986 5/8" ir w/fhwa alum cap

20202 1331792.335 1165718.563 5649.506 47°51'25.669415"N 112°46'20.869719"W 5607.031 0.999233788 5/8" ir w/fhwa alum cap

20203 1331407.995 1165352.831 5659.581 47°51'21.727026"N 112°46'25.994973"W 5617.1214 0.999233024 5/8" ir w/fhwa alum cap

20204 1331221.879 1165169.121 5666.600 47°51'19.815181"N 112°46'28.573603"W 5624.1482 0.999232552 5/8" ir w/fhwa alum cap

MP 9.24

PROJECT :South Fork Teton MP 6.91 & 9.24 DATE OF FIELD WORK : August-September 2020 DATE OF FINAL ADJUSTMENT : September 2020

PROJECT UNITS : International Foot COORDINATE SYSTEM : Montana SPCS NAD83 2011

EPOCH DATE : 2010.0000

VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

MP 6.91

C

M yF ile s\

Pr oj ec ts

_2

0\ M on ta na \S ou th

_F or k_ Te to n\ fie ld

S ou th _F or k_

Te to n_ M

P6 .9

1_ 9.

_c on tr ol sh ee t.

xl sx

]S he

-J un -2

3:

P M

W

FL

H D

S ur ve y

W

FL

H D

S ur ve y

D es ig ne d by

C he ck ed b y:

STATE PROJECT

J.1

SHEET

NUMBER

FS ERFO 2018(1)-73(1)MT

SURVEY CONTROL

MT FS ERFO 2018(1)-73(1) K.1

MT FS ERFO 2018(1)-73(1) K.2

MT FS ERFO 2018(1)-73(1) K.3

"8

Outside margin =

"8

Border radius = 1

"8

Border thickness = specific project information background. Adjust text to match

Black border and text on white

Refer to Subsection 107.01A

SWPPP Sign

3'-6"

2" C

2"

2" C

3"

" B2

"2

4" C

3"

14"

:1 o v e m b e r

S W

P P

P S ig

T W

E x p o r t\

M T

F S

E R

F O

\m t-e f e c .d g n

SWPPP SIGN

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) K.4

MT FS ERFO 2018(1)-73(1) L.1

MT FS ERFO 2018(1)-73(1) L.2

MT FS ERFO 2018(1)-73(1) L.3

MT FS ERFO 2018(1)-73(1) L.4

FSR 109 MP 6.91, FSR 235 MP 8.20 and FSR 235 MP 8.87.

Flagger hours estimated to be used for FSR 109 MP 8.01, [1]

FOOTNOTE:

:5

O c to b e r

T a b u la ti o n o f T e m p o ra ry

T ra ff ic

C o n tr o l

Q u a n ti ti e c p w w o r k \d

\m t-e f tt c .d g n

TRAFFIC CONTROL QUANTITIES

TABULATION OF TEMPORARY

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) M.1

:5

O c to b e r

T e m p o ra ry T ra ff ic C o n tr o l

P la

T W

E x p o r t\

M T

F S

E R

F O

\m t-e f tt c .d g n

CONTROL PLAN

TEMPORARY TRAFFIC

STATE PROJECT

NUMBER

MT FS ERFO 2018(1)-73(1) M.2

6 MP 19.76

FSR 108

MP 8.87

FSR 235

MP 8.20

FSR 235

To Augusta

~20 miles

To Augusta

~23 miles

0 1 2 3 41 0 1 2 31

PRESERVE

RIVER GATE

FSR 23

MANAGEMENT AREA

STATE WILDLIFE

SUN RIVER

Sun River

Ros eCrk

MANAGEMENT AREA

STATE WILDLIFE

EAR MOUNTAIN

S o u th F k

B e a r

G u lc h

G u lc h

Station

Gaging

Ridge Lonesome

MP 9.24

FSR 109

MP 8.01

FSR 109 MP 6.91

FSR 109

MP 6.12

FSR 109 To Choteau

~28 miles

R ie r d o n

G r e e n G u lc h

B e llv ie w R o a d

0 1 2 3 41

FSR 1

F S

R

FSR 108

See "Single Lane Closure Layout (With Stop Sign)" See "Single Lane Closure Layout (With Stop Sign)"

See "Single Lane Closure Layout (With Stop Sign)" See "Road Closure Layout (With Flaggers)" See "Road Closure Layout (With Flaggers)"

See "Road Closure Layout (With Flaggers)" See "Single Lane Closure Layout (With Flaggers)"

MT FS ERFO 2018(1)-73(1) M.3

MT FS ERFO 2018(1)-73(1) M.4

MT FS ERFO 2018(1)-73(1) M.5

MT FS ERFO 2018(1)-73(1) M.6

2022-01-10T12:00:31-0800
BRENT L COE

File details come from the government source that posted it. Updated .