Mixville Park Pedestrian Bridge Plans.pdf
PDF 2 MB Posted
- Attached to
- 2627-05 Mixville Park Pedestrian Bridge
- Solicitation number
- 39407
- Issued by
- New Haven County, Connecticut
About this file
This file contains the project plans for a pedestrian bridge construction project at Mixville Park in Cheshire, Connecticut. The Town of Cheshire is soliciting bids from qualified contractors for the construction of a timber pedestrian bridge and associated infrastructure connecting the Upper and Lower Mixville Ponds. The scope of work includes relocation of existing stone slab pathways, installation of timber bridge structures, construction of two outlook platforms, installation of helical pile foundations, construction of precast concrete abutments, implementation of sedimentation and erosion control measures, restoration of disturbed areas, and establishment of permanent turf cover. A non-mandatory pre-bid conference is scheduled for October 22, 2026 at 11:00 a.m. at the existing Upper Pavilion at Mixville Park. Vendor questions must be submitted by October 26, 2026 at 4:00 p.m. EDT, and bids are due November 3, 2026 at 11:00 a.m. EST. Inquiries and complete solicitation documentation should be directed to Phil Straker at the Town of Cheshire, 84 South Main Street, Cheshire, CT 06410, 203-271-6650, or pstraker@cheshirect.gov.
The solicitation is open to all qualified vendors with no stated set-asides or preference programs. Payment terms are to be vendor-specified under Free On Board Destination delivery terms. The solicitation does not state an estimated contract value, identify an incumbent contractor, or reference contract renewal options. No funding requirements, amounts, or sources are specified in the available documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE VICINITY MAP:
PREPARED BY:
LOCATION MAP:
MIXVILLE PARK BOARDWALK
OVER MIXVILLE POND
NOTCH ROAD
CHESHIRE, CONNECTICUT
SLR PROJECT NO. 11047.00075
SEPTEMBER 29, 2026
PREPARED FOR:
MAREK KEMENT, PE/LS
TOWN OF CHESHIRE
84 SOUTH MAIN STREET
CHESHIRE, CONNECTICUT 06410
LIST OF DRAWINGS
NO. NAME TITLE
01 TITLE TITLE SHEET
02 N-01 GENERAL NOTES & LEGEND
03 EX-01 EXISTING CONDITIONS AND BASELINE INFORMATION
04 PR-01 PROPOSED PLAN
05 STR-01 STRUCTURAL PLAN AND ELEVATION
06 STR-02 STRUCTURAL DETAILS
07 STR-03 STRUCTURAL DETAILS
08 SE-01 SEDIMENTATION & EROSION CONTROL PLAN
09 RA-01 REGULATED ACTIVITIES
0' 25' 50'
SCALE 1" = 50'
0 1/2" 1"
0' 100' 200'
SCALE 1" = 200'
0 1/2" 1"
99 REALTY DRIVE
CHESHIRE, CT 06410
203.271.1773
SLRCONSULTING.COM
GENERAL NOTES:
1. CONSTRUCTION SPECIFICATIONS:
CONNECTICUT DEPARTMENT OF TRANSPORTATION, STANDARD
SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND
INCIDENTAL CONSTRUCTION, FORM 819, DATED JANUARY 2026; AND
SPECIAL PROVISIONS.
2. COORDINATE SYSTEM:
NORTH ORIENTATION AND COORDINATES BASED ON CONNECTICUT
GRID SYSTEM NAD 83.
3. VERTICAL DATUM:
ELEVATIONS BASED ON NAVD 88.
4. SURVEYED BY:
SLR CONSULTING, INC.
5. MAINTENANCE RESPONSIBILITY:
TOWN OF CHESHIRE.
UPPER
MIXVILLE
POND
LOWER
MIXVILLE
POND
UPPER MIXVILLE POND
MIXVILLE PARK
PROJECT LOCATION
NOTCH ROAD
MIXVILLE
PARK
M
IX
V
IL
LE
R
O A
D
TE
N
M
IL
E R
IV
ER
LOWER MIXVILLE POND
Know what's below.
before you dig.Call
R www.digsafelynewyork.com
SHEET NAME
DATE
N-01
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
SR
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
AS NOTED
G
EN
ER
A
L N
O
TE
S
L
EG
EN
D
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
GENERAL NOTES
1. SLR CONSULTING ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF MAPS
AND DATA WHICH HAVE BEEN SUPPLIED BY OTHERS.
2. WETLAND LIMITS SHOWN HAVE BEEN DELINEATED BY SLR CONSULTING. THE
CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE "BEST
MANAGEMENT PRACTICES FOR THE PROTECTION OF THE ENVIRONMENT" AS
OUTLINED IN THE STANDARD SPECIFICATIONS.
3. THE PROPERTY LINES DEPICTED HAVE BEEN COMPILED FROM VARIOUS SOURCES
INCLUDING TOWN OF CHESHIRE LAND RECORDS AND ARE NOT TO BE CONSTRUED
AS BEING OBTAINED AS THE RESULT OF A FIELD SURVEY, NOR DO THEY
REPRESENT A PROPERTY/BOUNDARY OPINION.
4. ALL CONSTRUCTION MATERIALS AND METHODS SHALL CONFORM TO THE
APPLICABLE SECTIONS OF THE STATE OF CONNECTICUT DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES,
AND INCIDENTAL CONSTRUCTION, FORM 819 (2024); SUPPLEMENTAL
SPECIFICATIONS DATED JANUARY 2026; AND SPECIAL PROVISIONS.
5. THE CONTRACTOR SHALL BE AWARE OF THE WORK WHICH IS TO BE PERFORMED
WITHIN AND ADJACENT TO PRIVATE PROPERTY RIGHT-OF-WAYS.
6. SEDIMENT AND EROSION CONTROL MEASURES AS DEPICTED ON THESE PLANS
AND DESCRIBED WITHIN THE SEDIMENT AND EROSION CONTROL NARRATIVE
SHALL BE IMPLEMENTED AND MAINTAINED UNTIL PERMANENT COVER AND
STABILIZATION IS ESTABLISHED. ALL SEDIMENT AND EROSION CONTROL
MEASURES SHALL CONFORM TO THE "GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL, CONNECTICUT - REVISED 2002", AND IN ALL CASES BEST
MANAGEMENT PRACTICES SHALL PREVAIL.
7. THE PLANS REQUIRE A CONTRACTOR'S WORKING KNOWLEDGE OF LOCAL,
MUNICIPAL, WATER AUTHORITY, AND STATE CODES FOR UTILITY SYSTEMS.
ANY CONFLICTS BETWEEN MATERIALS AND LOCATIONS SHOWN, AND LOCAL
REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR
TO THE EXECUTION OF WORK. THE MUNICIPALITY WILL NOT BE HELD LIABLE FOR
COSTS INCURRED TO IMPLEMENT OR CORRECT WORK WHICH DOES NOT CONFORM
TO LOCAL CODE.
8. ALL FUEL, OIL, PAINT, OR OTHER HAZARDOUS MATERIALS SHOULD BE STORED IN
A SECONDARY CONTAINER AND REMOVED TO A LOCKED INDOOR AREA WITH AN
IMPERVIOUS FLOOR DURING NON-WORK HOURS.
9. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE RE-FUELED A MINIMUM
OF 100-FT AWAY FROM WETLANDS AND WATERCOURSES.
10. CONSTRUCTION EQUIPMENT SHALL BE STORED OUTSIDE OF AREAS SUBJECT TO
FLOODING.
11. CONTRACTOR TO STAKE OUT WORK LIMITS AND COORDINATE SELECTIVE
CLEARING WITH THE TOWN. NO SEPARATE PAYMENT.
12. A PRE-CONSTRUCTION MEETING SHALL BE HELD BETWEEN ALL PARTIES
INCLUDING THE TOWN ENVIRONMENTAL PLANNER PRIOR TO MOBILIZATION BY
THE CONTRACTOR.
13. THE CONTRACTOR SHALL REVIEW AND CLEAR THE SITE DAILY FOR TRASH AND/OR
DEBRIS.
14. THE CONTRACTOR SHALL PROVIDE ON-SITE LAVATORY FACILITIES TO BE
MAINTAINED THROUGHOUT CONSTRUCTION. TO BE PAID UNDER ITEM
"MOBILIZATION AND PROTECTION CLOSEOUT."
UTILITIES
1. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH APPROPRIATE
UTILITY COMPANIES REGARDING RELOCATION AND PROTECTION OF THEIR
FACILITIES AND SCHEDULING OF SUCH WORK.
PROPOSEDEXISTING
LEGEND
STREET LINE
PROPERTY LINE
CONTOUR
SPOT GRADE
STATE WETLAND BOUNDARY
FEDERAL WETLAND BOUNDARY
FEMA FLOODWAY
FEMA 100 YEAR FLOOD
UPLAND REVIEW AREA
ORDINARY HIGH WATER
TREE LINE
TREE
SHRUB
FENCE LINE
GUIDERAIL
STORM DRAIN W/ CATCH BASIN
UNDERGROUND ELECTRIC
UNDERGROUND COMMUNICATION
LIGHT POST
ELECTRIC MANHOLE
ELECTRIC BOX
TRANSFORMER
SIGN
MAILBOX
WELL
MONUMENT
CONTROL POINT
CURB
CONSTRUCTION EASEMENT LINE
DRAINAGE EASEMENT LINE
SEDIMENT EROSION CONTROL
SYSTEM
CUT LIMIT
FILL LIMIT
BORING
OHW
B-1
T
Pe de st ria n Tr ai l
Gazebo
229.34
230.35
228.43
228.31
228.73
228.93
228.93
228.90
226.75
226.97
228.98
229.27
229.45
229.26
228.38
227.19
226.97
227.78
229.24
229.51
229.80
229.25227.50
229.62
227.81 229.52
229.57
228.61
227.43
227.24
227.43
226.96
226.89
227.33
227.01
227.25 227.15
227.20
228.51
228.66
228.80
228.95
228.89
227.31
227.22
227.23
227.30
227.10
227.03
226.88
227.18
227.05
226.86
226.98
226.75
227.06
227.11
226.81
227.06
227.15
227.09
226.79
227.30
227.00
227.01
226.72
226.85
226.95
227.14
226.79
226.85
227.19
227.06
226.92
226.84
226.99
227.47
227.08
226.96
227.28
227.10
227.07
227.05
227.12
227.00
227.15
227.29
227.33
227.51
227.52
227.09
227.67
227.65
227.68
227.77
227.73
227.68
227.66
227.67
227.67
227.71
227.64
227.67
227.96
229.20
228.65
229.51
229.41
229.20
229.17
229.07
229.34
229.03
228.73
228.40 228.31
228.18
229.19
228.66
228.12
227.61
229.17
229.49
228.46
228.44
228.77
229.05
227.88
229.42
227.85
229.95
229.76
229.55
228.86
228.88
229.24
229.08
228.87
227.97
227.68
228.66
227.62
226.85 226.79
228.40
228.59
228.72 228.67
228.57
228.65
227.60
227.72
227.71
227.64
227.63
227.95
227.85
227.82
227.97 228.15
227.96
227.70
227.99
227.96
228.15
227.98
228.41
228.30
228.23
228.53
228.89
229.93
229.60
229.33
229.16
228.85
229.34
230.35
228.43
228.31
228.73
228.93
228.93
228.90
226.75
226.97
228.98
229.27
229.45
229.26
228.38
227.19
226.97
227.78
229.24
229.51
229.80
229.25227.50
229.62
227.81 229.52
229.57
228.61
227.43
227.24
227.43
226.96
226.89
227.33
227.01
227.25 227.15
227.20
228.51
228.66
228.80
228.95
228.89
227.31
227.22
227.23
227.30
227.10
227.03
226.88
227.18
227.05
226.86
226.98
226.75
227.06
227.11
226.81
227.06
227.15
227.09
226.79
227.30
227.00
227.01
226.72
226.85
226.95
227.14
226.79
226.85
227.19
227.06
226.92
226.84
226.99
227.47
227.08
226.96
227.28
227.10
227.07
227.05
227.12
227.00
227.15
227.29
227.33
227.51
227.52
227.09
227.67
227.65
227.68
227.77
227.73
227.68
227.66
227.67
227.67
227.71
227.64
227.67
227.96
229.20
228.65
229.51
229.41
229.20
229.17
229.07
229.34
229.03
228.73
228.40 228.31
228.18
229.19
228.66
228.12
227.61
229.17
229.49
228.46
228.44
228.77
229.05
227.88
229.42
227.85
229.95
229.76
229.55
228.86
228.88
229.24
229.08
228.87
227.97
227.68
228.66
227.62
226.85 226.79
228.40
228.59
228.72 228.67
228.57
228.65
227.60
227.72
227.71
227.64
227.63
227.95
227.85
227.82
227.97 228.15
227.96
227.70
227.99
227.96
228.15
227.98
228.41
228.30
228.23
228.53
228.89
229.93
229.60
229.33
229.16
228.85
229.34
230.35
228.43
228.31
228.73
228.93
228.93
228.90
226.75
226.97
228.98
229.27
229.45
229.26
228.38
227.19
226.97
227.78
229.24
229.51
229.80
229.25227.50
229.62
227.81 229.52
229.57
228.61
227.43
227.24
227.43
226.96
226.89
227.33
227.01
227.25 227.15
227.20
228.51
228.66
228.80
228.95
228.89
227.31
227.22
227.23
227.30
227.10
227.03
226.88
227.18
227.05
226.86
226.98
226.75
227.06
227.11
226.81
227.06
227.15
227.09
226.79
227.30
227.00
227.01
226.72
226.85
226.95
227.14
226.79
226.85
227.19
227.06
226.92
226.84
226.99
227.47
227.08
226.96
227.28
227.10
227.07
227.05
227.12
227.00
227.15
227.29
227.33
227.51
227.52
227.09
227.67
227.65
227.68
227.77
227.73
227.68
227.66
227.67
227.67
227.71
227.64
227.67
227.96
229.20
228.65
229.51
229.41
229.20
229.17
229.07
229.34
229.03
228.73
228.40 228.31
228.18
229.19
228.66
228.12
227.61
229.17
229.49
228.46
228.44
228.77
229.05
227.88
229.42
227.85
229.95
229.76
229.55
228.86
228.88
229.24
229.08
228.87
227.97
227.68
228.66
227.62
226.85 226.79
228.40
228.59
228.72 228.67
228.57
228.65
227.60
227.72
227.71
227.64
227.63
227.95
227.85
227.82
227.97 228.15
227.96
227.70
227.99
227.96
228.15
227.98
228.41
228.30
228.23
228.53
228.89
229.93
229.60
229.33
229.16
228.85
OHW-6
OHW-103
OHW-113
OHW-101
OHW-4
OHW-112
OHW-104
OHW-106
OHW-111
OHW-8
OHW-102
OHW-15
OHW-108
OHW-110
OHW-11
OHW-107
OHW-100
OHW-109
OHW-3
OHW-7
OHW-9
OHW-10
OHW-13
OHW-2
OHW-14
OHW-5
OHW-105
OHW-1
OHW-12
UPPER MIXVILLE POND LOWER MIXVILLE POND
EXISTING STONES
(300 SQFT)
233232
231 230
MIXVILLE PARK
BE
AC
H
0+
1+
2+
2+
STA.0+00.00
N. 748415.4531 E.948093.3560
STA.2+30.00
N. 748636.3355 E.948157.4727
TP-01 (SEE TEST PIT NOTE ON STR-02)
SHEET NAME
DATE
EX-01
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
SR
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
1" = 20'-0"
EX
IS
TI
N
G C
O N
D
IT
IO
N
S A
N D
B A
SE
LI
N E
IN
FO
R M
A
TI
O N
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
0' 10' 20'
0 1/2" 1"
S
W
N
E
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
EXISTING CONDITIONS PLAN
SCALE:1" = 40'-0"
I HEREBY CERTIFY THAT THE INLAND WETLAND BOUNDARY AND WATERCOURSE LINE(S)
AS SHOWN ON THIS MAP ARE SUBSTANTIALLY CORRECT
MATTHEW SANFORD - REGISTERED SOIL SCIENTIST
UPLAND REVIEW AREA
MAJOR CONTOUR
MINOR CONTOUR
ORDINARY HIGH
WATER LINE
FEMA FLOODWAY
LEGEND
FEMA 100 YEAR FLOOD
'-0
UP
LA
ND
R
EV
IE
W A
RE
A
Pe de st ria n Tr ai l
Gazebo
UPPER MIXVILLE POND LOWER MIXVILLE POND
233232
231 230
0+
1+
2+
2+
0"
SO
U
TH
R
AM
P
0"
N O
RT
H
R
AM
P
0"
BO
AR
D W
AL
K
EAST OUTLOOK
WEST OUTLOOK
ABUTMENT NO. 1
ABUTMENT NO. 2
HP-1 HELICAL PILE (TYP.)
(SEE STR-02 FOR HELICAL PILE NOTES AND DESIGN)
0'
-0
1'
-2
MIXEVILLE PARK
228227
'-0
UP
LA
ND
R
EV
IE
W A
RE
A
STA.0+19.08
N. 748433.7780 E.948098.6767
STA.2+10.92
N. 748618.0097 E.948152.1547
NOTES
1. COORDINATE FINAL LOCATION AND SPACING FOR
EXISTING STONES WITH TOWN ENGINEER.
2. STONE PATH SHALL EXTEND TOWARDS BOARDWALK
(CURRENTLY UNDER CONSTRUCTION).
EXISTING STONES SHALL BE SPACED AT 18"-24".
CONTRACTOR SHALL REPLACE ANY BROKEN STONES AT NO ADDITIONAL COST.
SHEET NAME
DATE
PR-01
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
SR
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
1" = 20'-0"
PR
O
PO
SE
D P
LA
N
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
0' 10' 20'
0 1/2" 1"
S
W
N
E
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
PROPOSED PLAN
SCALE: 1" = 20'-0"
0+00 1+00 2+00 2+30
80'-0"
(BOARDWALK)
6'-0"
(OUT-TO-OUT)
BOARDWALK PLAN
SCALE: 18" = 1'-0"
0" (T
YP
10'-0"
(TYP.)
55'-0"
SOUTH RAMP
55'-0"
NORTH RAMP
10'x10' EAST OUTLOOK
10'x10' WEST OUTLOOK
UPPER MIXVILLE POND
MIXVILLE PARK
ABUTMENT NO.1
Ordinary High Water Line
LOWER MIXVILLE POND
Ordinary High Water Line
ABUTMENT NO. 2
HP-1 HELICAL PILE (TYP.)
(SEE STR-02) FOR HELICAL PILE NOTES AND DESIGN
7' -6
2'-0"
7' -6
2'-0"10'-0"
(TYP.)
5'-0"
(LANDING)
8' -0
(T
YP
50'-0"
UPLAND REVIEW AREA
5'-0"
(LANDING)
80'-0"
(BOARDWALK)
10'-0"
OUTLOOK
10'-0"
OUTLOOK
BOARDWALK ELEVATION
SCALE: 18" = 1'-0"
5'-0"
(TYP.)
55'-0"
SOUTH RAMP
30'-0"5'-0"20'-0"
55'-0"
NORTH RAMP
30'-0" 5'-0" 20'-0"
190'-0"
ABUTMENT NO. 1
(SEE DETAIL ON STR-03)
ABUTMENT NO. 2
(SEE DETAIL ON STR-03)
10'-0" 10'-0" 5'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 5'-0" 10'-0" 10'-0"
5'-0"
(TYP)
30'-0" 30'-0"
EL. 224.35 EL. 224.35
EL. 233.50EL. 233.50 EL. 233.50
NOTE:
- RAILINGS NOT SHOWN FOR CLARITY
EL. 229.40
EL. 230.50 EL. 230.50
EL.
228.40
8'-0" 8'-0"
Ex. Grade
FINISHED GRADE
RAILING POST (TYP.)
2'-0"
(TYP.)
HP-1 HELICAL PILE (TYP.)
(SEE STR-02 FOR HELICAL PILE NOTES AND DESIGN)
SHEET NAME
DATE
STR-01
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
SR
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
AS NOTED
ST
R
U C
TU
R
A L
PL
A
N A
N D
E
LE
VA
TI
O N
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
S
W
N
E
STR-02
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
JG
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
AS NOTED
ST
R
U C
TU
R
A L
D
ET
A
IL
S
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
8"x4" TIMBER BEAM
1'-0"
(TYP.)
4'-0" (BOARDWALK)
TYPICAL BOARDWALK/OVERLOOK SECTION
SCALE: 12"=1'-0"
4"Ø BOLTS (TYP.)
NOTES
1. ALL POSTS AND TOP RAIL SHALL BE ACTUAL SIZE.
2. ALL MEMBERS SHALL BE PRESSURE TREATED TIMBER, COLOR TO BE DETERMINED.
3. ALL PRESSURE TREATED TIMBER SHALL BE NOMINAL SIZE.
4. CROSS BRACE AT TIMBER COLUMN AS REQUIRED.
5. ALL EXPOSED END OF POSTS AND RAILS SHALL BE 1" CHAMFERED (45°) EDGES.
6. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR APPROVAL.
5'-2" (BOARDWALK)
(CLEARANCE)
6'-0" (BOARDWALK)
(OUT-TO-OUT)
2"x6" TIMBER DECKING
(TYP.)
EXTEND 4"x4" POST
THROUGH DECK
(2) - 2"x10" JOIST
@ 10" O.C. (TYP.)
4x4 CEDAR POST
(TYP.)
2"x6" CEDAR RAIL CAP
W/ CHAMFERED EDGES
(45° ANGLE)
L31 2"x31
2"x
4" (TYP.)
COUNTERSINK LAG
BOLTS (TYP.)
2"x10" DIAPHRAGM
(TYP.)
FINISHED GRADE
3' -6
HP-1 4.5" OD GALVANIZED ROUND SHAFT
HELICAL PILE @ 10'-0" O.C. (TYP.)
SUPPORT BRACKET (TYP.)
2"Ø HEX HEAD BOLT W/
NUT & LOCKWASHER
(TYP.)
WIRE MESH PANEL SYSTEM MESH 4"x4"x1
4" THICK STEEL (OPENING SHALL
NOT EXCEED 4") MESH SHALL BE ON FRAMED WITH U-CHANNEL AND
PANEL SHALL BE MOUNTED TO TIMBER POSTS AND 2x4 PER
MANUFACTURER RECOMMENDATIONS ALL HARDWARE AND SYSTEM SHALL
BE COLOR BLACK WIRE MESH PANEL SYSTEM AS MANUFACTURED BY WILD
HOG PRODUCTS, TEL. 1-888-246-4463 OR APPROVED EQUAL
2"
1"
1" 3 4"
2"
312"
2"x4" (TYP.)
FASTENING NOTES
1. JOISTS TO POSTS - 1/2"Ø HEX HEAD BOLTS & 3/4"Ø THRU BOLTS AS SHOWN ON DETAILS.
2. DECKING TO JOISTS - 3" GALVANIZED SCREWS.
3. RAILINGS TO POSTS & GUSSET PLATE - 3" GALVANIZED SCREWS.
STEEL NOTES
1. ALL STEEL SHALL CONFORM TO ASTM A36.
2. ALL STEEL BRACKETS AND PLATES SHALL BE HOT-DIPPED GALVANIZED TO ASTM
A385/AASHTO M111 STANDARDS
BOARDWALK, PLATFORM, AND OVERLOOK
PART 1 - GENERAL
DESCRIPTION OF WORK:
BOARDWALK CONSTRUCTION INCLUDES THE FOLLOWING TYPES OF WORK:
· WIRE MESH PANEL RAILING SYSTEM
· CONCRETE ABUTMENTS
· HELICAL PILE
· TIMBER FRAMING & DECKING
PLATFORM CONSTRUCTION INCLUDES THE FOLLOWING TYPES OF WORK:
· WIRE MESH PANEL RAILING SYSTEM
· HELICAL PILE
· TIMBER FRAMING & DECKING
REFERENCES
LUMBER STANDARDS: COMPLY WITH PS 20 AND WITH APPLICABLE RULES OF THE
RESPECTIVE GRADING AND INSPECTING AGENCIES FOR SPECIES AND PRODUCTS
INDICATED.
SUBMITTALS
PRODUCT DATA: SUBMIT MANUFACTURER'S SPECIFICATIONS AND INSTALLATION
INSTRUCTIONS FOR MATERIALS LISTED BELOW:
WOOD TREATMENT DATA: SUBMIT TREATMENT MANUFACTURER'S INSTRUCTIONS FOR
PROPER USE OF EACH TYPE OF TREATED MATERIAL.
PRESSURE TREATMENT: FOR EACH TYPE SPECIFIED, INCLUDE CERTIFICATION BY TREATING
PLANT STATING CHEMICALS AND PROCESS USED, NET AMOUNT OF PRESERVATIVE RETAINED
AND CONFORMANCE WITH APPLICABLE STANDARDS.
HELICAL PILE: HELICAL PILE AND PILE-HEAD SHOP DRAWINGS SHALL BE COORDINATED
WITH THE TIMBER FRAMING AND REVIEWED BY THE ENGINEER OF RECORD.
PRODUCT HANDLING
DELIVERY AND STORAGE: KEEP MATERIALS DRY AT ALL TIMES. PROTECT AGAINST EXPOSURE
TO WEATHER AND CONTACT WITH DAMP OR WET SURFACES. STACK LUMBER AND PLYWOOD,
AND PROVIDE AIR CIRCULATION WITHIN STACKS.
PART 2 - PRODUCTS
MATERIALS
LUMBER, GENERAL
FACTORY MARK EACH PIECE OF LUMBER WITH TYPE, GRADE, MILL AND GRADING AGENCY,
EXCEPT OMIT MARKING FROM SURFACES TO BE EXPOSED WITH TRANSPARENT FINISH OR
WITHOUT FINISH.
NOMINAL SIZES ARE INDICATED, EXCEPT AS SHOWN BY DETAIL DIMENSIONS. PROVIDE
ACTUAL SIZES AS REQUIRED BY PS 20, FOR MOISTURE CONTENT SPECIFIED FOR EACH USE.
PROVIDE DRESSED LUMBER, S4S, UNLESS OTHERWISE INDICATED.
PROVIDE SEASONED LUMBER WITH 19% MAXIMUM MOISTURE CONTENT AT THE TIME OF
DRESSING.
PROVIDE SOUTHERN PINE LUMBER, ALL RAILING TO BE CEDAR. ALL JOISTS & BEAMS TO BE
No. 2 GRADE S.Y.P.
POSTS SHALL RUN FULL HEIGHT AND NO SPLICING ALLOWED.
MISCELLANEOUS MATERIALS
FASTENERS AND ANCHORAGES: PROVIDE SIZE, TYPE, MATERIAL AND FINISH AS INDICATED
AND AS RECOMMENDED BY APPLICABLE STANDARDS, COMPLYING WITH APPLICABLE
FEDERAL SPECIFICATIONS FOR NAILS, STAPLES, SCREWS, BOLTS, NUTS, WASHERS AND
ANCHORING DEVICES. PROVIDE METAL HANGERS AND FRAMING ANCHORS OF THE SIZE
AND TYPE RECOMMENDED BY THE MANUFACTURER FOR EACH USE INCLUDING
RECOMMENDED NAILS. PROVIDE FASTENERS AND ANCHORAGES WITH A HOT-DIP ZINC
COATING (ASTM A 153).
WOOD PRESERVATIVE TREATMENT: .40 ACQ PER AWPA STANDARDS C2.
PART 3 - EXECUTION
MATERIALS, GENERAL
DISCARD UNITS OF MATERIAL WITH DEFECTS WHICH MIGHT IMPAIR QUALITY OF WORK, AND
UNITS WHICH ARE TOO SMALL TO USE IN FABRICATING WORK WITH MINIMUM JOINTS OR
OPTIMUM JOINT ARRANGEMENTS.
SET CARPENTRY WORK ACCURATELY TO REQUIRED LEVELS AND LINES, WITH MEMBERS
PLUMB AND TRUE AND ACCURATELY CUT AND FITTED.
SECURELY ATTACH CARPENTRY WORK TO SUBSTRATE BY ANCHORING AND FASTENING AS
SHOWN AND AS REQUIRED BY RECOGNIZED STANDARDS. COUNTERSINK SCREW AND NAIL
HEADS ON EXPOSED CARPENTRY WORK AND RILL HOLES. SELECT FASTENERS OF SIZE THAT
WILL NOT PENETRATE MEMBERS WHERE OPPOSITE SIDE WILL BE EXPOSED TO VIEW. MAKE
TIGHT CONNECTIONS BETWEEN MEMBERS. INSTALL FASTENERS WITHOUT SPLITTING OF
WOOD; PRE-DRILL AS REQUIRED.
GENERAL NOTES
1. THE CONTRACTOR SHALL OBTAIN A BUILDING PERMIT PRIOR TO THE BEGINNING OF WORK.
2. ALL WOOD FOR THE BOARDWALK FRAMING AND DECKING SHALL BE PRESSURE TREATED .40 ACQ
LUMBER, (SOUTHERN YELLOW PINE).
3. ALL POST AND RAILING SHALL BE CEDAR.
4. ALL NAILS, SCREWS, CONNECTORS, BRACKETS, PLATES, AND FASTENERS ARE TO BE HOT-DIP
GALVANIZED.
5. BOARDWALK IS TO HAVE HELICAL PILES AS SHOWN .
SPECIFICATIONS
SPECIFICATIONS:CONNECTICUT DEPARTMENT OF TRANSPORTATION FORM 819 (2024), SUPPLEMENTAL
SPECIFICATIONS AND SPECIAL PROVISIONS.
DESIGN SPECIFICATIONS: AASHTO LRFD DESIGN SPECIFICATIONS, 10TH EDITION, 2024, AS
SUPPLEMENTED BY THE CONNECTICUT DEPARTMENT OF TRANSPORTATION BRIDGE AND ROADWAY
STRUCTURES DESIGN MANUAL, RELEASE (BRSDM).
DESIGN LOADING
ALLOWABLE DESIGN STRESSES:
PRECAST f'c = 5,000 psi
THE SPECIFIED CONCRETE STRENGTH USED IN DESIGN, f'c, OF THE CONCRETE COMPONENTS IS NOTED ABOVE. THE MINIMUM COMPRESSIVE STRENGTH OF THE CONCRETE IN THE CONSTRUCTED COMPONENTS
SHALL CONFORM TO THE REQUIREMENTS OF "SECTION 6.01 CONCRETE FOR STRUCTURES".
REINFORCEMENT
(ASTM A615 GRADE 60) fy = 60000 psi
LIVE LOAD: 90 PSF PEDESTRIAN LOAD
DEAD LOAD: ALL PEDESTRIAN BOARDWALK AND PLATFORM COMPONENTS.
CONCRETE NOTES:
1. REMAIN-IN-PLACE FORMS: THE USE OF REMAIN-IN-PLACE FORMS ON THIS STRUCTURE IS NOT
ALLOWED.
2. THE FOLLOWING PAY ITEMS AND CONCRETE CLASSES ARE REQUIRED FOR CAST-IN-PLACE BRIDGE
COMPONENTS:
3. EXPOSED EDGES: EXPOSED EDGES OF CONCRETE SHALL BE BEVELED 1"X1" UNLESS DIMENSIONED
OTHERWISE.
4. CONCRETE COVER: ALL FOOTING REINFORCEMENT SHALL HAVE THREE INCHES OF COVER. ALL
OTHER REINFORCEMENT SHALL HAVE TWO INCHES OF COVER UNLESS DIMENSIONED OTHERWISE.
5. REINFORCEMENT: ALL REINFORCEMENT SHALL BE ASTM A615 GRADE 60 .
ITEM BRIDGE COMPONENTS
PRECAST ABUTMENTS
TYPICAL WIRE MESH PANEL RAILING
NOT TO SCALE
TYPICAL WIRE MESH PANEL
NOT TO SCALE
TEST PIT
TP-01
· 0-2ft: SURFACE COBBLE WITHIN LOOSE COARSE SAND
· 2-5ft: MEDIUM DENSE, FINE TO COARSE SAND WITH SOME SILT
HELICAL PILES NOTES
1. CHANCE RS500.337: 4.5" OUTSIDE DIAMETER X 0.377 INCH NOMINAL WALL, HOT DIPPED
GALVANIZED, OR APPROVED EQUAL.
2. PROPOSED LEAD: CHANCE C1070943 WITH 10/12/14 INCH HELICES AND MATCHING ROUND SHAFT EXTENSIONS. FINAL HELIX CONFIGURATION AND LENGTH SHALL BE ESTABLISHED BY THE PILE
SPECIALIST .
3. MINIMUM EMBEDMENT, INSTALLATION TORQUE AND LOAD-TEST ACCEPTANCE CRITERIA SHALL BE
ESTABLISHED BY THE PILE SPECIALIST AND SUBMITTED TO THE ENGINEER OF RECORD.
PRELIMINARY ACTIONS PER PILE
ACTION SERVICE
COMPRESSION 7.0 KIPS
HORIZONTAL 0.50 KIPS
STR-03
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
JG
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
AS NOTED
ST
R
U C
TU
R
A L
D
ET
A
IL
S
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
VARIES (SEE PLAN VIEW) 4x4 CEDAR POST (TYP.)
(2) - CONTINUOUS JOISTS
@ EDGES (STAGGER JOISTS)
6"x6" TIMBER
BEAM (TYP.)
(2) - 2"x10" JOISTS WITH
2'-0" OVERLAP TO BE
NAILED
2"x6" PRESSURE TREATED DECKING (TYP.)
FASTEN USING HIDDEN FASTENERS W/ STAINLESS
STEEL SCREWS AND 14" GAP B/T BOARDS. END
BOARDS, USE 3" (#8) STAINLESS STEEL SCREWS
(2 PER CONNECTION). COUNTERSINK HOLE TO SET
SCREW HEADS 18" BELOW DECK SURFACE.
POST CONNECTOR (TYP.)
(SEE DETAIL)
BOARDWALK FRAMING PLAN
SCALE: 12"=1'-0"
EQ. EQ.
L 31 2"x31
2"x1
4" (TYP.)
'2x' BLOCKING
@ 3'-4" (TYP.)
6' -0
(B
O A R D
W A
LK
(P
A Y
W
ID
TH
(O U
T-
TO
-O U
T)
312" (TYP.)
5' -2
(C
LE
A R A N
C E
A B O
V E)
3'-4"
2"x10" DIAPHRAGM (TYP.)
TYPICAL CONCRETE ABUTMENT (PRECAST)
SCALE: 1
2" = 1'-0"
PLAN ELEVATION
1'-2"
7' -6
2'-0" 10"
6' -6
6"
6"
5' -0
2x10 JOIST @ 10" O.C. (TYP.)
2x6 TIMBER PLATE
1'-0"
6"
TIMBER DECKING
2'-0"
#6 HORIZONTAL BARS AT
12" O.C. EACH FACE
#6 VERTICAL BARS AT
12" O.C. EACH FACE
EXISTING GRADE
SEE "ENLARGED DETAIL A"
ON THIS SHEET
10" 1'-2"
6' -0
FIRST SPAN
CURTAIN WALLBACKWALL
NOTE
PROVIDE ADDITIONAL BLOCKING
AS REQUIRED AT POSTS.
TYPICAL OVERLOOK FRAMING PLAN
SCALE: 12" = 1'-0"
0"
4' -0
4'
-0
5' -0
5'
-0
1' -0
1'
-0
1'-0" 8'-0" 1'-0"
2x10 TIMBER JOIST @ 10" O.C. (TYP.)
(2) - 2x10 TIMBER JOIST (TYP.)
6x6 TIMBER BEAM (TYP.)
10" (TYP.)
'2x' BLOCKING AT MIDSPAN
SEE "JOIST HANGER DETAIL"
ON THIS SHEET FOR CONNECTION
10'-0"
RAILING POST (TYP.)
VARIES (SEE PLAN VIEW) 2x6 TIMBER RAIL CAP
4"x4" CEDAR POST (TYP.)
2"X6" TIMBER WEARING
SURFACE (TYP.)
SEE DETAIL ON THIS SHEET FOR
POST CONNECTION
3' -6
TYPICAL RAILING ELEVATION
SCALE: 12"=1'-0"
EQ. EQ.
WIRE MESH PANEL SYSTEM MESH 4"x4"x1
4" THICK STEEL
(OPENING SHALL NOT EXCEED 4") MESH SHALL BE ON
FRAMED WITH U-CHANNEL AND PANEL SHALL BE MOUNTED
TO TIMBER POSTS AND 2x4 PER MANUFACTURER
RECOMMENDATIONS ALL HARDWARE AND SYSTEM SHALL BE
COLOR BLACK WIRE MESH PANEL SYSTEM AS
MANUFACTURED BY WILD HOG PRODUCTS, TEL.
1-888-246-4463 OR APPROVED EQUAL
(SEE PHOTO/ADDITIONAL INFORMATION ON THIS SHEET)
HP-1 4.5" OD GALVANIZED ROUND SHAFT
HELICAL PILE @ 10'-0" O.C.
2x10 TIMBER JOIST (TYP.)
SIMPSON STRONG HANGER
OR APPROVED EQUAL
JOIST HANGER DETAIL
SCALE: 11
2"=1'-0"
SIMPSON STRONG HANGER
OR APPROVED EQUAL
2x10 TIMBER JOIST (TYP.)
NOTE:
- FASTENERS SHALL BE PER MANUFACTURER SPECIFICATIONS.
BLOCKING
L31 2"x31
2"x
4" (TYP.)
(2) - 12"Øx31
2""THRU
BOLTS EACH SIDE
(TYP.)
(2) - 12"Ø THRU BOLTS
4x4 RAILING POST
4"
(TYP.)
PLAN
RAILING POST CONNECTION
SCALE: 11
2"=1'-0"
(2) - CONTINUOUS TIMBER JOIST
@ EDGES (STAGGER JOIST)
2x10 JOIST
L31 2"x31
2"x
4" (2) - 12"Ø THRU BOLTS EACH
SIDE (TYP.)
(2) - 12"Ø THRU
BOLTS
(2)- CONTINUOUS TIMBER JOIST
AT EDGES
(2) - 3 16"Øx10" LAG
SCREW (TYP.)
BLOCKING
SECTION
8"
(2) - 3 16"x10" LAG
SCREW
5"
112"
3" 1"
2"
TIMBER DECKING
BOARDWALK
JOIST
CONCRETE ABUTMENT BACKWALL
±6'-0" (POST TO POST) x6"x1 4"
GALVANIZED STEEL PLATE
3"x14" NOTCH
3" SCREW (TYP.)
ENLARGED DETAIL A
SCALE: 1 12"=1'-0"
BACKWALL SHALL BE SLOPED
TO MATCH BOARDWALK
SE-01
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
SR
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
AS NOTED
SE
D
IM
EN
TA
TI
O N
E
R O
SI
O
N C
O N
TR
O
L
PL
A N
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
SEDIMENT & EROSION CONTROL SPECIFICATIONS
GENERAL
1. THESE GUIDELINES SHALL APPLY TO ALL WORK CONSISTING OF ANY AND ALL
TEMPORARY AND/OR PERMANENT MEASURES TO CONTROL WATER POLLUTION
AND SOIL EROSION, AS MAY BE REQUIRED, DURING THE CONSTRUCTION OF
THE PROJECT.
2. IN GENERAL, ALL CONSTRUCTION ACTIVITIES SHALL PROCEED IN SUCH A
MANNER SO AS NOT TO POLLUTE ANY WETLANDS, WATERCOURSE,
WATERBODY, AND CONDUIT CARRYING WATER, ETC. THE CONTRACTOR SHALL
LIMIT, INSOFAR AS POSSIBLE, THE SURFACE AREA OF EARTH MATERIALS
EXPOSED BY CONSTRUCTION METHODS AND IMMEDIATELY PROVIDE
PERMANENT AND TEMPORARY POLLUTION CONTROL MEASURES TO PREVENT
CONTAMINATION OF ADJACENT WETLANDS, WATERCOURSES, AND
WATERBODIES, AND TO PREVENT, INSOFAR AS POSSIBLE, EROSION ON THE
SITE.
3. THE CONTRACTOR SHALL BE THE RESPONSIBLE PARTY FOR THE
IMPLEMENTATION AND MAINTENANCE OF THE SEDIMENT AND EROSION
CONTROL MEASURES ON SITE.
4. THE ENGINEER OF RECORD SHALL SUBMIT SEDIMENT AND EROSION CONTROL
REPORTS TO THE INLAND WETLANDS AND WATERCOURSES AGENCY ON A
WEEKLY BASIS AND AFTER RAINFALL EVENTS GREATER THAN ONE HALF INCH
(0.5"), WHICHEVER IS SOONER.
5. THE CONTRACTOR SHALL MONITOR WEATHER REPORTS AND BE PREPARED TO
STABILIZE THE SITE IF MORE THAN ONE HALF INCH (0.5") OF RAINFALL IS
PREDICTED BY THE NATIONAL WEATHER SERVICE (70% CHANCE OR HIGHER).
6. THE CONTRACTOR SHALL MAINTAIN A STOCKPILE OF SEDIMENT AND EROSION
CONTROL MATERIALS FOR THE PURPOSE OF MAINTAINING AND/OR REPAIRING
PROPOSED SEDIMENT AND EROSION CONTROL MEASURES.
7. NO BYPASS PUMPING OF THE WATERCOURSE IS PROPOSED AS A PART OF THIS
PROJECT.
LAND GRADING
GENERAL
1. THE RESHAPING OF THE GROUND SURFACE BY EXCAVATION AND FILLING OR A
COMBINATION OF BOTH, TO OBTAIN PLANNED GRADES, SHALL PROCEED IN
ACCORDANCE WITH THE FOLLOWING CRITERIA:
a. THE CUT FACE OF EARTH EXCAVATION SHALL NOT BE STEEPER THAN
TWO HORIZONTAL TO ONE VERTICAL (2:1).
b. THE PERMANENT EXPOSED FACES OF FILLS SHALL NOT BE STEEPER THAN
TWO HORIZONTAL TO ONE VERTICAL (2:1).
c. THE CUT FACE OF ROCK EXCAVATION SHALL NOT BE STEEPER THAN ONE
HORIZONTAL TO FOUR VERTICAL (1:4).
d. PROVISION SHOULD BE MADE TO CONDUCT SURFACE WATER SAFELY TO
STORM DRAINS TO PREVENT SURFACE RUNOFF FROM DAMAGING CUT
FACES AND FILL SLOPES.
e. EXCAVATIONS SHOULD NOT BE MADE SO CLOSE TO PROPERTY LINES AS
TO ENDANGER ADJOINING PROPERTY WITHOUT PROTECTING SUCH
PROPERTY FROM EROSION, SLIDING, SETTLING, OR CRACKING.
f. NO FILL SHOULD BE PLACED WHERE IT WILL SLIDE OR WASH UPON THE
PREMISES OF ANOTHER OWNER OR UPON ADJACENT WETLANDS,
WATERCOURSES, OR WATERBODIES.
g. PRIOR TO ANY REGRADING, A STABILIZED CONSTRUCTION ENTRANCE
SHALL BE PLACED AT THE ENTRANCE TO THE WORK AREA IN ORDER TO
REDUCE MUD AND OTHER SEDIMENTS FROM LEAVING THE SITE.
TOP SOILING
GENERAL
1. TOPSOIL SHALL BE SPREAD OVER ALL EXPOSED AREAS IN ORDER TO PROVIDE
A SOIL MEDIUM HAVING FAVORABLE CHARACTERISTICS FOR THE
ESTABLISHMENT, GROWTH, AND MAINTENANCE OF VEGETATION.
2. UPON ATTAINING FINAL SUBGRADES, SCARIFY SURFACE TO PROVIDE A GOOD
BOND WITH TOPSOIL.
3. REMOVE ALL LARGE STONES, TREE LIMBS, ROOTS AND CONSTRUCTION
DEBRIS.
4. APPLY LIME ACCORDING TO SOIL TEST OR AT THE RATE OF TWO (2) TONS PER
ACRE.
MATERIAL
1. TOPSOIL SHOULD HAVE PHYSICAL, CHEMICAL, AND BIOLOGICAL
CHARACTERISTICS FAVORABLE TO THE GROWTH OF PLANTS.
2. TOPSOIL SHOULD HAVE A SANDY OR LOAMY TEXTURE.
3. TOPSOIL SHOULD BE RELATIVELY FREE OF SUBSOIL MATERIAL AND MUST BE
FREE OF LARGE STONES, LUMPS OF SOIL, ROOTS, TREE LIMBS, TRASH, OR
CONSTRUCTION DEBRIS. IT SHOULD BE FREE OF ROOTS OR RHIZOMES SUCH
AS THISTLE, NUTGRASS, AND QUACKGRASS.
4. AN ORGANIC MATTER CONTENT OF SIX PERCENT (6%) IS REQUIRED. AVOID
LIGHT COLORED SUBSOIL MATERIAL.
5. SOLUBLE SALT CONTENT OF OVER 500 PARTS PER MILLION (PPM) IS LESS
SUITABLE. AVOID TIDAL MARSH SOILS BECAUSE OF HIGH SALT CONTENT AND
SULFUR ACIDITY.
6. THE pH SHOULD BE MORE THAN 6.0. IF LESS, ADD LIME TO INCREASE pH TO
AN ACCEPTABLE LEVEL.
APPLICATION
1. AVOID SPREADING WHEN TOPSOIL IS WET OR FROZEN.
2. SPREAD TOPSOIL UNIFORMLY TO A DEPTH OF AT LEAST FOUR INCHES (4"), OR
TO THE DEPTH SHOWN ON THE PLANS.
PERMANENT VEGETATIVE COVER
GENERAL
1. PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED AS VARIOUS
SECTIONS OF THE PROJECT ARE COMPLETED IN ORDER TO STABILIZE THE
SOIL, REDUCE DOWNSTREAM DAMAGE FROM SEDIMENT AND RUNOFF, AND TO
ENHANCE THE AESTHETIC NATURE OF THE SITE. IT WILL BE APPLIED TO ALL
CONSTRUCTION AREAS SUBJECT TO EROSION WHERE FINAL GRADING HAS
BEEN COMPLETED AND A PERMANENT COVER IS NEEDED.
SITE PREPARATION
1. INSTALL REQUIRED SURFACE WATER CONTROL MEASURES.
2. REMOVE LOOSE ROCK, STONE, AND CONSTRUCTION DEBRIS FROM AREA.
3. PERFORM ALL PLANTING OPERATIONS PARALLEL TO THE CONTOURS OF THE
SLOPE.
4. APPLY TOPSOIL AS INDICATED ELSEWHERE HEREIN.
5. APPLY FERTILIZER ACCORDING TO SOIL TEST OR:
*SPREAD SEEDING: WORK DEEPLY IN SOIL, BEFORE SEEDING, 300 LBS. OF
10-10-10 FERTILIZER PER ACRE (7 LBS. PER 1,000 SQ. FT.); THEN SIX (6) TO
EIGHT (8) WEEKS LATER, APPLY ON THE SURFACE AN ADDITIONAL 300 LBS. OF
10-10-10 FERTILIZER PER ACRE. AFTER SEPTEMBER 1, TEMPORARY VEGETATIVE
COVER SHALL BE APPLIED.
*FALL SEEDING: WORK DEEPLY IN SOIL, BEFORE SEEDING, 600 LBS. OF 10-10-10
FERTILIZER PER ACRE (14 LBS. PER 1,000 SQ. FT.)
PLANTING NOTES
GENERAL
1. THE LANDSCAPE CONTRACTOR SHALL PROVIDE A 6" MINIMUM DEPTH OF
TOPSOIL FOR ALL LAWN AREAS. WATER AS NECESSARY TO ESTABLISH TURF.
2. ALL PLANT MATERIAL IS SUBJECT TO INSPECTION AND APPROVAL BY THE
LANDSCAPE ARCHITECT PRIOR TO AND AFTER PLANTING.
3. IN AREAS OF SEEDING - TOPSOIL TO CONTAIN 6-12% ORGANIC CONTENT (BY
WEIGHT), AMEND SOIL WITH ORGANIC MATTER (LEAF COMPOST).
EROSION CHECKS
GENERAL
1. TEMPORARY PERVIOUS BARRIERS USING BALES OF HAY OR STRAW, HELD IN
PLACE WITH STAKES DRIVEN THROUGH THE BALES AND INTO THE GROUND OR
GEOTEXTILE FABRIC FASTENED TO A FENCE POST AND BURIED INTO THE
GROUND, SHALL BE INSTALLED AND MAINTAINED AS REQUIRED TO CHECK
EROSION AND REDUCE SEDIMENTATION.
CONSTRUCTION
1. BALES SHOULD BE PLACED IN A ROW WITH ENDS TIGHTLY ABUTTING THE
ADJACENT BALES.
2. EACH BALE SHALL BE EMBEDDED INTO THE SOIL A MINIMUM OF FOUR INCHES
(4").
3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY WOOD STAKES OR
REINFORCEMENT BARS DRIVEN THROUGH THE BALES AND INTO THE GROUND.
THE FIRST STAKE IN EACH BALE SHALL BE ANGLED TOWARD THE PREVIOUSLY
LAID BALE TO FORCE BALES TOGETHER.
4. GEOTEXTILE FABRIC SHALL BE SECURELY ANCHORED AT THE TOP OF A THREE
FOOT (3') HIGH FENCE AND BURIED A MINIMUM OF FOUR INCHES (4") TO THE
SOIL. SEAMS BETWEEN SECTIONS OF FILTER FABRIC SHALL OVERLAP A
MINIMUM OF TWO FEET (2').
INSTALLATION AND MAINTENANCE
1. BALED HAY EROSION BARRIERS SHALL BE INSTALLED AT ALL STORM SEWER
INLETS.
2. BALED HAY EROSION BARRIERS AND GEOTEXTILE FENCE SHALL BE INSTALLED
AT THE LOCATION INDICATED ON THE PLAN AND IN ADDITIONAL AREAS AS
MAY BE DEEMED APPROPRIATE DURING CONSTRUCTION.
3. ALL EROSION CHECKS SHALL BE MAINTAINED UNTIL ADJACENT AREAS ARE
STABILIZED.
4. INSPECTION SHALL BE FREQUENT (AT MINIMUM MONTHLY AND BEFORE AND
AFTER HEAVY RAIN) AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY
AS NEEDED.
5. EROSION CHECKS SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR
USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORMWATER FLOW OR
DRAINAGE.
EROSION CONTROL MAINTENANCE INTERVALS
EROSION CONTROL
MEASURE CONTROL OBJECTIVE INSPECTION/MAINTENANCE FAILURE INDICATORS REMOVAL
SILT FENCE (SF)
(RELATED: IP, STK)
- INTERCEPT, AND REDIRECT/DETAIN
SMALL AMOUNTS OF SEDIMENT FROM
SMALL DISTURBED AREAS.
- DECREASE VELOCITY OF SHEET FLOW.
- PROTECT SENSITIVE SLOPES OR
SOILS FROM EXCESSIVE WATER FLOW.
INSPECT AT LEAST ONCE A WEEK AND WITHIN 24 HOURS
OF THE END OF A STORM WITH A RAINFALL OF 0.5
INCHES OR MORE. ACCUMULATED SEDIMENT MUST BE
REMOVED ONCE ITS DEPTH IS EQUAL TO ½ THE TRENCH
HEIGHT. INSPECT FREQUENTLY DURING PUMPING
OPERATIONS IF USED FOR DEWATERING OPERATIONS.
- PHYSICAL DAMAGE OR
DECOMPOSITION
- EVIDENCE OF OVERTOPPED OR
UNDERCUT FENCE
- EVIDENCE OF SIGNIFICANT FLOWS
EVADING CAPTURE
- REPETITIVE FAILURE
SILT FENCE MAY BE REMOVED AFTER
UPHILL AND SENSITIVE AREAS HAVE
BEEN PERMANENTLY STABILIZED.
HAY BALES (HB)
- INTERCEPT, AND REDIRECT/DETAIN
SMALL AMOUNTS OF SEDIMENT FROM
SMALL DISTURBED AREAS.
- DECREASE VELOCITY OF SHEET FLOW.
- PROTECT SENSITIVE SLOPES OR
SOILS FROM EXCESSIVE WATER FLOW.
INSPECT AT LEAST ONCE A WEEK AND WITHIN 24 HOURS
OF THE END OF A STORM WITH A RAINFALL OF 0.5
INCHES OR MORE. ACCUMULATED SEDIMENT MUST BE
REMOVED ONCE THE DEPTH OF SEDIMENT IS EQUAL TO
½ THE HEIGHT OF THE BARRIER. INSPECT FREQUENTLY
DURING PUMPING OPERATIONS IF USED FOR
DEWATERING OPERATIONS.
- PHYSICAL DAMAGE OR
DECOMPOSITION
- EVIDENCE OF OVERTOPPED OR
UNDERCUT FENCE
- EVIDENCE OF SIGNIFICANT FLOWS
EVADING CAPTURE
- REPETITIVE FAILURE
HAY BALES MAY BE REMOVED AFTER
UPHILL AREAS HAVE BEEN
PERMANENTLY STABILIZED.
STOCKPILE
PROTECTION
(STK)
- RETAIN SOIL STOCKPILE IN
LOCATIONS SPECIFIED, AND REDUCE
WATER-TRANSPORT.
INSPECT SILT FENCE AT THE END OF EACH WORK DAY
AND IMMEDIATELY REPAIR DAMAGES. PERIODIC
REINFORCEMENT OF SILT FENCE, OR ADDITION OF HAY
BALES MAY BE NECESSARY.
- EVIDENCE OF STOCK PILE
DIMINISHING DUE TO RAIN EVENTS
- FAILURE OF SILT FENCE
STOCKPILE PROTECTION MAY BE
REMOVED ONCE THE STOCKPILE IS
USED OR REMOVED.
FLAT BOTTOM COVERED
BY FILTER FABRIC
6' MIN.
NOTES
1. IF PUMPING VOLUME EXCEEDS BASIN CAPACITY,
BASIN MAY BE USED IN TANDEM OR TIERS.
2. INCREASE RIPRAP SIZE ON BASIN BOTTOM AS
NECESSARY TO MAINTAIN SEDIMENT-FREE
DISCHARGE WATERS.
3. TEMPORARY DEWATERING BASIN SHALL BE PAID
FOR UNDER "HANDLING WATER".
6"
BASIN 2
SPILLWAY
BASIN 1
6' M
IN
TEMPORARY DEWATERING BASIN
NOT TO SCALE
INLET HOSE
DIAMETER = 'D'
STAKE
STRAW BALES
STONE ENERGY DISSIPATOR
RIPRAP
FILTER FABRIC
COVERING BOTTOM
AND SIDES
GRAVEL/RIPRAP
PROTECTION AS
NECESSARY
FLO
W
TWO STAKES PER BALE
BACKFILL AND COMPACT
EXCAVATED SOIL ON
UPHILL SIDE OF BALES
PLACE BALES SO
BINDINGS ON BALES ARE
PARALLEL TO THE GROUND
ENTRENCH BALES TO A
DEPTH OF 2" TO 4"
FILL VOIDS
WITH LOOSE
STRAW
NOTES
1. IDEALLY, BALES SHOULD BE ENTRENCHED 2 TO 4 INCHES AND TIGHTLY
BUTTED TOGETHER. BALES CAN BE SUCCESSFULLY PLACED WITHOUT A
TRENCH IF GOOD GROUND CONTACT IS MADE. REMOVE HEAVY BRUSH AND
FILL ALL VOIDS WITH LOOSE STRAW.
2. BALES SHALL BE ONLY USED AS A TEMPORARY BARRIER AND FOR NO
LONGER THAN 60 DAYS.
3. WHEN SEDIMENTATION DEPOSITS REACH WITHIN 3" OF THE TOP OF BALES,
REMOVE SEDIMENTATION OR ADD ADDITIONAL BALES ON SEDIMENTATION
DIRECTION BEHIND FIRST ROW OF BALES AS DIRECTED BY THE ENGINEER.
4. UPON ESTABLISHMENT OF GROUND COVER ON DISTURBED AREAS AND
WHEN DIRECTED BY THE ENGINEER, HAY BALES WILL BE REMOVED AND
USED AS MULCH. ANY SEDIMENTATION WILL BE THINLY SPREAD UPON
ESTABLISHED GROUND COVER.
HAYBALE BARRIER PROTECTION
NOT TO SCALE
FILTER
FENCE
STAKED
STRAW BALE
NOT TO SCALE
SEDIMENT FILTER
FENCE AND HAY BALE
FLOW
SEDIMENT FILTER FENCE
FENCE POST (TYPICAL)
AMOCO PROPEX SILT STOP
SEDIMENT CONTROL FABRIC OR
APPROVED EQUAL (GEOTEXTILE)
EXISTING
GRADE
BURY END OF GEOTEXTILE
MIN. 6" INTO SOIL
FLOW
NOT TO SCALE
0°
12" MIN.
EXISTING GRADE
CONSTRUCTION ACCESS ROAD
NOT TO SCALE
4" CRUSHED STONE 12"
MIN. THICKNESS
GEOTEXTILE (NON-WOVEN, AMOCO
454 OR EQUAL)
NOTES:
1. TIMBER OR CRANE MATS MAY BE USED IN PLACE OF GRAVEL.
2. NO DISTURBANCE SHALL BE MADE TO EXISTING GRADE, ALL
ACCESS ROADS SHALL BE PLACED ON GRADE.
12'-0" (MIN.)
0+00 1+00 2+00 2+30
P
P
0+00 1+00 2+00 2+30
UPPER MIXVILLE POND
MIXVILLE PARK
LOWER MIXVILLE POND
190'-0"
55'-0"
SOUTH RAMP
55'-0"
NORTH RAMP
80'-0"
BOARDWALK
WEST OUTLOOK
EAST OUTLOOK
ABUTMENT NO. 1
ABUTMENT NO. 2
HELICAL PILE (TYP.)
TEMPORARY DEWATERING BASIN (TYP.)
AS REQUIRED (SEE SE-01)
TEMPORARY CONSTRUCTION
ACCESS ROAD (SEE SE-01)
TEMPORARY DEWATERING PIPE (TYP.)
TEMPORARY SILT FENCE
(SEE SE-01)
TEMPORARY SILT FENCE
(SEE SE-01)
TEMPORARY SILT FENCE
(SEE SE-01)
Ex. Roundabout
TEMPORARY DEWATERING PUMP (TYP.)
50'-0"UPLAND REVIEW AREA
SEE SE-01 FOR TOP SOILING AND
RESTORATION OF PERMANENT
VEGETATIVE COVER
CONSTRUCTION
STAGING AREA
TEMPORARY SOIL STOCKPILE
Tennis C ourt
Beach
Pedestrian Trail
G azebo
G azebo
Pedestrian Path
O H
W -6 O
H W
-103 O
H W
-113
O H
W -101
O H
W -4
O H
W -112
O H
W -104
O H
W -106
O H
W -111
O H
W -8
O H
W -102
O H
W -15
O H
W -108
O H
W -110
O H
W -11
O H
W -107
O H
W -100
O H
W -109
O H
W -3
O H
W -7
O H
W -9
O H
W -10
O H
W -13
O H
W -2
O H
W -14
O H
W -5
O H
W -105
O H
W -1
O H
W -12
BOARDWALK BY OTHERS
CONSTRUCTION SEQUENCE
1. INSTALL WATER HANDLING AND SEDIMENT AND EROSION CONTROLS.
2. INSTALL PROPOSED CONSTRUCTION ACCESS ROAD.
3. REMOVE EXISTING STONES AND STOCKPILE.
4. INSTALL CONCRETE ABUTMENTS AND HELICAL PILES.
5. INSTALL BOARDWALK FRAMING.
6. REMOVE WATER HANDLING CONTROLS.
7. INSTALL EXISTING STONES AT FINAL LOCATION.
8. REMOVED TEMPORARY CONSTRUCTION ACCESS ROAD.
9. INSTALL TOP SOIL AND RESTORATION OF PERMANENT VEGETATIVE COVER.
NOTES:
1. CONTRACTOR SHALL USE CRANE MATS TO AUGER PILES.
2. ANY SPOILS FROM AUGURED PILES SHALL BE BUCKETED AND REMOVED OFF SITE.
UPLAND REVIEW AREA
MAJOR CONTOUR
MINOR CONTOUR
ORDINARY HIGH WATER LINE
FEMA FLOODWAY
LEGEND
SHEET NAME
DATE
RA-01
PROJECT NO.
DESIGNED
KP
SCALE
DRAWN
JG
CHECKED
KP
SEPTEMBER 29, 2026
11047.00075
1" = 20'-0"
R
EG
U
LA
TE
D
A C
TI
VI
TI
ES
C H
ES
H
IR
E, C O
N N
EC
TI
C U
T
M
IX
VI
LL
E
PA
R K
B O
A R
D W
A
LK
O
VE
R M
IX
VI
LL
E
PO
N
D
N O
TC
H
R O
A D
SHEET NO.
D
ES
C R
IP
TI
O N
B Y
D A
TE
R
EA
LT
Y D
RI
VE
CH
ES
H
IR
E, C
T
3.
1.
SL
RC
O N
SU
LT
IN
G
.C O
M
S
W
N
EREGULATED ACTIVITIES
ACTIVITY TOTAL
DIRECT WETLAND DISTURBANCE ±17 (SQFT)
DIRECT WETLAND ENHANCED/RESTORED ±283 (SQFT)
PERMANENT UPLAND REVIEW AREA DISTURBANCE ±49 (SQFT)
TEMPORARY DISTURBANCE WITHIN UPLAND REVIEW
AREA (BASINS AND DEWATERING PUMP) ±277 (SQFT)
File details come from the government source that posted it. Updated .