MQR.pdf

PDF 159 KB Posted

Attached to
JTE Radar Transmitter
Solicitation number
SPRHA4-26-R-0514
Issued by

About this file

This is a Manufacturing Qualification Requirements document for a Radar Transmitter component (NSN: 5840-01-656-4618, P/N: 125606-2 or A9070-060702) used in the AN/TSQ-T10 Joint Threat Emitter system. Dated 26 February 2019, the document establishes mandatory qualification standards that potential offerors must satisfy to become approved sources for this part. The qualification process requires offerors to notify the appropriate government Small Business Office or contracting officer of their intent to qualify, certify possession of required manufacturing, testing, and inspection facilities with validated and calibrated equipment for RF testing, gain variation analysis, and VSWR measurements, and verify a complete data package including all applicable procedures, drawings, and specifications referenced in Drawing A9070-060702.

Offerors must demonstrate manufacturing and process compliance with ESA-approved engineering data, including Unique Identification requirements per DFARS 211.274, and submit quality and environmental evaluation results at their own expense. The qualification process requires submission of a test plan to 415 SCMS/GUMBB for prior approval, completion of testing with government inspection rights and 30-day advance notification of test dates, and provision of a pre-contract award qualification article for form-fit-function evaluation. Government notification of qualification article pass/fail status occurs within 90 days of submission. The estimated qualification cost is $39,000.00, with an estimated 180-day completion timeline. Offerors may not be denied consideration if they can demonstrate qualification capability before the contract award date, and approval as a qualified source does not guarantee contract award. The document also provides six source qualification waiver criteria (QWC1-QWC6) allowing potential waiver of qualification requirements for sources with prior supply history, mirror-image articles, assembly/subassembly relationships, earlier dash numbers, similar items, or previous qualifications following corporate changes, provided the engineering authority verifies no increase in complexity or criticality.

View the file

Other files

File Type Posted
SPRHA426R0514.pdf PDF
EDR.pdf PDF
SPI.pdf PDF
CPP.pdf PDF
Pkg_SOW.pdf PDF
EDL.pdf PDF
Unmarked Eng Data 2022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURING QUALIFICATION REQUIREMENTS

NSN: 5840-01-656-4618

P/N: 125606-2 or A9070-060702 Noun: TRANSMITTER, RADAR Application: AN/TSQ-T10 Joint Threat Emitter

26 Feb 2019 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this TRANSMITTER, RADAR.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror must certify to the government that they have, or have access to, qualified facilities to perform testing for section 3.4 Environmental Requirements of Drawing A9070-060702. The offeror must certify to the government that they possess, or have access to, validated and calibrated equipment to perform the testing for RF in section 3.2.2.1, Gain variation in section 3.2.2.1.5, VSWR in section 3.2.2.2 and any other specialized equipment to satisfy the requirements for this part. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Northrup Grumman Amherst Systems (1L4J7) drawing A9070-060702 and any documents referenced herein. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications. In the event of a form-fit-function part replacement, the offeror must provide a complete list of all procedures, drawings, and specifications, including change notices regarding the developed part for review of conformance to drawing A9070-060702 and any documents referenced herein.

Offerors will be notified whether or not their data package has passed or failed the review within 60 days of submitting the full data package for government review.

d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS/GUMBB. The offeror shall also identify its sources for materials and its standards for internally used processes.

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS/GUMBB for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing A9070-060702. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 415 SCMS/GUMBB for their review and approval prior to

P/N: 125606-2 or A9070-060702

26 Feb 2019 Section C 2/3 the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.

f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing A9070-060702. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 90 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.

g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $39,000.00.

h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the TRANSMITTER, RADAR and other factors.

i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: 125606-2 or A9070-060702

26 Feb 2019 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.

File details come from the government source that posted it. Updated .