This document is a solicitation for a Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP). The solicitation is exclusively for small businesses and seeks contractors to perform river structure maintenance and navigation channel repair between River Mile 498.2 and River Mile 750.0. The contract has a total value of $49 million, with a five-year performance period from 15 July 2025 to 14 July 2030, and individual task orders ranging from $3,000 to $19 million.

The project involves various construction services including river work, dredging, habitat creation, stabilization, rock placement, and earth moving activities. Work will primarily be executed from floating plant with some land access required. Contractors must have capabilities for stone placement, river navigation, and equipment operation. Proposals are due by 31 July 2025 at 2:00 PM CST, with evaluation based on technical capabilities, stone quality, past performance, and pricing. The primary NAICS code is 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45 million.

View the file

Other files for this federal contract opportunity

Other files attached to Bank Stabilization and Navigation Project (BSNP) River Structure Maintenance Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Amendment 0001 for W9128F25R0043_BSNP MATOC Solicitation.pdf PDF
BSNP MATOC Contractor Sign In Sheet 07152025.pdf PDF
W9128F25R0043_BSNP MATOC Specifications for BASE 4of4.pdf PDF
W9128F25R0043_BSNP MATOC Specifications for TO 2of4.pdf PDF
W9128F25R0043_BSNP MATOC Specifications for TO 2of4.pdf PDF
MRPO00101_2025 BSNP MATOC Drawings 3of4.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)

RETURN WITH OFFER: INFORMATION REQUIRED BY SECTION 00 10 00 (SF1442 AND PROPOSING SCHEDULE), SECTION 00 22 00, AND SECTION 00 45 00 OF THE MATOC CONTRACT AND SECTION 00 10 00 (SF1442 AND PRICING SCHEDULE) OF TASK

ORDER NO. 0001.

THIS SOLICITATION IS RESTRICTED TO SMALL BUSINESS CONTRACTORS.

CLINTON E RUSSELL 402-995-2086

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Jun-2025

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________480 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Per Task Order

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________31 Jul 2025 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U.S. ARMY CORPS OF ENGINEERS, OMAHA DIST

CONTRACTING OFFICE

1616 CAPITOL AVENUE

OMAHA NE 68102-4901

W9128F

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128F25R0043 78

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9128F25R0043

Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 49,000,000 Job Missouri River BSNP MATOC IDIQ

FFP

Missouri River Bank Stablization Navigation Program MATOC IDIQ . Task Orders will be placed against this IDIQ and will consume this $49,000,000.00 total capacity. Ordering Period 15 July 2025 - 14 July 2030.

FOB: Destination

PSC CD: Z2KB

NET AMT

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

1.00 $3,000.00 49,000,000.00 $49,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

1.00 $3,000.00 49,000,000.00 $19,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

SEED PROJECT PRICE SCHEDULE

PRICE SCHEDULE

BASIC

Item Estimated Unit No. Description Quantity Unit Price Amount

0001. Entire work, complete, for quarried stone, ‘Basic - N’ Sheet 3.01 as shown on the drawings and in the specifications from River Mile 648 to 732 (7 Structures) 20,438 Tons $_________ $___________

0002. Entire work, complete, for quarried stone, ‘Basic - CB’ Sheet 3.01 as shown on the drawings and in the specifications from River Mile 572 to 648 (1 Structure) 2,389 Tons $_________ $___________

0003. All remaining work Except for Option

Items listed below 1 Job XXX $___________

TOTAL BASIC AMOUNT (Items 0001 thru 0003) $_______________

OPTION 1

0004. Entire work complete, for quarried stone, ‘Option 1’

Sheet 3.01 as shown on the drawings and in the specifications from River Mile 498 to 572 (2 Structures) 4,892 Tons $_________ $___________

0005. All remaining work

TOTAL OPTION AMOUNT (Items 0004 thru 0005) $_______________

OPTION 2

0006. Entire work, complete, for quarried stone, ‘Option 2’ Sheet 3.01 as shown on the drawings and in the specifications from River Mile 498 to 572 (6 Structures) 6,693 Tons $_________ $___________

0007. All remaining work

TOTAL OPTION AMOUNT (Items 0006 thru 0007) $_______________

TOTAL BASIC AMOUNT (Items 0001 thru 0003) $_______________

TOTAL AMOUNT BASIC PLUS OPTIONS (Items 0001 thru 0007) $_______________

Notes:

1. The quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to Contract Clauses "Variation in Estimated Quantity."

2. Prices must be entered for all items of the schedule. Total price amount submitted without unit prices being entered on individual items where identified in the Price Schedule will be rejected.

Extensions will be subject to verification by the Government. In case of variation between the unit prices and the total price, the unit prices will be considered the price submitted.

3. A modification to a price which provides for a single adjustment to the total amount proposed should state the application of the adjustment to each respective unit price and lump sum price affected. If the modification is not so apportioned, the single adjustment will be applied to Item No. 0003.

4. See Section 01 22 00 MEASUREMENT AND PAYMENT for additional information.

5. Option Items 0004 thru 0005 and 0006 thru 0007 the sub-items under options will be awarded in full or not at all. If the Option Items are awarded, the completion date of 480 calendar days from issuance of the Notice to Proceed will not be extended.

SPECIFICATIONS FOR TASK ORDER

SPECIFICATION FOR SEED TASK ORDER ATTACHED TO SOLICTATION

SEE ATTACHMENT # 1

Specifications Task Order 01 (W9128F25R0043)

DRAWINGS FOR TASK ORDER

DRAWINGS FOR SEED TASK ORDER ATTACHED TO SOLICTATION

SEE ATTACHMENT # 2

Drawings Task Order 01 (W9128F25R0043)

SPECIFICATIONS BASE MATOC

SPECIFICATIONS FOR BASE MATOC ATTACHED TO SOLICTATION

SEE ATTACHMENT # 3

Specifications W9128F25R0043 BSNP MATOC

STATEMENT OF WORK

Scope of Work Missouri River, Bank Stabilization and Navigation Project (BSNP) MATOC

1. Contract Definition

This contract is for a $49M Missouri River, Bank Stabilization and Navigation Project (BSNP) and Chute Repairs for construction work in/on/around/adjacent to the Missouri River Valley from Rulo, NE (River Mile 498.2) to Lower Ponca Bend (River Mile 750.0).

2. Scope of Work

The scope of this work is for work along the Missouri River, Bank Stabilization and Navigation Project (BSNP) and Chute Repairs for construction work in/on/around/adjacent to the Missouri River Valley from Rulo, NE (River Mile 498.2) to Lower Ponca Bend (River Mile 750.0). The work would include maintenance of riverbanks, navigation channels and repair of levees excavation and the placement of stone and the construction of needed chute features. A wide range of construction services including river work, dredging, habitat creation, stabilization, rock placement, earth moving activities and incidental related work. Building a variety of structures including, but not necessarily limited to, revetments, roots, reverse sills, chevrons, dikes, L-heads, and kickers. New structures would be less common as the focus is repairing and maintaining the functionality of the original structures. The preponderance of the work can be executed with river access only, but some must be completed ashore with land access.

3. Eligibility

The competition of this contract is restricted to all Small Business (SB) concerns. The primary North American Industry Classification System (NAICS) code is 237990 (Other Heavy and Civil Engineering Construction) with a size standard of $45M.

Competitive RFP will be issued to all members of the pool and a firm fixed price Task Order will be awarded to the contractor that meets the selection process outlined in the RFP for Task Order. Prior to task order award, the Government will provide all members of the selected MATOC pool a fair opportunity to be considered for each order exceeding $3,000 (FAR 16.505(b)(1)(i)) unless an exception to fair opportunity under FAR 16.505(b)(2) applies.

4. Total Amount of Contract

The total capacity of this contract is $49M and there is no limit on the number of Task Orders that can be issued as long as there is available capacity, and no single Task Order can exceed $19M. The total amount of capacity among all contractors awarded contracts under this contract shall not exceed $49M.

5. Guaranteed Contract Amount

Each contract awarded under this solicitation shall have a guaranteed minimum amount of $3,000.00. The guaranteed minimum will be met with the obligation of a Task Order meeting or exceeding the guaranteed amount or will be funded on the basic contract.

6. Performance Period

This MATOC will have a basic performance period of Five (5) years.

7. Pricing

The Government reserves the right to request certified cost or pricing data; or information other than certified cost or pricing data from the contractor at the task order level to assess the reasonableness of the proposed task order pricing.

When requests for proposal (RFPs) for task order requirements are issued, offerors must provide sufficient detail with regard to labor categories and hours, material, and travel to allow an evaluation of the proposed cost. Travel costs shall not exceed the amounts allowed under the Joint Travel Regulation. Profit/fee is not allowable on travel costs.

8. Procurement Contracting Office The U.S. Army Corps of Engineers, Northwest Division, Omaha District (CENWO) is the Procurement Contracting Office and no other agency can make changes to the Base Contract. Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

Section 00 21 00 - Instructions

INSTRUCTIONS TO OFFERORS

Section 00 21 00 - Instructions to Offerors

INSTRUCTIONS TO OFFERORS (RFP)

PART 1 GENERAL

1. GENERAL SOLICITATION INFORMATION:

This Request for Proposal (RFP) is for solicitation of a Multiple Award Task Order Contract (MATOC). This solicitation is restricted to small business participants only.

2. SUBMISSION DEADLINE:

Offers shall be submitted as stated and by the time and date as specified in Block 13, Page 1 of the 1442 Solicitation. Only an electronic proposal will be accepted.

ELECTRONIC DELIVERY TO:

Contract Specialist – Clinton Russell at clinton.e.russell@usace.army.mil

Contracting Officer – Nadine Catania at nadine.l.catania@usace.army.mil

See Section 00 22 10 SUPPLEMENTARY INSTRUCTIONS (SUBMISSION REQUIREMENTS AND EVALUATION) for additional submission details.

3. COPIES OF SOLICITATION DOCUMENT AND AMENDMENTS:

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the SAM.gov website. https://sam.gov/

3.1.It shall be the Contractor's responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation.

There will be no public opening of the proposals received as a result of this solicitation.

4. OFFEROR'S QUESTIONS AND COMMENTS:

Questions and/or comments relative to these documents should be submitted via Bidder Inquiry as indicated below.

For any other administrative matters regarding this RFP, please contact:

Contract Specialist – Clinton Russell at clinton.e.russell@usace.army.mil and

Contracting Officer – Nadine Catania at nadine.l.catania@usace.army.mil

5. BIDDER INQUIRY

Questions relating to the proposal are to be submitted via Bidder Inquiry in ProjNet at:

https://www.projnet.org/projnet/ No Later Than 4pm Central Time on 21 July 2025, in order that they may be given consideration or actions taken prior to receipt of offers. The Bidder Inquiry system is to be used to ask and receive answers to all non-proprietary questions.

To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via ProjNet email notification after an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet.

The Solicitation Number is: W9128F25R0043

The Bidder Inquiry Key is: 52DTRD-48EPCZ

a. Registration for ProjNet Bidder Inquiry Access

If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret

Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

b. Entering Bidder Inquiries in ProjNet Bidder Inquiry System

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

8. Follow online screen instructions to enter specific bidder inquiries for the project.

c. The Bidder Inquiry System will be unavailable for new inquires as stated above in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

6. GENERAL DESCRIPTION OF WORK

The work includes all work required for a wide range of construction services including river work, dredging, habitat creation, stabilization, rock placement, earth moving activities and incidental related work located along the Missouri River Valley from Rulo, NE (River Mile 498.2) to Lower Ponca Bend (River Mile 750.0).

7. PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION AND CONTRACT

AWARD

See Section 00 22 00 SUBMISSION REQUIREMENTS AND EVALUATION

7.1. In order to be considered for award of a contract for the requirements of this solicitation, the Offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposal shall consist of two Volumes:

Volume 1, Technical Proposal / Past Performance

Factor 1 – Technical Capabilities- Construction Equipment, Staff, and Rock Placement Capacity

Factor 2 – Stone Quality and Capacity Factor 3 – Past Performance

Volume 2, Price Proposal Factor 4 – Price Proposal, consisting of an original signed

Standard Form 1442 “Solicitation, Offer, and Award”;

providing a price for all line items for the first Task Order in the corresponding price schedule and price breakout; and acknowledgment of all amendments to the solicitation.

Proposal Characteristics Each Volume shall contain a table of contents. All text must be legible and easily read. The page size of the Offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced. Margins (1-inch) shall be clean and clear. Offerors shall limit Volume 1, Technical / Past Performance Proposal, to a maximum of 40 pages. Pages in excess of 40 pages will not be evaluated. Each Volume of the proposal shall be identified on the cover by the Solicitation Number, project title, name, address, and telephone number of the Offer, and one of the following on each volume in bold letters:

VOLUME 1: TECHNICAL / PAST PERFORMANCE PROPOSAL

VOLUME 2: PRICE PROPOSAL

7.2. The Proposal’s clarity, organization and cross referencing are mandatory. No material shall be incorporated by reference. General cross-references or cross referencing guides will not be considered appropriate cross-references.

7.3. The Proposal shall be organized by factors. They shall be described in separate sections, appropriately tabbed in a report form. All pages of each factor shall be sequentially numbered. Elaborate or lengthy presentations are not necessary or desirable.

7.4. The Technical narrative shall be written in a way to demonstrate a clear understanding of the requirements, but should not simply parrot the specifications. The Technical proposal shall not refer the reviewer to information contained in the Price proposal.

7.5. Additional Information to Be Provided in Volume 2.

Pro Forma Requirements. This information should be submitted in an envelope labeled “Pro Forma Requirements”. Provide an original and two copies.

This information consists of the following:

- The Offeror will submit a cover letter containing:

1) Solicitation number.

2) Name, address, email, and telephone and fax numbers of the Offeror.

3) Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this RFP.

4) Name, title and signature of the person authorized to sign the proposal.

5) A statement specifying agreement with all terms, conditions and provisions included in the RFP.

- The Offer (the SF1442) duly executed with an original signature by an official authorized to bind the company. Include the Offeror’s DUNS number in block 14.

- Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).

- The completed Section 00 45 00 of the RFP (Representations and Certifications) and the

- Payment and Performance Bonds are required for each Task Order for which the Offeror is submitting a price proposal.

- Financial statement and bank letter that verify that sufficient funds will be available to finance the work.

8. JOINT VENTURES

8.1. Joint Ventures shall submit the following additional documentation regarding their business entities:

A certified copy of their Joint Venture agreement.

A detailed statement outlining the following in terms of percentages, where appropriate:

The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.

The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the joint venture and perform the duties necessary to complete the work.

The structure of the joint venture and decision-making responsibilities of the joint venture parties in terms of who will control the manner and method of performance of the work.

The bonding responsibilities of the joint venture parties.

Identification of the key personnel having authority to legally bind the joint venture to subcontracts and state who will provide or contract for the labor and materials for the joint venture.

Identification of party maintaining the joint venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the joint venture.

Identification of party furnishing the facilities, such as office supplies and telephone service.

Identification of party having overall control of the joint venture.

Joint Venture CAGE code.

8.2. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual joint venture parties and identify the party, or hired as employees of the joint venture.

8.3. If one of the joint venture parties possesses experience and/or past performance as a Federal Government contractor or as a Corps of Engineers contractor, that experience and/or past experience will be included as the experience and/or past experience of the joint venture.

8.4. If subcontractor experience is submitted for consideration as part of the proposal, the offeror should include a commitment signed by offeror and subcontractor certifying that if a contract is awarded resulting from the proposal, the parties commit to joint performance as proposed. If the signed commitment is not fully executed by both parties and provided with the Past Performance Proposal, subcontractor references will not be evaluated or considered.

8.4.1. Affiliate companies, sister companies, teaming arrangements, joint venture agreement, etc., will be considered provided that sufficient documentation is included in the proposal. The primary offering entity must demonstrate that the affiliate will perform significant and critical aspects of the contract if awarded.

Documentation includes a copy of the signed arrangement such as documented affiliation, a copy of the teaming agreement, a copy of the joint venture agreement, etc.

9. BASIS FOR AWARD

9.1. The Government intends to establish a multiple award ID/IQ contract that will enable it to allow members of the contract pool to compete for future task orders. The Government intends to award a target of five (5) ID/IQ contracts from this solicitation to the responsible offeror(s) whose proposal conforms to the solicitation and is determined to be the Lowest Priced/Technically acceptable (LPTA) value to the Government. Award will be made on the basis of the lowest evaluated price of those proposals meeting or exceeding the acceptability standards for non-cost factors.

The Government reserves the right to award fewer contracts, more contracts, or none at all based on the proposals received. The Government intends to make its decision without discussions, but reserves the right to do so if the Contracting Officer determines it is necessary.

9.2. The Contracting Officer may establish a competitive range and conduct discussions with all the most highly rated proposals, unless the range is further reduced for purposes of efficiency pursuant to FAR 15.306(c)(2). At the conclusion of discussions, each offeror still in the competitive range shall be given an opportunity to submit a final proposal revision.

9.3. The Government will base its evaluation on the following factors.

9.4. There are two Technical Factors – Technical Capabilities, Stone Quality and Quantity, and one Past Performance Factor. All non-price factors are of equal importance.

Proposals are evaluated for acceptability, but not ranked using the non-price factors.

In order to be considered awardable, there must be an acceptable rating in every non-price factor. For the purpose of awarding the base ID/IQ contract(s), the price factor will be determined using the price submitted by the offeror(s) for the seed project provided along with this solicitation.

9.5. The first task order is included with this package. The Government intends to award a task order concurrently or very soon after award of the base contract(s). Offerors must submit a price for the first task order in order to be considered eligible for award of a base ID/IQ contract.

9.6. As stated, award of the base ID/IQ contracts will be based on the evaluation of pricing for the first task order only. The first task order will be awarded to the lowest price offered for the first task order from among those offerors selected for a base contract award.

10. SUBMISSION REQUIREMENTS

10.1 VOLUME I – FACTOR 1 – CONSTRUCTION EQUIPMENT, STAFF, AND ROCK

PLACEMENT CAPABILITY

10.1.1 The Contractor shall prepare and submit a narrative demonstrating adequate floating plant and equipment to perform the work. The narrative shall not exceed three pages in length.

The contractor shall submit copies of all licenses and certificates required in Factor 1 in addition to the narrative. The total narrative for Factor One shall be no more than three pages in length and shall include, as a minimum, the following elements and sub-elements.

10.1.2 The narrative shall identify ownership or access to floating plant equipment, pilots, operators, and crew including the following:

A. Floating plant consisting of tow vessels, material barge(s), work barge(s), excavator(s), support vessels.

1. At least two tow vessels, 27 feet long or longer.

2. 4 equipment barges.

3. Mechanisms to load and place rock (loaders and excavators).

4. Support vessel such as a skiff.

5. Equipment type, manufacturer, make, model, year, dimensions, draft, propulsion engine horsepower, maximum load capacity.

B. Tow Vessel Pilots and Licenses. Identify all tow vessel pilots that may operate the tow vessels. All pilots shall be appropriately licensed. Contractor shall provide copies of all proposed tow vessel pilots’ current license.

C. Certificates of Inspection for vessels listed in 10.1.2.A

10.1.3 The narrative shall also indicate the experience of the contractor and a description of means and methods for transporting to the placement locations on the Missouri River.

The narrative shall include a means and methods paragraph(s) that provides an overview discussion that demonstrates the Contractor understands the necessary means and methods to accomplish the work. Relevant information would include assumed means and methods of transport, weekly or monthly placement rates, and transport time from the rock source. Capability shall account for an annual placement period that matches the navigation flow support season on the Missouri River. The annual placement period will include less than 8 months, from 1 April through 20 November for the entire reach of river.

10.1.4 Provide in the proposal, a list and quantity of equipment with capabilities that the

Offeror’s shop(s) currently possess in accordance with Technical Capabilities listed below. The equipment list provided as part of the proposal shall include; type of equipment (make, model, year, and relevant accessories (draft, HP, bucket type/capacity, reach, load limits, etc.), number available, description providing narrative showing equipment meets functional needs of project. Proposals will be considered technically acceptable if the Offeror provides a list and quantity of equipment to be used and has all of the following capabilities:

A. Must have barge(s) that are equipped to deliver and operate equipment which allows for the placement of stone to repair or modified specific river rock structures.

B. Must have towboats and barge(s) able to access, in low draft and/or high flow areas behind or around structures with a draft of 6 feet of water for loaded rock and equipment barges, and tow boats.

C. Must be able to use mooring piles, anchors, or spud barges to obtain proper alignment and configuration while placing stone.

D. Must have dock barge or similar loading equipment to ensure proper rock loading. Load systems and/or methods that do not prevent rock loss into river, and/or causes channel obstructions and/or impede commercial navigation are not acceptable.

E. Equipment used to place stone must be capable of accurately placing stone on structures and accurately placing stone below water to a depth of 20 feet below water surface.

10.1.5 If an Offeror is not currently in possession of the required equipment, Offeror must adequately demonstrate they can acquire the equipment in time to perform the work required under the first task order, which is to be awarded concurrently with award of the base ID/IQ contract, and demonstrate they can acquire the equipment required to satisfy all requirements in the base contract for any subsequent task order. Offerors must acquire the requisite equipment through ownership, lease, subcontract, etc., in time to perform the work.

10.2 VOLUME I – FACTOR 2 – STONE QUALITY AND CAPACITY

10.2.1 The contract will require placement of stone meeting USACE specifications within the

Missouri River at multiple locations. Specific structures, and locations will be provided with the seed project and subsequent task orders. All stone to be placed in all locations in the seed project and following task orders will be subject to the specification provided in seed task order, specification 35 31 19 of this solicitation requires investigations and a narrative describing the results of the investigations. The investigations and the narrative shall address the items specified below in the Factor 2 submission requirements. The current stone specification, in its entirety, is provided for reference in seed task order, specification 35 31 19.

10.2.2 The Contractor shall review and fully comprehend the specification. Questions should be submitted via Projnet, as described in the earlier portion of this solicitation. Contractors shall expect the Corps to perform quality testing of the stone supplied during performance of any Task Orders issued from a resulting contract. The seed project and task order Plans and Specifications will include additional and substantial project requirements. Submittal and acceptance of the Contractor listed stone sources does not imply any Government acceptance of Contractor identified stone sources for project use.

10.2.3 Submission Requirements:

A. Narrative. The Contractor shall provide a brief narrative, no more than 1 page in length, summarizing the stone investigation and including all the following items.

B. The narrative shall identify and include the names of the quarries and contact information for the representatives of the quarries that were coordinated with during the investigation.

C. The narrative shall indicate whether the contractor has secured a preliminary agreement with a quarry that can supply or has previously supplied stone that meets the requirements (or similar requirements) of the specification in seed task order, specification 35 31 19.

D. Previously supplied stone must have been supplied within the last one year.

10.2.4 Testing Results - All stone that will be allowed for use on the job must meet the stone quality specification requirements in seed task order, specification 35 31 19. In addition to the 1-page narrative, the Contractor shall also provide available stone test results as demonstration of quality. However, no new testing is required for this submittal. Offerors who fail to provide previous, similar test results, may be rated as unacceptable. Test results shall be substantially similar to those required in the seed task order, specification 35 31 19, Stone specification.

10.3 VOLUME I – FACTOR 3 – PAST PERFORMANCE

10.3.1 OBTAINING PAST PERFORMANCE RECORDS

A. Accessing Past Performance information directly from Contractor Performance

Assessment Reporting System (CPARS) website at https://www.cpars.gov/ for CCASS completed before 27 June 2014 and for merged CPARS completed after 1 July 2014.

CPARS is an electronic repository of performance information collected by all the major federal performance reporting systems and can be accessed at the website.All Department of Defense (DoD) employees (military and civilian), including DoD Contractors that are working on site (military/government facilities) or contractors working offsite using Government Furnished Equipment (GFE) are required to use certificates from DoD Public Key Infrastructure (PKI) to access CPARS. If the contractor doesn't work on site or with GFE they are encouraged to obtain and use a certificate from an External Certificate Authority (ECA). For DoDusers, the use of PKI Login is Mandatory. Federal and Contractor users can use the PKI login category if they have PKI.

B. External Certificate Authority

1. External Certificate Authorities (ECAs) and Interim External Certificate Authorities (IECAs) provide digital certificates to the DoD's private industry partners, contractors using their own equipment or working in non-government facilities, allied partners, and other agencies.

2. Additional information about the PKI certificate is at https://www.cpars.gov/pki_info.htm web page. You will also need your UEI number and Marketing Partner Identification Number (MPIN) to log onto CPARS. The MPIN number was selected by whoever registered your company in the System for Award Management (SAM) Registry at https://sam.gov. If you do not know your MPIN number, you will need to contact the SAM help desk by emailing them from the email link on the SAM web page. Please be aware that they will only release the MPIN number to the person who originally registered your company. Additional instructions on locating your MPIN is located in the Frequently Asked Questions (FAQs) section under the Help tab, or –

C. Past Performance Questionnaires (PPQs) may be used to provide or supplement a firm’s past performance with other than U.S. Governmental clients (see Attachment 3). Contact your client point of contact (POC) for the project you need a past performance record and request the POC to complete the PPQ. The PPQ included in this solicitation is provided for the Offeror to submit to the client for each project the Offeror may need a past performance record for to meet the requirements in this synopsis. Ensure correct phone numbers and email addresses are provided for the client POC. Completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). It is the Offeror’s responsibility to follow-up with client POCs to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Contract Specialist, via email at clinton.e.russell@usace.army.mil prior to proposal closing date. Offerors must not incorporate by reference into their proposal PPQs previously submitted for other RFPs; this does not preclude an Offeror submitting a previously completed PPQ as long as the full PPQ is submitted and completed in its entirety. This also does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If a PPQ is to be submitted for a project, the complete PPQ must be submitted (either by the client POC or the Offeror) prior to proposal closing date.

D. The Government reserves the right to contact any persons who may be knowledgeable about the project or projects (this is not limited to contracts identified by the offeror) submitted in an offeror’s proposal. In addition, the Government may review and take into consideration other sources of information pertinent to the evaluation of the offeror’s Past Performance, including both the previous experience projects and other similar projects performed by the offeror. Other sources may include, but are not limited to, Past Performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all Commercial and Government Entity (CAGE)/DUNS numbers of team members (partnership, Joint Venture, teaming arrangement, or parent firm/subsidiary/affiliate) identified in the Offeror's proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

E. While the Government may elect to consider data from other sources, the burden of ensuring detailed, current, accurate and complete Past Performance information rests with the offeror.

10.3.2 The Offeror shall provide a minimum of three (3) projects and a maximum of five (5) projects completed within the last five (5) years that demonstrate experience as they relate to Factor 1- CONSTRUCTION EQUIPMENT, STAFF, AND ROCK PLACEMENT CAPABILITY. For each project, provide the following: Project name, a short description of the work, contract amount, owner’s name and telephone number, completion date and percentage of project completed using your own forces.

The projects shall be of similar type and complexity as this project. Acceptable projects of similar type and complexity are projects valued over $1,000,000 that were performed from a floating barge, involved rock placement, and demonstrates experience in at least one of the following areas:

A. Placing stone on specified structures and under water to a specified depth using floating plant within an inland river system.

B. Using barges with equipment to draft 6 feet of water or less to access areas behind or around structures with faster moving water.

C. Loading barges safely with mobile loading system or dock barge.

10.3.3 If the Offeror represents the combining of two or more companies, state if this project represents a joint venture of the listed parties.

10.3.4 The contractor must submit signed copies of all interim and final ratings received during the time period of March 1, 2018, to May 1, 2023 as included in the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Contractor Assessment Reporting System (CPARS) or other databases using all CAGE/UEI numbers of team members (joint venture, teaming arrangement, or parent company/subsidiary/affiliate) that will be performing the work identified in Factor 1 above. All ratings must include the contact information, e-mail or phone, of the rating official.

10.4 VOLUME II – FACTOR 4 – PRICE

Provide a complete price in the proposal, the Price Proposal Schedule, and Price Breakout Schedule from the first Task Order. Proposed prices must be entered for all items of the Price Proposal Schedule and a detailed price breakout must be submitted.

Price will be analyzed using the price analysis techniques provided in FAR 15.404- 1(b). In the event of a discrepancy between the unit price and the price total, the unit price will prevail.

ORDER INSTRUCTIONS TASK ORDER

ORDERING PROCEDURES FOR CONSTRUCTION TASK ORDERS

I. GENERAL:

DELIVERY OR PERFORMANCE REQUIREMENTS: Performance Requirements will be established in each Task Order scope of work.

Individual Task Orders contemplated under this solicitation may range from $3,000 to $19,000,000.

The minimum Task Order amount is $3,000 for any given Task Order. When the Government requires supplies or services covered by this contract in amount of less than $3,000 for any one Task Order, the Government is not obligated to purchase, nor is the Contractor obligated to furnish those items under the contract.

II. ORDERING PROCEDURES:

1) ORDERING: To clarify the contract clause 252.216-7006 "Ordering" the following shall apply:

a. When the Government requires work under the contract, a Request for Task Order Proposal (RFTOP) will be issued to all the members of the MATOC pool. RFTOP will normally be issued electronically by email but may be placed via mail, telephone, facsimile, or other electronic means.

b. The Government will not be obligated to reimburse the contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs, except as authorized by duly executed Task Orders.

c. The Government request for proposal will delineate the: (1) scope of work; (2) location of work;

(3) time period(s) within which the work must be performed. (4) additional technical specification or drawings and (5) a price schedule.

d. Task orders will be evaluated for technical acceptability. The contractor shall prepare a firm fixed price proposal to perform the work and submit his/her proposal in writing to the individual and within the time specified in each request for proposal.

e. Each task order will be discussed by the contractor and the Contracting Officer, as necessary, to develop a mutual understanding of:

1) Type and scope of work to be accomplished, including accuracy criteria.

2) End product required by the Contracting Officer.

3) Existing site conditions, survey control, and other available data.

4) A fair and reasonable price to perform the work

f. Time periods within which required work must be accomplished will be defined in each task order placed against the basic contract. Each task order will contain the agreed to scope of work, project to be performed, specific deliverable items, and the final negotiated fixed price for performing the work.

g. Each proposal submitted will be evaluated for fair and reasonable price to perform the work.

e. Upon award the awardee will be notified and all members of the MATOC pool will be notified of the award decision electronically by email.

f. The need for Pay and Performance Bonds will be determined at the Task Order level and will be IAW FAR

Part 28. Awardee of the Task Order will need to provide the required bonds with 10 days of award.

2) NOTICE TO PROCEED:

The contractor shall commence work upon receipt of a properly executed Task Order or modification to a task order and after Payment and Performance bonds are received and found to be legally sufficient. The contractor shall complete the work within the time specified in each task order or modification to each task order.

3) UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL:

Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of the Task Order of the base contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.

4) PERIOD OF PERFORMANCE: The Base Contract ordering period shall begin upon the date of contract award and shall, unless terminated sooner in accordance with the termination contract clause continue for a period specified. Task Orders shall be issued during the ordering period in the base contract unless the terms of the contract are extended depending on the needs of the government.

5) OBLIGATION BY THE GOVERNMENT: The Government is not obligated to fund the maximum cumulative dollar amount of this contract.

6) DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE(S) (COR): Designation will be made upon award of each Task Order and a copy of the designation letters will be furnished to the contractor. Limits of authority are described in each designation letter.

7) AUTHORIZED REPRESENTATIVE OF THE CONTRACTOR:

The contractor shall designate a member or employee who will act as project manager for the base contract or during the performance of a Task Order. This official shall be the liaison between the contractor’s work forces and the Government.

8) OPTION(S) WITHIN TASK ORDERS AND/OR MODIFICATIONS: The Government may require performance of additional work as identified as an option item in individual Task Orders or by a Modifications to Task Orders, at the price stated. Contractor will be notified of the Modification to the Task Order by the government. The Contracting Officer may exercise the option by written notice to the Contractor prior to completion of the work previously authorized under each appropriate task order.

9) GENERAL WAGE DECISION: Davis Bacon Act wage rates will be identified for all Task Orders at the time of request for proposal is issued under this contract and updated at the time of award of the Task Order.

10) AVAILABILITY OF FUNDS (REFERENCE FAR 52.232-18): The Government may request proposals for Task Orders for which funding is not currently available for the award. If funds fail to become available for the award of the project, the event shall not constitute a basis for equitable adjustment under this contract. If after the Government receives a contractor's proposal and funds are not available, the Government may request an extension of the contractor's proposal acceptance period without further competition for the project or may re-solicit the project at its option. If the proposal acceptance period is not extended by the contractor the project may be re-solicited.

TASK ORDER POP AND LDS

INSTRUCTIONS FOR TASK ORDER LDs & PERIOD OF PERFORMANCE

As per base MATOC LDs and POP will be specified per individual Task Order.

For Task Order # 1 the Period of Peformance is the following:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 480 calendar days. * The time stated for completion shall include final cleanup of the premises.

(End of clause)

For Task Order # 1 the LIQUIDATED DAMAGES are as follows:

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)