Missouri Example PWS EXEVAL.pdf
PDF 618 KB Posted
- Attached to
- National Guard CBRN Exercise Support IDIQ
- Solicitation number
- W912NS26X1BAA
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for External Evaluation (EXEVAL) Training Support Services for the Missouri Army National Guard (MOARNG) Homeland Response Force (HRF) Region VII.
The contract requires contractor support for a Structural Collapse Venue Site (SCVS) reset at Crisis City, Kansas, scheduled for July 15-19, 2024. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control to reset the SCVS training environment for National Guard CBRNE Response Enterprise (CRE) training. Primary deliverables include: (1) Program Management—participation in post-award kick-off meetings approximately 10 days after award, planning meetings, daily "hot wash" briefings, and submission of meeting notes; (2) SCVS Reset Support—reset of structural collapse training venues with minimum 25 search and extraction lanes, provision of an on-site manager, equipment package (10-ton forklift, vehicle, specified lumber and concrete materials), and compliance with safety and environmental standards, with reset completion no later than one hour prior to exercise start each day; (3) SCVS Training Support—provision of qualified Subject Matter Experts (SMEs) with Technical Rescue Level 2 Certification to serve as safeties, trainers, and urban search and rescue liaisons for up to 12 hours daily; (4) Role Player and Mannequin Support—coordination of 25-50 moulaged casualty role players daily, 25 trauma mannequins, two Advanced Life Support ambulances with four paramedics per day, ICS role players, and patient coordinators; and (5) Status Reporting—submission of contractor's status report and After-Action Report (AAR) comments no later than 7 days after the period of performance. The contract period runs from July 15-19, 2024, with a phase-in period for preparation. Performance standards require no more than two instances of non-compliance per week for most tasks, monitored through random surveillance by the Contracting Officer's Representative (COR). The contractor is responsible for all safety of employees, compliance with OSHA and environmental regulations, and adherence to Army installation security procedures including AT Level I Awareness training within 20 calendar days of contract start.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Texas Example PWS ExEVAL.pdf | ||
| CRE 101 Overview 20 JAN 23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ver. October 2022
PERFORMANCE WORK STATEMENT (PWS)
FOR
External Evaluation (EXEVAL) Training Support Services Missouri Army National Guard (MOARNG), Homeland Response Force (HRF)
1.0 General: This is a non-personal services contract to provide Missouri HRF Region VII – External Evaluation 2024 (EXEVAL24) Crisis City contractor support for SCVS reset. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform SCVS Reset Services at Crisis City KS, as defined in this PWS. Contractor personnel assigned to this contract shall possess the skills and expertise necessary to perform the requirements in this PWS.
1.1.1 Objectives: This PWS establishes performance requirements for contractor tasks necessary to reset SCVS. These SCVS were built to be realistic, challenging, and maintainable, and to provide skill lanes required to conduct National Guard (NG) CBRNE Response Enterprise (CRE) training as identified in the Training and Evaluation Outlines/CATS. The training venues provide strategic and tactical challenges of such complexity that repetitiveness does not breed familiarity with the training prop and training lanes. The SCVS is of sufficient size and complexity to keep the Search and Extraction (S&E) teams training in a realistic condition and environment, so individuals gain valuable experience and expertise working on a simulated "real world" structural collapse.
1.2 Background: In conjunction with the National Guard Bureau (NGB), Missouri HRF Region VII is tasked to develop and support regional training and exercise activities aimed at enhancing domestic contingency readiness. Missouri HRF Region VII ensures these functions are integrated and complementary where appropriate. NGB uses Structural Collapse Simulators (SCS) to simulate the collapsed state of buildings due to a natural disaster or a domestic terrorism event. The use of these simulator venues supports regional training and exercises to enhance domestic contingency preparedness exercises and evaluations of CBRNE Enhanced Response Force Package (CERFP), Homeland Response Force (HRF) and other CBRNE response capabilities. A SCVS is a location where one or more SCS are used to simulate the collapsed state of buildings.
1.3 Period of Performance (PoP): The POP for this requirement will be:
• Post Award Kick-Off Meeting: TBD (Approximately 10 days after contract award)
• Phase-In Period: TBD (Preparation for Contract Performance)
• Contract Period: 15 July 2024 - 19 July 2024
• EXEVAL24 Crisis City After Action Review: TBD
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of approximately 0700-1900 on Monday through Friday in accordance with Technical Exhibits 3 and 4, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
Performance shall be at Crisis City, 6401 W. M60 Rd, Lindsborg KS 67456. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
Employment and staffing difficulties are not justification for the contractor’s failure to meet established requirements.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.
The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days prior to commencement of performance. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.4.1 Quality Assurance Surveillance Plan (QASP): The Contracting Officer’s Representative (COR) will monitor contractor performance and complete the Quality Assurance Worksheet (Technical Exhibit 6) at the end of the contract period of performance. However, the COR may submit a Quality Assurance Worksheet at any time and as often as necessary to document quality levels.
1.4.4.2 If Contractor response to an identified quality deficiency is unsatisfactory, the Contracting Officer or COR will contact the appropriate Contractor representative to implement a plan of action to remedy the identified deficiency. A quality rating may change from “Green” to “Red” without notice. We anticipate the COR utilizing the “Yellow” quality rating to alert the contracting office of quality issues that have the potential for a “Red” quality rating if corrective action is not taken. If the performance rating for any task in this order is “Red” during any time in the performance period, the COR will notify the Contracting Officer.
Rating Description Green Yes, performance and technical specifications are being met at AQL.
Yellow
Yes, performance and technical specifications are currently being met at the minimum AQL, but the following service / deliverable needs contractor attention.
The Customer must identify what component of the deliverable and/or service requires attention.
Red
No, performance and technical specifications are not being met at AQL and the following service / deliverable needs immediate contractor resolution.
The Customer must identify what component of the deliverable and/or service is below the minimum AQL.
1.4.5 Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility or area. Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Reserved.
1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by government representative).
1.4.5.3 AT Level I training: This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I Awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I Awareness training is available at the following website:
https://jko.jten.mil.
1.4.5.4 iWATCH Training. This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 20 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Reserved.
1.4.5.7 Reserved.
1.4.5.8 Reserved.
1.4.5.9 Reserved.
1.4.5.10 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.
1.4.5.11 For Contracts that require OPSEC Training. Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training.
New employees must be trained within 10 calendar days of their reporting for duty and annually thereafter.
1.4.5.12 Reserved.
1.4.5.13 Reserved.
1.4.5.14 Reserved.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Reserved.
1.4.6.1.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.
1.4.6.1.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.
1.4.6.1.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.
1.4.6.2 Reserved.
1.4.7 Special Qualifications: The contractor shall ensure applicable employees possess all required licenses for operating vehicles and forklift used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.7.1 Contractor employees supporting this contract requirement are identified as professional employees as defined in 29 CFR 541 and are not subject to the requirements of the Service Contract Act of 1965 (FAR Subpart 22.11 Professional Employee Compensation).
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.
The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.
The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.
The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes), if applicable, from its employees who depart employment for any reason. The contractor shall return all identification media (i.e. badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at
FAR 22.17.
1.4.12 Contractor Travel. Travel to other government facilities or other contractor facilities is not anticipated to be required during the period of performance. All contractor travel to support this contract shall be accounted for in the contractor’s proposal on a firm fixed price basis. The cost of shipping training aids for the performance of this contract shall be borne by the contractor and these costs should be accounted for in the contractor’s proposal on a firm fixed price basis.
1.4.13 Reserved.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Phase In / Phase Out Periods. Upon award, the contractor shall initiate their Phase In period to prepare for full contract performance (Reference paragraph 1.3 Period of Performance).
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Breaching and Breaking: The most dangerous skill to perform in a collapse condition as it is the most likely to initiate, by battering a broken building, a secondary collapse. Typically done by jack hammering on concrete to make a hold to make entry to break down an object. Atypically, as carefully as possible, widen any existing opening to allow access to responders and entrapped victims.
2.1.2 Chemical, Biological, Radiological, Nuclear, and Explosives (CBRNE) Enhanced Response Force Packages (CERFP): The CERFP teams and WMD-CSTs provide a phased capability; WMD-CSTs detect and identify CBRNE agents/substances, assess the effects and advise the local authorities on managing the effects of the attack. The WMD-CSTs also assist with requests for other forces. The CERFP teams locate and extract victims from a contaminated environment, perform mass patient/casualty decontamination, and provide treatment as necessary to stabilize patients for evacuation. The teams are specially trained to respond to a weapons-of-mass-destruction incident. The WMD-CSTs are dedicated units of National Guard personnel on active duty, whereas the CERFPs are comprised of existing National Guard units in traditional reserve status. They can be mobilized in state active duty, Title 32, or Title 10 status. Each CERFP can be ready to deploy to an incident site within six hours of notification of a CBRNE or WMD incident.
2.1.3 Confined Space: A space that is large enough and so configured that an employee can bodily enter and perform assigned work; has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits); and is not designed for continuous employee occupancy. Typically, confined space entry training is to ensure clean air is inside a confined space. The removal of victims in a "permitted space" is what most training covers. Atypically, in a collapse there is no permit, no attendant or anyway to follow the prescribed guidelines.
2.1.4 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.5 Contract Manager: A person delegated to ensure performance of the contract. The name of this person and an alternate who shall act for the contractor shall be designated in writing to the Contracting Officer. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
2.1.6 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.7 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.8 Dual Status Command: Dual status command allows one commander to command both federal (Title 10) and state forces (National Guard in Title 32 and/or State Active-Duty status) with the consent of a governor and the authorization of the president. This centralized command and control construct provides both the federal and state chains of command with a common operating picture through the eyes of the DSC. It also enables the DSC to maximize his or her federal and state capabilities, as well as facilitate unity of effort from all assigned forces.
2.1.9 Homeland Response Force: Composed of approximately 310 personnel, encapsulates lifesaving capabilities including Search and Extraction, Decontamination, Emergency Medical, Security, and Command and Control (C2). Each HRF will be staffed with Army National Guard Soldiers and Air National Guard Airmen. HRFs provide a scalable capability to bridge a gap between initial National Guard (NG) response and Title 10 capabilities.
2.1.10 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.11 Lifting and Hauling: The term hauling implies that rigging equipment is used to move a heavy object. Typically moving a heavy object with technology. Atypically, to use what is in the surrounding area without returning to a cache for technology.
2.1.12 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.13 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.14 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.15 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.16 Rubble Pile: informal term for Structural Collapse Venue Site.
2.1.17 Shoring: The goal of shoring is to stabilize the object that is causing an unacceptable risk to extractors. Stabilizing can be accomplished by other means such as tying back and cribbing, both are faster than shoring and require fewer materials.
2.1.18 Structural Collapse Simulator (SCS): A structure, tunnel or collapsed building, use to simulate a normal structure in a collapsed state due to either a natural disaster or a domestic terrorism event.
2.1.19 Structural Collapse Venue Site (SCVS): A physical location, as in a training area.
A site where there is one or more structures to simulate the collapsed state of buildings due to a natural disaster or a domestic terrorism event. SCVS is typically constructed of substantial material such as sea containers, concrete slabs, concrete tubes, and a multitude of concrete debris to simulate the collapse of a structure.
2.1.20 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AAR After Action Report AC Area Commander AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operations Security BI Background Investigation CBRNE Chemical, Biological, Radiological, Nuclear, and Explosives CERFP CBRNE Enhanced Response Force Packages CFR Code of Federal Regulations CM Contract Manager COMSEC: Communications Security COR Contracting Officer Representative CST Civil Support Team DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Domestic Support to Civil Authorities FAR Federal Acquisition Regulation FPCON Force Protection Condition GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HRF Homeland Response Force IA Information Assurance IC Incident Commander ICS Incident Command System IS Information System(s) KO Contracting Officer MSR Monthly Status Report NGB National Guard Bureau NLT No Later Than OCI Organizational Conflict of Interest OPSEC Operations Security PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control
QCP Quality Control Program SCR Service Contract Reporting SCS Structural Collapse Simulator SCVS Structural Collapse Venue Site SME Subject Matter Expert SSN Social Security Number TE Technical Exhibit WAWF Wide Area Workflow
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):
The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: The Contractor will be provided an area of land near existing SCVS to pre-stage equipment for SCVS reset.
3.2 Materials: The government will not provide any materials associated with the performance of this contract.
3.3 Equipment: The government will not provide any equipment associated with the performance of this contract.
3.4 Services: The government will not provide any services associated with the performance of this contract.
3.5 Utilities: The contractor shall instruct employees in utilities conservation practices.
The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount. Contract employees may utilize water buffalos, latrines and hand washing stations in the area of performance if available.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: Not applicable.
4.3 Materials: The Contractor shall provide all materials to support SCVS reset. Locate, acquire, and transport all construction and building materials to the site.
4.4 Equipment: The Contractor shall provide all equipment necessary to ensure total mission support of SCVS reset. Contractor will provide at a minimum the following equipment including any additional items necessary for operations and maintenance support for items identified in the PWS and (i.e. fuel, hydraulic fluid, hand tools, and repair parts) for Search and Extraction Training:
Forklift: 10 ton, 1 ea.
Vehicle to deliver materials: 1 ea.
Lumber and Materials for Shoring Operations:
Item Dimensions Quantity Lumber 4 x 4 x 12 90 Lumber 2 x 4 x 16 40 Lumber 2 x 6 x 16 100 Lumber 2 x 4 x 12 10 Lumber 3/4" x 4' x 8' Sanded CDX 30 Hardware 16 penny duplex nails (lbs) 60 Hardware 8 penny duplex nails (lbs) 60 Rebar ¾ inch rebar (20 foot) 1 Rebar 1 inch rebar (20 foot) 1
SCVS Reset Materials:
Item Dimensions Quantity Concrete 5 ft. x 5 ft. x 6-inch slab 5 Concrete 42 in. x 42 in. x 4 in. slab with metal reinforcement 15 Concrete 42 in. x 42 in. x 4 in. slab without metal reinforcement 15
4.5 Safety Considerations: The contractor is responsible for the safety of its employees throughout the period of performance.
5.0 Requirements: The contractor shall provide SCVS reset for EXEVAL24 Crisis City support for dates 15 July – 19 July 2024:
5.1 Task 1, Program Management: The contractor shall provide materials and services to accomplish all tasks outlined in this Performance Work Statement throughout the period of performance of the contract.
5.1.1 Deliverables:
5.1.1.1 Meetings: The contractor shall prepare for, conduct, and participate in meetings and reviews when required or directed.
5.1.1.1.1 The contractor shall participate in a Post-Award Kick-off meeting approximately 10 days after contract award, in coordination with the Contracting Officer and requiring activity. The Kick-off meeting will determine the need for further planning meetings. The contractor shall resolve action items assigned to the contractor at these meetings.
5.1.1.1.2 The contractor shall submit reports and all requests IAW with Technical Exhibit
5. The contractor shall submit a roll up of all meeting notes to the Contracting Officer or their designated representative.
5.1.1.1.3 Contract Manager shall attend planning meetings and the AAR Briefing (Reference paragraph 1.3).
5.1.1.1.4 Contract Manager or representative shall attend the daily “hot wash” briefing usually held each evening following the daily training to obtain any changes and/or get further coordinating instructions. If the Exercise Lead does not have a “hot wash” for the day, it is the Contractor’s responsibility to contact the on-site Exercise Lead to gather this information.
5.1.1.2 Safety: The contractor is responsible at all times for their staff. Follow all applicable federal, state, and local safety regulations. Liability and/or usage agreement may be required for access to training site. Training shall continue during inclement weather unless safety concerns prohibit such continuation of training.
5.1.1.2.1 Use government provided identification badges (if required).
5.1.1.2.2 Ensure staff shall park only in designated areas.
5.1.1.2.3 Provide a formal plan procedures and resources available for on-site safety, ‘real-world’ emergencies, and life support.
5.1.1.2.4 Provide mandatory safety equipment (hard hats, eyeglasses, etc.) for all staff entering the collapse structure (rubble pile) location.
5.1.1.2.5 Provide points of contact with a high visibility method of identification (e.g.
vest) at all training sites to supervise and support personnel.
5.1.1.3 Communications Plan: Contractor shall have effective and clear communications with Exercise Planner, Exercise Control, the COR and any pertinent key personnel within the contractor’s employees on ground determined by the Contractor. Provide point of contacts to Exercise Lead and any pertinent key personnel. Obtain radios and arrange for Internet access if required. The contractor shall ensure the assigned Contract Manager coordinates with Exercise Lead.
5.1.2 Minimum Acceptable Standard: The meetings notes shall be delivered to the COR via e-mail in a PDF format on the Contractor’s letterhead on the next business day and the content of the report shall be free of grammatical, spelling and factual errors.
5.2 Task 2, Provide SCVS Reset Support:
5.2.1 Deliverable: The Contract Manager shall reset the SCVS to create a realistic and challenging training environment so the Search and Extraction (S&E) teams can gain valuable experience and expertise working in a simulated "real world” natural disaster or a domestic terrorism event. The contractor will ensure the SCVS is reset prior to the start of the exercise for each training period. This may require the contractor to perform a site visit to identify and plan for the necessary materials required for a complete SCVS reset. The contractor shall provide heavy equipment, labor and construction material required to reset the SCVS.
5.2.1.1 SCVS Reset Support: Provide SCVS reset in accordance with Technical Exhibit 4 specifications (locations, time and conditions) for each of the exercises. Times may shift slightly based on training requirements as directed by exercise planners.
5.2.1.1.1 Provide an on-site manager, expert, for assuring quality of SCVS reset.
5.2.1.1.2 The Structure Collapse Venues Simulator (SCVS) must be an adequate size and complexity to allow multiple training venues to occur simultaneously and meet industry, state, and local safety standards (responsibility of the hosting State). SCVS must be sufficient to train personnel on tasks and in accordance with NFPA 1670:
Standard on Operations and Training for Technical Search and Rescue Incidents.
5.2.1.1.3 Props must create the appearance of a "real world” collapsed structure, allowing National Guard Units to develop experience and expertise in real disasters.
5.2.1.1.4 Provide a minimum of twenty-five (25) Search and Extraction (S&E) lanes covering overarching Training & Evaluation Outline (T&EO): Conduct Search and Extraction Deployment Operation (05-3-0001-CERFP); Conduct Rope Extraction Operations (05-3-0002-CERFP).
5.2.1.1.5 Reset venues to maximize exercise goals and maintain a safe work environment for each training period.
5.2.1.1.6 Pile reset shall include 5 concrete breaching slabs no less than 5ft X 5ft X 6in.
5.2.1.1.7 Provide the Lumber Kit as specified in paragraph 4.4.
5.2.1.1.8 Comply with all environmental determinations. Address and resolve all environmental considerations and issues. Adhere to OSHA and OSHA ladder safety regulations.
5.2.1.1.9 Complete resetting of the SCVS prior to the beginning of the ensuing training period.
5.2.1.1.10 Provide reset of Lifting and Hauling prop with a minimum footprint of 40 ft. by 75 ft. with tactical rock or firm, packed gravel.
5.2.1.1.11 Provide reset of shoring prop with a minimum footprint of wall surface 12 ft.
tall by 45 ft. long. A building one or two stories high with smooth surfaces, windows, and doors.
5.2.1.1.12 Provide reset of confined Space prop with a minimum footprint of 3.5 ft. tall (inside) by 40 ft. long. Site must have firm footing for maneuvering and spot shoring.
5.2.1.1.13 Provide reset of rope prop with a minimum footprint of 25 ft. tall by 30 ft. long.
Site must have tactical rock or firm gravel to land on and belay from.
5.2.1.1.14 Provide reset of breaching and breaking prop with heavy debris to break precisely as directed with a minimum footprint of 60 ft. by 60 ft. Site must have tactical rock or firm gravel and must have good drainage.
5.2.1.1.15 Minimum Acceptable Standard: All SCVS reset shall be setup no later than 1 hour prior to the scheduled start time for each venue for each training period.
5.3 Task 3, Provide SCVS Training Support
5.3.1 Deliverable: Provide SCVS Subject Matter Experts (SMEs) to perform as safeties, trainers, or urban search and rescue liaisons within the ICS during the exercise in accordance with Technical Exhibits 3 and 4 specifications (quantity, locations, time and conditions) as necessary.
5.3.1.1 Qualifications: All personnel involved in the training are certified in accordance with any U.S. certifying Agencies for this purpose (must have experience and Technical Rescue Level 2 Certification in all relevant functional areas below).
5.3.1.2 Training shall meet industry, state and local safety standards.
5.3.1.3 Ensure the safe placement of role players and mannequins at the urban search and Rescue venues during the operational periods. Coordinate with Role Player Staff concerning the placement and recovery of mannequins.
5.3.1.4 Provide continuous exercise operational period support up to 12 hours daily (shift/ flexible work hours) when required.
5.3.2 Minimum Acceptable Standard:
The contractor shall provide adequately trained contractor employees in order to receive all appropriate briefings and orientations at one day prior to the exercise.
5.4 Task 4, Provide Role Player, Moulage, Trauma Mannequin Support
5.4.1 Deliverable: The Contract Manager shall coordinate with the POC and Exercise Lead for the placement and rotation/recycle of role players within their specified time frames to maintain adequate flow rates of injured personnel for the exercise.
5.4.2 Provide all support for exercise contained in Technical Exhibit 3, including on-site manager and one staff member to play role of EMS coordinator/county coroner as exercise dictates.
5.4.3 Provide casualty role players, displaced civilians, and trauma mannequins. Set up “fixed” moulage and holding sites; administer moulage and glo germ techniques;
provide waterproof injury/mass casualty cards and props as required. Provide transportation for role players as required.
5.4.4 Minimum Acceptable Standard:
The contractor shall provide adequately trained personnel to perform role player, moulage, and trauma mannequin support.
5.5 Task 5, Submit Contractor’s Status Report and AAR comments:
5.5.1 Deliverable: The Contractor’s Status Report indicates the progress of the work, status of the program, and of the assigned tasks. This report shall include information relating to accomplishments, existing or potential problem areas, and proposed action to resolve the problems. The contractor shall include the Status Report with each invoice submitted for payment. Contractor’s Status Report and AAR Comments shall be in accordance with Technical Exhibit 5.
5.5.2 Minimum Acceptable Standard: Contractor’s Status Report and AAR Comments shall be delivered to the COR via e-mail in a PDF format on the Contractor’s letterhead NLT 7 days after the period of performance. The content of the report shall be free of grammatical, spelling, and factual errors.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition
Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars DoDM 1000.13-M-V1
DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 (Change 1:
07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm
DoDM 5200.2 Procedures for the DoD Personnel Security Program
(PSP)
04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common
Access Card (CAC)
09/09/14 (Change 1:
05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/
DoDI 5400.11 Department of Defense Privacy and
Civil Liberties Programs
01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD 5400.11-R Department of Defense Privacy
Program
05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoDD 8140.01 Cyberspace Workforce Management
10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/
DoD 8570.01-M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 5220.22-M National Industrial Security Program
Operating Manual (NISPOM)
02/28/2006 (Change 2:
05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/
Army Directive 2014-05 Policy and Implementation
Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/A rmyDir.aspx
AR 25-2
Information Assurance
04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 530-1
Operations Security
09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 525-13
Antiterrorism
12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 381-12
Threat Awareness and Reporting
Program (TARP) (Section II, ¶ 2-4.b)
06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172-2
Application for Identification Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I-9 Employment Eligibility Verification
10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security
Agreement
Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001- 0499.htm
DD 250
Material Inspection and Receiving
Report
Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance
Objective Performance Standard Acceptable Quality
Levels (AQL) Surveillance Method / By
Whom
5.1 Program
Management
- Participate in Post-Award Kick-off meeting approx. 10 days after contract award.
- Attend planning meetings, AAR briefing, and daily “hotwash” as required.
- Resolve action items assigned to the contractor at meetings.
- Develop safety and communications plans and provide applicable safety equipment
Acceptable when no more than 2 instances of non-compliance to standards per week
Random Monitoring / COR
5.2 Provide
SCVS Reset
Support
- Provide all support for exercise contained in Technical Exhibit 4
- Provide on-site manager
- Provide “real world” props
- Set up 25 training lanes
- Provide equipment and materials specified in paragraph 4.4
- Comply with safety and environmental standards.
- Reset prior to commencement of next operational period
Acceptable when no more than 2 instances of non-compliance to standards per week
Random Monitoring / COR
5.3 Provide
SCVS Training
Support
- Provide all support for exercise contained in Technical Exhibits 3 and 4.
- Provide qualified SCVS SMEs
- Provide training to participants as required
- Safely place role players and mannequins as required
- Provide continuous support up to 12 hours daily (shift/ flexible work hours) when required
Acceptable when no more than 2 instances of non-compliance to standards per week
Random Monitoring / COR
5.4 Provide Role
Player, Moulage, Trauma
- Provide all support for exercise contained in Technical Exhibit 3.
- Provide on-site manager and one staff member to play role
Acceptable when no more than 2 instances of non-compliance to standards per week
Random Monitoring / COR
Mannequin Support of EMS coordinator/ county coroner as exercise dictates
- Provide casualty role players, displaced civilians, and trauma mannequins
- Set up “fixed” moulage and holding sites
- Administer moulage and glo germ techniques
- Provide waterproof injury/ mass casualty cards and props as required
- Provide transportation for role players as required
5.5 Contractor’s
Status Report and AAR Comments
- Contractor’s Status Report submitted NLT 7 days following the POP
- Submitted to COR electronically in PDF format, including the info requested in Technical Exhibit 5
Acceptable when no more than 1 instance of non-compliance to standards
Random Monitoring / COR
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
Kick-off meeting Participate via MS TEAMS approximately 10 days after contract award
One (1) copy Review minutes from kick-off meeting
COR
Quality Control Plan
(QCP)
Submit 10 days prior to commencement of Period of
Performance
One (1) copy PDF, Electronically
COR
Contractor’s Status Report and AAR
Comments
Submit NLT 7 days after Period of Performance
One (1) copy via email and attach to Invoice in
WAWF
Format IAW Exhibit 5
COR
TECHNICAL EXHIBIT 3
Role Player / Mannequin Support Information
Event: MO Region IIV HRF SYCTE Location: Lindsborg KS Training Site – Crisis City Event Dates: 15-19 July 2024
15 July 2024 (1500-2000) DAY 0 (MON), SYNC Meeting.
• Meeting with Region VII HRF and Contractors.
• No Mannequins or roles players required / Key personnel only.
16 July 2024 (0700-1900) – Day 1 (TUES), Two Operational Periods
• Provide twenty-five (25) mannequins with waterproof laminated injury cards for rubble pile and water decontamination operations.
• Provide two (2) ICS role players, to include Area Commander, Incident
Commander.
• Provide two (2) SMEs to perform urban search and rescue trainers as liaisons with the Incident Command System and assist OC/Ts to ensure that the maximum training and exercise value will be provided during the use of the collapsed structure simulator(s). The SMEs will be providing training support and oversight for the search & extraction team and may assist ICS role players as SMEs on the evaluation day.
• Provide fifty (50) casualty role players must be moulaged and available for placement at site NLT 0700 hours. Casualty iterations and injury types will be determined by exercise requirements. Role players are required to rotate through the extraction, decontamination, and medical process no less than three (3) iterations during each operational period.
• Provide one (1) Patient Coordinator role player. Job description. Generally stationed behind the medical section to receive role players once they have been processed through the CERFP/HRF footprint. Will then escort the role players back to the rubble pile or through the DECON line to ensure role player flow is achieved.
• Provide two (2) ALS (Advanced Life Support) ambulances on site with four paramedics for the duration of the training event. Paramedics will provide National Registry of Emergency Medical Technicians Paramedic (NREMTP) certificates prior to the exercise.
17 July 2024 (0700-1900) – Day 2 (WED), One Operational Period cards for rubble pile and water decontaminations operations.
Commander. The remaining will be any of the following (branch chief, civil authority, section leader, etc).
that the maximum training and exercise value will be provided during the use of the collapsed structure simulator(s). The SMEs will be providing be determined by exercise requirements. Role players are required to
• Provide one (1) Patient Coordinator role player. Job description - Generally have been processed through the CERFP/HRF footprint. Will then escort
NREMTP certificates prior to the exercise.
18 July 2024 (0700-1900) – Day 3 (THUR), Two…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .