MLO Construction Project Options_Draft Floorplans_v2.pptx

PPTX presentation 90 KB Posted

Attached to
Site Planning Services for the NOAA/OAR Mauna Loa Observatory
Solicitation number
NRMJ0002100439NGB
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft Floor Plan – Keeling Building & Addition (Office, Kitchenette, Bathrooms) Floor Plan South Elevation

~700 sqft (New) 840 sqft (Existing)

Kitchenette Visitor Bathroom Staff Bathroom Mixed use – Office & break area w/ desks

Storage Sink

High top bar w/ stools

X

X

Fridge Storage Mechanical Microwave

Fridge/

Water Cabinet Cabinet Sink Shelves Science Bench Science Science Rack Science Rack Desk Science Rack

Historic Instrument Science Outreach Area Outreach Materials

Divider (knee wall w/ glass or similar)

Stairs Up 🡪 Roof deck

N

Aerosol Sampling Stack (existing) Roof deck (w/ railings) and stairs from north side of bldg

Desk

Desk

Note: Site telecom panel is located inside Keeling at this location. Relocate to new addition or build internal/external closet for telecom gear to be secure.

Floor Plan East Elevation

~650 sqft

NOAA

Draft Floor Plan – Tower Building

Non-NOAA

Panel

Overhead Cable Tray (route cables off tower and into both rooms)

Roof pitched toward south to accommodate future solar panels install – match roof pitch to ideal panel tilt for MLO location (NREL Report) Upper wall transom windows to let in daylight and minimize need for lighting use Benches (3’ deep) around perimeter of both rooms (typical)

NOTE: Separate pump room/closet is desirable to reduce noise within facility, will need to work plan to see if possible with civil work and available footprint for building.

Draft Floor Plan – Carport & Garage/Shop Floor Plan East Elevation ~700 sqft = Garage/shop

Workshop area

Carport – near flat gable roof

Roof pitched toward south to accommodate future solar panels install – match roof pitch to ideal panel tilt for MLO location (NREL Report)

Approx. Grade

Carport – near flat gable roof

Keeling Office Addition

Garage area Carport area ~350 sqft b/t buildings

Bench (3’ deep)

Sliding barn door allows to open space open or close off to separate

Tool storage

Materials storage Ladder storage Drill press & band saw

Tool storage

Double doors or garage door if grade allows

Draft Floor Plan – Solar Calibration Facility & Roof Deck

~650 sqft = Calibration Building

Overhead Cable Tray (route cables from deck above down into room – will need ~10 roof penetrations from outside deck to inside cable trays for cables mngmt)

Benches (3’ deep)

Floor Plan North Elevation

~800 sqft = Calibration Deck Layout

Benches (2’ deep). Need to be anchored to decking surface.

Cable conduits thru roof and down into room. Align over E-W cable trays within the room.

NOTE: Add power on each roof deck table every 4’ with quad outlet. Each bench should have ~4 circuits (max 2 outlets/circuit).

Posts for deck can be free standing or integrated into building structure. Either option is acceptable.

Draft Floor Plan – New Co-Op Science Building & Roof Deck

Floor Plan East Elevation

Visitor Bathroom

Fridge

Kitchenette

Mechanical

Water

HVAC

Network Closet

Science 1 Science 3 Science 5 Science 7 Science 9 Science 2 Science 6 Science 8 Science 4 ~3600 sqft = Calibration Building (1200 sqft roof deck)

Posts for roof deck can be free standing or integrated into building structure. Either option is acceptable.

Roof pitched to accommodate solar panels – roof pitch to ideal panel tilt (NREL Report) Double doors Conference

File details come from the government source that posted it. Updated .