This is a Manufacturing Qualification Requirements document for the LF Chiller (Part Number EAS80200-101, NSN 4130015475222), a component of the Minuteman III ICBM Environmental Control System (LGM-30). The document, effective June 12, 2025, establishes the mandatory qualification standards that potential manufacturers must satisfy to become approved sources for this defense system component.
Offerors must complete nine qualification requirements to achieve approved source status: submit a prequalification notice to the appropriate government Small Business Office or contracting officer; certify possession of required manufacturing, inspection, testing, packaging, and storage facilities; verify a complete technical data package including drawings EAS80200 and EAS82000 with all change notices; manufacture the item in conformance with ESA-approved engineering data and DFARS Unique Identification requirements; prepare and submit a qualification test plan detailing verification of performance, environmental, mechanical, and quality assurance requirements for 414 SCMS approval; provide a pre-contract award qualification article for form, fit, and function evaluation with government notification of pass/fail results within 60 days; and achieve full qualification before the contract award date. The estimated qualification cost is $1,016,480, with an estimated completion timeline of 500 days based on component complexity and government review processes. The document notes that qualification does not guarantee contract award, and successful offerors may still be required to provide a post-contract award first article exhibit. Three source qualification waivers are available for suppliers with prior government supply history, successor entities of previously qualified manufacturers, or those with access to an EAS82000 Brine Chiller Test Stand.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPI.pdf | ||
| PackagingSOW.pdf | ||
| EDL.pdf | ||
| SPRHA2-26-R-0678 CUI.pdf | ||
| CDRLCPP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURING QUALIFICATION REQUIREMENTS
NSN: 4130015475222
P/N: EAS80200-101
Noun: LF Chiller Application: Minuteman III ICBM Environmental Control System (LGM-30)
12 Jun 2025 Section C 1/3
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this LF Chiller.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum EAS80200 (and all associated drawings/technical data) and EAS82000 (and all associated drawings/technical data). The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by (414 SCMS). The offeror shall also identify its sources for materials and its standards for internally used processes.
e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to (414 SCMS) for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by drawing EAS82000 (and all associated drawings/technical data). After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to (414 SCMS) for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all the requirements of Drawing EAS82000 (and all associated drawings/technical data). This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the
P/N: EAS80200-101
12 Jun 2025 Section C 2/3 weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether their qualification article passed or failed the required qualification testing within 60 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.
g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $1,016,480.
h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 500 days. This is based on complexity of the LF Chiller and other factors, including government review of submitted articles.
i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
P/N: EAS80200-101
12 Jun 2025 Section C 3/3
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.
c. QWC7: The potential source has access to an EAS82000 “Brine Chiller Test Stand” other than the
USAF owned EAS82000 asset.