This document contains an experience project data sheet template and information on a federal contract opportunity for constructing a trainer facility at Naval Technical Training Center.
The experience project data sheet template requests information on relevant past project experience, including project details, the offeror's role, challenges faced, and results achieved. The federal contract opportunity is for constructing two CONEX-type structures to resemble a Navy ship and shore facility, to be enclosed under a fabric roof structure at NTTC. The ship structure should include bridge, engine room, living quarters and open deck spaces over three levels, while the building should include hallways allowing 4-way intersections and two interior stairwells. Both temporary structures will incorporate electricity, HVAC and plumbing. The pre-solicitation notice does not include response dates or pricing terms. The work will be performed for the Air Force Air Education and Training Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004 FA301620R00490004.pdf | ||
| Amendment 0003 FA301620R00490003 SF 30.pdf | ||
| Attachment 3 DD 1354.pdf | ||
| Attachment 9- As-builts-Cad Files-see revised 28Apr20.pdf | ||
| Attachment 5 - Physical Data 2018 - 2019.pdf | ||
| Attachment 2 Submittal Register.pdf | ||
| Attachment 4 - Construction Cost Estimate Breakdown.pdf | ||
| Amendment 0001 FA301620R00490001.pdf | ||
| Attachment 1 SOW.pdf | ||
| Amendment 0002 FA301620R00490002 SF 30.pdf | ||
| Attachment 10 -Conceptual Drawings Site Layout.pdf | ||
| Attachment 6 -Wage Determination.pdf | ||
| Attachment 8 - Past Performance Information Sheet.pdf | ||
| San Diego TTS.jpg | JPG image | |
| Hawaii TTS.Jpg | JPG image |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 7 – Construction & Design Experience Project Data Sheet
(Present as many projects as requested by the agency in the RFP)
EXAMPLE PROJECT KEY NUMBER
Project No.
PROJECT SAMPLE REFERENCE FOR:
Prime Joint Venture Teaming Partner Designer of Record
Full Plans & Specs Other (explain):
TITLE AND LOCATION (City and State)
Contract No. Task Order (if applicable) DoD Agency or Private/Commercial Entity:
Project Title:
Location (i.e. JBSA Lackland, San Antonio, Texas)
COMPLETE THE TYPE OF PROJECT INFORMATION
Type of Construction Project:
Repair/Alteration Other (Explain):
Type of Design Project:
Design-Build Designer of Record RFP Development Other Engineering Services
Full Plans & Specs Other (explain):
Applicable Divisions:
Architectural Structural Electrical Civil Mechanical
PROJECT OWNER’S INFORMATION
A. Project Owner B. Point Of Contact Name C. Point Of Contact (Email & Telephone Number)
d. Award Date e. Completion Date f. Project Size (Sq. Ft)
g. If PoP had to be extended beyond original PoP on Awarde, please explain reason.
h. Award Amount i. Final Price
j. If Final Amount is different from Contract Amount, please explain reason.
RenovationNew Construction
FA301620R0049 Attachment 7
k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. If design-build, include a description of the design-effort.
l..Provide a detailed description of what work your firm self-performed on this project.
m. Provide a detailed description of challenges faced, actions taken, and result achieved.
| EXAMPLE PROJECT KEY NUMBER: |
| Project No: |
| PROJECT SAMPLE REFERENCE FOR: |
| Prime: Off |
| Joint Venture: Off |
| Teaming Partner: Off |
| Designer of Record: Off |
| Full Plans Specs Other explain: Off |
| TITLE AND LOCATION City and State: |
| Contract No Task Order if applicable DoD Agency or PrivateCommercial Entity Project Title Location ie JBSA Lackland San Antonio Texas: |
| New Construction: Off |
| Other Explain: Off |
| Renovation: |
| RepairAlteration: Off |
| DesignBuild: Off |
| Designer of Record_2: Off |
| RFP Development: Off |
| Other Engineering Services: Off |
| Full Plans Specs Other explain_2: Off |
| A Project OwnerRow1: |
| B Point Of Contact NameRow1: |
| C Point Of Contact Email Telephone NumberRow1: |
| d Award DateRow1: |
| e Completion DateRow1: |
| f Project Size Sq FtRow1: |
| g If PoP had to be extended beyond original PoP on Awarde please explain reasonRow1: |
| h Award AmountRow1: |
| i Final PriceRow1: |
| j If Final Amount is different from Contract Amount please explain reasonRow1: |
| k Provide a detailed description of the project and the relevancy to the project requirements of this RFP If designbuild include a description of the designeffortRow1: |
| lProvide a detailed description of what work your firm selfperformed on this projectRow1: |
| m Provide a detailed description of challenges faces actions taken and result achievedRow1: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Check Box10: Off |
| Check Box11: Off |
File details come from the government source that posted it. Updated .