MRPO00101_2025 BSNP MATOC Drawings 3of4.pdf
PDF 21 MB Posted
- Attached to
- Bank Stabilization and Navigation Project (BSNP) River Structure Maintenance Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W9128F25R0043
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001 for W9128F25R0043_BSNP MATOC Solicitation.pdf | ||
| BSNP MATOC Contractor Sign In Sheet 07152025.pdf | ||
| W9128F25R0043_BSNP MATOC Specifications for TO 2of4.pdf | ||
| W9128F25R0043_BSNP MATOC Specifications for BASE 4of4.pdf | ||
| W9128F25R0043_BSNP MATOC Solicitation 1of4.pdf | ||
| W9128F25R0043_BSNP MATOC Specifications for TO 2of4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
OMAHA DISTRICT
OF ENGINEERS
US ARMY CORPS
WIDTH
FOR REPAIR TOP
SEE C3 SHEETS
REPAIR HEIGHT
FOR AVERAGE
SEE C3 SHEETS
DEFICIENCY LENGTH
SEE C3 SHEETS FOR
MILE IS LISTED ON THE THE C2 OR C3 SHEETS.
3) APPROXIMATE STRUCTURE RIVER
AND GENERAL REPAIR GUIDANCE.
"STRUCTURES" FOR DEFINITIONS
2) SEE SPECIFICATION 35 31 20
AVAILABLE ON THE C2 OR C3 SHEETS.
1) STRUCTURE REPAIR DIMENSIONS
NOTES:
SECTION
DEGRADED
ANGLE OF REPOSE
8'
9'
TYPICAL SECTION
BURIED STONE REFUSAL
NOT TO SCALE
EXISTING GROUND
ANGLE OF REPOSE
8'
REFUSAL
STONE
BURIED
NOT TO SCALE
SHOWN IN THE SITE PLANS
COORDINATE POINT AS
(AVE 7 TONS/LF)
STONE FILL
(AVE 7 TONS/LF)
EXISTING GROUND
ANGLE OF REPOSE
STONE FILL
NOT TO SCALE
SHOWN IN THE SITE PLANS
COORDINATE POINT AS
DEFICIENCY LENGTH
SEE C3 SHEETS FOR
CRP +3.0'
CRP +3.0'
ELEVATION =
DEFICIENCY LENGTH
SEE C3 SHEETS FOR
OF REPOSE
ANGLE
GROUND
EXISTING
REPOSE
ANGLE OF
TYPICAL SECTION
TYPICAL CENTERLINE PROFILE OF SPUR DIKE & REFUSAL
NEW STONE FILL
TYPICAL SECTION
TYPICAL CENTERLINE PROFILE OF SPUR DIKE ONLY
REPAIR TOP WIDTH
SEE C3 SHEETS FOR
AZIMUTH LINE
STRUCTURE
SECTION
NOT TO SCALE
DIKE
ROCK
EXISTING
PLANE (CRP)
REFERENCE
CONSTRUCTION
PILING
H
IG
H B
A N
K
E X
IS
T
IN
G
ROCK DIKE
EXISTING
PILING
DIKE REPAIR TYPICAL - PLAN VIEW
NOT TO SCALE
SECTION
NOT TO SCALE
STRUCTURE
EXISTING PILE
OF DIKE
PORTION
BURIED
STONE FILL
EXISTING
(RECYCLING ALL TOP SOIL REMOVED)
EXCAVATE AND BACKFILL
(RECYCLING ALL TOP SOIL REMOVED)
EXCAVATE AND BACKFILL
PLANE (CRP)
REFERENCE
CONSTRUCTION
C E
N T
E R
L
IN
E
S T
R U
C T
U R
E
11 ON 1
TO EXCEED
BUT NOT
11 ON 1
SLOPE
APPROX.
11 ON 1
TO EXCEED
BUT NOT
11 ON 1
SLOPE
APPROX.
STONE FILL
EXISTING GROUND LINE
TYPICAL CROSS SECTION OF SPUR DIKE
NOT TO SCALE
HIGH BANK
EXISTING
STRUCTURE WITHOUT PRIOR APPROVAL OF THE COR.
4. REPAIR SEGMENT LENGTH AND ROCK TONS SHALL NOT BE EXPANDED BEYOND THE TABULATED AMOUNT FOR ANY
STRUCTURE WITH THE DESIRED GEOMETRY AND MINIMAL VOIDS.
WITH THIS PROCESS. AVOID INCREASING THE REVETMENT LAYER THICKNESS. THIS SHOULD RESULT IN A DENSE AND COMPACT THE ROCK DOWN TO ACHIEVE DESIGN ELEVATION. DO NOT DAMAGE THE REVETMENT OR UNDERLYING BANK MATERIAL WHEN PLACING ROCK ON A REVETMENT IN AREAS WITH AN INTACT BANK BACKING, BUILD ABOVE FINAL GRADE AND TAMP THE REPAIR SECTION AND THEN TAMPING THE ROCK DOWN TO ACHIEVE THE DESIRED CROWN WIDTH AND ELEVATION.
PRACTICE IS SIMILAR TO A DIKE. REPAIR WILL CONSIST OF BUILDING THE STRUCTURE HEIGHT ABOVE THE FINAL GRADE IN
3. AT KICKER STRUCTURES AND REVETMENTS THAT HAVE LOST ALL BANK BACKING MATERIAL BEHIND THE REVETMENT REPAIR
LOWER NON-REPAIR SECTION THAT WOULD CREATE BANK EROSIVE CONDITIONS DUE TO REVETMENT ROCK HEIGHT.
FLOW PATH ALONG THE BANK. UNDER NO CIRCUMSTANCES SHALL THE REVETMENT REPAIR BE TERMINATED TO CAUSE A FIELD ADJUSTMENT MAY BE REQUIRED TO AVOID CREATION OF A LOWER NON-REPAIR SECTION THAT WOULD CREATE A WHEN PRACTICAL. GENERAL PRACTICE IS TO CONTINUE THE REPAIR SEGMENT UNTIL ELEVATIONS ARE WITHIN ONE FOOT.
PREFERABLE IS THAT THE REPAIR SEGMENT TERMINATES IN AN AREA WITH GOOD QUALITY BANK MATERIAL BACKING FINAL REVETMENT GRADE IN THE REPAIR SECTION MAY BE HIGHER THAN AN ADJACENT UNREPAIRED SECTION.
2. REVETMENT STRUCTURE REPAIRS MAY INCLUDE ONE OR MORE SEPARATE SEGMENTS AND NOT THE ENTIRE STRUCTURE.
THE LANDWARD DIKE END BE LOWER ELEVATION THAN THE RIVERWARD END.
AND COMPACT STRUCTURE WITH THE DESIRED GEOMETRY AND MINIMAL VOIDS. UNDER NO CIRCUMSTANCES SHALL TAMP THE ROCK IN A MANNER THAT RESULTS IN SIGNIFICANT MATERIAL DAMAGE. THIS SHOULD RESULT IN A DENSE SECTION AND THEN TAMPING THE ROCK DOWN TO ACHIEVE THE DESIRED CROWN WIDTH AND ELEVATION. DO NOT THIS PROCESS WILL CONSIST OF BUILDING THE DIKE HEIGHT SLIGHTLY ABOVE THE FINAL GRADE IN THE REPAIR SLOPE (MAXIMUM OF 1 FOOT) FOR ENTIRE DIKE LENGTH FROM THE BANK TO THE RIVERWARD END. NORMALLY TO THE RIVERWARD END. CONTRACTOR SHALL REGRADE THE ENTIRE DIKE TOP AS NECESSARY TO PROVIDE MINIMAL
1. FINAL CONSTRUCTED DIKE CROWN MUST MAINTAIN A LEVEL OR SLIGHT DOWNWARD SLOPE FROM THE BANK
STONE NOTES:
COMPLEX DIKE AT +3)
DIKE AT +3 & KICKER
DIKE AT +1, L-HEAD
(CRP) (STAND ALONE
REFERENCE PLANE
CONSTRUCTION
DISTANCE ABOVE
COMPLEX = CRP +3.0 (*)
3. IF DIKE IS PART OF A KICKER
STRUCTURE = CRP +3.0
2. IF DIKE IS PART OF A L-HEAD
1. STAND ALONE DIKE = CRP +1.0
COMPLEX = CRP +3.0 (*)
3. IF DIKE IS PART OF A KICKER
STRUCTURE = CRP +3.0
2. IF DIKE IS PART OF A L-HEAD
1. STAND ALONE DIKE = CRP +1.0
COMPLEX = CRP +3.0 (*)
3. IF DIKE IS PART OF A KICKER
STRUCTURE = CRP +3.0
2. IF DIKE IS PART OF A L-HEAD
1. STAND ALONE DIKE = CRP +1.0
CROSSING AND THE NEXT STRAIGHT-OUT DIKE DOWNSTREAM
(*) KICKER COMPLEX CONSISTS OF THE KICKER REVETMENT AT THE
CROSSING AND THE NEXT STRAIGHT-OUT DIKE DOWNSTREAM
(*) KICKER COMPLEX CONSISTS OF THE KICKER REVETMENT AT THE
100' FOR STRUCTURE 593.70 (ALL OTHERS: 25')
P O
D R
A Z
A
R
P O
D R
A Z
A
B
R E
A M
C
C
IE
S L
IK
M
R M
P R
-3
X
C O
R P
S O
F E
N G
IN
E
E R
S
O M
A H
A
N E
B R
A S
K A
H T
T P
/W
W W
.U S
A C
E .A
R M
Y .M
IL
A D
V E
R T
IS
E
M E
N T
S E
T
M
IS
S O
U R
I R
IV
E
R B
A N
K S
T A
B
IL
IZ
A
T
IO
N
N A
V
IG
A T
IO
N
P R
O
JE
C T
R E
P A
IR
S
T O
N E
S T
R U
C T
U R
E S
F O
R T
H E
S
E A
S O
N
R M
T
O
M
IS
S O
U R
I R
IV
E
R
IO
W
A
M
IS
S O
U R
I
N E
B R
A S
K A
A N
S I
D
J U
N E
W F
R
W F
C
X
X
F
IL
E N
U M
B E
R
P L
O T
S
IZ
E
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
O
L A
V E
N U
E
O M
A H
A
N E
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
P
P
P
P
BAS/OPT
C4.02
C O
U N
C
IL
B E
N D
S T
R U
C T
U R
E R
E P
A
IR
D E
T
IL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
OMAHA DISTRICT
OF ENGINEERS
US ARMY CORPS
SECTION
DEGRADED
TO CRP (+3)
REPAIR REVETMENTS
NOT TO SCALE
1SECTION
NOT TO SCALE
PILING
STONE FILL
EXISTING
STRUCTURE
EXISTING PILE
WITHOUT RIVERBANK
MOORING CLUMPS
STONE FILL REVETMENT
RIVERWARD SIDE
STRUCTURE AZIMUTH LINE
LANDWARD SIDE
1V ON 1 1/4 H
APPROX. SLOPE
EXISTING GROUND
STONE FILL
EXISTING GROUND
REVETMENT
EXISTING
NOT TO SCALE
SECTION 2
REVETMENT REPAIR TYPICAL - PLAN VIEW
REFERENCE PLANE (CRP)
CONSTRUCTION
1V ON 1 1/4 H
APPROX. SLOPE
4. REPAIR SEGMENT LENGTH AND ROCK TONS SHALL NOT BE EXPANDED BEYOND THE TABULATED AMOUNT FOR ANY STRUCTURE WITHOUT PRIOR APPROVAL OF THE COR.
PROCESS. AVOID INCREASING THE REVETMENT LAYER THICKNESS. THIS SHOULD RESULT IN A DENSE AND COMPACT STRUCTURE WITH THE DESIRED GEOMETRY AND MINIMAL VOIDS.
ACHIEVE THE DESIRED CROWN WIDTH AND ELEVATION. WHEN PLACING ROCK ON A REVETMENT IN AREAS WITH AN INTACT BANK BACKING, BUILD ABOVE FINAL GRADE AND TAMP THE ROCK DOWN TO ACHIEVE DESIGN ELEVATION. DO NOT DAMAGE THE REVETMENT OR UNDERLYING BANK MATERIAL WITH THIS
3. AT KICKER STRUCTURES AND REVETMENTS THAT HAVE LOST ALL BANK BACKING MATERIAL BEHIND THE REVETMENT, REPAIR PRACTICE IS SIMILAR TO A DIKE. REPAIR WILL CONSIST OF BUILDING THE STRUCTURE HEIGHT ABOVE THE FINAL GRADE IN THE REPAIR SECTION AND THEN TAMPING THE ROCK DOWN TO
UNDER NO CIRCUMSTANCES SHALL THE REVETMENT REPAIR BE TERMINATED TO CAUSE A LOWER NON-REPAIR SECTION THAT WOULD CREATE BANK EROSIVE CONDITIONS DUE TO REVETMENT ROCK HEIGHT.
GOOD QUALITY BANK MATERIAL BACKING WHEN PRACTICAL. GENERAL PRACTICE IS TO CONTINUE THE REPAIR SEGMENT UNTIL ELEVATIONS ARE WITHIN ONE FOOT. FIELD ADJUSTMENT MAY BE REQUIRED TO AVOID CREATION OF A LOWER NON-REPAIR SECTION THAT WOULD CREATE A FLOW PATH ALONG THE BANK.
2. REVETMENT STRUCTURE REPAIRS MAY INCLUDE ONE OR MORE SEPARATE SEGMENTS AND NOT THE ENTIRE STRUCTURE. FINAL REVETMENT GRADE IN THE REPAIR SECTION MAY BE HIGHER THAN AN ADJACENT UNREPAIRED SECTION. IT IS PREFERABLE THAT THE REPAIR SEGMENT TERMINATES IN AN AREA WITH
SIGNIFICANT MATERIAL DAMAGE. THIS SHOULD RESULT IN A DENSE AND COMPACT STRUCTURE WITH THE DESIRED GEOMETRY AND MINIMAL VOIDS. UNDER NO CIRCUMSTANCES SHALL THE LANDWARD DIKE END BE AT A LOWER ELEVATION THAN THE RIVERWARD END.
THE RIVERWARD END. NORMALLY THIS PROCESS WILL CONSIST OF BUILDING THE DIKE HEIGHT SLIGHTLY ABOVE THE FINAL GRADE IN THE REPAIR SECTION AND THEN TAMPING THE ROCK DOWN TO ACHIEVE THE DESIRED CROWN WIDTH AND ELEVATION. DO NOT TAMP THE ROCK IN A MANNER THAT RESULTS IN
1. FINAL CONSTRUCTED DIKE CROWN MUST MAINTAIN A LEVEL OR SLIGHT DOWNWARD SLOPE FROM THE BANK TO THE RIVERWARD END. CONTRACTOR SHALL REGRADE THE ENTIRE DIKE TOP AS NECESSARY TO PROVIDE MINIMAL SLOPE (MAXIMUM OF 1 FOOT) FOR ENTIRE DIKE LENGTH FROM THE BANK TO
STONE NOTES:
STONE FILL REVETMENT
ON RIVERBANK HIGHER THAN CRP +3
NOT TO SCALE
SECTION 2
PLANE (CRP)
REFERENCE
CONSTRUCTION
CONSTRUCTION REFERENCE PLANE (CRP)
WHEN DETECTED
ANCHOR PILE
VARIES
0.5'
10.5'
1V O
N
H
1V O
N
H
0.5'
THICKNESS
MINIMUM 2.5FT
1V
ON 3
H
AWAY FROM THE RIVER
MIN. SLOPE 1V ON 50H
AWAY FROM THE RIVER
MAX. SLOPE 1V ON 20H
1on 2
CROWN FILL
APP
R
O X.
S
LO
PE:
V O
N /2 H
GROUND
EXISTING
REPAIR REVETMENTS TO CRP (+3)
RIVERWARD SIDE
STRUCTURE AZIMUTH LINE
LANDWARD SIDE
SEE SHEET C3.01.
FOR REPAIR HEIGHTS,
TO CRP (+3)
REPAIR REVETMENTS
RIVERWARD SIDE LANDWARD SIDE
FILL
STONE
GROUND
EXISTING
VARIABLE
V A
R
IE
S
REFERENCE PLANE (CRP)
CONSTRUCTION
1V ON 1 1/4 H
APPROX. SLOPE
1V o n 1H
EXISTING GROUND
STRUCTURE AZIMUTH LINE
STONE FILL REVETMENT
ON RIVERBANK LOWER THAN CRP +3
NOT TO SCALE
SECTION 2
SPOIL MATERIAL
SEE C3 SHEETS
NOTCH LENGTH
CONSTRUCTION GUIDANCE.
35 31 20 PAR 2.1.1/2.3.1 FOR
REFER TO SPECIFICATION SECTION
PROVIDED IN TABLE & ON PLAN SHEETS.
4) GENERAL NOTCH LOCATIONS
ON THE THE C2 OR C3 SHEETS.
STRUCTURE RIVER MILE IS LISTED
3) APPROXIMATE
AND GENERAL REPAIR GUIDANCE.
"STRUCTURES" FOR DEFINITIONS
2) SEE SPECIFICATION 35 31 20
AVAILABLE ON THE C2 OR C3 SHEETS.
1) STRUCTURE REPAIR DIMENSIONS
NOTES:
REPAIR TOP WIDTH.
SEE SHEET C3.01 FOR
REPAIR TOP WIDTH.
SEE SHEET C3.01 FOR
SEE SHEET C3.01.
FOR REPAIR HEIGHTS,
SEE SHEET C3.01.
FOR REPAIR HEIGHTS,
REPAIR TOP WIDTH.
SEE SHEET C3.01 FOR
LAYER THICKNESS
PROVIDE MINIMUM 3 FOOT
REVETMENT OVERLAY
TO CRP (+3)
REPAIR REVETMENTS
TO CRP -3
MINIMUM 6FT DEPTH
CONSTRUCT OVERLAY
REFERENCE PLANE (CRP)
CONSTRUCTION
EXISTING GROUND
BANK TOE
EXISTING GROUND
STONE FILL REVETMENT OVERLAY
ON RIVERBANK WITH DETERIORATED ROCK
NOT TO SCALE
FILL
STONE
1V ON 1 1/4 H
TIE-IN APPROX. SLOPE
EXISITNG REVETMENT
B A N
K S
LO
P E V
A R
IE
S
QUALITY VARIES
EXISITNG REVETMENT
ENDS AT CRP -3 TO -5
DETERIORATED ROCK GENERALLY
BACKSLOPE LENGTH
TIE-IN AND MINIMIZE
A SOLID PLATFORM FOR OVERLAY
BUCKET WORK TO PROVIDE
FOR OVERLAY BY MINOR
PREPARE REVETMENT
AS NEEDED:
P O
D R
A Z
A
R
P O
D R
A Z
A
B
R E
A M
C
C
IE
S L
IK
M
R M
P R
-3
X
C O
R P
S O
F E
N G
IN
E
E R
S
O M
A H
A
N E
B R
A S
K A
H T
T P
/W
W W
.U S
A C
E .A
R M
Y .M
IL
A D
V E
R T
IS
E
M E
N T
S E
T
M
IS
S O
U R
I R
IV
E
R B
A N
K S
T A
B
IL
IZ
A
T
IO
N
N A
V
IG
A T
IO
N
P R
O
JE
C T
R E
P A
IR
S
T O
N E
S T
R U
C T
U R
E S
F O
R T
H E
S
E A
S O
N
R M
T
O
M
IS
S O
U R
I R
IV
E
R
IO
W
A
M
IS
S O
U R
I
N E
B R
A S
K A
A N
S I
D
J U
N E
W F
R
W F
C
X
X
F
IL
E N
U M
B E
R
P L
O T
S
IZ
E
O M
A H
A D
IS
T
R
IC
T
C
A P
IT
O
L A
V E
N U
E
O M
A H
A
N E
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
P
P
P
P
BAS/OPT
C4.03
R E
V E
T M
E N
T R
E P
A
IR
T Y
P
IC
A L
D E
T
IL
File details come from the government source that posted it. Updated .