MLO Construction Project Options_Master Plan Layout_Draft_v4b.pptx
PPTX presentation 743 KB Posted
- Solicitation number
- NRMJ0002100439NGB
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NRMJ0002100439 QA Final.docx | DOCX document | |
| MLO Grounding Survey Cover Letter.pdf | ||
| NRMJ0002100439 Combined Synopsis FINAL.docx | DOCX document | |
| MLO Grounding Report (1).pdf | ||
| MLO Grounding Report (2).pdf | ||
| MLO Grounding Report (3).pdf | ||
| NRMJ0002100439 SOW_RFQ.pdf | ||
| Science Tower Structural Integrity Conditions Assessment.pdf | ||
| NRMJ0002100439 SF18.doc | DOC document | |
| MLO Grounding Survey Final Report.pdf | ||
| MLO Construction Project Options_Draft Floorplans_v2.pptx | PPTX presentation |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design criteria – Principles/Goals for the MLO Site:
Maintain stature of the site (world-class facility) Modern and efficient facilities Dedicated science, office, kitchenette, & bathroom Right-sized, co-located science areas:
NOAA science & solar deck area Non-NOAA science and solar deck area Calibration facility Tower re-location & tower science building Keeling history preserved Outreach support Workshop/garage/storage area Support for comms partners Renewable energy generation (solar only) on site OAR Global Monitoring Laboratory – Mauna Loa Observatory (MLO), Hawaii
Paul version 1
Office/ Kitchen/ Bath Comms
Phase 1 – Keeling Upgrade, Tower, Tower Bldg, Move Chin (comms)
-- Walkway -- Stairs -- MLO Welcome Sign & Time Capsule
-- Roof deck
-- Obsolete – Remove from site -- Army Comms Monopole
X
Tower Science
Kitchen/ Bath
Phase 2 – Shop/Garage, Car Port, Retaining Walls, Solar Cal Facility
Solar Cal Facility & Roof Deck
Shop/ Garage Public Parking
-- MLO Welcome Sign & Time Capsule
-- Roof deck
-- Retaining Wall
Car Port
Co-op Science Bldg
Kitchen/ Bath
Phase 3 – New Co-op Science Facility & Roof Deck
Garage
-- MLO Welcome Sign & Time Capsule
-- Roof deck
Garage Office/ Kitchen/ Bath Comms Solar Panels
Phase 4 – Paving & Solar Panels
-- MLO Welcome Sign & Time Capsule
-- Roof deck
Garage Office/ Kitchen/ Bath
Final Plan
NOAA/CRN Possible Re-location
-- MLO Welcome Sign & Time Capsule
-- Roof deck
Garage Office/ Kitchen/ Bath Comms
Tentative Fiber Plan – Waiting on report from Summit Kinetics
-- MLO Welcome Sign & Time Capsule
-- Roof deck image2.jpg image1.jpg