This file is a Feasibility Study appendix prepared by Empire State Development (ESD) for the Mohawk Valley Psychiatric Center Site Reuse Project in Utica, New York, in coordination with the New York State Office of Mental Health (OMH) and other state agencies. The study presents a redevelopment concept for a 6.88-acre vacant parcel located on York Street at the Mohawk Valley Psychiatric Center Campus, a 119-acre facility formerly known as Utica State Hospital. The proposed project involves the development of 150 affordable housing units, comprising 86 workforce housing apartments (ranging from one to three bedrooms) and 50 supportive housing units, along with 14 townhomes (five two-story units and nine three-story units) positioned to front York Street. The redevelopment concept allocates approximately 4.5 acres to the eastern section for housing with surface parking and green space, while preserving the western half for future development potential. The site is well-positioned for development, with no identified environmental constraints, archaeological sensitivity, or major contamination issues, and benefits from existing infrastructure including electrical, broadband, water, sewer, and natural gas services.
The estimated total development cost is approximately $65.4 million, comprising $6.94 million in site preparation costs and $58.45 million in construction costs. The site's Mixed-Use Campus (MUC) zoning supports redevelopment without requiring rezoning, though Planned Development Districts may be pursued if additional flexibility is needed. The feasibility study emphasizes sustainable site design with stormwater management systems including vegetated swales, bioretention cells, tree trenches, constructed wetlands, permeable pavers, and underground facilities designed to mimic natural hydrologic systems. Key considerations include the site's proximity to the historic Old Main structure and community concerns regarding large external developers, which the RFP process aims to address through stakeholder engagement and alignment with local preferences. ESD plans to release a formal Request for Proposals to identify a Designated Developer to advance the project in coordination with the City of Utica and partner state agencies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix C Phase 1 ESA Building 51.pdf | ||
| Appendix F- HFA-Underwriting-Model-2026.xlsx | XLSX spreadsheet | |
| Appendix G- RUSH Budget Utica-template.xlsx | XLSX spreadsheet | |
| Appendix I- Site Tour RSVP Form.doc | DOC document | |
| Mohawk Valley Psychiatric Center RFP.pdf | ||
| Appendix H Access Permit.MVPC.RFP respondents.docx | DOCX document | |
| Appendix D Infrastructure Cost Estimates.pdf | ||
| Appendix E- ESD IT Security_Briefv6.pdf | ||
| Appendix B Phase 1 ESA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mohawk valley psychiatric center site reuse project
City of Utica, NY
2 Mohawk Valley Psychiatric Center Site Reuse Project
Introduction
Existing Conditions
Site Reuse Concept
Next Steps
• Contents
3Mohawk Valley Psychiatric Center Site Reuse Project
Between December 2024 and February 2024, Empire State Development (ESD) advanced redevelopment feasibility planning for a portion of the Mohawk Valley Psychiatric Center in Utica. Stakeholder meetings held during that period identified an alternate, preferred site on the larger campus and, in September 2025, ESD re-initiated the redevelopment feasibility planning, focusing on the stakeholder preferred parcel. This report presents the current conditions at the site, key site challenges and opportunities, and a redevelopment concept plan that aligns with community identified priorities.
• INTRODUCTION
4 Mohawk Valley Psychiatric Center Site Reuse Project
December-Febuary
September
Timeline
• Redevelopment feasibility study advanced for the initially identified site.
• Four stakeholder meetings held.
October-December
2024-2025
• Work reinitated on new site.
• Virtual stakeholder meeting to inform group about updated site and to provide an opportunity for them to raise concerns about the site.
• In-person site visit to Mohawk Valley Psych Center by technical team. Development of reuse concepts.
• Call with State agency representatives (ESD, OMH, HCR, ODTA) to confirm feasibility of site reuse concepts.
• Drafting of final feasibility study for new site.
• Final stakeholder call to present final feasibility study.
5Mohawk Valley Psychiatric Center Site Reuse Project
Site Size: 6.88 acres Location: York Street, Utica Site Owner: New York State Office of Mental Health (OMH) Existing Buildings: Vacant
Existing Conditions
Site Opportunities
The project site is relatively flat, contains no buildings , is not flagged as archaeologically sensitive by NYS Office of Parks, Recreation, and Historic Preservation (OPRHP), contains no environmental constraints (e.g., endangered species, wetlands) identified by NYS Department of Environmental Conservation (NYSDEC), and has limited old growth trees that would need to be removed to pursue development. Based on a Phase 1 ESA prepared for the site, there are no major contamination issues.
The current zoning district of the site (MUC) is well-suited for redevelopment, since this district is tailored to the reuse of existing institutional and campus-type facilities. Redevelopment efforts that comply with existing regulations can avoid the need for rezoning.
Should redevelopment require additional flexibility, the city allows for the establishment of Planned Development Districts (PDDs).
The site is also well served by infrastructure including:
• National Grid overhead electrical with available substation capacity
• Broadband, satellite broadband, and fiber optic service, with additional planned services
• Public water and sewer
• National Grid natural gas
6 Mohawk Valley Psychiatric Center Site Reuse Project
7Mohawk Valley Psychiatric Center Site Reuse Project
Site Challenges
The primary challenges associated with the site are not associated with the site itself, but with the larger campus and other external trends. Within the campus itself, consideration must be given to the continued varied usage of the Mohawk Valley Psychiatric Center and proximity of the site to existing historic structures, notably Old Main. While the site itself does not contain any structures, the impact of development on this neighboring historic structure should be considered. Also, while not included in the site, Building 51 is in deteriorated condition and demolition is being pursued.
Outside of the campus, the broader community has experienced extensive development in recent years, including several large market-rate and above market-rate housing developments. This has instilled a sense of mistrust and fear of large developments and outside developers in the community, which could present a hurdle for redevelopment on the site.
8 Mohawk Valley Psychiatric Center Site Reuse Project
Site Reuse Concept
Based on conversations with local stakeholders and various State agencies, a redevelopment concept for the new site was put forth. This concept shows a four-story residential building and townhomes on the eastern half of the site, leaving the western half open green space or available for potential future development. The total development program shown in the concept includes 150 affordable housing units (50 of which would be supportive units).
The depicted multi-family building includes 136 affordable and supportive residential units ranging in size from one to three bedrooms. The concept also shows 14 townhomes fronting York Street;
five that are two stories (1,900 square feet) and nine that are three stories (2,800 square feet). The concept plan includes 194 parking spaces for the multi-family buildings and townhomes; the design of this redevelopment concept places surface parking at the back (western end) of the site and ensures the townhomes have street frontage. There is also the opportunity for ample connection to greenspace with multi-use paths throughout the site and clear vehicular and pedestrian circulation.
9Mohawk Valley Psychiatric Center Site Reuse Project
1.
3.
8.
3.
10.
11.
12.13.
14.
15.
7.
5.
9.
2.
4.
2.
3.
4.
7.
8.
9.
10.
11.
12.
13.
14.
15.
5.
6.
1.
6.
Eastern section of the parcel: approx.. 4.5 acres accommodating 150 housing units with surface parking and green space.
Residential Multifamily Bldg.: 155,350 gsf 4story bldg. w/ Amenity terraces
• 86 Workforce housing apt units:
- 34% 3BD units // 1250sf avg net per unit: 29 units
- 42% 2BD units // 950 sf avg net per unit: 36 units
- 24% 1BD units // 768 sf avg net per unit: 21 units
• 50 Supportive housing apt units:
- 500 sf avg per unit Green Courtyard Amenity space Surface Parking Area:
• Resid. Multifamily surface pkg. @ approx. 1sp per bed:
- (29) 3BD: 87 spaces needed
- (36)2BD: 72 spaces needed
- (21)1BD: 21 spaces needed
- Total surface pkg spaces provided: 180 spaces Public Community Green Space (Includes permeable paving and landscaping for Stormwater Needs) Townhomes:
• 14 total Townhomes:
- (9) 3story 2800 gsf TH
- (5) 2story 1900 gsf TH Existing Frontage Road – Resurfaced plus add parallel parking area.
Existing Access Road Existing Green space area New pedestrian concrete sidewalk Existing Adjacent Green Area w/ New Lighting, and (Includes new permeable paving and landscaping for Stormwater Needs) Existing Old Main, Utica State Hospital Bldg.
Existing Concrete Surface Existing Green Space Existing Surface Parking Lot
REFERENCE IMAGES
YORK STREET
UTICA MASTERPLAN
Old Main, Utica State Hospital, 1213 Court
St, Utica, NY 13502
N
TYPICAL UNIT LAYOUT DIAGRAM
0’ 30’ 60’ 120’
REFERENCE IMAGES
RENDERINGS
Old Main, Utica State Hospital, 1213 Court
St, Utica, NY 13502
SUSTAINABILITY - STORMWATER
LEGEND
REFERENCE IMAGES
Sustainability has recently become an important and integral part of project design and development. Sustainability goals have evolved from buildings and building systems to the landscape. A renewed focus has been placed on sustainable site design, and stormwater control design is at the forefront of sustainability measures. With the increasing intensity of storms and increasing impervious area due to continued development, stormwater control is now more important than ever to prevent flooding, protect our waterways, recharge our groundwater supply, and protect and provide habitat for native species.
Today’s stormwater control systems are more advanced than the unsightly dry detention basins of the past. We must control not only water quantity, but also water quality. The design philosophy has changed… It’s no longer about getting the water into underground pipes for conveyance to detention basins or streams as quickly as possible; now it’s more about mimicking natural hydrologic systems to slow the water down, allowing for better infiltration and habitat support within a “treatment train” of multiple smaller facilities dispersed throughout the site. In applying that “treatment train” philosophy, we have the opportunity to employ several types of stormwater treatment facilities across the site. Each facility presents a different system for use to comply with stormwater regulations, and these systems can be interchangeable to fit specific site conditions and needs.
The diagram provided illustrates general locations and types of facilities that may be used for stormwater treatment on the site.
It is a starting point for further design studies; final determination of type, location, and extent of these features shall be made by a licensed professional as part of the site development design. A master site or individual site implementation strategy may be used based on development construction phasing, existing and proposed conditions, and funding. We are highlighting the use of vegetated swales, bioretention, tree trenches, and constructed wetlands. Additionally, we are also showing the use of permeable pavers and underground facilities in more intensively built-out areas. Vegetated Swales, smaller Bioretention Cells, and Tree Trenches are commonly found along streets where they act as conveyance and treatment systems. Constructed wetlands and larger Bioretention Cells are commonly placed at low points and are designed to capture, hold, and treat larger amounts of runoff. All these systems mimic the natural flow of water across the landscape, helping to prevent flooding, protecting our waterways, recharging groundwater supply, and providing habitat for native species.
PROPERTY LINE
VEGETATED SWALES/ BIORETENTION/ TREE TRENCH
CONSTRUCTED WETLAND/ BIORETENTION
PERMEABLE PAVERS/ UNDERGROUND STORMWATER FACILITY
Old Main, Utica State Hospital, 1213 Court St, Utica, NY 13502
NUTICA MASTERPLAN
SUSTAINABILITY DIAGRAM
COMMUNITY GREEN SPACE
0’ 30’ 60’ 120’
SUSTAINABILITY - STORMWATER
LEGEND
REFERENCE IMAGES
Sustainability has recently become an important and integral part of project design and development. Sustainability goals have evolved from buildings and building systems to the landscape. A renewed focus has been placed on sustainable site design, and stormwater control design is at the forefront of sustainability measures. With the increasing intensity of storms and increasing impervious area due to continued development, stormwater control is now more important than ever to prevent flooding, protect our waterways, recharge our groundwater supply, and protect and provide habitat for native species.
Today’s stormwater control systems are more advanced than the unsightly dry detention basins of the past. We must control not only water quantity, but also water quality. The design philosophy has changed… It’s no longer about getting the water into underground pipes for conveyance to detention basins or streams as quickly as possible; now it’s more about mimicking natural hydrologic systems to slow the water down, allowing for better infiltration and habitat support within a “treatment train” of multiple smaller facilities dispersed throughout the site. In applying that “treatment train” philosophy, we have the opportunity to employ several types of stormwater treatment facilities across the site. Each facility presents a different system for use to comply with stormwater regulations, and these systems can be interchangeable to fit specific site conditions and needs.
The diagram provided illustrates general locations and types of facilities that may be used for stormwater treatment on the site.
It is a starting point for further design studies; final determination of type, location, and extent of these features shall be made by a licensed professional as part of the site development design. A master site or individual site implementation strategy may be used based on development construction phasing, existing and proposed conditions, and funding. We are highlighting the use of vegetated swales, bioretention, tree trenches, and constructed wetlands. Additionally, we are also showing the use of permeable pavers and underground facilities in more intensively built-out areas. Vegetated Swales, smaller Bioretention Cells, and Tree Trenches are commonly found along streets where they act as conveyance and treatment systems. Constructed wetlands and larger Bioretention Cells are commonly placed at low points and are designed to capture, hold, and treat larger amounts of runoff. All these systems mimic the natural flow of water across the landscape, helping to prevent flooding, protecting our waterways, recharging groundwater supply, and providing habitat for native species.
PROPERTY LINE
VEGETATED SWALES/ BIORETENTION/ TREE TRENCH
CONSTRUCTED WETLAND/ BIORETENTION
PERMEABLE PAVERS/ UNDERGROUND STORMWATER FACILITY
Old Main, Utica State Hospital, 1213 Court St, Utica, NY 13502
NUTICA MASTERPLAN
SUSTAINABILITY DIAGRAM
COMMUNITY GREEN SPACE
0’ 30’ 60’ 120’
10 Mohawk Valley Psychiatric Center Site Reuse Project
Site Layout
1. Eastern section of the parcel ; 4.9 acres accommodating 150 housing units with surface parking and greenspace.
2. Residential multifamily building: 4-story building with amenity terraces
• 29 three-bedroom units / 1,250 SF per unit
• 36 two-bedroom units / 950 SF per unit
• 21 one-bedroom units / 768 SF per unit
• 50 supportive units / 500 SF per unit
3. Community courtyard amenity space
4. Surface parking area: 180 total spaces for multifamily building
5. Public community greenspace (permeable paving and landscaping for stormwater needs
6. Townhomes:
• Nine three-story homes / 2,800 SF per home
• Five two-story homes / 1,900 SF per home
7. Existing frontage road: resurfaced and parallel parking area
8. Exising access road
9. Existing greenspace
10. New sidewalk
11. Existing adjacent greenspace with new lighting
12. Old Main
13. Existing concrete surface
14. Existing greenspace
15. Existing surface parking lot
11Mohawk Valley Psychiatric Center Site Reuse Project
Sustainability Approach
Sustainable design is a key element of the site reuse concept. This approach protects groundwater, habitat health, and stormwater management alongside increasing the quality of life for local area residents. The sustainability diagram shows the general location and types of facilities that may be used for stormwater treatment. These include vegetated swales, bioretention, tree trenches, and constructed wetlands. Also shown are permeable pavers and underground facilities in more built-out areas. These systems are meant to mimic the natural flow of water across the landscape, helping to prevent flooding, protecting waterways, recharging groundwater supply, and providing natural habitat for species.
12 Mohawk Valley Psychiatric Center Site Reuse Project
Anticipated Site Prep & Development Costs
The approximate site prep costs for this redevelopment concept is estimated at $7 million. See the table below for a detailed description of site prep costs.
The estimated construction costs for this redevelopment concept total about $58.45 million. See the table below for a breakdown of these costs.
Site Prep Costs
Description Estimated Cost
Site Clearing $150,000
Site Improvements $1,566,500
Site Utilities $942,000
Site Electrical $1,544,000
Miscellaneous $30,000
Contingency & Overhead $1,005,642
Escalation $905,078
TOTAL $6,938,930
Construction Costs
Description Estimated Cost
Multifamily Building (136 units) $43,498,000
Townhomes (two-story) $1,710,000
Townhomes (three-story) $4,536,000
Site Electrical $1,544,000
Escalation $8,705,200
TOTAL $58,449,200
13Mohawk Valley Psychiatric Center Site Reuse Project
Next Steps
Along with partner agencies, ESD plans to develop and release an RFP for the redevelopment of the Mohawk Valley Psychiatric Center site. The RFP will include specifications for supportive units and highlight the preferences expressed by local stakeholders and community representatives for the design of the project. In coordination with State agencies, the developer selected for the project will be expected to work with the City of Utica to ensure the project aligns with community character and addresses the widest possible array of local needs.