Attachment 10 -Conceptual Drawings Site Layout.pdf
PDF 1 MB Posted
- Attached to
- CONSTRUCT NTTC TRAINER (SHOOT HOUSE) Federal contract opportunity
- Solicitation number
- MPLS170017
About this file
This document includes conceptual drawings and site layout plans for the construction of two training structures at the Navy Technical Training Center. The structures will include a three-story ship replica and a two-story port operations building, both enclosed within safety netting.
The solicitation seeks contractors to construct the structures according to the specifications provided. The ship replica will resemble a Navy vessel with spaces for a bridge, engine room, living quarters, galley and open deck areas. It must be capable of disassembly and relocation. The port operations building will include hallways allowing various intersection configurations and at least two interior stairwells. Electricity, HVAC and plumbing will be installed. The concrete foundation and minimum 15-foot spacing between structures is also required. Railing and rappel points will be incorporated. The Air Force is the contracting agency, with work to be completed at the Navy Technical Training Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0004 FA301620R00490004.pdf | ||
| Amendment 0003 FA301620R00490003 SF 30.pdf | ||
| Attachment 6 -Wage Determination.pdf | ||
| Attachment 8 - Past Performance Information Sheet.pdf | ||
| Amendment 0001 FA301620R00490001.pdf | ||
| Attachment 1 SOW.pdf | ||
| Amendment 0002 FA301620R00490002 SF 30.pdf | ||
| Attachment 7 - Experience Project Data Sheet.pdf | ||
| Attachment 4 - Construction Cost Estimate Breakdown.pdf | ||
| Attachment 3 DD 1354.pdf | ||
| Attachment 9- As-builts-Cad Files-see revised 28Apr20.pdf | ||
| Attachment 5 - Physical Data 2018 - 2019.pdf | ||
| Attachment 2 Submittal Register.pdf | ||
| Hawaii TTS.Jpg | JPG image | |
| San Diego TTS.jpg | JPG image |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Block 0, Item 1, 2, & 3 (Port Ops, Ship with Brow and Safety Netting) feet 1
126 feet
LEGEND:
1. Port Operation Building
2. Ship with Brow
3. Fence (safety netting)
114 feet
Main ACP Inbound Lanes
80 feet
15 feet
60 feet 25 feet 41 feet
30 feet
FA3016120R0049 05 MAY 2020 Attachment 10
TTFFA3016120R0049 05 MAY 2020 Attachment 10
Exterior
TTF SHIPFA3016120R0049 05 MAY 2020 Attachment 10
1st Floor
2cnd Floor
TTF SHIP
3rd Floor
Roof
TTF SHIP
TTF PORT OPS
Exterior
1st Floor
2cnd Floor
3rd Floor
Roof
| TTS Layout |
| TTS Drawings |
File details come from the government source that posted it. Updated .