FOR THE PURCHASE AND REDEVELOPMENT OF PARCEL WITHIN MOHAWK VALLEY PSYCHIATRIC CENTER
Solicitation number
2140041
Issued by
Oneida County, New York

About this file

Summary

This Request for Proposals (RFP) issued by New York State Urban Development Corporation, d/b/a Empire State Development (ESD), in coordination with the New York State Office of Mental Health (OMH) and Homes and Community Renewal (HCR), seeks qualified respondents to purchase and redevelop a 6.13-acre parcel within the Mohawk Valley Psychiatric Center Campus in Utica, New York. The project requires development of mixed-use residential housing featuring at least 50 affordable supportive housing rental units for individuals with serious mental illness and approximately 100 additional affordable housing units, along with potential community facilities, retail space, and open space. The development program mandates compliance with HCR financing requirements, adequate parking, environmental remediation, Building 51 demolition, infrastructure improvements, and sustainable building practices aligned with New York State's Climate Leadership and Community Protection Act. Respondents must submit complete two-part proposals (Administrative and Technical) to the designated Dropbox by February 1, 2027. A site tour is scheduled for November 16, 2026, with an RSVP deadline of November 10, 2026. The submission deadline for questions is November 23, 2026, with ESD responses due by December 4, 2026.

The purchase price will be determined post-designation via appraisal, with respondents assuming a $1 million acquisition price for underwriting purposes. A selected Designated Developer must execute a Cost Agreement and fund a $300,000 imprest account within five days of ESD request. The project will utilize OMH capital funding for supportive housing construction, available only to not-for-profit entities with 501(c)(3) status that are part of the long-term ownership structure. RUSH (Redevelopment of Underutilized Sites for Housing) funding up to $500 million is available statewide for eligible infrastructure costs including building demolition, parking construction, and utility construction. MWBE participation goals are established at 30 percent overall (15 percent MBE and 15 percent WBE), with an SDVOB goal of 6 percent. The project is subject to environmental review under SEQRA, consultation with the State Historic Preservation Office regarding the Historic District designation, and local zoning approvals or ESD General Project Plan processes. ESD reserves the right to consider disposition by ground lease rather than fee title, potentially enabling tax exemption and requiring PILOT payments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 | Mohawk Valley Psychiatric

Center in the City of Utica Project RFP

REQUEST FOR PROPOSALS

FOR THE PURCHASE AND REDEVELOPMENT OF

PARCEL WITHIN MOHAWK VALLEY PSYCHIATRIC

CENTER

1400 Noyes St, Utica, NY 13502

Page 2 | Mohawk Valley Psychiatric

Issued: October 26, 2026

Important Notice: A restricted period under the Procurement Lobbying Law is currently in effect for this Procurement and it will remain in effect until approval of the Contract. Bidders are prohibited from contact related to this procurement with any New York State employee other than the designated contacts listed below.

Designated Contacts for this Request for Proposals:

Primary Contact: Shanah Jack Secondary Contact: Ralph Volcy

All contacts/inquiries shall be made by email to the following address:

MohawkValleyUtica2026RFP@esd.ny.gov

Proposals must be uploaded to the designated Dropbox:

https://www.dropbox.com/request/je2zpkvdke9hlhxt04sx

This Request for Proposals is posted on the Empire State Development and New York State Office of Mental Health websites:

https://esd.ny.gov/doing-business-ny/requests-proposals New York State Office of Mental Health Request for Proposals (RFP) and Request for Information (RFI)

Submission Deadline: February 1, 2027

Late submissions will not be taken into consideration.

mailto:MohawkValleyUtica2026RFP@esd.ny.gov https://www.dropbox.com/request/je2zpkvdke9hlhxt04sx https://esd.ny.gov/doing-business-ny/requests-proposalsh https://omh.ny.gov/omhweb/rfp/

Page 3 | Mohawk Valley Psychiatric

Table of Contents

I. INTRODUCTION

II. RFP TIMELINE

III. SITE CONTEXT AND DESCRIPTION

A. Site and Surrounding Area

B. Zoning and Land Use; Subdivision

C. Existing Structures, Infrastructure, and Utilities

D. Environmental Review

E. Ownership and Taxes

IV. RESOURCES

A. Redeveloping Underutilized Sites for Housing

B. OMH Capital Funding

V. DEVELOPMENT OBJECTIVES AND REQUIREMENTS

A. Development Objectives

B. Development Program

C. Transaction Structure

D. Cost Agreement and Imprest Account and Other Fees

E. MWBE and SDVOB Subcontractor Interest

VI. REQUIRED PROPOSAL CONTENTS

A. Project Description

B. Site Plan and Architectural Design

C. Community Engagement Plan

D. Local Hiring Plan

E. Financial Proposal

F. Purchase Price

G. Development Schedule

H. Respondent Description and Qualifications

VII. SELECTION CRITERIA

VIII. CONDITION AND DUE DILIGENCE

IX. DISPOSITION AND APPROVALS

X. PROPOSAL SUBMISSION INSTRUCTIONS

Page 4 | Mohawk Valley Psychiatric

A. Submission of a Complete Two-Part Proposal

B. Questions

C. Site Visit

X. GENERAL PROVISIONS

XI. PROCUREMENT FORMS AND REQUIREMENTS

A. Non-Collusive Bidding Certification

B. Conflicts of Interest

C. State Finance Law Sections 139-j and 139-k Forms

D. Vendor Responsibility Questionnaire

E. Iran Divestment Act

F. Executive Order 16

H. Executive Order 177

I. Compliance with State Finance Law Section 139-M

J. Non-Discrimination and Contractor & Supplier Diversity Requirements

K. Encouraging the Use of NYS Businesses in Contract Performance Form

L. Certification under State Tax Law Section 5-a

M. Schedule A

N. Project Sunlight

O. Insurance Requirements

P. W-9 Form

XII. APPENDICES

Page 5 | Mohawk Valley Psychiatric

I. INTRODUCTION

New York State Urban Development Corporation, d/b/a Empire State Development, a public authority of the State of New York, constituting a political subdivision and public benefit corporation (“ESD”) is seeking proposals (“Proposals”) from qualified and responsible parties for a project (the “Project”) that entails the disposition and redevelopment of state-owned land for residential use, including affordable housing. Each party that submits a Proposal to this Request for Proposals (“RFP”) is referred to herein as a “Respondent.”

A Respondent that is conditionally designated through this RFP process is referred to herein as a “Designated Developer.”

The Project site is part of the Mohawk Valley Psychiatric Center Campus (the ”Campus”), formerly known as Utica State Hospital, which opened in 1843. The Campus encompasses the old Utica State Hospital and the former Marcy State hospital. The Campus sits on 119 acres and the parcel site that is being considered for disposition and redevelopment is 6.13 acres (the “Site”). The Site is currently zoned for Mixed-Use Campus (MUC) uses.

In 2025, ESD worked with LaBella Associates to conduct a feasibility study, attached hereto as Appendix A: Feasibility Study (the “Feasibility Study”), which examines the viability of the Site for reuse for affordable housing and supportive services. The Development Program set forth in Section V(B), is based on the preferences and concerns of the community as reflected in the redevelopment concept described in the Feasibility Study. Proposals should use the proposed Development Program in the Feasibility Study as a guide or explain why variation from such program is preferable. Please note that while the Feasibility Study focused on a 6.8 acre site that did not include any existing buildings, this RFP focuses on a smaller site that includes Building 51.

ESD invites all qualified parties to submit Proposals for the redevelopment of the Site in accordance with the goals and objectives of the Project and the parameters specified in this RFP. Respondents are invited to propose for the Site a mixed-use development plan with affordable and supportive housing along with space for supportive services, if feasible. Rental housing should include at least 50 units of supportive housing for people with serious mental illness (“SMI”), as defined by the New York State Office of Mental Health (“OMH”), and approximately 100 additional units of affordable housing. This RFP is expected to award OMH capital funding for the construction of the supportive housing units for people with SMI.

Parties eligible to receive such funding and operate the SMI units that are constructed with such funding must be not-for-profit entities with 501(c)(3) status that have demonstrated experience in operating housing with social services for individuals with SMI and that are a part of the long-term ownership structure of the overall Project. Responses may be submitted by Respondent teams that include for-profit entities, provided that the entity or entities that will receive the funding and operate the supportive housing units for people with SMI meet the eligibility criteria set forth in the previous sentence. Should OMH funding not be available the state may offer other funding mechanisms which may dictate alternative transaction structures.

The residential component of the Project should ensure compliance with all public agency financing and program requirements. The affordable rental housing component should show building breakdowns and assume a single transaction for affordable housing using applicable New York State Homes and Community Renewal (“HCR”) term sheets, including term sheets for funding for supportive housing development. Proposals may contemplate additional supportive housing for other populations, provided the plan complies with any applicable Olmstead requirements. Operating funding for the supportive units

Page 6 | Mohawk Valley Psychiatric is not available through this RFP. The Awardee will be expected to apply for operating funding post-award through the Empire State Supportive Housing Initiate ("ESSHI”) or one or more other operating funding sources.

Proposals also need to include on-site building demolition and infrastructure improvements necessary to facilitate the development. Proposed redevelopment should comply with existing zoning or explain how the Respondent will obtain approval from the local jurisdiction for any variation therefrom.

Based on Project needs, ESD may evaluate other entitlement processes, including overrides of provisions of the local zoning code and other local law through its General Project Plan process as authorized by Urban Development Corporation Act (the “UDC Act”) Section 16.

Respondents must demonstrate sufficient financial resources, professional ability and experience to develop the Site and provide services for the full breadth of the development program. It is expected that Proposals will be submitted by joint development teams that include members with established records demonstrating that they can successfully deliver the different elements of the proposed program, including supportive housing for people with SMI; affordable rental housing; off-street parking;

environmentally responsible demolition of existing building; and infrastructure improvements such as roadways and utilities. Proposals may also include community facility space; retail space; and/or passive and active open spaces. Refer to Section VI(H): Respondent Description and Qualifications for more information.

Page 7 | Mohawk Valley Psychiatric

II. RFP TIMELINE

The following are significant dates in the RFP process. Please note, ESD reserves the right to change any of the dates listed in this RFP.

Milestone Timeline

RFP Release Date On or about October 26, 2026

Deadline to RSVP for Site Visit Tour November 10, 2026

Site Tour November 16, 2026

Deadline for Submission of Questions November 23, 2026

Deadline for ESD Responses to Questions On or about December 4, 2026

Deadline for Submission of Proposals February 1, 2027

Page 8 | Mohawk Valley Psychiatric

III. SITE CONTEXT AND DESCRIPTION

A. Site and Surrounding Area The Mohawk Valley Psychiatric Center Redevelopment Project RFP Site comprises approximately 6.13 acres of the larger 119-acre Campus (see Figure 1) and is located in the Yorkville neighborhood of Utica at 1400 Noyes St, Utica, NY 13502 within Oneida County. The Site is located on the westward side of the Campus. It is bordered by York Street and sits behind (to the South-West of) Building 31 (the Old Main Building). The Old Main Building sits outside the parcel and is surrounded by a fence. The Old Main building will remain, but it is the Designated Developer’s responsibility to remove the fence. The parcel includes one building, Building 51 (shown in Figure 1). This building requires demolition by the Designated Developer. The Site is adjacent to active buildings, including Building 36, occupied by New York State Office of Addiction Services and Supports (OASAS) and Building 15, occupied by the New York State Police.

The Utica State Hospital opened in 1843 and was the first state-run mental health facility in New York State. In 1911, the state acquired additional acreage to establish the Marcy Hospital to house any transferred patients from Utica State. Both facilities continued to provide psychiatric services and Marcy Hospital continued expanding, eventually including a nursing school. In 1985, both facilities merged and became the Mohawk Valley Psychiatric Center Campus, which is run by OMH. Today, OMH continues to provide personalized services for individuals with mental illness as well as individuals in need of rehabilitation services. Adult outpatient services are also provided in conjunction with additional community programs and services.

Currently the site is accessible from the New York State Thruway 90 by Exit 31 and local routes. In the immediate area, local transportation includes rail and bus lines through Centro that connect to other locations within the Mohawk Valley. The site is in a residential neighborhood and is surrounded predominately by two- and three-story homes. The neighborhood also includes an elementary and a middle school.

Page 9 | Mohawk Valley Psychiatric

Figure 1: Area map with redevelopment parcel outlined in red.

Page 10 | Mohawk Valley Psychiatric

B. Zoning and Land Use; Subdivision The current zoning district is MUC, Mixed-Use Campus, which provides flexibility for redevelopment.

Should Proposals contemplate approval of local zoning changes, ESD will evaluate such Proposal based on financial viability, justification, and level of community benefit to the Town, County and State.

The Designated Developer will be responsible for local approvals, execution of a subdivision of the

Property, and redesignation of one or more tax lots thereon.

Based on Project needs, ESD may evaluate other entitlement processes, including overrides of provisions of the local zoning code and other local law through its General Project Plan process as authorized by

Urban Development Corporation Act (the “UDC Act”) Section 16.

C. Existing Structures, Infrastructure, and Utilities The Site currently contains one building, Building 51. This building is vacant and unused, and it is anticipated that this building will require demolition. Demolition of the building will likely require asbestos and lead remediation, based on the years in which campus buildings were constructed. A

Phase 1 Environmental Site Assessment has been completed for Building 51 and is set forth in Appendix

C: Phase 1 ESA: Building 51.

Additionally, the Site is adjacent to Building 31, the Old Main building, which is surrounded by a fence.

The Designated Developer is responsible for removal of the fence and ensuring that new buildings will be located at a suitable setback from the Old Main building.

Utilities that serve the site include:

Electric

• Currently, there are two 13,200-volt overhead electrical feeders from National Grid that serve the area running north-south on York Street.

• Feeders are served by separate substations and are at 40% and 77% peak capacity, leaving room for future development.

Telecommunications

• Currently, there is standard broadband service (copper) available from Spectrum on shared overhead utility poles with electric running North-South on York Street.

• Satellite broadband service is available from Starlink, ViaSat and HughesNet. This would be for residential applications.

• There is aerial fiber optic service available from Northland Networks on shared overhead utility poles with electric running North-South on York Street.

• Northland Network plans to add additional fiber optic cable service on the corner of Court and

York Street.

Water

• The project appears to be served by the existing 6” watermain in York Street.

• It is assumed that adequate pressure and flow are available for the proposed development.

Page 11 | Mohawk Valley Psychiatric

• This will be reviewed and confirmed as proposed re-development options are considered.

Sanitary Sewer

• This area had no previous building development. Based on current information it appears as though an extension of the existing sanitary sewer is necessary to service the site.

• Based on current information, the proposed development area is located in “local” Storm

Sewershed #8.

• Development in this area will likely require storm sewer detention in the form of surface ponds, underground tanks and/or permeable pavement.

• Design will be advanced and coordinated with proposed re-development density and layout.

D. Environmental Review ESD’s approval of the Project will be subject to environmental review in accordance with the New York State Environmental Quality Review Act (“SEQRA”). The lead agency for environmental review will be established during the SEQRA process for the Project. For more information on environmental review and the disposition process, see Section IX: Dispositions and Approvals

Due to the Site’s location within the Mohawk Valley Psychiatric Center Historic District, which is eligible for listing in the State and National Registers of Historic Places (“S/NR”), the Project will require consultation with the New York State Office of Parks, Recreation and Historic Preservation’s State Historic Preservation

Office (“SHPO”) in accordance with Section 14.09 of the State Historic Preservation Act. The proposed demolition of Building 51, which is S/NR eligible, will also require consultation with SHPO.

E. Ownership and Taxes The Site is currently owned by the People of the State of New York acting through the Dormitory Authority of the State of New York (“DASNY”) and managed by OMH. Due to State ownership, the Site is presently exempt from property taxes. Upon disposition, the Site will be subject to City of Utica real property taxes and charges. Property tax exemptions may be available for eligible Projects or Project components. For details of relevant tax exemption programs, Respondents should consult relevant statutes and rules.

Proposals should indicate which tax exemption program(s), if any, Respondents plan to utilize. It is the Designated Developer’s responsibility to apply for and meet the requirements of any specific tax benefit program(s).

Notwithstanding the foregoing, ESD reserves the right to consider disposition by ground lease rather than fee title. The ground lease disposition would enable the Site to remain tax exempt. In such case, payments in lieu of taxes (PILOT) might be required. ESD reserves the right to make such requests to all Respondents or to a subset of all Respondents as set forth in Section VII: Selection Criteria. Any Respondents still under consideration may be given the opportunity to revise their Proposals, and any related provisions of the RFP will be amended or deemed amended as necessary.

Page 12 | Mohawk Valley Psychiatric

IV. RESOURCES

A. Redeveloping Underutilized Sites for Housing As part of the 2024 State of the State and the FY2025 Enacted Budget, Governor Kathy Hochul outlined a vision for addressing New York State’s housing crisis to make the State more affordable and livable for all New Yorkers. This groundbreaking and multifaceted plan to build new housing across the State included a $500 million capital fund to develop up to 15,000 new homes on state land through the Redevelopment of Underutilized Sites for Housing (“RUSH”) initiative building upon Executive Order 30, signed by Governor Hochul in 2023, which required all state agencies to examine properties within their control to determine their housing potential.

RUSH funding may be available to meaningfully offset the cost to the Designated Developer to build out infrastructure and utilities needed to facilitate development of the Site. Proposals should include how much RUSH funding is requested and provide a basis for that request, including a breakdown of the cost estimate for each item.

The list of RUSH eligible items includes:

1. Building demolition

2. Roadway and utility demolition

3. Parking construction

4. Open space construction

5. Roadway and utility construction

ESD will review Proposals that include additions to the above list of RUSH eligible items. ESD will evaluate Proposals, in part, on their efficient use of RUSH funds. Respondents are required to complete the RUSH Budget template (Appendix G).

B. OMH Capital Funding OMH capital funding can be used to fund property construction and/or rehabilitation of units designated for individuals with SMI, subject to the approval of the New York State Division of the Budget. OMH reserves the right to limit funds for project costs and to determine appropriate per bed and per square foot costs for construction.

OMH will provide technical assistance as well as coordinate necessary studies including architectural feasibility reports to evaluate the potential project.

OMH’s capital funding program contemplates the advance of State grant funds during construction.

Upon construction completion, the OMH grant will be replaced by a governmental mortgage loan made to the grant recipient as borrower. Debt service payments on the mortgage loan are to be funded by

OMH, in addition to the other covered operating expenses.

OMH’s capital funds may only be disbursed through a contract with a not-for-profit entity with 501(c)3 status that is demonstrated to be part of the long-term ownership structure of the property and project.

OMH’s capital grant funds will be made available pursuant to 14 NYCRR Part 521; all applicants should familiarize themselves with this regulation.

Page 13 | Mohawk Valley Psychiatric

Should OMH funding not be available, the state may offer other funding mechanisms which may dictate alternative transaction structures.

V. DEVELOPMENT OBJECTIVES AND REQUIREMENTS

A. Development Objectives The primary development objective of the Site is an affordable housing development that provides residential units to meet housing demand, improves economic opportunities in Utica, and advances the goals of New York State.

The Feasibility Study proposed possible development goals for the Site, see Appendix A: Feasibility Study.

The proposed development program may reflect the work done during the Feasibility Study, which included local stakeholder engagement and coordination with partner agencies including OMH and HCR.

Overall development objectives include:

• Benefit the Yorkville neighborhood and surrounding areas.

• Maximize the number of affordable housing units for individuals and families, while optimizing site capacity. Project may consist of one or more buildings.

• Provide affordable supportive housing rental units for people with SMI.

• Implement sustainable and resilient building practices that align with the New York State Climate Leadership and Community Protection Act (“CLCPA”) and the HCR Sustainability Guidelines, prioritizing energy efficiency, emissions reduction, and climate adaptation.

B. Development Program Respondents must include the following development program in their Proposals. Failure to comply with the State requirements may result in disqualification of the response from evaluation.

1. Provide at least 50 affordable supportive housing rental units, for people with SMI; additional supportive housing may be included at the developer’s discretion. Supportive units must be integrated with affordable units throughout the project;

2. Provide approximately 100 units of affordable housing for individuals and families without an age restriction, ensuring an efficient use of site capacity and available financing resources;

3. Ensure compliance with HCR financing and program requirements1;

4. Ensure adequate parking for the proposed development;

5. Improve infrastructure and undertake environmental remediation necessary to facilitate the proposed development, including demolition of Building 51 and removal of existing fence around Old Main;

6. Incorporate environmentally sustainable, resilient, and energy efficient development and building design that aligns with the greenhouse gas reduction goals of the CLCPA and broader climate objectives. Additionally, HCR Design and Sustainability Guidelines should be followed;

7. Create local job opportunities for area residents during construction and operation; and

8. Ensure meaningful participation by certified MBE, WBE, and SDVOB entities.

1 Information on HCR term sheets and program requirements can be found at: https://hcr.ny.gov/multifamily-finance-tax-exempt-bond-and-subsidy-financing-program-materials https://hcr.ny.gov/multifamily-finance-tax-exempt-bond-and-subsidy-financing-program-materials https://hcr.ny.gov/multifamily-finance-tax-exempt-bond-and-subsidy-financing-program-materials

Page 14 | Mohawk Valley Psychiatric

Proposals may also include community facility space; retail space; and or passive and active open spaces.

While ESD retains the right to modify the program, Proposals should demonstrate their alignment with existing concepts. Proposals that deviate from this program should provide a rationale for the proposed changes. Please note that while the Feasibility Study focused on 6.8 acres and did not include any buildings, this RFP focuses on a smaller portion of that site and adds Building 51.

Proposals should discuss infrastructure investments necessary to achieve the project. This includes, but is not limited to, environmental remediation; demolition of the existing building, construction of roadways and utilities; and construction of parking lots. Cost estimates for infrastructure work were completed as part of the Feasibility Study. Please see Appendix D: Infrastructure Cost Estimates. See Section IV: Resources for more information on potential State funding available for infrastructure investments.

C. Transaction Structure It is anticipated that, at closing of the Site disposition to Designated Developer (the “Closing”), the Site will be conveyed by DASNY to ESD and then conveyed by ESD to the Designated Developer and that the Designated Developer will hold title during development of the Site. The transaction documents will include a purchase and sale agreement, deed, restrictive covenant, environmental indemnifications, and other customary transaction documents for this type of development.

ESD reserves the right to consider disposition by long-term ground lease instead of a sale. ESD reserves the right to make such requests to all Respondents or to a subset of all Respondents as set forth in Section VII: Selection Criteria. Any Respondents still under consideration may be given the opportunity to revise their Proposals, and any related provisions of the RFP will be amended or deemed amended as necessary.

D. Cost Agreement and Imprest Account and Other Fees

A Respondent who is chosen in the initial selection process to advance toward designation as the Designated Developer will be responsible for all out-of-pocket costs and expenses (“Costs”) incurred by ESD in connection with that Respondent’s proposed development of the Project. In addition, the Respondent will be required to deliver funds to ESD in the amount of $300,000 to be deposited into an interest-bearing imprest account (the “Imprest Account”) for the Project. ESD will draw on the Imprest Account to pay Costs, including without limitation costs and expenses of legal counsel, environmental consultants, and other consultants as needed. The Designated Developer will replenish the Imprest Account each time the balance of the Imprest Account is reduced to below $125,000, which amounts are subject to change over the course of the project, at ESD’s discretion, based on Project requirements. When ESD determines that no further Costs will be incurred (whether due to Closing of all transaction, discontinuation of Respondent’s candidacy, or discontinuation of the Project), ESD will return the balance (principal and interest) remaining in the Imprest Account. A more complete description of the parties’ respective rights and obligations with respect to Costs and the Imprest Account will be memorialized in an agreement containing ESD’s standard terms and conditions (the “Cost Agreement”). Execution of the Cost Agreement and funding of the Imprest Account, within five days of request by ESD, will be a condition of advancement in the selection process.

Page 15 | Mohawk Valley Psychiatric

E. MWBE and SDVOB Subcontractor Interest New York State certified Minority- and Women-Owned Businesses (“MWBE”) and Service-Disabled Veteran Owned Businesses (“SDVOB”) may request that their firm’s contact information be included on a list of firms interested in serving as a subcontractor of Respondents to this RFP. The listing will be publicly posted on ESD’s website for reference by the bidding community. A firm requesting inclusion on this list should send contact information and a copy of its New York State certification to:

MohawkValleyUtica2026RFP@esd.ny.gov

Nothing prohibits an MWBE Vendor from submitting a Proposal as a prime Respondent.

VI. REQUIRED PROPOSAL CONTENTS

The following must be submitted with all Proposals responding to the RFP. ESD reserves the right, in its sole discretion, to reject any Proposal that is deemed incomplete, inconsistent with stated requirements within this RFP, or nonresponsive to the RFP requirements. ESD also reserves the right, in its sole discretion, to reject any and all Proposals, and to proceed (or not proceed) with the development of the Site without completing this RFP process.

In addition to the forms required as described later in Section XI: Procurement Forms and Requirements (such forms together comprise the “Administrative Proposal”), each complete Proposal must contain the elements outlined in this section (the “Technical Proposal”).

A. Project Description The project description should include a detailed narrative describing all relevant aspects of the proposed Project. Proposals should also describe how the proposed development of the Site will advance the Development Objectives set forth in this RFP. At a minimum, Proposals should include:

• Residential development program, including the total number of housing units, the number of units per target population (e.g., affordable rentals, supportive units) and the mix of unit sizes;

• On-street and off-street parking distribution throughout the Site;

• Non-residential development program, including uses and square footages, and distribution of uses throughout buildings on the Site, if applicable;

• Open space design and distribution throughout the Site, if applicable;

• Height, bulk, and size (gross and net square footages) of the development;

• Approach to site preparation including building demolition and infrastructure improvements;

• List of proposed partners or tenants and any letters of intent from potential tenants, including proposed community facilities and retail operators;

• Total development costs, including all hard costs, soft-costs, contingencies, and escalations;

• Estimated number of direct and indirect permanent and construction jobs to be created by the Project; and

• A detailed plan on how the Respondent would meet Non-Discrimination and Contractor and Supplier Diversity Requirements outlined in Section XI: Procurement Forms and Requirements.

B. Site Plan and Architectural Design Proposals must include the following:

Page 16 | Mohawk Valley Psychiatric

• Summary of the proposed building program for the Project with gross and net square footages for each use;

• At a minimum a set of concept sketches, drawings, diagrams and renderings of the full proposed Project showing the site plan, site circulation, principal elevations and massing, typical floor plans, streetscape, open space network and landscape plans, entry features and signage;

• Description of the proposed architectural character, exterior materials, and other relevant specifications;

• Off-street parking plan showing the number of spaces provided in the parking lot;

• Compliance with HCR Design and Sustainability Guidelines

Proposals should also address how the Project will support the State’s goal for environmentally sustainable, resilient, and energy efficient development and building design as set forth in the New York State Climate Leadership and Community Protection Act (the “Climate Act”)2. Accordingly, Respondents must provide:

• A comprehensive table describing how the project responds directly to the targets stipulated in the Climate Act, including any net-zero design principles included in the Plan (e.g., clean energy generation); and

• A narrative describing the broader sustainability, energy, carbon neutrality, and resilience strategies (e.g. geothermal and solar) for the Project construction and operation, including the proposed types and levels of certifications that best support that strategy. Proposals that contemplate the highest certification levels will be considered by ESD to be more competitive than Proposals that contemplate other lower certification(s) or no certification.

C. Community Engagement Plan Respondents must submit a community engagement plan that details how local stakeholders will be informed of project plans throughout the design and construction process. The Designated Developer will be expected to present their plans at community and stakeholder meetings as needed. This includes, but is not limited to, meetings with adjacent property owners and residents, local civic and chamber organizations, and local elected officials. At a minimum, the Respondent must be prepared to present to stakeholders: elevation and site plan renderings, an overview of key project facts (unit count, building height, amenities, community benefits, etc.), and the overall project timeline.

D. Local Hiring Plan Respondents should include a narrative as part of the Proposal describing their commitment to local hiring, including an explanation of how the Project will create jobs for local residents and a summary of which community organizations Respondents will partner with in order to maximize local hiring.

E. Financial Proposal Respondents must submit a Pro-Forma for the Project’s rental component, attached as Appendix F:

Rental Underwriting Template. Proposals must comply with all terms of any HCR subsidy programs utilized, as well as the requirements of OMH funding programs. The Pro-Formas should include:

• Statement of assumptions on which all calculations are based;

• Sources and uses of funds;

2 The New York State Climate Leadership and Community Protection Act (https://climate.ny.gov/) https://climate.ny.gov/

Page 17 | Mohawk Valley Psychiatric

• Construction budget;

o Costs associated with non-residential spaces should be separated from residential costs;

• Operational budgets, including contributions to capital reserve and sitewide maintenance;

• The rental pro-forma should include a fifteen-year period and assume a single transaction for the income restricted housing using applicable New York State Homes and Community Renewal (“HCR”) term sheets and include funding for supportive housing services. Underwriting should also show the per building breakdown. Underwriting must comply with the HCR term sheets/programs used, including maximum subsidy limits;

• Trade cost breakdown of infrastructure work to be funded by RUSH;

• Detailed description of proposed tax credit equity and construction and permanent financing, including a detailed breakdown of all sources of equity and terms, as well as interest rate and term for financing; and Information regarding all necessary capital investments over time and reserves and debt service payments associated with all financings.

Additionally, Respondents must submit a complete RUSH Budget, attached as Appendix G: RUSH Budget Template.

Respondents must also submit financing letters of interest and/or intent from lenders and tax credit equity investors. Letters of interest from potential tenants of non-residential spaces should also be included and should acknowledge the rent being assumed for that space.

F. Purchase Price The project currently requires fair market value to be paid at closing. Purchase price will be determined post-designation via appraisal. For purposes of the underwriting submitted with the RFP, respondents should assume a $1 million acquisition price.

G. Development Schedule Respondents must submit a development timeline for the Project. Proposals should include a schedule that includes building demolition, infrastructure demolition and construction, and construction of mixed-use buildings with the estimated length of time to reach key milestones, such as commencement and completion of design, financing, construction, and operational stabilization for the development program.

Any contingencies that may affect this timeline should be identified.

H. Respondent Description and Qualifications Each Respondent must demonstrate sufficient financial resources and professional ability to develop the Site in a manner consistent with its Proposal. It is expected that Proposals will be submitted by development teams that include members with established records showing that they can successfully deliver the elements of the proposed program, including supportive housing for people with SMI. To be considered a “Qualifying Organization,” Respondent teams or joint ventures (“Respondent Teams”) must demonstrate collectively their significant experience, expertise, and capacity:

• In developing and operating residential or mixed-use projects that include affordable rental, including supportive housing;

• With at least three project examples in the last seven years for which Respondent or Respondent Teams acted as a developer and/or principal operator of similar mixed-use development projects.

Project examples should affordable rental housing, including supportive housing; mixed-use

Page 18 | Mohawk Valley Psychiatric developments with community facility uses, neighborhood retail, open space, and parking; and building demolition and roadway and utilities demolition and construction; and

• In equity investments in substantial or ground-up real estate development projects.

• Respondent teams must include a not-for-profit organization with 501(c)3 status and demonstrated experience operating supportive housing for individuals with SMI to receive the OMH capital funding and operate the supportive housing units for people with SMI. This organization must be part of the long-term ownership structure of the property and the project.

Each Proposal must also include a description of the Respondent Team including:

Development Team

• A 1-page explanation, with figures and org charts, laying out the intended form and structure of the firm, joint venture partnerships, contractors, and subcontractors. Any proposed partnership or joint venture must be clearly explained.

• A chart or diagram that clearly illustrates the Project Team structure and an accompanying table reflecting the availability and time each member on the Project Team will dedicate to the Project.

Past Projects and Experience

• Experience developing and operating mixed-use multifamily developments that incorporated affordable rental housing, including supportive housing. This should include marketing, leasing, and compliance.

• Experience developing and operating community facilities (if community facilities are included in the Proposal): Respondents should describe their previous experience acting as principal developer and/or operator of community facilities, specifically as they relate to the Proposal, that were part of a mixed-use development or stand-alone projects.

• Experience undertaking building demolition and roadway and utilities demolition and construction.

• Intended general contractors, property managers, and social service providers should be presented with an explanation of their background and experience.

• Experience developing similarly complex projects involving regulatory compliance and approvals across different levels of government.

• Other experience that makes the Respondent Team uniquely suited to plan, develop, and manage the proposed project.

Contact and Financial Information

• Name, address, phone number and email of each member of the Respondent Team. Respondents must also provide their Federal Employer Identification Number (“EIN”) and identify a primary contact person.

• Current operating budget and previous three (3) years of audited financials for each member of the Respondent Team. If available, copies of the interim financial statement for each quarter since the last fiscal year for which audited statements are provided. In addition, any details that describe the financial strength of the Respondent should be provided including but not limited to:

o Details of any material events that may affect the entity’s financial standing since the last annual or interim financial statements provided;

o Details of any credit rating; and

Page 19 | Mohawk Valley Psychiatric o Details of any bankruptcy, insolvency, company creditor arrangement, or other insolvency litigation in the last three fiscal years.

References and Past Project Description Summaries of comparable projects completed by members of the Respondent Team. For each project, the following information is requested:

• Name of Respondent Team member;

• Project name;

• Current status of project / completion date or anticipated completion date;

• Project description;

• Location;

• Total development costs;

• Reference (name, email, telephone number); and

• Relevance to RFP.

Additional Information

• Description of any prior RFPs for which Respondent has been selected, but which have not resulted in a successfully developed project.

• Any additional documentation or information evidencing the strength of the Respondent and its ability to complete the Project.

• Documentation addressing whether any participating member of the Respondent Team has been involved in any litigation or legal dispute against the State or any agency, department, authority or subdivision of the State or any litigation or legal dispute regarding a real estate venture during the past five years.

• All required procurement forms are identified in Section XI: Procurement Forms and Requirements of this RFP.

ESD reserves the right to determine whether a Respondent is a Qualifying Organization based on the collective experience of the Respondent Team’s constituent members. Entities that may not individually meet the above eligibility criteria (e.g., construction contractors, facility managers and operators, providers of design, engineering, surveying, and specialty construction or maintenance services; and/or lenders or other capital providers, legal or financial advisors, or other providers of professional services) may participate in a submission as part of a Respondent Team that collectively is a Qualifying Organization.

Please note the following entities and individuals are precluded from responding to this RFP and from participating as part of any Respondent Team, unless otherwise authorized by ESD:

• Any consultant firm that has provided professional services to ESD, OMH, or OPWDD in connection with the Project;

• Any entity that is a parent, affiliate, or subsidiary of any of the foregoing entities, or that is under common ownership, control, or management with any of the foregoing entities; and

• Any employee or former employee of any of the foregoing entities who was involved with the Project while serving as an employee of such entity.

Notwithstanding the foregoing, if ESD determines in its sole discretion that there is no conflict, or that adequate safeguards are in place to prevent the conflict from occurring, or that all of the work provided

Page 20 | Mohawk Valley Psychiatric by such firm, entity, or employee has been made publicly available by ESD, then ESD may provide written authorization that such firm, entity, or employee may respond to the RFP or participate on a Respondent team.

VII. SELECTION CRITERIA

ESD shall establish a selection committee that includes representatives of OMH and HCR to evaluate

Proposals. When reviewing Proposals, the selection committee will consider the following criteria and assign point values to each Proposal based on their evaluation.

Proposals may be reviewed by employees of ESD, OMH, HCR and other State officials and staff.

Category Description Scoring

Development Program and Schedule

1. Responsiveness to the development objectives and program

2. Ability to execute the necessary infrastructure investments

3. Timeliness and feasibility of development schedule

4. Alignment with principles laid out in the Feasibility

Study (Appendix A) or rationale for variation

Up to 25 points

Design and Sustainability

1. Site plan, use program, massing and design, including attractiveness and buildability.

2. Incorporation of sustainable and resilient building practices, including conformance with HCR Sustainability Guidelines.

3. Incorporation of State sustainability goals and policy.

Up to 20 points

Respondent Qualifications

1. Taking into account Respondent’s existing project pipeline, including projects with the State, the Respondents demonstrated ability and capacity to form a dedicated project team that can execute the project and meet project milestones both pre- and post-closing.

2. Experience, financial capabilities, and qualifications of the Respondent Team in developing, financing, leasing, operating, and managing projects of similar size and/or with similar combinations of uses.

3. Local development expertise and experience with public engagement in the Utica area; demonstrated ability to take project through necessary approvals.

4. Experience with affordable housing rental marketing, leasing, compliance, and operations.

5. Experience with providing services and operating supportive housing marketing, leasing, compliance, and operations.

Up to 30 points

Financial Proposal 1. Financial feasibility of the Proposal. Up to 25 points

Page 21 | Mohawk Valley Psychiatric

Category Description Scoring

2. Conformance with housing subsidy program term sheets and maximizing affordability while efficiently using housing subsidy resources.

3. Efficient use of RUSH resources.

ESD reserves the right to conduct in-person interviews with or pose questions in writing to individual Respondents to clarify the content of each Respondent’s Proposal and to ensure a full and complete understanding of such Proposal. ESD will undertake to pursue uniformity in questioning Respondents to the extent practicable, but ESD may ask different or additional questions to different Respondents in the context of any individual interview or in writing. Respondents who are invited for an interview will receive additional instructions upon their invitation.

ESD reserves the right, in its sole discretion, to reject any Proposal that is deemed incomplete, inconsistent with stated requirements within this RFP, or nonresponsive to the RFP requirements. ESD also reserves the right, in its sole discretion, to reject any and all Proposals, and to proceed (or not proceed) with the development of the Site without completing this RFP process.

In evaluating the capabilities of Respondents, ESD may use any and all information available, including information not provided by Respondent. Proposals should clearly and concisely state the unique capabilities, experience, and advantages of Respondent and demonstrate Respondent’s capability to satisfy the requirements and objectives set forth in this RFP. ESD further reserves the right to ask additional written or oral clarifying questions to all Respondents or to a subset of Respondents.

ESD anticipates that a single Respondent will be conditionally designated based upon the evaluation committee’s determination of the best Proposal, and as further described in Section IX. Disposition and Approvals.

VIII. CONDITION AND DUE DILIGENCE

Respondents should assume that the Site, including land, improvements, and any supporting building infrastructure, will be disposed of “AS IS” and “WHERE IS” without any express or implied warranties, guarantees, or representations as to quantity, quality, title, character, physical and environmental condition, size, or kind, or that the same is in condition or fit to be used for the Respondent’s purpose.

The Designated Developer will be responsible for conducting all due diligence investigations and remediation, including, but not limited to, environmental site assessments, which include sampling and testing of the soil, sediments, and ground water (if any). No representation or warranty is made nor shall be given by ESD, the State of New York, or any other entity as to any environmental condition at or under the Project Site. The term “environmental condition” as used herein includes but is not limited to any hazardous and/or toxic substance as defined in any State or Federal law, rule or regulation, solid waste, petroleum and/or petroleum by-products, endangered species of fauna or flora, archeological feature or artifact or any other matter or site condition which may affect the development of the Project Site.

In October 2025, a Phase 1 Environmental Site Assessment was conducted by Labella Associates, D.P.C., see Appendix B: ESA Phase I Report. Additionally, a Phase 1 Environmental Site Assessment was

Page 22 | Mohawk Valley Psychiatric conducted by Labella Associates, D.P.C. for Building 51, see Appendix C: Building 51 ESA Phase 1. This report is to be used for information purposes only in preparing responses to this RFP; ESD makes no representations about the accuracy or completeness of the report’s review of environmental conditions on the Site that were documented in the report.

Information regarding the RFP will be posted on the ESD website (https://esd.ny.gov/doing-business-ny/requests-proposals). Respondents are encouraged to check for updates. Prospective Respondents should notify ESD of their interest as soon as possible in order to ensure that they receive all updates associated with this RFP, by sending an email to MohawkValleyUtica2026RFP@esd.ny.gov

Respondents must rely solely on their own independent research and investigations for all matters, including, but not limited to: title matters, including easements and encumbrances; costs, including taxes;

zoning and entitlements, survey; development; financing; construction; and environmental conditions and remediation. Respondents should not rely on the information provided in connection with this RFP.

ESD makes no representation or warranty concerning the accuracy or utility of information posted or otherwise provided to potential or actual Respondents.

IX. DISPOSITION AND APPROVALS

The following is a summary description of the property disposition and project approval process.

Term Sheet and Pre-Development Agreement(s). After a review of the Proposals, ESD intends to conditionally designate one Respondent as the Designated Developer. The Designated Developer and ESD will sign a non-binding term sheet regarding key aspects of the Project, as well as the Cost Agreement described in Section V(D). The Designated Developer may also enter into term sheets and/or pre-development agreements with other State and/or municipal agencies as needed.

Public Approvals. In order to implement the Project and dispose of the Project Site, ESD, with the cooperation of the Conditionally Designated Developer, must comply with legal and regulatory requirements including but not limited to: (i) SEQRA; (ii) Public Authorities Law; (iii) State Finance Law;

and (iv) the UDC Act. Such compliance must be completed before conveyance of the Project Site to the Designated Developer for the Project.

In implementing the project, including the disposition process, ESD intends to, without limitation:

• If acting as lead agency for SEQRA, conduct a SEQRA-compliant environmental review of the Project, which may require preparation of either an environmental assessment (EA”) or environmental…