mt-d-malm202301_DAR2023(1)_Plans_STAMPED.pdf
PDF 11 MB Posted
- Attached to
- MT DAR MALM 2023(1) Defense Access Roads FY 2023
- Solicitation number
- 69056723B000007
About this file
This file relates to a federal solicitation for Defense Access Roads FY 2023 construction and maintenance services. The Department of Transportation Federal Highway Administration solicitation number 69056723B000007 seeks proposals for work on MT DAR MALM 2023(1) projects. Offerors should submit proposals in response to the requirements for road construction and maintenance near military installations as outlined in the 11MB pdf file named mt-d-malm202301_DAR2023(1)_Plans_STAMPED.pdf by the anticipated award date in early 2023. Eligible vendors will be selected through full and open competition to provide road construction and maintenance services for Defense Access Roads projects in Montana for fiscal year 2023.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2023.06.09 15:08:58 -07'00'
TP
BH
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000EL. 1234.56
TP
TP
SEC.
SEC.
NO SCALE
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservior; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
11/2001 DETAIL APPROVED FOR USE
6/2022
10/2014 10/2009 1/2007 9/2005 REVISED: 101-1W
WFLHD DETAIL
ABBREVIATIONS
PLAN SYMBOLS AND
:0
P
M
J a n u a ry
D e t W
-1 rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m t-d -m a lm
D
A R
\D
G N
\G e n e ra l In fo rm a ti o n \m t-d -m a lm a b .d g n
PROJECT
NUMBER
SHEET
A.2
MT DAR MALM 2023(1)
N
1 0.5 0 1 2
SCALE IN MILES
M.P. 0.00
SCHEDULES A, B, & C
BEGIN K-04 ROAD WORK
K-04
M.P. 1.95
SCHEDULES A, B, & C
END K-04 ROAD WORK
M.P. 0.01
SCHEDULES A, B, & C
BEGIN K-03 ROAD WORK
M.P. 7.44
SCHEDULES A, B, & C
END K-03 ROAD WORK
K-03
MONTANA
MONTANA
DEBUFF RD
U P P E
R N I H I L L R
D
P R
O N
G H
O R
N R
D
UPPER NIHILL RDUPPER NIHILL RD
LOWER NIHILL RD
L O
W E
R N I H I L L R
D
HEDGESVILLE RD
HEDGESVILLE
3 Miles
To Harlowton
M ile s
To H a rl o w to n
24 Miles
To Ryegate
M il e s
T o J u d it h G a p
Long. = 109° 45' 56" W
Lat. = 46° 29' 24" N
109° 45' 56" W
46° 29' 24" N
109° 37' 09" W
46° 29' 50" N
109° 30' 01" W
46° 27' 29" N
109° 29' 13" W
46° 28' 30" N
B N S F
B N S F
B N S F
B N S F
ROBERTS CREEK
CARELESS CREEK
B L A
K E C
R E E
K
G A
L L
O W
A Y C
R E
E K
T I
M B
E R C
R E
E K
ROBERTS CREEK
R O
B E
R T S C
R E E
K
E A S T F
O R
K
C A
R E
L E S
S C
R E
E K
ALKALI CREEK
MUSSELSHELL RIVER
CARELESS CREEK
:4
J a n u a r y
U n ti tl e d
R
P A
H
L N
\S h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\G e n e r a l
I n f o r m a ti o n \m t-d m a lm a d K
K
.d g n
K-03 & K-04 ROADS
VICINITY MAP
PROJECT
A.3
SCALE IN MILES
M.P. 2.85
SCHEDULES A, B, & C
END K-07 ROAD WORK
M.P. 0.02
SCHEDULES A, B, & C
BEGIN K-07 ROAD WORK
ANTELOPE RD
S S
H A
W M
U T R
D
CANAL RD
D
EAD
M
ANS
RD
M U
D C
R E E
K R
D
B O
X C
A R T
R A I L
S
SH
AW
M
UT
RD
W H
E A
T L
A N
D C
O
G O
L D
E N V
A L L E
Y C
O
SHAWMUT
MONTANA
8 Miles
To Rygate
10 Miles
To Harlowton
K 7109° 31' 28" W
46° 20' 35" N
109° 31' 40" W
46° 18' 10" N
M
USSELSHELL RIVER
MUSSELSHELL RIVER
DEADM
ANS BASIN SUPPLY CANAL
DEADMANS BASIN
RESERVOIR
MUD
CREEK
:5
J a n u a r y
U n ti tl
R
P A
H
L N
\S h a r e d
\h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\G e n e r a l
I n f o r m a ti o n \m t-d m a lm a e K
.d g n
K-07 ROAD
VICINITY MAP
PROJECT
A.4
TWO DOT
1 0.5 0 1 2
SCALE IN MILES
M.P. 6.90
SCHEDULES A, B, & C
END K-10 ROAD WORK
M.P. 5.41
SCHEDULES B & C
END K-09 ROAD WORK
M.P. 0.01
SCHEDULES B & C
BEGIN K-09 ROAD WORK
M.P. 0.01
SCHEDULES A, B, & C
BEGIN K-10 ROAD WORK
MONTANA
MONTANA
H A
Y M
A K
E R R
D
J O
H N R
D M
E X I C
E
X I C
A N J
O H
N R
D
TWO MILE RD
C L Y
D E S R
D
D A
L G
A R
N O L
N
M E
X I C
A N J
O H
N R
D
O L D G
A P R
D
LOWER N HILL RD
O L
D G
A P R
D
L O
D E R
D
L O
D E R
D
JENKINS RD
M il e s
To J u d it h G a p
K-09
K-09
K
K
K
HARLOWTON
109° 59' 48" W
46° 29' 24" N
109° 56' 46" W
46° 26' 46" N
109° 53' 34" W
46° 32' 00" N
109° 51' 47" W
46° 26' 23" N
K-10 and K-11 material disposal site
Wheatland County Shop
ValenciaValencia
M E
X
IC
A N
JO
H N C
R E E
K
B
IG
C
O U
LE
E
H O
P L E
Y C
R E E
K
TWODOT CANAL
TWODOT CANAL
T W
O D
O T C
A N
A L
MUSSELSHELL RIVER
MUSSELSHELL RIVER
A N
T E L O
P E C
R E E
K
H O P L E Y C
R E E K
A N
T E L O P E C
R E E
K
M
UD
CREEK
C R
E E
K M
IL
T
O N
:5
A p r il
U n ti tl r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\G e n e r a l
I n f o r m a ti o n \m t-d m a lm a f K
K
.d g n
K-09 & K-10 ROADS
VICINITY MAP
PROJECT
A.5
SCALE IN MILES
K
K
K
M il e s
T o H a r lo w to n
O L
D G
A P R
D
OKA RD
O K
A R
D
JELLIS
O
N
TR
L
L O
D E R
D
L O
D E R
D
LODE RD
JENKINS RD
D A
L G
A R
N O L
N
M E
X I C
A N J
O H
N R
D
H A
Y M
A K
E R R
D
RANCH RD
HAYMAKER
OLAF RD
M.P. 0.00
SCHEDULES A, B, & C
BEGIN K-11 ROAD WORK
M.P. 8.49
SCHEDULES A, B, & C
END K-11 ROAD WORK
109° 58' 39" W
46° 36' 00" N
109° 53' 34" W
46° 32' 00" N
A N T E
LO
P E C
R E E K
A N
T E L O P E C
R E E
K
R O
B E R T S C
R E E
K
B
IG
C
O U L E E
H O
P L E
Y C
R E
E K
WEST FORK HOPLEY CREEK
H O P
LE
Y C
R E E K
M
ID
D
LE
FO
H O
P L E
Y C
R E
E K
E A
S T F
O
X
IC
A N
JO
H N C
R E E
K
:0
J a n u a r y
U n ti tl
R
P A
H
L N
\S h a r e d
\h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \G e n e r a l
I n f o r m a ti o n
\m t-d m a lm a g
K
.d g n
K-11 ROAD
VICINITY MAP
PROJECT
A.6
W H E A T L A N D C O U N T Y
1 0.5 0 1 2
SCALE IN MILES
M.P. 6.39
SCHEDULE C
END L-06 ROAD WORK
M.P. 7.15
SCHEDULE C
END L-05 ROAD WORK
2 Miles
To Judith Gap
109° 30' 48" W
46° 33' 47" N
M.P. 0.01
SCHEDULE C
BEGIN L-05 ROAD WORK
109° 31' 40" W
46° 39' 00" N
109° 38' 26" W
46° 35' 13" N
109° 37' 09" W
46° 39' 55" N
M.P. 0.01
SCHEDULE C
BEGIN L-06 ROAD WORK
L
L
P R
O N
G H
O R
N R
D
L I V I N
G S
P R I N
G S R
D
B E
R C
A I L R
D
G A L L O
W A
Y C
R E E
K R
D
L U
C A
S R
D
R E
D F
O X R
D
G L E
N N I E L
N
JUDITH GAP RD
LAMMERS LN
L
IT
T L E C
A R E L E S S
M E
Y E
R S R
D
T I M
B E
R C
R E
E K R
D
B L A
K E C
R E E
K R
D
J U
D I T
H G
A P R
D
OXFORD RD
C R E E K R
D
Oxford
B N S F
Oxford
B N S F
S P R
IN
G C
R E E
K
C A
R E L E S S C
R E E
K
L
IT
T L E C
A R
E L E S S C
R E E
K
B E R
C A
IL
C
R E E K
T
IM
B E
R C
R E E
K
G A
L L O
W A
Y C
R E E
K
W E S
T G
A L L O
W A
Y C
R E E
K
B L A
K E C
R E E
K
E A
S T F
O R
K R
O B
E R
T S C
R E
E K
:1
J a n u a r y
U n ti tl
R
P A
H
L N
\S h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\G e n e r a l
I n f o r m a ti o n \m t-d m a lm a i_
L L
.d g n
L-05 & L-06 ROADS
VICINITY MAP
PROJECT
A.7
W H E A T L A N D C O U N T Y
C O U N T Y
GAP
JUDITH
M O U N T A I N S N
1 0.5 0 1 2
SCALE IN MILES
MONTANA
M il e s
T o H a r lo w to n
M il e s
T o H o b s o n
W
HEATLAND CO.
JUD
ITH BASIN CO
FERGUS CO.
JUDITH GAP
WHEATLAND CO.
F E
R G
U S C
O
J U
D I T
H B
A S I N C
O
M.P. 7.09
SCHEDULES B & C
END L-08 ROAD WORK
109° 52' 19" W
46° 40' 43" N
109° 45' 16" W
46° 40' 14" N
M.P. 0.03
SCHEDULES B & C
BEGIN L-08 ROAD WORK
J U
D I T
H G
A P R
D
G O
P H
E R L
N
N E
L S
O N R
D
O L
D G
A P R
D
O K
A R
D
BREWINGTON RDLINE RD
LODE RD
OLD GAP RD
OKA RD
LODE RD
SAWMILL RD
COYOTE LN
C E
M E
T E
R Y R
D
C L Y
D E S R
D
L-08
STEPHENS LN
GAUGLER RANCH RD
B N S F
B N
S F
B N S F
B N
S F
E A
S T F
O R
K R
O B
E R
T S C
R E
E K
OKA COULEE
S T E P H E N S G
U L C
H
ROSS FORK CREEK
RED B
LUFF C
REEK
R O
B E R T S C
R E E K
M E A
D C
R E E K
A N T E L O P E C
R E E K
R O
B E R T S C
R E E K
:2
J a n u a r y
U n ti tl r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\G e n e r a l
I n f o r m a ti o n \m t-d m a lm a j_
L .d g n
L-08 ROAD
VICINITY MAP
PROJECT
A.8
M Line E Item
Pay Item Pay Item Description Unit
Number N No. K-03 D
AlO0O 15101-0000 MOBILIZATION LPSM
A1002 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM
A1004 15301-0000 CONTRACTOR QUALITY CONTROL LPSM
A1006 15401-0000 CONTRACTOR TESTING LPSM
A1008 15501-0000 CONSTRUCTION SCHEDULE LPSM
A1010 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 7,700
A1012 15801-0000 WATERING FOR DUST CONTROL MGAL 980
Al014 20101-0000 CLEARING AND GRUBBING ACRE 2.7
Al016 20301-1900 REMOVAL OF PIPE CULVERT EACH 5
A1018 20302-0700 REMOVAL OF FENCE LNFT 5,500
A1020 20401-0000 ROADWAY EXCAVATION CUYD 2,146
A1022 20403-0000 UNCLASSIFlED BORROW CUYD 14,956
A1024 30202-2000 ROADWAY AGGREGATE, METHOD 2
(K ROADS) TON 205
! A1026 30302-6000 ROADWAY RECONDITIONING LNFT 33,264
0 A1028 30302-6000 ROADWAY RECONDITIONING
M N
(AGGREGATE REMOVAL) LNFT
! A1030 31103-3000 STABILIZED AGGREGATE SURFACE
I COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (K ROADS) TON 19,082
� Al034 31110-0000 CALCIUM CHLORIDE TON 340
A1036 60201-0800 24-INCH PIPE CULVERT LNFT 270
A1038 60202-0600 36-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE 0
CULVERT LNFT 100 I
M
A1040 60704-0000 CLEANING CULVERT IN PLACE EACH N
A1042 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 1
A1044 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 5,511
I
A1046 61902-2500 GATE, BARBED WIRE, 4-STRAND EACH 2
A1048 61921-1000 REMOVE AND RESET FENCE LNFT 1,470
A1050 62201-0300 DUMP TRUCK, 12 CUBIC YARD �
� HOUR 1
5 .:
HOUR
� HOUR �
HOUR
MINIMUM CAPACITY
A1052 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH
A1054 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE
A1056 62301-0000 GENERAL LABOR
MileStone: SIGNOFF Date Completed: 05/31/23 Report Date: 05/31/23
SUMMARY OF QUANTITIES - Schedule A
Sheet and Description
K-04 K-07 K-09 K-10 K-11 L-05 L-06 L-08
120 120 100
142 222 540 658
230 250 285 290
10,296 14,942 39,547
36,379 5,280
4,909 8,192 19,945 24,097
88 146 356 430
3 3
1 4 7 ll r� 1it �' � � t
� ¥� �L-□' i\ MA ,K'V['lP ��
�".'§ ;�)'11n\"1i �JJ ◄
�"��2 I I
PROJECT
SHEET
NUMBER
MT DAR MALM 2023(1) B.1
Estimated Quantities
Remarks and/or Determination of
Bid Estimated Quantity Schedule
ALL
ALL
ALL
ALL
ALL
8,040
2,542
2.7
5,500
2,146 Contract Quantity
14,956
1,260
98,049 Contract Quantity
Contract Quantity
41,659
76,225
1,360
5,511
1,470
E Item N No.
A1058
A1060
A1062
A1064
Pay Item
Number
62405-0300
62502-0000
63501-0000
63506-0500
Pay Item Description
PLACING CONSERVED TOPSOIL,
4-INCH DEPTH
TURF ESTABLISHMENT (DRY
METHOD)
TEMPORARY TRAFFIC CONTROL
TEMPORARY TRAFFIC CONTROL,
FLAGGER
MileStone: SIG NO FF Date Completed: 05/31/23 Report Date: 05/31/23
Unit
SQYD
SQYD
LPSM
HOUR
SUMMARY OF QUANTITIES - Schedule, A
Sheet and Description 1------.------,-----r-------.----�------r----.------.------,,------r-------.----�----1
K-03 K-04 K-07 K-09 K-10 K-11 L-05 L-06 L-08
13,275 45 180 315
13,275 45 180 315
900 100 180 400 440
PROJECT
SHEET
NUMBER
MT DAR MALM 2023(1) B.2
Estimated
Quantities
Bid
Schedule
13,815
13,815
ALL
2,020
Remarks and/or
Determination of
Estimated Quantity
PROJECT
NUMBER
SUMMARY OF QUANTITIES - Schedule B MT DAR MALM 2023(1) B.3
A Sheet and Description Estimated
M Line Quantities
Remarks and/or E Item
Pay Item Pay Item Description Unit Determination of
Number N No. K-03 K-04 K-07 K-09 K-10 K-11 L-05 L-06 L-08 Bid Estimated Quantity
D Schedule
B1000 15101-0000 MOBILIZATION LPSM ALL
B1002 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
B1004 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
B1006 15401-0000 CONTRACTOR TESTING LPSM ALL
B1008 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
B1010 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 7,700 120 120 200 100 540 8,780
B1012 15801-0000 WATERING FOR DUST CONTROL MGAL 980 142 222 423 540 658 395 3,360
B1014 20101-0000 CLEARING AND GRUBBING ACRE 2.7 2.7
B1016 20301-1900 REMOVAL OF PIPE CULVERT EACH s s
B1018 20302-0700 REMOVAL OF FENCE LNFT 5,500 5,500
B1020 20401-0000 ROADWAY EXCAVATION CUYD 2,146 2,146 Contract Quantity
B1022 20403-0000 UNCLASSIFIED BORROW CUYD 14,956 14,956
B1024 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (RIPRAP HEADWALL) � CUYD 14 14
! 81026 25101-0300 PLACED RIPRAP, METHOD A,
0 CLASS 3 (RIPRAP HEADWALL) CUYD 16 16
M N
B1028 30202-2000 ROADWAY AGGREGATE, METHOD 2
! (K ROADS) TON 205 230 250 255 285 290 1,515
I B1030 30302-6000 ROADWAY RECONDITIONING LNFT 33,264 10,296 14,942 28,512 39,547 37,277 163,838 Contract Quantity
B1032 30302-6000 ROADWAY RECONDITIONING Contra ct Quantity
� (AGGREGATE REMOVAL) LNFT 36,379 5,280 41,659
E
B1034 31103-3000 STABILIZED AGGREGATE SURFACE
COURSE, CALCIUM CHLORIDE,
IMPORTED AGGREGATE (IL ROADS) TON 9,859 9,859 0
B1038 31103-3000 STABILIZED AGGREGATE SURFACE
I
M
COURSE, CALCIUM CHLORIDE, N
IMPORTED AGGREGATE (IK ROADS) TON 19,082 4,909 8,192 15,632 19,945 24,097 91,857
B1042 31110-0000 CALCIUM CHLORIDE TON 340 88 146 279 356 430 375 2,014
I
B1044 60201-0800 24-INCH PIPE CULVERT LNFT 270 270
B1046 60202-0600 36-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE �
CULVERT LNFT 100 100 1
5 B1048 60704-0000 CLEANING CULVERT IN PLACE EACH 4 3 3 10 .: /'
B1050 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 1 1 1 4 7 �,Nri��, 14
B1052 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 5,511 � � �
�f 5,511
B1054 61902-2500 GATE, BARBED WIRE, 4-STRAND EACH 2 w� I ��-'h, 2 :;: MJI Uc !V�!IP� Cl. B1056 61921-1000 REMOVE AND RESET FENCE LNFT 1,470 1,470 � .1 �: 111- -•- ■-n '·�'"' .Mi
��;Q.JAL� MileStone: SIGNOIFF Date Completed: 05/31/23 Report Date: 05/31/23
E Item
Pay Item Pay Item Description Unit
N No.
Number
D K-03
B1058 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR
B1060 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR
B1062 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR
B1064 62301-0000 GENERAL LABOR HOUR
B1066 62405-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH SQYD 13,275
B1068 62502-0000 TURF ESTABLISHMENT (DRY
METHOD) SQYD 13,275
B1070 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM
B1072 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 900
M N
I" E
!!!z "' 0 �
I
M N i 1!
E
I g
I �
Cl.
n
MileStone: SIG NO FF Date Completed: 05/31/23 Report Date: 05/31/23
SUMMARY OF QUANTITIES - Schedule B
Sheet and Description
K-04 K-07 K-09 K-10 K-11 L-05 L-06 L-08
45 45 180 315
45 45 180 315
100 180 280 400 440 320
PROJECT
SHEET
NUMBER
MT DAR MALM 2023(1) B.4
Estimated Quantities
Remarks and/or
Determination of Bid Estimated Quantity
Schedule
13,860
13,860
ALL
2,620
-- / �ollri �i;' � .
�c; ��� �1,� 1 } l �p- .��I
��:�1
PROJECT SHEET
SUMMARY OF QUANTITIES - Schedule C MT DAR MALM 2023(1) B.5
A M Line Pay Item
Number E Item Pay Item Description N No.
D
Cl000 15101 -0000 MOBI LIZATIO N
C1002 1520 1 -0000 CONST RUCTION SURVEY AND
STAKING
C100 4 15301-0000 CONTRACTOR QUALITY CONT ROL
C1006 15 401-0000 CONTRACTOR TEST ING
C1008 15501 -0000 CONSTRUCTION SCHEDULE
Cl0lO 15705 -1400 SOIL EROSION CONTRO L, FIBER
ROLL
C1012 15801-0000 WATERING FOR DUST CONTROL
C1014 20101-0000 C LEARING AND GRUBBING
C 1016 20301 -1900 REMOVAL OF PIPE CULVERT
C 1018 20302 -0700 REMOVAL OF FENCE
Unit
LPSM
LPSM
LPSM
LPS M
LPSM
LNFT
MGAL
ACR E
EACH
LNFT
Sheet and Description 1-------r-------r--------.----..-------r-------r--------.----..-------r-------r--------.----..-------1
K-03 K-04 K-07 K-09 K-10 K-11 L-05 L-06 L-08
7,700 120 120 200 100 100 540 980 142 222 423 540 658 392 350 395 2.7
5,500
Estimated Quantities
Bid Schedule
ALL
ALL
ALL
ALL
ALL
8,880 4,102
2.7
5,500
Remarks and/or Determination of
Estimated Quantity
C102G 20 401-0000 ROADWAY EXC AV ATION CUYD 2,146 2,146 Contract Quantity
C1022 20403 -0000 UNCLASSIFIED BOR ROW
C1024 25101-0200 PLACED RIPR AP, METH OD A,
CLASS 2 (RIPRAP HEADW ALL)
j C1026 2 5101-0300 P LA CE D RIPRAP, METHOD A, � CLASS 3 (RIPR AP HEA DWALL)
CUYD
CUYD
CUYD
14,956 14,956
14 14
16 16 21---------------------------------------------------------------------------------------------
� C1028 3 0202 - 2000 R OA DWAY AGGREGAT E, METHOD 2
! (K ROADS) TON 205 230 250 255 285 290 1,515
i---C -1-0-30--+-3- 0_ 3_0_2_-6_0_0_0-+-R-O_A_D_W_A_ Y_R-EC_O_N_D _lT_I_O_N_I _N_G __ --+-_L_ N_FT _____ 3 _3,-2-6-4--
1-0-,2- 9- 6 -+---l-4,-9 -4-2__._2_8_,5_ 1_2_....._ _____ 3_9_,5_4_ 7_.....__3_7,-6-9-9__._3_3_
,6_8_6_.....__3_7, -2-7-7__. ____ ....._ ___ -+-_________ 2_3_5,- 2-2-3-C-o-n-t-ra-c-t-
Q -u-a-nt-it-y
�-----C-1 -0 -3 2---+-3- 0_3_0_2 _-6_0_0_0-+-R-O _A_D_W_A_Y_R_EC_ O_N _D_IT_I_O_N_I _N_G __ ---+----+-------.----+------+------+-------.----+------+------+-------.----+------+------+---------1- C-o-n-t-ra-c-t-
Q -u-a-nt-ity
� LNFT 36,379 5,280 41,659 c (AG GREGAT EREM OVAU •1----+----+------+---------------+-----t-------t----+------+------+-------t----+------+------+-------t----+------+------+--------1-----1------------tl
� C103 4 31103-3000 ST ABILIZED AGGREGAT E SURF ACE
I§ COURSE, CALCIUM CH LORIDE,
� o IMPO RTED AGGR EGATE (L R OADS) TON 9,486 8,476 9,859 27
N O� l----+----+------+---------------+-----t-------t----+------+------+-------t----+------+------+-------t----+------+------+------t-----1------------tl
, C1040 31103-3000 STABILIZED AGGREGAT E SURFACE
� COURSE, CALCIUM CHLORIDE,
1! IMPORTED AGGREGATE (IK ROADS) TON 19,082 4,9 09 8,192 15,632 19,945 24,097 91,857 -,:,1----+-----+------+---------------+----+---------+------+------+---------+------+------+---------+------+------+------+----1--------- � C1042 31110 -0000 CALCIUM CHLORIDE TON 340 88 146 279 356 430 361 323 375 2,698 �ll----+----+------+---------------+-----t-------t----+------+------+-------t----+------+------+-------t----+------+------+------t-----1-----------tl g C1044 602 01-080 0 24 -INCH PIPE CULVERT LNFT 270 270 �---+----+------+---------------+-----t-------t----+------+------+-------t----+------+------+-------t----+------+------+--------1-----1------------tl
N C1046 60202- 0600 36- INCH EQUIVALENT DIAMETER
i
� ARCH OR ELLIPT ICA L PIPE
j C ULVERT LNFT 100
[ C1048 60704-0000 C LEANING CULVERT IN PLAC E EAC H 4 3 3 1 5
1----+----+------+---------------+-----t-------t----+------+------+-------t----+------+------+-------t----+---
Cl0S0 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 1
C1052 61901-0900 FENC E, BARBED WIRE, 4 ST R AND LNFT 5,511
C1054 61902-2500 GATE, BARBED WIRE, 4-STRAN D EACH 2
1 1 4 7 1 1
:;:1----+----+------+---------------+-----t-------t----+------+------+-------t----+------+------+-------t----+---
� C1056 61921-1 000 REMOVE AND RESET FENCE LNFT 1 , 4 70
MileStone: SIGNOIFF Date Completed: 05/31/23
PROJECT
NUMBER
SUMMARY OF QUANTITIES - Schedule C MT DAR MALM 2023(1) B.6
A Sheet and Description Estimated
M Line Quantities
Remarks and/or E Item
Pay Item Pay Item Description Unit Determination of
N No.
Number Bid Estimated Quantity
D K-03 K-04 K-07 K-09 K-10 K-11 L-05 L-06 L-08
Schedule
C1058 62201-0300 DUMP TRUCK, 12 CUBIC YARD
MINIMUM CAPACITY HOUR 40
C1060 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 40
C1062 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
C1064 62301-0000 GENERAL LABOR HOUR 40
C1066 62405-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH SQYD 13,275 45 45 180 315 45 45 13,950
C1068 62502-0000 TURF ESTABLISHMENT (DRY
METHOD) SQYD 13,275 45 45 180 315 45 45 13,950
;:;, C1070 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL e C C1072 63506-0500 TEMPORARY TRAFFIC CONTROL, .g
FLAGGER HOUR 900 100 180 280 400 440 280 260 320 3,160
E
-6
I " 6 � E z "' N "'
I
M N
E l I
I
I � g 5-f :c
::::: � ,.ir,.f;' �'
� � �--1�, �-- riML!l ��
:;: A tK:��fjp' c Cl.
N n
�i� MileStone: SIG NO FF Date Completed: 05/31/23
1:3
Travel lane Travel lane
1:3
Existing Slope
Existing Slope
Roadway reconditioning
4-inch compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, [1]
5% Crown ± 1/2% [1]5% Crown ± 1/2%
[2]3' [2]3' [4] [3]9' min. - 12' max. [4] [3]9' min. - 12' max.
Original ground li m it s o n s tr u c ti o n
[6]1' min.
FOOTNOTE:
NOTE:
reconditioning.
Re-establish existing ditches to the minimum depth during roadway[6] centerline, whichever is less.
Disturbances allowed out to existing fenceline or 30' from[5] material removal during roadway reconditioning, as directed.
Roadbed width beyond 26' may require excess shoulder[4]
Taper at a rate of 25:1 between widths. See Sheet C.5.
Adjust to match existing roadbed width as approved. [3] foreslopes. Remove and dispose of material where required.
Break up vegetated material on shoulders and 3 feet down[2] a maximum of 8% superelevation.
Superelevate roadway on curves to a minimum of 5% and[1]
30' max. 30' max.
LC
D.3 for estimated quantities.
disturbed during proposed drainage improvements. See Sheet
2. Conserve topsoil and re-establish vegetation along all slopes
1. See Sheets D.2 and D.3 for quantities.
li m n s tr u c ti o n
(4" NEW AGGREGATE STABILIZATION)
TYPICAL SECTION NO. 1
NO SCALE
:1
J a n u a r y
U n ti tl e d r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\T y p ic a l
S e c ti o n s \m t-d m a lm c b .d g n
Sheet 1 of 4
TYPICAL SECTIONS
PROJECT
C.1
NO SCALE
FOOTNOTE:
NOTE:
D.3 for estimated quantities.
disturbed during proposed drainage improvements. See Sheet
2. Conserve topsoil and re-establish vegetation along all slopes
1. See Sheets D.2 and D.3 for quantities.
reconditioning.
Re-establish existing ditches to the minimum depth during roadway[7] of the new imported aggregate.
Incorporate calcium chloride to a depth of 4 inches from the top[6] centerline, whichever is less.
Disturbances allowed out to existing fenceline or 30' from[5] material removal during roadway reconditioning, as directed.
Roadbed width beyond 25' may require excess shoulder[4]
Taper at a rate of 25:1 between widths. See Sheet C.5.
Adjust to match existing roadbed width as approved. [3] foreslopes. Remove and dispose of material where required.
Break up vegetated material on shoulders and 3 feet down[2] a maximum of 8% superelevation.
Superelevate roadway on curves to a minimum of 5% and[1]
30' max.
li m n s tr u c ti o n
30' max.
LC
Travel lane
Existing Slope
Existing Slope
[1]
5% Crown ± 1/2% [1]5% Crown ± 1/2%
[2]3' [2]3' [4] [3]9' min. - 12' max. [4] [3]9' min. - 12' max.
Original ground
Roadway reconditioning
1:3 1:3
[6]2-inch compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, Travel lane stabilized aggregate surface
Top of existing
4-inch stabilized depth
Calcium chloride, (2" NEW AGGREGATE AND 2" EXISTING AGGREGATE STABILIZATION)
TYPICAL SECTION NO. 2
[7]1' min.
[5 li m it s
C o n s tr u c ti o n
:4
J a n u a r y
U n ti tl e d r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \T y p ic a l
S e c ti o n s \m t-d m a lm c c .d g n
Sheet 2 of 4
TYPICAL SECTIONS
PROJECT
C.2
1:3
Existing Slope
Existing Slope
4-inch compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, 5% Crown 5% Crown
11'11'
Original ground
C le a r in g l im it s
2' min.
FOOTNOTE:
NOTE:
See Sheets D.5 - D.6.[3]
5' or to existing permanent easement line, whichever is less.[2]
Construct slopes as shown in the Staking Report.[1]
Turf establishment (dry method) limits Placing conserved topsoil, 4-inch depth
Turf establishment (dry method) limits Placing conserved topsoil, 4-inch depthLC unless otherwise approved.
2. Reset or replace fence to the permanent easement line,
1. See Sheets D.2 and D.3 for quantities.
C le a r in g l im it s
SCHEDULES A, B, & C
K-03 ROAD, M.P. 0.16 - 1.29
[3]
(GRADE RAISE
TYPICAL SECTION NO. 3
11' 11'
Unclassified borrow
Slope stake
Slope stake
[1]
Variable
Variable
Var iab le
[2]
5'
5'
Profile grade
NO SCALE
:4
J a n u a r y
U n ti tl e d
F h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \T y p ic a l
S e c ti o n s \m t-d m a lm c d
.d g n
Sheet 3 of 4
TYPICAL SECTIONS
PROJECT
C.3
1:3
Existing Slope
Existing Slope
(aggregate removal)
Roadway reconditioning
4-inch compacted depth calcium chloride, imported aggregate, Stabilized aggregate surface course, [1]
5% Crown ± 1/2% [1]5% Crown ± 1/2%
Variable Variable 11'11'
Original ground li m n s tr u c ti o n
[3]1' min.
FOOTNOTE:
is variable. Estimated widths and quantities are shown for information only.
limits to native ground unless otherwise approved. Aggregate depth
Remove excess aggregate material within allowable disturbance[4] reconditioning.
Re-establish existing ditches to the minimum depth during roadway[3] centerline, whichever is less.
Disturbances allowed out to existing fenceline or 30' from[2] a maximum of 8% superelevation.
Superelevate roadway on curves to a minimum of 5% and[1]
30' max. 30' max.
LC
li m n s tr u c ti o n
SCHEDULES A, B, & C
K-11 ROAD, M.P. 0.00 - 1.00
K-10 ROAD, M.P. 0.01 - 6.90
WITH AGGREGATE REMOVAL)
(4" NEW AGGREGATE STABILIZATION
TYPICAL SECTION NO. 4
11' 11'
[4] material (typ.)
Excess aggregate
NOTE:
1. See Sheets D.2 and D.3 for quantities.
NO SCALE
:4
A p r il
U n ti tl e d r p a h ln
\s h a r e d
\h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \T y p ic a l
S e c ti o n s \m t-d m a lm c e .d g n
Sheet 4 of 4
TYPICAL SECTIONS
PROJECT
C.4
PROFILE
PROFILE
25:1 Taper
25:1 Taper
TYPICAL TAPER
PLAN
LC
or paved roadway
Existing structure e x is ti n g w id th
V a ri a b le e x is ti n g w id th
V a ri a b le surfacing section
Match mainline surfacing section
Match mainline
Profile grade
[2]200' min.
[2]50' min.
grade line
[1]Existing road
Profile grade grade line
Existing roadImported surface aggregate
Imported surface aggregate
AND PAVED INTERSECTIONS
CATTLE GUARDS TO REMAIN IN-PLACE,
TYPICAL CONNECTION TREATMENT AT EXISTING BRIDGES,
d e p th s u r f a c in g
B e g in
/E n d f u ll
[3]EXISTING UNPAVED COUNTY ROADS
AT INTERSECTION OF PROJECT ROUTES WITH
TYPICAL CONNECTION TREATMENT
See Section E.
are to match existing within the right-of-way as approved.
to existing minor private and farm field approaches public road intersections, as needed. Connections
For use at beginning/end of project routes and for [3] structures and existing roadways as directed.
Adjust transition length to provide a smooth transition to[2]
Excavate and dispose of existing gravel surfacing.
profile grade from existing grade to the depth shown.
intersecting roadway or from the structure. Taper
Excavate existing gravel surfacing from the edge of [1]
NO SCALE
:0 p r il
U n ti tl r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\T y p ic a l
S e c ti o n s \m t-d m a lm c f .d g n
TYPICAL DETAILS
PROJECT
C.5
:1
M a r c h
D D e s ig n I n tl t r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\P la n a n d P r o f il e \m t-d m a lm la
.d g n
SURVEY CONTROL
K-03 ROAD
PROJECT
D.1
31103-3000 and 1.85% by in-place aggregate weight.
Calcium chloride quantities based on 1.85% by dry weight of item [6]
Quantities are based on 1.93 TON/CUYD [5]
3. 0.029 MGAL/CUYD for unclassified borrow.
2. 0.015 MGAL/TON for imported surface course aggregate.
1. 35 MGAL/mile for roadway reconditioning and dust control.
Quantities are based on the following:[4]
See Sheets C.1 - C.4 for typical sections.
[3]
Based on a conserved topsoil depth of 6 inches.
[2]
Unadjusted quantity. Includes conserved topsoil.
[1]
:4
A p r il
D
.2 r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\P la n a n d P r o f il e \m t-d m a lm lb
.d g n
Sheet 1 of 2
TABULATION OF QUANTITIES
PROJECT
D.2 easement line unless otherwise approved.
See Sheets H.1-H.3. Place fence and gates at permanent [2] pipe replacements.
disturbance based on grade raises, pipe repairs, and
For re-establishing vegetation at disturbed areas. Areas of [1]
:0
J a n u a r y
D
.3
R
P A
H
L N
\S h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\P la n a n d P r o f il e \m t-d m a lm lb
.d g n
Sheet 2 of 2
TABULATION OF QUANTITIES
PROJECT
D.3
NOTE:
See Sheet D.3 for utility contact information.3.
See Sheet D.2 for typical section ranges and quantities.2.
All culverts are existing unless otherwise noted.1.
existing widths and radii as approved.
Gravel existing approaches and turnouts to match1.
B E
G
IN
P R
O J E
C T
W
.P
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.4
E N
D T
Y P
S
E C
T
IO
N N
O
FOOTNOTE:
See Sheets D.5 - D.6 for Plan and Profiles.
[3]
See Sheet C.3 for Typical Section.
[2]
For information only. Adjust in field as approved.
[1]
M is s il e L a u n c h F a c il it y K
-0
M is s il e L a u n c h F a c il it y A p p r.
L T
M .P
.4
F a rm
F ie ld A p p r.
L T
M .P
.9
F a rm
F ie ld A p p r.
R
T
M .P
.3
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.9
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.9
I n c lu d e s o f E x te n s io n R
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
F a rm
F ie ld A p p r.
R
T
M .P
.9
R e m o v e a n d
R e s e t
F e n c e L
T
D e s ig n e d
A p p r.
L T
M .P
.9
Fence, Barbed Wire, 4-Strand RT
Removal of Fence RT
M.P. 0.22 - 1.27
R e m o v e a n d
R e s e t
F e n c e L
T
R e p la c e w it h
P ip e C u lv e r t
M .P
.3
R e m o v e a n d
R e s e t
F e n c e L
T
R e p la c e w it h
P ip e C u lv e r t
M .P
.4
R e m o v e a n d
R e s e t
F e n c e L
T
R e p la c e w it h
P ip e C u lv e r t
M .P
.5
R e m o v e a n d
R e s e t
F e n c e L
T
R e p la c e w it h
P ip e C u lv e r t
M .P
.2
R e m o v e a n d
R e s e t
F e n c e L
T
R e p la c e w it h
P ip e C u lv e r t
M .P
.0
D ia m e te r P ip e A r c h e s
R e p la c e w it h
E q u iv a le n t
M .P
.2
S tr a n d R
T
G a te
B a r b e d W ir e
D e s ig n e d
A p p r.
R T
M .P
.9
R e m o v e a n d
R e s e t
F e n c e L
T
M .P
.2
Grade Raise
M.P. 0.16 - 1.29
[3] a rm
F ie ld A p p r.
R
T
M .P
.3
S tr a n d R
T
G a te
B a r b e d W ir e
D e s ig n e d
A p p r.
R T
M .P
.3
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u n
.9
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
:5
J a n u a r y
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
K
.d g n
SCHEDULES A, B, & C
LINE GRAPH
K-03 ROAD
PROJECT
D.4
CP 3
CP 4
.3
N
N89°55'34"E e = NC
'2,535.17L =
'1,267.59T =
'500,000.00R =
(RT)00°17'26"Δ =
116+93.14PI
.5
PC
.7
PT
Existing ground
Profile grade
Line to be constructed
Slope stake limits
Slope stake limits
Fence, barbed wire, 4-strand
In s ta ll p ip e c u lv e rt
M
.P
.2
In s ta ll p ip e c u lv e rt
M
.P
.3
In s ta ll p ip e c u lv e rt
M
.P
.4
In s ta ll p ip e c u lv e rt
M
.P
.5
R e m o v a l o f p ip e c u lv e rt
M .P
.2
R e m o v a l o f p ip e c u lv e rt
M .P
.4
R e m o v a l o f p ip e c u lv e rt
M .P
.5
100+00 = M.P. 0.16
SCHEDULES A, B, & C
TYPICAL SECTION NO. 3
BEGIN K-03 ROAD GRADE RAISE
El. = 4415.57 E = 1902452.398 N = 816736.384
Gate, barbed wire, 4-strand
V295
BM
Long. = 109° 45' 45"W Lat. = 46° 29' 24"N
Temporary construction permit
Temporary construction permit
See Sheets H.1 - H.2
Fence, barbed wire, 4-strand, RT reset fence, LT Remove and
Remove and reset fence, LT reset fence, LT Remove and reset fence, LT Remove and
100+00 105+00 110+00 115+00 120+00 125+00 130+00
4,380 4,380
4,390 4,390
4,400 4,400
4,410 4,410
4,430 4,430
4,440 4,440
4,450 4,450
4,460 4,460
-0.15% -0.45%
+1.80%
-0.82% +2.56
% -1.88% +1.67% -1.37% +2.19%
.0
.0
.8
.0
.7
.0
.8
.0
.8
.0
.7
.0
.5
.0
.4
.0
' VC200
76K =
'512SSD = ' VC200
45K =
'343SSD =
' VC200
66K =
'456SSD =
' VC200
86K =
'562SSD =
' VC500
1649K =
'3808SSD =
' VC200
59K =
'330HLSD =
' VC300
85K =
'407HLSD =
' VC200
56K =
'308HLSD =
Sheet 1 of 2
PLAN AND PROFILE
K-03 ROAD
:4
M a rc h
L o w e r
N iH il l R d
P la n
S h e t] h ig h w a y s \F
H W
A \2 m t-d -m a lm
D
A R
\D
G N
\P la n a n d P ro fi le
\m t-d -m a lm p p K
-0 .d g n
PROJECT
D.5
Ackley
Proposed Fiber Line
Triangle Communications
Proposed Fiber Line
Triangle Communications Proposed Fiber Line
Triangle Communications
No utilities appear to be present at this site.
T
.7
CP 2
.0
A
.4
N
S89°47'01"E N89°44'31"E S89°49'49"E e = NC
'223.90L =
'111.95T =
'30,000.00R =
(RT)00°25'39"Δ =
149+06.37PI
e = NC '248.43L = '124.21T = '30,000.00R =
(LT)00°28'28"Δ =
145+13.29PI
.0
.5
.4
Profile grade
Existing ground
Fence, barbed wire, 4-strand
Gate, barbed wire, 4-strand
Line to be constructed
Slope stake limits
Slope stake limits
In s ta ll p ip e c u lv e rt
M .P
.0
R e m o v a l o f p ip e c u lv e rt
M .P
.1 c u lv e rt R e m o v a l o f p ip
.2 a rc h c u lv e rt e q u iv a le n t p ip
In ta ll D o u b le
M
.P .2
159+70 = M.P. 1.29
SCHEDULES A, B, & C
TYPICAL SECTION NO. 3
END K-03 ROAD GRADE RAISE
El. = 4375.85 E = 1908422.379 N = 816726.533
CP 1
Long. = 109° 44' 19"W Lat. = 46° 29' 24"N
Temporary construction permit
Temporary construction permit
See Sheets H.1 - H.2
Fence, barbed wire, 4-strand, RT reset fence, LT Remove and reset fence, LT Remove and reset fence, LT Remove and
130+00 135+00 140+00 145+00 150+00 155+00 160+00
4,360 4,360
4,370 4,370
4,380 4,380
4,390 4,390
4,400 4,400
4,410 4,410
4,420
4,430 4,430
-2.14%
-0.45%
-5.00%
+0.38%
.4
.0
.6
.0
.1
.0
' VC750
444K =
'1014SSD =
' VC250
87K =
'502SSD =
' VC450
84K =
'381HLSD =
Sheet 2 of 2
PLAN AND PROFILE
K-03 ROAD
:5
A p ri l
L o w e r
N iH il l R d
P la n
S h e rp a -h ln -0
\s h a re d \h ig h w a y s \F
H W
A \2 m t-d -m a lm
D
A R
\D
G N
\P la n a n d P ro fi le
\m t-d -m a lm p p K
-0 .d g n
PROJECT
D.6
See Sheet D.3 for utility contact information.4.
See Sheet D.2 for typical section ranges and quantities.3.
All culverts are existing unless otherwise noted.2.
existing widths and radii as approved.
Gravel existing approaches and turnouts to match1.
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.9
E N
D T
Y P
S
E C
T
IO
N N
O
P u b li c A p p r.
L T
M .P
.1
F a rm
F ie ld A p p r.
R
T
M .P
.0
P ri v a te
A p p r.
L T
M .P
.5
F a rm
F ie ld A p p r.
R
T
M .P
.7
P u b li c A p p r.
R T
M .P
.9
P ri v a te
A p p r.
L T
M .P
.3
F a rm
F ie ld A p p r.
R
T
M .P
.3
P ri v a te
A p p r.
L T
M .P
.6
P ri v a te
A p p r.
R T
M .P
.9
M is s il e L a u n c h F a c il it y K
-0
A p p r.
R T
M is s il e L a u n c h
F a c il it y
M .P
.9
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.0
M .P
.0
M .P
.0
M .P
.0
:2
J a n u a r y
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
K
.d g n
SCHEDULES A, B, & C
LINE GRAPH
K-04 ROAD
PROJECT
D.7
See Sheet D.2 for typical section ranges and quantities.3.
All culverts are existing unless otherwise noted.2.
existing widths and radii as approved.
Gravel existing approaches and turnouts to match1.
F a rm
F ie ld A p p r.
R
T
M .P
.4
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.8
E N
D T
Y P
S
E C
T
IO
N N
O
FOOTNOTE:
For information only. Adjust in field as approved.
[1]
M is s il e L a u n c h F a c il it y K
-0
M is s il e L a u n c h F a c il it y A p p r.
R T
M .P
.8
P ri v a te
A p p r.
R T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.5
F a rm
F ie ld A p p r.
L T
M .P
.9
P ri v a te
A p p r.
L T
M .P
.0
P ri v a te
A p p r.
R T
M .P
.1
F a rm
F ie ld A p p r.
L T
M .P
.9
D o N o t
D is tu rb
E x is ti n g B ri d g e
M .P
.4
I n c lu d e s o f E x te n s io n L
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
.8
F a rm
F ie ld A p p r.
L T
M .P
.0
P ri v a te
A p p r.
L T
M .P
.0
P ri v a te
A p p r.
L T
M .P
.5
P ri v a te
A p p r.
R T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.5
P u b li c A p p r.
R T
M .P
.8
M .P
.0
M .P
.0
M .P
.0
:2
J a n u a r y
U n ti tl r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
K
.d g n
SCHEDULES A, B, & C
LINE GRAPH
K-07 ROAD
PROJECT
D.8
See Sheet D.2 for typical section ranges and quantities.3.
All culverts are existing unless otherwise noted.2.
existing widths and radii as approved.
Gravel existing approaches and turnouts to match1.
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.4
E N
D T
Y P
S
E C
T
IO
N N
O
FOOTNOTE:
For information only. Adjust in field as approved.
[1]
F a rm
F ie ld A p p r.
L T
M .P
.2
F a rm
F ie ld A p p r.
R
T
M .P
.2
F a rm
F ie ld A p p r.
R
T
M .P
.5
F a rm
F ie ld A p p r.
R
T
M .P
.7
F a rm
F ie ld A p p r.
L T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.9
F a rm
F ie ld A p p r.
R
T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.0
M is s il e L a u n c h F a c il it y K
-0
M is s il e L a u n c h F a c il it y A p p r.
R T
C le a n
C u lv e rt i n
P la c e R
T
M .P
.4
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.4
D o N o t
D is tu rb
E x is ti n g B ri d g e
M .P
.9
C le a n C u lv e r t in P la c e
M .P
.3
C le a n C u lv e r t in P la c e
M .P
.8
I n c lu d e s o f E x te n s io n R
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
C le a n C u lv e r t in P la c e
M .P
.0
F a rm
F ie ld A p p r.
L T
M .P
.9
P u b li c A p p r.
R T
M .P
.0
P ri v a te
A p p r.
R T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.9
P u b li c A p p r.
R T
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
:2
J a n u a r y
U n ti tl r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
K
.d g n
SCHEDULES B & C
LINE GRAPH
K-09 ROAD
PROJECT
D.9
See Sheet D.2 for typical section ranges and quantities.3.
All culverts are existing unless otherwise noted.2.
existing widths and radii as approved.
Gravel existing approaches and turnouts to match1.
F a rm
F ie ld A p p r.
R
T
M .P
.7
F a rm
F ie ld A p p r.
L T
M .P
.4
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.9
E N
D T
Y P
S
E C
T
IO
N N
O
FOOTNOTE:
For information only. Adjust in field as approved.
[1]
P u b li c A p p r.
R T
M .P
.4
P ri v a te
A p p r.
L T
M .P
.4
P ri v a te
A p p r.
R T
M .P
.6
P u ll o u t
R T
M .P
.2
F a rm
F ie ld A p p r.
R
T
M .P
.8
F a rm
F ie ld A p p r.
L T
M .P
.9
F a rm
F ie ld A p p r.
R
T
M .P
.4
P u b li c A p p r.
L T
M .P
.4
M is s il e L a u n c h F a c il it y K
-1
M is s il e L a u n c h F a c il it y A p p r.
R T
M .P
.9
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.8
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.7
C le a n C u lv e r t in P la c e
M .P
.4
C le a n C u lv e r t in P la c e
M .P
.6
In c lu d e s o f E x te n s io n L
T
R T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
.6
In c lu d e s o f E x te n s io n L
T
R T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
I n c lu d e s o f E x te n s io n R
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
.1
I n c lu d e s o f E x te n s io n R
T
E q u iv a le n t
D ia m e te r C
M p a ir
D r a in a g e S tr u c tu r e
M .P
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.9
F a rm
F ie ld A p p r.
R
T
M .P
.8
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.3
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.2
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.8
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
:2
J a n u a r y
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
K
.d g n
SCHEDULES A, B, & C
LINE GRAPH
K-10 ROAD
PROJECT
D.10
See Sheet D.2 for typical section ranges and quantities.3.
All culverts are existing unless otherwise noted.2.
existing widths and radii as approved.
Gravel existing approaches and turnouts to match1.
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.4
E N
D T
Y P
S
E C
T
IO
N N
O
FOOTNOTE:
For information only. Adjust in field as approved.
[1]
P ri v a te
A p p r.
R T
M .P
.4
F a rm
F ie ld A p p r.
R
T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.6
F a rm
F ie ld A p p r.
L
T
M .P
.9
P u b li c A p p r.
L T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.1
F a rm
F ie ld A p p r.
R
T
M .P
.2
M is s il e L a u n c h F a c il it y K
-1
M is s il e L a u n c h F a c il it y A p p r.
R T
M .P
.4
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.0
C le a n C u lv e r t in P la c e
M .P
.9
C le a n C u lv e r t in P la c e
M .P
.7
C le a n C u lv e r t in P la c e
M .P
.7
I n c lu d e s o f E x te n s io n R
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
I n c lu d e s o f E x te n s io n L
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
I n c lu d e s o f E x te n s io n L
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
I n c lu d e s o f E x te n s io n R
T
E q u iv a le n t
D ia m e te r C
M p a ir
D r a in a g e S tr u c tu r e
M .P
In c lu d e s o f E x te n s io n L
T
R T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
I n c lu d e s o f E x te n s io n R
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
I n c lu d e s o f E x te n s io n R
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
F a rm
F ie ld A p p r.
L
T
M .P
.0
F a rm
F ie ld A p p r.
L T
M .P
.0
F a rm
F ie ld A p p r.
R
T
M .P
.0
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.9
F a rm
F ie ld A p p r.
L T
M .P
.9
F a rm
F ie ld A p p r.
R
T
M .P
.0
P ri v a te
A p p r.
R T
M .P
.2
F a rm
F ie ld A p p r.
R
T
M .P
.3
F a rm
F ie ld A p p r.
R
T
M .P
.5
P u b li c A p p r.
R T
M .P
.0
B e g in
T y p S e c ti o n N o
E n d T y p
S e c ti o n
N o
M .P
.0
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.9
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
:2
J a n u a r y
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
K
.d g n
SCHEDULES A, B, & C
LINE GRAPH
K-11 ROAD
PROJECT
D.11
3. See Sheet D.3 for utility contact information.
2. See Sheet D.2 for typical section ranges and quantities.
1. All culverts are existing unless otherwise noted.
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.1
E N
D T
Y P
S
E C
T
IO
N N
O
FOOTNOTE:
For information only. Adjust in field as approved.
[1]
M is s il e L a u n c h
F a c il it y
L -0
M .P
.1
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.0
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.0
C le a n C u lv e r t in P la c e
M .P
.0
I n c lu d e s o f R e p la c e m e n t
R T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
.9
D o N o t
D is tu rb x is ti n g
P ip e C u lv e r t
M .P
.9
D o N o t
D is tu rb is ti n g x
C
M P
A
M .P
.9
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.1
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
:3
J a n u a r y
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
L
.d g n
SCHEDULE C
LINE GRAPH
L-05 ROAD
PROJECT
D.12
2. See Sheet D.2 for typical section ranges and quantities.
1. All culverts are existing unless otherwise noted.
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.3
E N
D T
Y P
S
E C
T
IO
N N
O
FOOTNOTE:
For information only. Adjust in field as approved.
[1]
M is s il e L a u n c h
F a c il it y
L -0
M .P
.3
C le a n C u lv e r t in P la c e
M .P
.1
C le a n C u lv e r t in P la c e
M .P
.7
C le a n C u lv e r t in P la c e
M .P
.0
I n c lu d e s o f E x te n s io n L
T
D ia m e te r C p a ir
D r a in a g e S tr u c tu r e
M .P
C le a n C u lv e r t in P la c e
M .P
.0
C le a n C u lv e r t in P la c e
M .P
.5
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.6
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
:3
J a n u a r y
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
L
.d g n
SCHEDULE C
LINE GRAPH
L-06 ROAD
PROJECT
D.13
2. See Sheet D.2 for typical section ranges and quantities.
1. All culverts are existing unless otherwise noted.
B E
G
IN
P R
O J E
C T
.0
B E
G
IN
T Y
P S
E C
T
IO
N N
O
E N
D P
R O
J E
C T
.P
.0
E N
D T
Y P
S
E C
T
IO
N N
O
M is s il e L a u n c h
F a c il it y
L -0
M .P
.0 f o r
D ia m e te r P ip e C u lv e r t
C la s s
R ip ra p H e a d w a ll
R
T
P la c e d R ip r a p M e th o d A
M .P
.6
P ip e C u lv e r t f o r
E q u iv a le n t
D ia m e te r
L T
R
T
C la s s
R ip r a p
H e a d w a ll la c e d R ip r a p M e th o d A
M .P
.5 f o r
D ia m e te r P ip e C u lv e r t
L T
R
T
C la s s
R ip r a p
H e a d w a ll
P la c e d R ip r a p M e th o d A
M .P
.5
D o N o t
D is tu rb
E x is ti n g C a tt le G u a r d
M .P
.1
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.8
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.9
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.0
D o N o t
D is tu rb
U ti li ty
C ro s s in g
K n o w n U n d e r g r o u
.1
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
M .P
.0
:3
J a n u a r y
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \P la n a n d P r o f il e \m t-d m a lm lb
L
.d g n
SCHEDULES B & C
LINE GRAPH
L-08 ROAD
PROJECT
D.14
6. 55 TON/pullout for K-10 pullout.
5. 35 TON/approach for K-03 approaches within grade raise area.
4. 60 TON/approach for missile launch facility approaches.
3. 40 TON/approach for public approaches.
2. 10 TON/approach for farm field approaches.
1. 15 TON/approach for private approaches.
Quantities are based on the following:
[4] to existing alignment of approach is at an angle.
Continue approach radius as required if connection [3] with adjacent roadway construction.
Construct side slopes of approaches to be compatible [2]
See Designed Approach Road Table.
[1]
Stationing Mainline x x x x x of highway x
Length Approach Road sections of approach as shown in cross Grade shown is designed grade of approach
APPROACH ROAD LOCATION SYMBOL
A
Type Approach slope Roadway E d g e o f g ra v e l
+15% maximum
-15% maximum
Designed grade
TYPE A APPROACHES
APPROACH ROAD PROFILE DETAIL
� of roadway
Edge of traveled way of approach of roadway
W
R
APPROACH ROAD PLAN DETAIL
[1]
[3]
[1]
R
[1
3]
Direction of increasing stationing
Variable 1:3
1:3
Clearing Limits
2% crown 2% crown
1'
[2]
TYPE A APPROACHES
APPROACH ROAD SECTION DETAIL
Variable[2]
Slope stake limit limit Slope stake limits (dry method) Turf establishment topsoil, 4-inch depth Placing conserved
4-inch compacted depth Roadway aggregate, method 2, limits (dry method)
Turf establishment topsoil, 4-inch depth
Placing conserved
NOTE:
K-03 Grade Raise only.
radii as approved. Reconstruction details for road surface elevation. Match existing widths and and turnouts noted in Section D to tie into the new Place roadway aggregate at the existing approaches1.
:0
J a n u a ry rp a
-h ln
-0
\s h a re d \h ig h w a y s \F
H W
A \2 m t-d -m a lm
D
A R
\D G
N \A p p ro a c h
R o a d s \m t-d
-m a lm d a .d g n
APPROACH ROAD DETAILS
GRADE RAISE AREA
K-03 ROAD
PROJECT
E.1
Flowing Drainage lo w in g D ra in a g e
D it c h
D it c h
Install fiber rolls [1]
Install fiber rolls [1]
D it c h
D it c h
FIBER ROLL PLACEMENT
TYPICAL
NOTE:
Adjust as directed.
grade raise area. See Sheet F.2 for proposed placement.
2. Place fiber rolls to intercept flow off project within the K-03 Road field.
approximate. Final locations are to be approved in the
1. The location of soil erosion control devices shown are
Culvert or bridge perpendicular to flowing water.
Place fiber rolls in ditches as needed, adjacent to standing water or[2] with standing or flowing water.
extend across any ditches intersecting the culverts or flowing water. See Sheet F.2 for details. Ensure rolls
Place fiber rolls around culverts with standing [1]
NO SCALE
:2
M a r c h
U n ti tl h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \E r o s io n C o n tr o l\ m t-d m a lm e a .d g n
EROSION CONTROL PLAN
PROJECT
F.1
CP 3
CP 4
N
Line to be constructed
Slope stake limits
Slope stake limits
100+00 = M.P. 0.16
SCHEDULES A, B, & C
TYPICAL SECTION NO. 3
BEGIN K-03 ROAD GRADE RAISE
Slope stake limits
Slope stake limits
159+70 = M.P. 1.29
SCHEDULES A, B, & C
TYPICAL SECTION NO. 3
END K-03 ROAD GRADE RAISE
fiber roll (typ.)
Install soil erosion control,Line to be constructed fiber roll (typ.)
Install soil erosion control, fiber roll (typ.)
Install soil erosion control, fiber roll (typ.)
Install soil erosion control, EROSION CONTROL PLANS
GRADE RAISE AREA
K-03 ROAD
:1
M a r c h
L o w e r N iH il l R d
P la n
S h e h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D G
N \E r o s io n C o n tr o l\ m t-d m a lm e c p p
K
.d g n
PROJECT
F.2
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø
U.S. CUSTOMARY DETAIL
DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NO SCALE
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
NOTE:
:3
J a n u a r y
W r p a h ln
\s h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\E r o s io n C o n tr o l\ m t-d m a lm e c .d g n
PROJECT
F.3
:4
J a n u a r y
R
P A
H
L N
\S h a r e d \h ig h w a y s \F
H W
A \2 m t-d m a lm
D
A R
\D
G N
\D r a in a g e \m t-d m a lm f a .d g n
PROJECT
G…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .