The document is a comprehensive set of architectural and engineering drawings for the Military Museum Expansion Project for the City of Huntsville, Alabama. The project involves constructing a new pre-engineered metal building at John Hunt Park, located at 2065 Steve Hettinger Drive SW in Huntsville, with a project number 2024-001. The expansion will include a museum display area, administrative spaces, restrooms, and supporting facilities, spanning approximately 36,200 square feet. The project is competitively bid with a construction timeline of 420 days, and bidders are required to provide unit pricing, handle potential site conditions, and comply with local building codes and specifications.

The project is funded by the City of Huntsville and includes multiple construction components with specific allowances and contingencies. Key financial aspects include several unit price categories for potential additional work, such as roof deck replacement, unsuitable soil removal, and landscape topsoil procurement, totaling up to $753,000 in potential additional work. The project requires detailed documentation, including shop drawings, submissions of material specifications, and compliance with local building and safety regulations. Contractors must provide performance and payment bonds, obtain necessary permits, and coordinate with multiple city departments and utility providers throughout the construction process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

FOR BID

PROJECT NUMBER

FO

ET

A T

S

A M

ABALA

D

T

ARCH

IT

E

C

R E

G

IST E R E

Jeffrey S. Alpha

REGISTRATION

NUMBER

05-29-2025

SEAL

05.29.2025

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

G000

COVER SHEET

MILITARY MUSEUM EXPANSION

JOHN HUNT PARK

CITY OF HUNTSVILLE

2065 STEVE HETTINGER DRIVE

HUNTSVILLE, ALABAMA 35801

JEFFREY S. ALPHA ARCHITECT A.I.A.

CITY OF HUNTSVILLE

GENERAL SERVICES

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

(256) 427-5531

JEFFREY.ALPHA@HUNTSVILLEAL.GOV

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

FOR BID

PROJECT NUMBER

FO

ET

A T

S

A M

ABALA

D

T

ARCH

IT

E

C

R E

G

IST E R E

Jeffrey S. Alpha

REGISTRATION

NUMBER

05-29-2025

SEAL

05.29.2025

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

G001

GENERAL NOTES AND

DRAWING INDEX

ALLOWANCES

UNIT PRICES

ARCHITECTURAL

STRUCTURAL

CIVIL

LANDSCAPE AND IRRIGATION

PLUMBING

MECHANICAL

ELECTRICAL

S001 GENERAL NOTES

S002 GENERAL NOTES

S003 TYPICAL DETAILS

S101 FOUNDATION & FLOOR PLAN

S102 ROOF FRAMING PLAN

S301 SECTIONS

S311 SECTIONS

S312 SECTIONS

S313 SECTIONS

S511 HELICOPTER SUPPORT DETAILS

C1.0 SITE DEMOLITION PLAN

C2.0 SITE DEVELOPMENT PLAN

C3.0 SITE LAYOUT PLAN

C4.0 SITE GRADING PLAN

C5.0 SITE DRAINAGE PLAN

C5.1 STORM PROFILES

C5.2 STORM & SANITARY PROFILES

C6.0 SITE UTILITY PLAN

C7.0 EPSC INITIAL

C7.1 EPSC INTERMEDIATE

C7.2 EPSC FINAL

C8.0 CONSTRUCTION DETAILS

C8.1 CONSTRUCTION DETAILS

C8.2 CONSTRUCTION DETAILS

C8.3 SANITARY SEWER DETAILS

C8.4 EROSION CONTROL DETAILS

L100 OVERALL HARDSCAPE PLAN

L101 NORTH HARDSCAPE PLAN AND

DETAILS

L102 NORTH LAYOUT PLAN AND DETAILS

L103 CENTRAL HARDSCAPE PLAN AND

DETAILS

L104 CENTARL LAYOUT PLAN AND

DETAILS

L105 DETAILS

L200 IRRIGATION PLAN "A"

L201 IRRIGATION PLAN "B"

L202 IRRIGATION DETAILS

L300 LANDSCAPE PLAN

L301 COURTYARD LANDSCAPE PLAN

L302 LANDSCAPE DETAILS

E001 LEGENDS AND NOTES

E002 RISER AND SCHEDULES

E003 EQUIPMENT SCHEDULE AND

PANEL SCHEDULES

E004 LIGHT FIXTURE SCHEDULE

AND DETAILS

E005 FIRE RISER DIAGRAM AND LOW

VOLTAGE DETAILS

E006 AUXILIARY

E100 SITE PLAN - ELECTRICAL

E101 SITE PLAN - DATA

E201 FLOOR PLAN LIGHTING - PART "A"

E202 FLOOR PLAN LIGHTING - PART "B"

E301 FLOOR PLAN POWER AND

AUXILIARY - PART "A"

E302 FLOOR PLAN POWER AND

AUXILIARY - PART "B"

E401 FLOOR PLAN - HVAC AND FIRE

ALARM - PART "A"

E402 FLOOR PLAN - HVAC AND FIRE

ALARM - PART "B"

M101 MECHANICAL FLOOR PLANS

M102 MECHANICAL FLOOR PLANS

M201 MECHANICAL DETAILS

M202 MECHANICAL DETAILS

M301 MECHANICAL SCHEDULES

M302 MECHANICAL SCHEDULES

P101 PLUMBING FLOOR PLANS

P102 ENLARGED PLUMBING FLOOR

PLAN

P103 ENLARGED PLUMBING FLOOR

PLAN

P201 PLUMBING DIAGRAMS

P301 PLUMBING DETAILS

P302 PLUMBING DETAILS

P401 PLUMBING SCHEDULES

A050 EXISTING SCOPE

A055 EXISTING SCOPE

A100 FLOOR PLAN

A105 ENLARGED PLAN "A"

A110 ENLARGED PLAN "B"

A200 EXTERIOR ELEVATIONS

A300 BUILDING SECTIONS

A301 WALL SECTIONS

A302 WALL SECTIONS

A303 WALL SECTIONS

A304 WALL SECTIONS

A305 DETAILS

A306 DETAILS

A307 DETAILS

A400 ROOF PLAN AND DETAILS

A500 RESTROOMS

A550 PARTITIONS

A560 STOREFRONT

A600 OPENINGS

A605 OPENINGS - DETAILS AND ELEVATIONS

A700 SIGNAGE

A800 FLOOR FINISHES

A810 REFLECTED CEILING PLAN

A900 CASEWORK

A910 BRONZE PLAQUES

DRAWING INDEX

VICINITY MAP

SEE SPECIFICATION SECTION 012200 FOR COMPLETE INFORMATION.

CERTAIN ASPECTS OF THE PROJECT WILL BE REQUIRED TO BE DETERMINED AFTER CONSTRUCTION

COMMENCEMENT. THE CONTRACTOR SHALL THE DETERMINE AND PROVIDE DOCUMENTATION OF

THE QUANTITY APPLICABLE TO EACH UNIT PRICE. THIS QUANTITY SHALL BE VERIFIED BY THE OWNER'S INDEPENDENT TESTING AGENCY. THE CONTRACTOR SHALL PROVIDE THE FOLLOWING UNIT

PRICES IN THEIR BID:

SEE SPECIFICATION SECTION 012100 FOR COMPLETE INFORMATION.

1.CERTAIN ASPECTS OF THE PROJECT WILL BE REQUIRED TO BE DETERMINED AFTER

CONSTRUCTION COMMENCEMENT.

2.THE LUMP SUM AMOUNT OF THE ALLOWANCE SHALL BE INCLUDED IN THE CONTRACTOR'S BID.

UNUSED AMOUNT SHALL BE RETURNED TO THE OWNER THROUGH DEDUCTIVE CHANGE ORDER AT

THE COMPLETION OF THE PROJECT.

3. APPROVED QUANTITIES TO BE INSTALLED SHALL BE VERIFIED BY THE OWNER'S INDEPENDENT TESTING AGENCY. THE CONTRACTOR SHALL PROVIDE THE FOLLOWING ALLOWANCES IN THEIR BID:

1. DURING THE BID PHASE, THE CONTRACTOR SHALL THOROUGHLY REVIEW THE PROJECT MANUAL AND DRAWINGS PRIOR TO SUBMITTING HIS BID. SHOULD A DISCREPANCY BE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY TO ISSUE A CLARIFICATION OR CORRECTION THROUGH AN ADDENDUM

TO BE INCORPORATED INTO THE CONSTRUCTION DOCUMENTS.

2. DURING THE BID PROCESS, SHOULD A DISCREPANCY BE DISCOVERED IN THE DRAWINGS AND SPECIFICATIONS THAT IS A DIFFERENCE IN PRICE, THE CONTRACTOR SHALL INCLUDE THE MORE COSTLY/EXPENSIVE MATERIAL AND LABOR IN HIS BID UNLESS CORRECTED BY ADDENDUM.

PROJECT GENERAL NOTES

BIDDING

1. ALL WORK PERFORMED BY THE CONTRACTOR OR HIS FORCES SHALL MEET ALL LOCAL, STATE AND FEDERAL BUILDING CODES.

2. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND APPROVALS AS WELL AS PAY AND INCLUDE IN HIS BID ALL FEES REQUIRED BY ALL AUTHORITIES HAVING

JURISDICTION NECESSARY TO COMPLETE THE PROJECT.

3. NOTIFY OWNER 72 HOURS IN ADVANCE FOR ANY DISRUPTION IN UTILITIES OR USE OF FACILITY.

4. THE CONTRACTOR SHALL VERIFY THAT ALL SUBCONTRACTORS WHO SHALL PROVIDE MATERIAL AND/OR LABOR FOR THE PROJECT HAVE THOROUGHLY

REVIEWED THE DRAWINGS AND PROJECT MANUAL..

5. SHOULD THE CONTRACTOR AND/OR A SUBCONTRACTOR DEVIATE FROM THE DRAWINGS WITHOUT SPECIFIC WRITTEN AUTHORIZATION FROM THE ARCHITECT, HE PROCEEDS AT HIS OWN RISK. ALL LABOR AND MATERIAL ASSOCIATED WITH CORRECTING DEVIATIONS SHALL BE PAID BY THE CONTRACTOR.

6. SHOULD THE ARCHITECT, ENGINEER, PROJECT MANAGER, CITY REPRESENTATIVE OR ANY PARTY PROVIDE A VERBAL CLARIFICATION TO THE CONTRACTOR, THE CONTRACTOR SHALL NOT PROCEED WITH ANY WORK THAT WILL CHANGE THE PROJECT SUM OR TIME UNTIL HE IS AUTHORIZED TO PROCEED BY A SIGNED CHANGE

ORDER ACCEPTED BY THE CITY OF HUNTSVILLE.

7. DO NOT SCALE ANY DRAWING UNLESS SPECIFICALLY AUTHORIZED BY THE ARCHITECT. SCALED DRAWINGS ARE PROVIDED TO ILLUSTRATE INTENT. CONTRACTOR AND HIS FORCES SHALL USE DIMENSIONS ONLY. CONTACT ARCHITECT TO PROVIDE SPECIFIC DIMENSIONS NOT PROVIDED IN THE DRAWINGS.

CONSTRUCTION

1. THE CONTRACTOR SHALL INCLUDE IN HIS PRICE THE COORDINATION AND SCHEDULING OF ALL REQUIRED OWNER ENGAGED TESTING AND VERIFICATION OF

QUANTITIES.

CONSTRUCTION TESTING

BUILDING PERMIT AND TEMPORARY UTILITIES

1. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND APPROVALS AS WELL AS PAY AND INCLUDE IN THEIR BID ALL FEES REQUIRED BY ALL AUTHORITIES HAVING

JURISDICTION NECESSARY TO COMPLETE THE PROJECT.

2. THE CONTRACTOR MUST OBTAIN TEMPORARY UTILITIES AS REQUIRED TO PERFORM ALL WORK IN THE CONTRACT.

PREBID CONFERENCE

1. SCHEDULED PREBID MEETING IS SHOWN IN THE CONTRACT DOCUMENTS.

2. THE CONTRACTOR SHOULD BE PRESENT AT THE PRE BID CONFERENCE TO REVIEW THE SCOPE OF WORK AND CLARIFY ANY ISSUES.

3. THE CONTRACTOR SHALL SCHEDULE ALL SITE VISITS WITH THE PROJECT MANAGER ASSIGNED TO THIS SPECIFIC PROJECT (256)427-5281.

4. SPECIFIC MATERIALS ARE A BASIS OF DESIGN. MANUFACTURER MAY BE SUBMITTED TO THE ARCHITECT TO BE REVIEWED FOR COMPLIANCE FOR VERIFICATION OF BEING EQUAL TO THE BASIS OF DESIGN PRIOR TO THE AWARD OF THE BID. "OR EQUAL" OR ACCEPTANCE OF THE SUBSTITUTION SHALL BE AT THE SOLE DISCRETION OF THE ARCHITECT, THE SYSTEM WILL BE INCORPORATED INTO AN ADDENDUM PRIOR TO THE AWARD OF THE BID. ANY DEVIATION IN MANUFACTURER AFTER THE AWARD OF

BID WILL BE REJECTED.

WASTE DISPOSAL AND SITE CLEANLINESS

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE CLEANLINESS AT ALL TIMES.

2. THE CONTRACTOR LEGALLY DISPOSE OF ALL WASTE DURING ALL PHASES OF CONSTRUCTION AS WELL AS AT THE COMPLETION OF THE CONTRACT TO PROVIDE A

COMPLETE AND FINISHED PROJECT MEETING THE INTENT OF THE DOCUMENTS.

3. THE CONTRACTOR SHALL PROVIDE AND INSTALL TEMPORARY FENCE, LARGE GATES FOR VEHICLE ACCESS AS WELL AS PERSONNEL GATES TO PREVENT

UNAUTHORIZED ACCESS. THE FENCE SHALL ENCOMPASS THE ENTIRE SITE.

CONTRACTOR'S RESPONSIBILITY OF DOCUMENT DISTRIBUTION

1. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL SUBCONTRACTORS HAVE ALL THE INFORMATION AND DOCUMENTS NECESSARY TO INCLUDE IN THEIR BID

PRICE AND PERFORM THE WORK.

2. SHOULD THE CONTRACTOR SELECTIVELY DISTRIBUTE DRAWINGS AND SPECIFICATION SECTIONS IN LIEU OF PROVIDING ALL THE INFORMATION TO

SUBCONTRACTORS AND MATERIAL SUPPLIERS, THEY DO SO AT THEIR OWN RISK.

3. ACCESS TO ALL DRAWINGS AND THE PROJECT MANUAL ARE ELECTRONICALLY AVAILABLE TO ALL SUBCONTRACTORS AND MATERIAL SUPPLIERS ON

BIDNETDIRECT.

4. THE OWNER IS NOT RESPONSIBLE FOR MATERIAL OR WORK LEFT OUT OF THE BID DUE TO INCOMPLETE DISTRIBUTION OF THE CONSTRUCTION DOCUMENTS.

SUBCONTRACTOR'S RESPONSIBILITY OF DOCUMENT CONTENT

1. DURING THE BID PHASE, THE SUBCONTRACTOR SHALL DOWNLOAD ALL DOCUMENTS AND THOROUGHLY REVIEW THE PROJECT MANUAL AND DRAWINGS PRIOR TO

SUBMITTING THEIR BID.

2. SHOULD A DISCREPANCY BE DISCOVERED, THEY SHALL NOTIFY THE CONTRACTOR TO REQUEST THE ARCHITECT IMMEDIATELY TO ISSUE A CLARIFICATION OR CORRECTION THROUGH AN ADDENDUM TO BE INCORPORATED INTO THE CONSTRUCTION DOCUMENTS.

3. SHOULD A DISCREPANCY BE DISCOVERED IN THE DRAWINGS AND SPECIFICATIONS THAT IS A DIFFERENCE IN PRICE, THE CONTRACTOR SHALL INCLUDE THE MORE

COSTLY/EXPENSIVE MATERIAL AND LABOR IN HIS BID UNLESS CORRECTED BY ADDENDUM.

4. FAILURE TO INCLUDE OR DELIBERATELY OMITTING MATERIAL AND LABOR SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND NOT BE ACCEPTED

UNLESS ASSOCIATED WITH AN UNFORESEEN CONDITION.

G000 COVER SHEET

GENERAL

G001 PROJECT INFORMATION

G002 DRAWING CONVENTIONS

ALLOWANCE NO. 1

REMOVAL AND REPLACEMENT OF METAL ROOF DECK

AMOUNT: 3,000 SQFT

1. CONTRACTOR SHALL INCLUDE ALLOWANCE NO. 1 IN THEIR BASE BID PRICE.

2. REFER TO UNIT PRICE NO.1 FORE USE OF THIS ALLOWANCE.

3. USE OF ALLOWANCE NO. 1 SHALL BE AT THE SOLE DISCRETION OF THE OWNER.

4. CONTRACTOR SHALL PROVIDE ITEMIZED MATERIAL AND LABOR COSTS AND ADDITIONAL

DOCUMENTATION AS DIRECTED BY THE ARCHITECT FOR VALIDITY.

UNIT PRICE NO. 1

REMOVAL AND REPLACEMENT OF METAL ROOF/DECK

MEASUREMENT: SQFT

ALL MATERIAL AND LABOR TO REMOVE DAMAGED METAL ROOF AND INSTALL METAL ROOF

TO MATCH EXISTING PANEL PROFILE, GAUGE, FINISH AND ATTACHMENT TYING INTO EXISTING

METAL ROOF/DECK TO REMAIN TO BE USED AS THE SUBSTRATE FOR THE NEW TPO ROOF.

PROJECT LOCATION

NEW BUILDING AND SITE

MODIFICATIONS

LIMITED EXISTING BUILDING

REPAIRS

NEW PLAZA

UNIT PRICE NO. 2

UNSUITABLE SOILS REMOVAL AND REPLACEMENT WITH OFFSITE STRUCTURAL FILL

MEASUREMENT: CUBIC YARD (CY)

ALL MATERIAL AND LABOR TO REMOVE UNSUITABLE SOILS AS WELL AS PROVIDE AND INSTALL

ACCEPTABLE TO THE GEOTECHNICAL ENGINEER. INCLUDE REQUIRED COMPACTION OF

INSTALLED SOIL.

UNIT PRICE NO. 3

ALLOWANCE NO. 2

UNSUITABLE SOILS REMOVAL AND REPLACEMENT WITH OFFSITE STRUCTURAL FILL

AMOUNT: 500 CUBIC YARDS (CY)

1. CONTRACTOR SHALL INCLUDE ALLOWANCE NO. 2 IN THEIR BASE BID PRICE.

2. REFER TO UNIT PRICE NO.2 FORE USE OF THIS ALLOWANCE.

3. USE OF ALLOWANCE NO. 2 SHALL BE AT THE SOLE DISCRETION OF THE OWNER.

4. CONTRACTOR SHALL PROVIDE ITEMIZED MATERIAL AND LABOR COSTS AND ADDITIONAL

DOCUMENTATION AS DIRECTED BY THE ARCHITECT FOR VALIDITY.

ALLOWANCE NO. 3

ADDITIONAL LANDSCAPE TOPSOIL LOCATED OFFSITE

AMOUNT: 500 CUBIC YARDS (CY)

1. CONTRACTOR SHALL INCLUDE ALLOWANCE NO. 3 IN THEIR BASE BID PRICE.

2. REFER TO UNIT PRICE NO.3 FORE USE OF THIS ALLOWANCE.

3. USE OF ALLOWANCE NO. 3 SHALL BE AT THE SOLE DISCRETION OF THE OWNER.

4. CONTRACTOR SHALL PROVIDE ITEMIZED MATERIAL AND LABOR COSTS AND ADDITIONAL

DOCUMENTATION AS DIRECTED BY THE ARCHITECT FOR VALIDITY.

ALLOWANCE NO. 5

EMERGENCY RESPONDER RADIO COMMUNICATIONS ENHANCEMENT SYSTEM

AMOUNT: $50,000.00 (LUMP SUM)

1. CONTRACTOR SHALL INCLUDE ALLOWANCE NO. 5 IN THEIR BASE BID PRICE.

2. USE OF ALLOWANCE NO. 5 SHALL BE AT THE SOLE DISCRETION OF THE OWNER.

3. CONTRACTOR SHALL PROVIDE ITEMIZED MATERIAL AND LABOR COSTS AND ADDITIONAL

DOCUMENTATION AS DIRECTED BY THE ARCHITECT FOR VALIDITY.

UNSUITABLE SOILS REMOVAL AND REPLACEMENT WITH OFFSITE LANDSCAPE TOP SOIL

MEASUREMENT: CUBIC YARD (CY)

ALL MATERIAL AND LABOR TO REMOVE UNSUITABLE SOILS AS WELL AS PROVIDE AND INSTALL

TOP SOIL ACCEPTABLE TO THE LANDSCAPE ARCHITECT.

UNIT PRICE NO. 4

EXISTING CONCRETE FOUNDATION REMOVAL AND REPLACEMENT WITH OFFSITE STRUCTURAL FILL

MEASUREMENT: CUBIC YARD (CY)

ALL MATERIAL AND LABOR TO REMOVE EXISTING UNFORESEEN SUBSURFACE MATERIAL, BURIED

CONSTRUCTION OR EQUIPMENT. PROVIDE AND INSTALL STRUCTURAL FILL ACCEPTABLE TO THE

GEOTECHNICAL ENGINEER AND INCLUDE COMPACTION OF SOIL.

ALLOWANCE NO. 4

EXISTING CONCRETE FOUNDATION REMOVAL AND REPLACEMENT WITH STRUCTURAL FILL

AMOUNT: 1,000 CUBIC YARDS (CY)

1. CONTRACTOR SHALL INCLUDE ALLOWANCE NO. 4 IN THEIR BASE BID PRICE.

2. REFER TO UNIT PRICE NO.4 FORE USE OF THIS ALLOWANCE.

3. USE OF ALLOWANCE NO. 4 SHALL BE AT THE SOLE DISCRETION OF THE OWNER.

4. CONTRACTOR SHALL PROVIDE ITEMIZED MATERIAL AND LABOR COSTS AND

ADDITIONAL DOCUMENTATION AS DIRECTED BY THE ARCHITECT FOR VALIDITY.

L100 LIFE SAFETY

LIFE SAFETY

ALLOWANCE NO. 6

UNFORESEEN CONDITIONS

AMOUNT: $150,000.00 (LUMP SUM)

1. CONTRACTOR SHALL INCLUDE ALLOWANCE NO. 6 IN THEIR BASE BID PRICE.

2. USE OF ALLOWANCE NO. 6 SHALL BE AT THE SOLE DISCRETION OF THE OWNER.

3. CONTRACTOR SHALL PROVIDE ITEMIZED MATERIAL AND LABOR COSTS AND ADDITIONAL

DOCUMENTATION AS DIRECTED BY THE ARCHITECT FOR VALIDITY.

SOILS AND SITEWORK

1. UNDERCUTTING AND SITE WORK STATED IN THE GEOTECH REPORT FOR THE BUILDING PAD SHALL

BE INCLUDED IN THE CONTRACTOR'S PRICE.

2. SITE WORK INCLUDING UNDERCUTTING NECESSARY TO COMPLETE THE PLAZA BETWEEN

BUILDINGS, ALL PARKING AND DRIVE SURFACES ARE INCLUDED IN THE CONTRACTOR'S PRICE.

3. SITE WORK NECESSARY TO COMPLETE THE LANDSCAPING AND IRRIGATION SHALL BE INCLUDED

IN THE CONTRACTOR'S PRICE.

4. UNIT PRICES AND ALLOWANCES BELOW ARE FOR UNFORESEEN CONDITIONS.

FIRE PROTECTION

FP101 FIRE PROTECTION FLOOR PLAN

FP201 FIRE PROTECTION DETAILS

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

FOR BID

PROJECT NUMBER

FO

ET

A T

S

A M

ABALA

D

T

ARCH

IT

E

C

R E

G

IST E R E

Jeffrey S. Alpha

REGISTRATION

NUMBER

05-29-2025

SEAL

05.29.2025

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

G002

DRAWING

CONVENTIONS

A

A/V AUDIO/VIDEO

AC ACRE

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASB ASBESTOS

ASPH ASPHALT

ATTEN ATTENUATION

B

B & B BOARD & BATTEN

BC

BD

BACK OF CURB

BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BLKT BLANKET

BM BEAM

BOT BOTTOM

BRG BEARING

BRK BRICK

BSMT BASEMENT

BUR BUILT UP ROOFING

BYND BEYOND

C

CAB CABINET

CB

D

DBL DOUBLE

DEPT DEPARTMENT

DESC DESCRIPTION

DET DETAIL

DF

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN

DR

DS

DOWN

DOOR

DOWNSPOUT

DSP DRY STANDPIPE

DWG DRAWING

DWR DRAWER

E E

EA

EJ

EL

EAST

EACH

EXPANSION JOINT

ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

EOS EDGE OF SLAB

EP

H

HB

HC

DRINKING FOUNTAIN

HOSE BIB

HOLLOW CORE

HDWD HARDWOOD

HDWR HARDWARE

HM HOLLOW METAL

HNDRL HANDRAIL

HORIZ HORIIZONTAL

HP HIGHPOINT

HPDL HIGH PRESSURE DECORATIVE

LAMINATE

HR

HT

HOUR

HEIGHT

HTR HEATER

HVAC HEATING, VENTILATION & AIR

CONDITIONING

HW HOT WATER

I

ID

IF

IN

INCL

INSIDE DIAMETER (DIM)

INSIDE FACE

INCH

INCLUDE

INSUL INSULATION

INT

IT

INTERIOR

INFORMATION & TECHNOLOGY

ELECTRICAL PANELBOARD

EQ EQUAL

EQPT EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXPO EXPOSED

EXT EXTERIOR

CATCH BASIN

CCTV CLOSED-CIRCUIT TV

CEM CEMENT

CER CERAMIC

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

CH

CI

CEILING HEIGHT

CAST IRON

CIP CAST-IN-PLACE (CONCRETE)

CJ CONTROL JOINT

CLG CEILING

CLKG CAULKING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CMW CASEWORK / MILLWORK

CNTR CENTER

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUOUS

CORR CORRIDOR

CPT CARPET

CR CARD READER

CSMNT CASEMENT

CTSK COUNTERSUNK

CW CURTAINWALL

F

FA FIRE ALARM

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FFE FINISHED FLOOR ELEVATION

FHC FIRE HOSE CABINET

FIN FINISH

FL FLOOR

FLASH FLASHING

FLOUR FLOURESCENT

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FPRFG FIREPROOFING

FRMG FRAMING

FS

FT

FULL SIZE

FOOT OR FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

G

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GFI GROUND FAULT INTERRUPTION

GL GLASS

GND GROUND

GR GRADE

GRTG GRATING

GWB GYPSUM WALL BOARD

GYP GYPSUM

J

JAN JANITOR

JST

JT

JOIST

JOINT

K

KIT KITCHEN

KO KNOCKOUT

L

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LG LONG

LH LEFT HAND

LKR LOCKER

LOC LOCATION

LP

LT

LTL

LVL

LOW POINT

LIGHT

LINTEL

LEVEL

M

MACH MACHINE

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

MUL MULLION

N N

NA

NORTH

NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OBS OBSCURE

OC ON CENTER

OD OUTSIDE DIAMETER (DIAM)

OD OVERFLOW DRAIN

OFCI OWNER FURNISHED CONTRACTOR

INSTALLED

OFF OFFICE

OPNG OPENING

OPP OPPOSITE

OZ OUNCE

P P

PA

PC

PAINT

PUBLIC ADDRESS

PRECAST

PCF POUNDS PER CUBIC FOOT

PERF PERFORATED

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLMBG PLUMBING

PLYWD PLYWOOD

PNL PANEL

POL POLISHED

PR PAIR

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI

PT

POUNDS PER SQUARE INCH

POINT

PTD PAINTED

PTN PARTITION

PVC POLYVINYL CHLORIDE

Q

QT QUARRY TILE

QTR QUARTER

R R

RB

RD

RADIUS

RUBBER BASE

ROOF DRAIN

REF REFERENCE

REFR REFRIGERATOR

REINF REINFORCED

REQD REQUIRED

RESIL RESILIENT

RGSTR REGISTER

RL RAIN LEADER

RLNG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

S S

SC

SOUTH

SOLID CORE

SCHED SCHEDULE

SECT SECTION

SF

SHLF SHELF

SHT SHEET

SQUARE FOOT

W

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDW WINDOW

WP WATERPROOF

WR WATER RESISTANT

WSCT WAINSCOT

WT WEIGHT

SHWR SHOWER

SIM SIMILAR

SLC SEALED CONCRETE

SPEC SPECIFICATION

SQ SQUARE

SS SANITARY SEWER

SST STAINLESS STEEL

SSURF SOLID SURFACE

STA STATION

STC SOUND TRANSMISSION

COEFFICIENT

STD STANDARD

STL STEEL

STN STONE

STOR STORAGE

STR STAIR

STRUCT STRUCTURAL

SUSP SUSPENDED

SY SQUARE YARD

SYM SYMMETRICAL

T

T&G TONGUE AND GROOVE

TC

TEL

TOP OF CURB

TELEPHONE

TEMP TEMPORARY

TERR TERRAZZO

THK THICK

TME TO MATCH EXISTING

TOS TOP OF SLAB

TOW TOP OF WALL

TP TOP OF PAVEMENT

TRD TREAD

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U

UL UNDERWRITERS LABORATORIES

UNF UNFINISHED

UNO UNLESS NOTED OTHERWISE

V

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VTR VENT THRU ROOF

VWC VINYL WALL COVERING

ARCHITECTURAL ABBREVIATIONS

DETAIL

SECTION

CALLOUT

DETAIL /

ENLARGED

PLAN CALLOUT

DRAWING SHEET

DRAWING IDENTIFICATION

MATCHLINE

CENTERLINE

CL

FIRE EXTINGUISHER W/

BRACKET (WALL MOUNTED)

SHEET

REVISION NUMBER

FIRE EXTINGUISHER CABINET

FEC

FE

WALL

SECTION

BUILDING

SECTION

SECTION / DETAIL TYPES

ELEVATION

BUILDING

ELEVATION

DRAWING SHEET

INTERIOR

ELEVATION

VIEW

MISC SYMBOLS

10COLUMN LINE

TAG TYPES

ROOM NAME/NUMBER

DOOR NUMBER

WINDOW TYPE

STOREFRONT /

CURTAIN WALL

WALL TYPE TAG

CEILING TYPE

ROOM NAME

101A

P3

B6 A100

B6 A100

SECTION

DRAWING SHEET

B6 A100

SECTION

DRAWING SHEET

B6 A100

DETAIL

DRAWING SHEET

B6 A100

(+) 10'-0"

FLOOR

ABOVE FIRST

FLOOR

FIRST FLOOR (+) 0'-0" (632.00')

FIRST FLOORELEVATION

FIRST FLOOR

ELEVATION

ABOVE

A100

DRAWING CONVENTIONS

B4

B5

ELEVATION

DRAWING SHEET

DRAWING CONVENTION NOTES

ST-02

ROOM NAME

AC-1

ROOM NAME

ROOM NUMBER

FLOOR PLAN

SCALE 14" = 1'-0"

B3 A100

LIFE SAFETY

SCALE

DETAIL

FINISH FACE

FF21

8"

DIMENSIONING

(-) 10'-0"

FLOOR

BELOW FIRST

FLOOR

FIRST FLOOR

ELEVATION

BELOW

PER CIVIL

SIMPLIFIED

1. DIMENSIONS ARE PROVIDED TO DEMONSTRATE INTENT. FIELD VERIFY AND COORDINATE REQUIRED ROUGH OPENINGS AND CLEARANCES PRIOR TO PROCEEDING

WITH SUBMITTALS.

2. ALL FIELD VERIFY DIMENSIONS SHALL BE PROVIDED BY THE CONTRACTOR AND COORDINATED WITH DIMENSIONS SHOWN IN THE DRAWINGS.

3. DO NOT SCALE DRAWINGS. IF A DIMENSION IS NOT PROVIDED, CONTACT THE ARCHITECT FOR CLARIFICATION.

4. DIMENSIONS NOTED AS "CLEAR" SHALL BE FROM FINISH FACE TO FINISH FACE.

5. "TYPICAL" (TYP.) SHALL MEAN IN ALL INSTANCES UNLESS NOTED OTHERWISE.

6. "SIMILAR" (SIM.) SHALL MEAN COMPARABLE CHARACTERISTICS WITH DEVIATIONS. VERIFY AND DIFFERENTIATE BETWEEN EACH CONDITION. NOTIFY ARCHITECT OF

ANY DISCREPANCIES.

7. "ALIGN" MEANS TO ACCURATELY LOCATE FINISH FACES IN THE SAME PLANE.

SS

SS

SS

SS

SS

SS

SS

SS

DEMOLITION NOTES:

1. ALL MATERIALS BEING REMOVED SHALL BE PROPERLY DISPOSED OF BY THE CONTRACTOR.

2. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CARE SHALL BE TAKEN TO PROTECT UTILITIES THAT ARE TO REMAIN. REPAIR ANY DAMAGE ACCORDING TO LOCAL STANDARDS AND AT THE CONTRACTOR'S EXPENSE.

COORDINATE ALL CONSTRUCTION WITH THE LOCAL UTILITY COMPANY.

3. THE CONTRACTOR SHALL VERIFY THE LIMITS OF DEMOLITION WITH OWNER PRIOR TO COMMENCEMENT OF WORK.

4. IN AREAS WHERE EXISTING PAVEMENT, WALKS, OR CURBS ARE TO BE REMOVED, SAW CUT TO PROVIDE A CLEAN EDGE.

COORDINATE EXTENT OF PAVEMENT DEMOLITION WITH THE LIMIT OF NEW IMPROVEMENTS ON THE LAYOUT PLAN &

UTILITY PLAN.

5. CONTRACTOR SHALL COORDINATE PHASING OF THE DEMOLITION WITH OWNER AND LOCAL GOVERNING AGENCY PRIOR TO BEGINNING WORK. DISRUPTION OF EXISTING UTILITY SERVICES AND TRAFFIC PATTERNS SHALL BE MINIMIZED TO THE EXTENT POSSIBLE AND INITIATED ONLY AFTER APPROVAL FROM THE LOCAL GOVERNING AGENCY

AND UTILITY COMPANIES.

6. CAVITIES LEFT BY STRUCTURE OR UTILITY REMOVAL SHALL BE SUITABLY BACKFILLED AND COMPACTED IN

ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.

7. THE CONTRACTOR SHALL USE WATER SPRINKLING AND OTHER SUITABLE METHODS AS NECESSARY TO CONTROL DUST

AND DIRT CAUSED BY THE DEMOLITION.

8. THE CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION AND REMOVAL NECESSARY TO ACCOMPLISH THE PROPOSED

IMPROVEMENTS SHOWN ON THESE PLANS.

9. THE CONTRACTOR SHALL PRESERVE AND PROTECT SURVEY CONTROL POINTS AND SHALL BE RESPONSIBLE FOR

REPLACEMENT OF ANY DISTURBED CONTROL POINTS.

10. THE CONTRACTOR SHALL INCLUDE IN HIS WORK ANY ISOLATION VALVES OR TEMPORARY PLUGS/CAPS REQUIRED TO

CONSTRUCT AND TEST NEW UTILITY LINES AND DEMOLISH EXISTING UTILITY LINES.

A

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

PROJECT NUMBER

SEAL

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

P.O. BOX 2612

HUNTSVILLE, AL 35804

(256) 429-9150 jmphillipseng@gmail.com

JMPE PROJECT NO. 24007

FOR BID 05.29.2025

N

SITE DEMOLITION

PLAN

C1.0

SCALE:

30 15 30 60

1" = 30'

DEMO SEWER MANHOLE

DEMO GRATE INLET

DEMO EXISTING ASPHALT

DEMO CONCRETE HEADWALL

DEMO STORM PIPE TO EXTENTS

SHOWN. ABANDON REMAINING

PIPE ACCORDING TO CITY OF

HUNTSVILLE STANDARDS

DEMO SANITARY SEWER PIPE

LIGHT POLES TO REMAIN

DEMO EXISTING

CONCRETE SIDEWALK

DEMO EXISTING

CONCRETE SIDEWALK

DEMO EXISTING ENTRANCE

CONCRETE AND ASPHALT

DEMO EXISTING ASPHALT

DEMO EXISTING FENCE

DEMO EXISTING

CONCRETE PAD

DEMO EXISTING ASPHALT

AS NECESSARY FOR STORM AND

SANITARY SEWER INSTALLATION

U&D BOUNDARY LINE

FENCE

WOOD PRIVACY FENCE

UTILITY POLE

UNDERGROUND COMMUNICATION LINE

UNDERGROUND POWER LINE

GAS LINE

WATER LINE

SANITARY SEWER

WATER METER

CONCRETE

ASPHALT

RIP RAP

TREE LINE

FIRE HYDRANT

PROPSED SPOT ELEVATION

LAYOUT POINT

LEGEND

XX

UGCUGC

UGPUGP

W

GAS GAS

W W

SS SS

BC BOTTOM OF CURB

BLDG. BUILDING

CMP CORRUGATE METAL PIPE

CONC. CONCRETE

ELEV. ELEVATION

EOP EDGE OF PAVEMENT

EX. EXISTING

F.F.E. FINISHED FLOOR ELEVATION

FG FINISHED GRADE

I.E. INVERT ELEVATION

INV. INVERT

L.F. LINEAR FEET

LOC. LOCATION

MAX. MAXIMUM

ABBREVIATIONS

M.B.L. MINIMUM BUILDING LINE

MH MANHOLE

MIN. MINIMUM

MON. MONUMENT

PVMT. PAVEMENT

RCP REINFORCED CONCRETE PIPE

REQ'D REQUIRED

R.S.B. REAR SET BACK

R.O.W RIGHT OF WAY

S.S. SANITARY SEWER

TEMP. TEMPORARY

TC TOP OF CURB

TYP. TYPICAL

U & D UTILITY & DRAINAGE

GENERAL NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR MAKING APPLICATION AND PAYING FOR ALL NECESSARY PERMITS.

2. CONTRACTOR SHALL PROTECT ALL PROPERTY CORNERS AND BENCHMARKS. IF DESTROYED DURING CONSTRUCTION, CONTRACTOR SHALL REPLACE AT THEIR EXPENSE.

3. BASE INFORMATION WAS PROVIDED BY CITY OF HUNTSVILLE.

4. THE CONTRACTOR SHALL CHECK ALL EXISTING CONDITIONS (i.e. INVERTS, UTILITY ROUTINGS, UTILITY CROSSINGS, AND DIMENSIONS) IN THE FIELD PRIOR TO COMMENCEMENT OF WORK. REPORT ANY DISCREPANCIES TO THE

ENGINEER.

5. THE EXISTING UTILITIES DEPICTED ARE BASED ON INFORMATION GATHERED FROM UTILITY MAPS AND ONSITE OBSERVATIONS. NO UTILITY STUDIES WERE CONDUCTED DURING THE PREPARATION OF THESE PLANS. ALL UTILITY

LOCATIONS DEPICTED SHOULD BE CONSIDERED APPROXIMATE.

6. THE EXACT LOCATION OF ALL EXISTING UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR. CARE SHALL BE TAKEN TO PROTECT UTILITIES THAT ARE TO REMAIN. ANY DAMAGE SHALL BE REPAIRED ACCORDING TO LOCAL STANDARDS AND AT THE CONTRACTOR'S EXPENSE. COORDINATE ALL CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANY.

THE CONTRACTOR SHALL CALL NATIONAL ONE CALL (811) 72 HOURS PRIOR TO ANY EXCAVATION. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF THE UTILITIES DEPICTED ON THESE

DRAWINGS.

7. THE CONTRACTOR SHALL CONFORM TO ALL LOCAL CODES AND RECEIVE NECESSARY APPROVAL BEFORE

CONSTRUCTION.

8. A SMOOTH TRANSITION SHALL BE PROVIDED BETWEEN EXISTING PAVEMENT AND NEW PAVEMENT. SLIGHT FIELD

ADJUSTMENT OF FINAL GRADES MAY BE REQUIRED.

9. DIMENSIONS ARE TO EDGE OF PAVEMENT AND/OR EXTERIOR FACE OF BUILDING, UNLESS NOTED OTHERWISE

10. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOBSITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL DEVICES AND SAFETY MEASURES FOR CONSTRUCTION WORK WITHIN PUBLIC RIGHT-OF-WAYS IN ACCORDANCE WITH THE U.S.

DEPARTMENT OF TRANSPORTATION FHWA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, ON, OR NEAR THE CONSTRUCTION SITE.

11. A GEOTECHNICAL ENGINEERING REPORT HAS BEING PREPARED FOR THE PROJECT BY AMIRI ENGINEERING CORPORATION. THE REPORT WAS NOT AVAILABLE FOR REVIEW DURING THE PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOLLOWING THE SITE PREPARATION RECOMMENDATIONS SPECIFIED

WITHIN THIS DOCUMENT, UNLESS MORE STRINGENT REQUIREMENTS ARE GIVEN ON THE PLANS.

12. SHOULD ADVERSE CONDITIONS BE FOUND IN THE FIELD, J.M. PHILLIPS ENGINEERING, LLC SHOULD BE NOTIFIED OF THE

PROBLEMS SO THAT WE MAY ADDRESS THEM.

13. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ALL SAFETY MEASURES REQUIRED FOR

COMPLIANCE WITH CURRENT OSHA STANDARDS.

DEMOLISH EXISTING STORM

BOX TOP

DEMOLISH EXISTING CONCRETE GUTTER

STEVE HETTINGER DRIVE SW

L

E X

M C

A L

L I

S T

E R

D R

I V

E S

W

X

X

X

X

XXXXXXXX

X

X

X

X

X X

X X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

XXXXXXX

X X

X X

X X

X X

X X

X

V A

N

VANVAN

SS

SS

SS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLASTDUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLO

PLA

ST

DUCTIL

E IR

ON

DO NOT P

OLL

UTE

DRAINS TO

W

ATE

RWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXX

X

X X

X X

X X

X X

X X

X X

N

SITE LAYOUT LEGEND

A REQ'D NEW STD. DUTY ASPHALT PAVEMENT

B REQ'D NEW STD DUTY CONCRETE PAVEMENT

C REQ'D NEW 24" CURB AND GUTTER, TYP.

D REQ'D NEW 24" CONCRETE RIBBON CURB

E REQ'D NEW 4" THICK CONCRETE SIDEWALK

F REQ'D NEW ADA ACCESSIBLE CURB RAMP

G

REQ'D NEW ADA ACCESSIBLE PARKING STALL WITH SIGN,

SYMBOL, WHEELSTOP AND BLUE STRIPING

H REQ'D NEW HEAVY DUTY CONCRETE PAVEMENT

I REQ'D CONCRETE WHEELSTOP, TYP.

J REQ'D 2' WIDE CONCRETE GUTTER

K

REQ'D UNDER SIDEWALK CROSS DRAIN WITH DIAMOND PLATE

LID

A

SITE DEVELOPMENT

PLAN

C2.0

A

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

PROJECT NUMBER

SEAL

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

P.O. BOX 2612

HUNTSVILLE, AL 35804

(256) 429-9150 jmphillipseng@gmail.com

JMPE PROJECT NO. 24007

FOR BID 05.29.2025

SCALE:

20 10 20 40

1" = 20'

A

B

B

C

C

C

D

D

E

E

F

F

F

F

G G

H

H

E

E

E

I

I

D

D

D

E

E

E

LIMITS OF CONSTRUCTION -

WORK SHOWN SOUTH OF THIS LINE

IS FUTURE AND FOR REFERENCE ONLY

B

E

F SEE LANDSCAPE PLANS FOR

COURTYARD HARDSCAPE, FENCING,

CURBING AND WALL.

MATCHLINE

MATCHLINE

E

J

K

LIMITS OF CONSTRUCTION -

WORK SHOWN SOUTH OF THIS LINE

IS FUTURE AND FOR REFERENCE ONLY

INCLUDE REPAIR OF EXISTING

CONDITIONS REMOVED

FOR STORM INSTALLATION

http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com

X

X

XXXXXX

X

X

X X

X

X

X

X

X X

X X

X

X

XXXXX

X X

X X

X X

X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X

XXXX

X X

X X

X X

X X

X X

X

V A

N

R25'

R25'

R3'

R3' R3'

R3'

R3'

R3' R3'

R3'

R25.07'

10'

10'

TYP.

T Y

P.

VANVAN 11'10'

10'

5.

8'

8'

8'

8'

5.

8'

R 368'

R

7'

R

4'

R 287'

R

1.9

8'

R35.5'

R

40'

10'

TYP.

T Y

P.

16'

R58'

R58'

12'

12'

.7

8'

8' 10.13'

.5

8'

.7

5'

' 61

.9 1'

.2

6'

11.94'

16'

R51 .39

R51.39'

.3

7'

8.14'

32'

R

.3 9'

.5

5'

8'

10' 10'10'

5' 5'

8'

8'

2'

2'

R344.76'

R478.33'

SS

SS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLASTDUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLO

PLA

ST

DUCTIL

E I

RON

DO NOT P

OLLU

TE

DRAINS TO

WATE

RWAYS

NYLOPLAST

DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

A

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

PROJECT NUMBER

SEAL

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

P.O. BOX 2612

HUNTSVILLE, AL 35804

(256) 429-9150 jmphillipseng@gmail.com

JMPE PROJECT NO. 24007

FOR BID 05.29.2025

N

SITE LAYOUT PLAN

C3.0

SCALE:

20 10 20 40

1" = 20'

PAVEMENT CONSTRUCTION GENERAL NOTES:

1. CRUSHED AGGREGATE BASE COURSE PLANT MIXED SHALL BE PLACED IN

ACCORDANCE WITH SECTION 301, ALDOT., 2012. ALL MATERIALS SHALL BE IN

ACCORDANCE WITH SECTION 825, TYPE B, 100% COMPACTION.

2. PRIOR TO PLACING AND COMPACTING EMBANKMENTS, THE SITE SHALL BE CLEARED

AND ALL UNSUITABLE MATERIAL REMOVED.

3. PRIOR TO THE PLACEMENT OF FILL ALL SUBGRADES SHALL BE CLEARED AND

GRUBBED, SCARIFIED TO A DEPTH OF 6" AND COMPACTED TO 95% OF THE MAXIMUM

DRY DENSITY, PLUS OR MINUS 2% OF OPTIMUM MOISTURE (ASTM D698).

4. DIRECTIONAL ARROWS AND PARKING SPACE STRIPING SHALL BE WHITE OR

YELLOW. HANDICAP PARKING STRIPING AND SYMBOL SHALL BE BLUE, UNLESS

OTHERWISE INDICATED IN LOCAL CODE.

5. TRAFFIC CONTROL DEVICES SHALL BE UTILIZED IN ACCORDANCE WITH THE

NATIONAL MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND

HIGHWAYS.

REINFORCED CONCRETE NOTES:

1. ALL CONCRETE SHALL BE AIR ENTRAINED 4,000 PSI MINIMUM COMPRESSIVE

STRENGTH AS 28 DAYS, UNLESS NOTED OTHERWISE.

2. ALL REINFORCING STEEL SHALL BE GRADE 60 DEFORMED BARS, AND SHALL

CONFORM TO ASTM A615, FOR BILLET STEEL.

3. ALL LAP SPLICES SHALL BE CLASS "B".

4. CONCRETE AIR ENTRAINMENT SHALL BE BETWEEN 3-6% BY VOLUME.

5. ALL REINFORCING BARS SHALL BE SHOP BENT IN ACCORDANCE WITH THE

CONCRETE REINFORCING STEEL INSTITUTE CURRENT STANDARD. HEATING OF

REINFORCING BARS TO BEND OR STRAIGHTEN THEM WILL NOT BE ALLOWED.

6. ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185, SMOOTH FABRIC WITH

A YIELD STRENGTH OF 65,000 PSI.

LIMITS OF CONSTRUCTION WORK SHOWN

SOUTH AND WEST OF THIS LINE

IS FUTURE AND FOR REFERENCE ONLY

INCLUDE REPAIR OF EXISTING

CONDITIONS REMOVED FOR STORM

AND SANITARY SEWER INSTALLATION

http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com

V A

N

X

X

X

X

XXXXXXXX

X

X

X

X

X X

X X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

XXXXXXX

X X

X X

X X

X X

X X

X

V A

N

VANVAN

.3

FFE ELEV.: 603.72

1.5

1.5

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLASTDUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLO

PLA

ST

DUCTIL

E IR

ON

DO NOT P

OLL

UTE

DRAINS TO

W

ATE

RWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

4.5%

2.2%

0.

7%

2.0%

603.70

603.34 603.24

603.24 603.34

603.96

605.17

605.05

603.40 603.80

TC:604.08

BC:603.58

603.70

603.70

603.70

HP: 603.11

HP: 602.95

HP: 603.10

602.83 603.01

602.91

603.09

603.51

603.40

602.98

602.88

603.14

HP: 603.09

603.24

602.53

TC:603.49

BC:603.16

TC:603.39

BC:603.06

HP: 603.12

603.68

603.37

603.50

603.55603.44

TC:604.12

BC:603.62

603.56

603.24

603.70

603.70

603.70 603.31

602.47

TC:602.68

BC:602.18

603.51

603.71

603.56

603.70

603.54

603.61

603.36

603.15

603.30 603.00

602.80

603.14

603.10

602.79

602.77

602.84

603.55 603.70

M.E.: 601.92

M .E.: 6

01.8

602.03

602.09

603.70

603.70 603.66

603.56

603.56

603.40 603.70

603.68

603.34

603.44

603.63

603.63

603.53603.63603.70

603.70

603.65 603.70

603.70

603.90 603.50

TC:603.90

BC:603.40

TC:604.50

BC:604.00

TC:603.11

BC:602.61

TC:603.61

BC:603.11

TC:603.96

BC:603.46

TC:603.88

BC:603.38

TC:603.58

BC:603.08 TC:603.73

BC:603.23

TC:603.82

BC:603.32

TC:603.67

BC:603.17

603.05

M.E.: 601.75

M.E.: 601.83

M.E.: 601.88

602.08

603.44

602.63

602.63 602.79

603.70

603.70

603.41 603.44

603.38

603.60

603.62 603.62

603.60

603.16

TC:603.16

BC:602.66 TC:604.29

BC:603.79

TC:604.43

BC:603.93

604.75

604.37

604.45

605.12

604.96 604.88

605.15

605.24

605.32 605.08

604.86

604.66

605.20

605.10

604.75

604.72

604.65

604.66

604.53

604.65

603.88

604.00

604.55

604.43

603.95 603.75

603.63 603.82

603.87603.64

602.33 602.68

603.18

603.06 602.68

602.51 602.33

603.57 603.57

603.24

TC:603.64

BC:603.14

TC:603.40

BC:602.90

TC:603.73

BC:603.23

TC:604.02

BC:603.52

TC:603.98

BC:603.48

HP: 603.31

603.60

603.70

603.61

603.52

603.38

603.54

603.65

603.39603.47603.53

603.39

603.53

603.54

603.70

1.6

1.0

1.4

2.2% 1.7%2.9%

2.9% 1.5%

1.2%

1.8%

4.8%

1.9%

1.1%

3.4%

2.

3%

1.5

2.

3%

1.4

2.

0%

603.07 603.07

603.12 603.32

0+

0+

0+

1+00

2+00 2+46

603.37

603.38

TC:602.81

BC:602.48

TC:603.33

BC:603.00

TC:604.51

BC:604.01

M.E.: 604.78

605.04

603.47

M.E.: 605.08 M.E.: ???

M.E.: 603.00 M.E.: 602.12

M.E.: 604.82

605.04

604.96 M.E.: 605.00

M.E.: 605.36

TC:604.25

BC:603.75

604.23

603.60

603.25

603.54

604.56

603.54

M .E.: 601.78

M .E.: 601.62

602.50

TC:603.00

BC:602.67

602.47

602.47

602.35

602.43

602.31

M .E.: 601.76

M .E.: 6

01.7

M.E.: 601.54

M.E.: 604.18

603.40

603.35603.32 603.14

603.46 603.46

603.38 603.38

603.28

603.61603.33

1.3

0.

6%

0.9%

0.8%

1.7

1.5

2.

1% 1.8

2.

0%

1.8

1.0%

1.6

5.

0%

0.

9%

TC:603.38

BC:603.05

TC:603.50

BC:603.17

TC:603.40

BC:603.07

TC:603.50

BC:603.17

TC:603.46

BC:603.13

TC:603.56

BC:603.23

TC:603.39

BC:603.06

TC:603.28

BC:602.95

TC:603.34

BC:603.01

TC:603.43

BC:603.10

TC:603.37

BC:603.04

TC:603.27

BC:602.94

TC:603.34

BC:603.01

TC:603.26

BC:602.93

TC:603.34

BC:603.01

TC:603.48

BC:603.15

TC:603.53

BC:603.20

TC:603.39

BC:603.06

TC:603.39

BC:603.06

TC:603.33

BC:603.00

603.38 603.38

603.61

1.8

602.75

601.79

601.94

602.95

602.95

1.5%

0.8%

1.4%

603.11

603.11 602.06

602.14

X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXX

X

X X

X X

X X

X X

X X

602.06

602.14

602.50

602.58

601.9

602.07

601.3

601.3

602.18

602.26

601.5

601.5

602.38

602.30

A

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

PROJECT NUMBER

SEAL

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

P.O. BOX 2612

HUNTSVILLE, AL 35804

(256) 429-9150 jmphillipseng@gmail.com

JMPE PROJECT NO. 24007

FOR BID 05.29.2025

EARTHWORK GENERAL NOTES:

1. UNLESS NOTED OTHERWISE ON THE PLANS, ALL PROPOSED CONTOURS AND ALL

PROPOSED SPOT ELEVATIONS SHOWN ARE FINISHED GRADE.

2. ALL EARTH FILL SHALL BE COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY

PLUS OR MINUS 2% OF THE OPTIMUM MOISTURE (ASTM D698) BENEATH BUILDING,

SIDEWALKS, AND PAVEMENT AREAS.

3. ALL EARTH FILL PLACED IN GRASSED AND LANDSCAPED AREAS TO BE COMPACTED

TO 90% OF THE MAXIMUM DRY DENSITY PLUS OR MINUS 2% OF THE OPTIMUM

MOISTURE (ASTM D698).

4. EARTH FILL SHALL BE PLACED IN UNIFORM LAYERS OR LIFTS, NOT TO EXCEED 6"

COMPACTED THICKNESS.

5. ALL EARTH FILL UNDER BUILDINGS SHALL ALSO MEET THE REQUIREMENTS OF THE

ARCHITECT'S PLANS AND SPECIFICATIONS.

6. MAXIMUM SLOPES FOR THE PROJECT ARE 3:1, UNLESS NOTED OTHERWISE.

7. THE CONTRACTOR IS TO BE SOLELY RESPONSIBLE FOR THE PROTECTION OF WORK.

ALL NECESSARY GRADING AND DRAINAGE SHALL BE PERFORMED TO PREVENT

SURFACE RUN OFF FROM DAMAGING THE WORK.

8. THE CONTRACTOR SHALL BE REQUIRED TO INSTALL SILT FENCES, HAY BALES, AND

OTHER EROSION AND SEDIMENT CONTROL DEVICES TO PREVENT LOOSE DIRT AND

SEDIMENT FROM WASHING INTO STREETS AND ONTO ADJACENT PROPERTY. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF THE EROSION

AND SEDIMENT CONTROL MEASURES UNTIL FINAL INSPECTION BY THE LOCAL

GOVERNING AGENCY.

9. IF A GEOTECHNICAL ENGINEERING REPORT HAS BEEN PREPARED FOR THE PROJECT,

THE CONTRACTOR SHALL BE RESPONSIBLE FOR FOLLOWING THE

RECOMMENDATIONS SPECIFIED WITHIN THIS DOCUMENT, UNLESS MORE

STRINGENT REQUIREMENTS ARE GIVEN ON THE PLANS OR WITHIN THE PROJECT

SPECIFICATIONS.

10. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ALL SAFETY

MEASURES REQUIRED FOR COMPLIANCE WITH CURRENT OSHA STANDARDS.

N

SITE GRADING PLAN

C4.0

SCALE:

20 10 20 40

1" = 20'

MATCHLINE

MATCHLINE

http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com

SSSSSSSSSS

W W

E

LE

C T

R A

N S

G GAS GAS

SSMH - (1)

SANITARY SEWER MANHOLE

N:1526407.8755 E:429734.8587

RIM:602.84

INV IN (N):598.33 8" Ductile Iron INV OUT (S):598.23 8" Ductile Iron

SSMH - (3)

SANITARY SEWER MANHOLE

N:1526016.8142 E:429701.5587

RIM:602.66

INV IN (N):596.00 8" Ductile Iron INV OUT (S):595.90 8" Ductile Iron

SSMH - (2)

SANITARY SEWER MANHOLE

N:1526205.0534 E:429655.1724

RIM:602.41

INV IN (N):597.07 8" Ductile Iron INV OUT (S):596.97 8" Ductile Iron

SS

SS

SS

SS

SS

SS

SS

SS Pipe - (1) 218' of 8" Ductile Iron @ 0.53%

SS

SS

SS

SS

SS

SS

SS Pipe - (2) 194' of 8" Ductile Iron @ 0.50%

W

STRUCTURE - (18)

Concentric Structure 48 dia 18 frame 24 cone

RIM:0.00

INV OUT (W):597.56 8" PVC

STRUCTURE - (19)

Concentric Structure 48 dia 18 frame 24 cone

RIM:0.00

INV IN (E):595.21 8" PVC

Pipe - (10)

200' of 8" PVC @ 1.18%

0+

1+

2+

3+

4+

5+

5+

PI: 0+00.00

PI: 2+17.91

PI: 4+11.78

EP: 5+29.00

X

X

X

XXXXXX

X

X

X X

X

X

X

X

X X

X X

X

X

XXXXX

X X

X X

X X

X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X

XXXX

X X

X X

X X

X X

X X

X

V A

N

VANVAN

SS

SS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLASTDUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLO

PLA

ST

DUCTIL

E I

RON

DO NOT P

OLLU

TE

DRAINS TO

WATE

RWAYS

NYLOPLAST

DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

NYLOPLAST DUCTILE IRON

DO NOT POLLUTE DRAINS TO WATERWAYS

0+00

1+00

2+

3+

4+

5+

6+00

7+00

7+35

STRUCTURE - (2.5)

GRATE INLET

RIM:602.70

INV IN (N):599.40 18" HP STORM PP

INV OUT (S):599.32 18" HP STORM PP

STRUCTURE - (4.4)

STORM JUNCTION BOX

WITH SOLID LID

RIM:602.73

INV.: 598.96

INV IN (E):599.10 18" Reinforced Concrete Pipe

INV OUT (W):598.96 18" CMP

Pipe - (2.4) 45' of 18" HP STORM PP @ 0.40%

STRUCTURE - (2.4)

GRATE INLET

RIM:602.74

INV IN (E):599.63 18" HP STORM PP

INV OUT (S):599.58 18" HP STORM PP

STRUCTURE - (5.1)

GRATE INLET

RIM:602.98

INV OUT (SW):600.66 15" HP STORM PP

STRUCTURE - (4.1)

GRATE INLET

RIM:602.96

INV OUT (N):600.31 15" HP STORM PP

Pipe - (5.1) 44' of 15" HP STORM PP @ 0.50%

STRUCTURE - (2.3)

GRATE INLET

RIM:603.29

INV IN (S):600.10 15" HP STORM PP

INV OUT (W):599.99 18" HP STORM PP

Pipe - (2.3) 91' of 18" HP STORM PP @ 0.40%

STRUCTURE - (7.7)

24" NYLOPLAST BASIN WITH

PEDESTRIAN GRATE INLET

RIM:602.74

INV IN (E):598.57 18" HP STORM PP

INV OUT (W):598.47 18" HP STORM PP

STRUCTURE - (7.8)

24" NYLOPLAST BASIN WITH

PEDESTRIAN GRATE INLET

RIM:602.77

INV IN (E):598.11 18" HP STORM PP

INV OUT (W):598.01 24" HP STORM PP

Pipe - (7.7) 72' of 18" HP STORM PP @ 0.50%

STRUCTURE - (7.9)

24" NYLOPLAST BASIN WITH

PEDESTRIAN GRATE INLET

RIM:602.55

INV IN (E):597.51 24" HP STORM PP

INV OUT (W):597.41 24" HP STORM PP

Pipe - (7.8) 100' of 24" HP STORM PP @ 0.50%

STRUCTURE - (2.7)

PEDESTRIAN GRATE INLET

RIM:602.33

INV IN (E):597.00 24" HP STORM PP

INV IN (N):598.40 18" HP STORM PP

INV OUT (S):596.80 24" HP STORM PP

Pipe - (7.9) 82' of 24" HP STORM PP @ 0.50%

STRUCTURE - (2.6)

STORM JUNCTION BOX

RIM:602.89

INV IN (N):598.94 18" HP STORM PP

INV OUT (S):598.84 18" HP STORM PP

Pipe - (2.6) 89' of 18" HP STORM PP @ 0.50%

Pipe - (2.5) 96' of 18" HP STORM PP @ 0.40%

STRUCTURE - (7.3)

18" NYLOPLAST DRAIN BASIN WITH

DOMED GRATE

RIM:603.15

INV IN (NW):600.18 18" HP STORM PP

INV OUT (E):600.08 18" HP STORM PP

STRUCTURE - (7.2)

24" NYLOPLAST DRAIN BASIN WITH

SOLID LID

RIM:603.58

INV IN (W):600.44 15" HP STORM PP

INV IN (NE):600.44 15" HP STORM PP

INV OUT (SE):600.34 18" HP STORM PP

Pipe - (7.2) 32' of 18" HP STORM PP @ 0.50%

STRUCTURE - (7.1)

15" NYLOPLAST DRAIN BASIN WITH

DOMED GRATE

RIM:603.30

INV OUT (E):600.69 15" HP STORM PP

Pipe - (7.1) 50' of 15" HP STORM PP @ 0.50%

Pipe - (4.1) 56' of 15" HP STORM PP @ 0.45%

STRUCTURE - (6.1)

15" NYLOPLAST DRAIN BASIN WITH

DOMED GRATE

RIM:603.38

INV OUT (NE):600.77 15" HP STORM PP

STRUCTURE - (6.2)

15" NYLOPLAST DRAIN BASIN WITH

DOMED GRATE

RIM:603.46

INV IN (SW):600.60 15" HP STORM PP

INV OUT (E):600.52 15" HP STORM PP

Pipe - (6.1) 35' of 15" HP STORM PP @ 0.49%

STRUCTURE - (2.2)

15" NYLOPLAST DRAIN BASIN WITH

DOMED GRATE

RIM:603.46

INV IN (W):600.40 15" HP STORM PP

INV IN (E):600.40 15" HP STORM PP

INV OUT (N):600.30 15" HP STORM PP

Pipe - (6.2) 23' of 15" HP STORM PP @ 0.50%

Pipe - (2.2) 39' of 15" HP STORM PP @ 0.50%

STRUCTURE - (2.1)

15" NYLOPLAST DRAIN BASIN WITH

DOMED GRATE

RIM:603.47

INV OUT (W):600.53 15" HP STORM PP

Pipe - (2.1) 27' of 15" HP STORM PP @ 0.50%

STRUCTURE - (7.4)

18" NYLOPLAST DRAIN BASIN WITH

DOMED GRATE

RIM:603.10

INV IN (W):599.81 18" HP STORM PP

INV OUT (S):599.71 18" HP STORM PP

Pipe - (7.3) 54' of 18" HP STORM PP @ 0.50%

STRUCTURE - (4.3)

STORM JUNCTION BOX

WITH SOLID LID

RIM:603.75

INV IN (E):599.41 18" Reinforced Concrete Pipe INV IN (N):599.49 15" Reinforced Concrete Pipe INV OUT (W):599.36 18" Reinforced Concrete Pipe

Pipe - (4.3) 58' of 18" Reinforced Concrete Pipe @ 0.45%

STRUCTURE - (4.2)

STORM JUNCTION BOX

WITH SOLID LID

RIM:604.53

INV IN (NE):600.25 15" Reinforced Concrete Pipe

INV IN (S):600.06 15" HP STORM PP

INV OUT (W):600.01 18" Reinforced Concrete Pipe

Pipe - (4.2) 133' of 18" Reinforced Concrete Pipe @ 0.45%

Pipe - (1.1) 28' of 15" Reinforced Concrete Pipe @ 0.50%

STRUCTURE - (1.1)

GRATE INLET

RIM:603.68

INV OUT (SW):600.39 15" Reinforced Concrete Pipe

STRUCTURE - (3.1)

GRATE INLET

RIM:602.52

INV OUT (S):599.58 15" Reinforced Concrete Pipe

Pipe - (3.1) 18' of 15" Reinforced Concrete Pipe @ 0.50%

0+

0+

0+

1+00

2+00 2+46

EXISTING PIPE

96' of 18" CMP @ 1.70%

STRUCTURE - (2.8)

NYOPLAST STRUCTURE WITH

GRATE INLET TOP

RIM:602.75

INV IN (N):596.41 24" HP STORM PP

INV OUT (S):595.92 24" HP STORM PP

Pipe - (2.7) 77' of 24" HP STORM PP @ 0.50%

STRUCTURE - (2.9)

NYOPLAST STRUCTURE WITH

GRATE INLET TOP

RIM:602.58

INV IN (N):595.32 24" HP STORM PP

INV OUT (E):593.22 24" HP STORM PP

Pipe - (2.8) 118' of 24" HP STORM PP @ 0.50%

EXISTING BRICK JUNCTION BOX

RIM:601.37

INV IN (NW):590.72 24" HP STORM PP

INV IN (NE):586.26 96" Reinforced Concrete Pipe

INV IN (E):596.74 18" HP STORM PP

INV OUT (W):586.16 96" Reinforced Concrete Pipe

Pipe - (2.9) 110' of 24" HP STORM PP @ 0.99%

STRUCTURE - (2.10)

STORM JUNCTION BOX

RIM:602.27

INV IN (W):592.13 24" HP STORM PP

INV OUT (SE):591.13 24" HP STORM PP

0+00

0+58

STRUCTURE - (7.6)

GRATE INLET

RIM:602.70

INV IN (N):598.93 18" HP STORM PP

INV OUT (W):598.83 18" HP STORM PP

Pipe - (7.4) 59' of 18" HP STORM PP @ 0.50%

Pipe - (7.6) 52' of 18" HP STORM PP @ 0.50%

0+00

1+00

2+

3+00 4+005+005+77

0+

0+

0+

0+

6" N12 HDPE ROOF LEADER @ 1% MIN. SLOPE, TYP.

CONNECT TO STORM PIPE WITH INSERTA-TEE

FITTING

COORDINATE FINAL DOWNSPOUT LOCATIONS WITH

ARCHITECTURAL PLANS

Pipe - (2.10) 41' of 24" HP STORM PP @ 1.00%

8" N12 HDPE STORM PIPE @ 1% MIN. SLOPE FROM 12"

NYLOPLAST BASIN.

CONNECT TO STORM PIPE WITH INSERTA-TEE FITTING

10" EZ FLOW FRENCH DRAIN @ 1% MIN.

SLOPE AND 6" MIN. COVER, TYP.

CONNECT TO 12" NYLOPLAST BASIN.

12" NYLOPLAST BASIN WITH DOMED GRATE, TYP.

10" EZ FLOW FRENCH DRAIN @ 1%

MIN. SLOPE AND 6" MIN. COVER, TYP.

CONNECT TO 12" NYLOPLAST BASIN.

8" N12 HDPE STORM PIPE @ 1% MIN. SLOPE FROM 12"

NYLOPLAST BASIN.

CONNECT TO STORM PIPE WITH INSERTA-TEE FITTING

8" N12 HDPE STORM PIPE @ 1% MIN. SLOPE FROM 12"

NYLOPLAST BASIN.

CONNECT TO STORM PIPE WITH INSERTA-TEE FITTING

STRUCTURE - (7.5)

GRATE INLET

RIM:603.17

INV IN (N):599.42 18" HP STORM PP

INV OUT (S):599.32 18" HP STORM PP

Pipe - (7.5) 77' of 18" HP STORM PP @ 0.50%

STRUCTURE - (61)

OPEN THROAT YARD INLET

RIM:602.76

OTI INV: 601.43

INV OUT (W):598.51 18" HP STORM PP

STRUCTURE - (62)

OPEN THROAT YARD INLET

RIM:602.54

OTI INV: 601.21

INV IN (E):597.67 18" HP STORM PP

INV OUT (W):597.57 18" HP STORM PP

Pipe - (42) 84' of 18" HP STORM PP @ 1.00%

Pipe - (43) 83' of 18" HP STORM PP @ 1.00%

A

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

PROJECT NUMBER

SEAL

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

P.O. BOX 2612

HUNTSVILLE, AL 35804

(256) 429-9150 jmphillipseng@gmail.com

JMPE PROJECT NO. 24007

FOR BID 05.29.2025

N

SITE DRAINAGE PLAN

C5.0

SCALE:

30 15 30 60

1" = 30'

INCLUDE REPAIR OF EXISTING

CONDITIONS REMOVED FOR STORM AND

SANITARY SEWER INSTALLATION NEW OTI TOP ON EXISTING

STORM JUNCTION BOX

http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com http://www.autodsys.com

E le va ti on

E levation

Station

(STORM) - (4) PROFILE

-0+50 0+00 1+00 2+00 3+003+00

E le va ti on

E levation

Station

(STORM) - (2) PROFILE

-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+008+00

E le va ti on

E levation

Station

(STORM) - (3) PROFILE

-0+50 0+00 1+001+00

E le va ti on

E levation

Station

(STORM) - (1) PROFILE

-0+50 0+00 1+001+00

St ru ct ur e

4.

3)

ST

O

R M

JU

N

C T

IO

N

B O

X W

IT

H

S O

LI

D

L

ID

ST

A

:1+

.4

R

IM

:6

.7

IN

V

IN

E

9.

" 1 in ch

C on cr et e Pi pe

IN

V

IN

N

9.

" 1 in ch C on cr et e

Pi pe

IN

V

O U

T

W

9.

" 1 in ch

C on cr et e Pi pe

St ru ct ur e

4.

2)

ST

O

R M

JU

N

C T

IO

N

B O

X W

IT

H

S O

LI

D

L

ID

ST

A

:0 +5

5.

R

IM

:6

.5

IN

V

IN

N E

0.

" 1 in ch C on cr et e

Pi pe

IN

V

IN

S) :6

.0

" 1 in ch

H P

ST

O

R M

P P

IN

V

O U

T

W

0.

" 1 in ch

C on cr et e Pi pe

Pipe - (4.2) 133' of 18" Reinforced Concrete Pipe @ 0.45%

Pipe - (4.3) 58' of 18" Reinforced Concrete Pipe @ 0.45%

St ru ct ur e

3.

1)

G R

A T

E

IN

LE

T

ST

A

:0 +0

0.

R

IM

:6

.5

IN

V

O U

T

S) :5

.5

" 1 in ch

C on cr et e Pi pe

Pipe - (3.1) 18' of 15" Reinforced Concrete Pipe @ 0.50%

St ru ct ur e

4.

3)

ST

O

R M

JU

N

C T

IO

N

B O

X W

IT

H

S O

LI

D

L

ID

ST

A

:1+

.4

R

IM

:6

.7

IN

V

IN

E

9.

" 1 in ch

C on cr et e Pi pe

IN

V

IN

N

9.

" 1 in ch C on cr et e

Pi pe

IN

V

O U

T

W

9.

" 1 in ch

C on cr et e Pi pe

E le va ti on

E levation

Station

(STORM) - (5) PROFILE

-0+50 0+00 1+001+00

EXISTING GRADE

PROPOSED GRADE

SCALE: 1" = 50' HORIZONTAL

1" = 5' VERTICAL

LEGEND

St ru ct ur e

5.

1)

G R

A T

E

IN

LE

T

ST

A

:0 +0

0.

R

IM

:6

.9

IN

V

O U

T

SW

0.

" 1 in ch

H P

ST

O

R M

P P

St ru ct ur e

7.

2)

" N

Y

LO

PL

A

ST

D

R A

IN

B

A

SI

N W

IT

H

SO

LI

D L

ID

ST

A :0

+4 9.

R

IM

:6

.5

IN

V

IN

W

0.

" 1 in ch H

P

ST

O R

M P

P

IN

V

IN

N

E

0.

" 1 in ch

H P

ST

O

R M

P P

IN

V

O U

T

SE

0.

" 1 in ch

H P

ST

O

R M

P P

St ru ct ur e

1.1

G R

A T

E

IN

LE

T

ST

A

:0 +0

0.

R

IM

:6

.6

IN

V

O U

T

SW

0.

" 1 in ch

C on cr et e Pi pe

Pipe - (1.1) 28' of 15" Reinforced Concrete Pipe @ 0.50%

St ru ct ur e

4.

2)

ST

O

R M

JU

N

C T

IO

N

B O

X W

IT

H

S O

LI

D

L

ID

ST

A

:0 +5

5.

R

IM

:6

.5

IN

V

IN

N E

0.

" 1 in ch C on cr et e

Pi pe

IN

V

IN

S) :6

.0

" 1 in ch

H P

ST

O

R M

P P

IN

V

O U

T

W

0.

" 1 in ch

C on cr et e Pi pe

Pipe - (2.1) 27' of 15" HP STORM PP @ 0.50%

St ru ct ur e

2.

2)

" N

Y

LO

PL

A

ST

D

R A

IN

B

A

SI

N W

IT

H

D O

M E

D G

R A

T E

ST

A

:0 +2

6.

R

IM

:6

.4

IN

V

IN

W

0.

" 1 in ch

H P

ST

O

R M

P P

IN

V

IN

E

0.

" 1 in ch

H P

ST

O

R M

P P

IN

V

O U

T

N

0.

" 1 in ch

H P

ST

O

R M

P P

St ru ct ur e

2.

1)

" N

Y

LO

PL

A

ST

D

R A

IN

B

A

SI

N W

IT

H

D O

M E

D G

R A

T E

ST

A

:0 +0

0.

R

IM

:6

.4

IN

V

O U

T

W

0.

" 1 in ch

H P

ST

O

R M

P P

Pipe - (2.2) 39' of 15" HP STORM PP @ 0.50%

E X

. B R

IC

K

JU

N

C T

IO

N

B O

X E

X

IS

T

IN

G B

R

IC

K

JU

N C

T

IO

N B

O X

ST

A

R

IM

:6

.3

IN

V

IN

N W

0.

4" in ch

H P

ST

O

R M

P P

IN

V

IN

N E

6.

6" in ch

C on cr et e Pi pe

IN

V

IN

E

6.

" 1 in ch H

P

ST

O R

M P

P

IN

V

O U

T

W

6.

6" in ch C on cr et e

Pi pe

Pipe - (2.10) 41' of 24" HP STORM PP @ 1.00%

St ru ct ur e

2.

ST

O R

M

JU

N C

T

IO

N B

O X

ST

A

:6 +9

0.

R

IM

:6

.2

IN

V

IN

W

2.

4" in ch H

P

ST

O R

M P

P

IN

V

O U

T

SE

1.1

" 2 in ch

H P

ST

O

R M

P P

Pipe - (2.9) 110' of 24" HP STORM PP @ 0.99%

St ru ct ur e

2.

9)

N Y

O

PL

A

ST

S T

R U

C T

U R

E W

IT

H

G R

A T

E

IN

LE

T

T O

P

ST

A :5

+8 1.2

R

IM

:6

.5

IN

V

IN

N

5.

4" in ch

H P

ST

O

R M

P P

IN

V

O U

T

E

3.

4" in ch H

P

ST

O R

M P

P

Pipe - (2.8) 118' of 24" HP STORM PP @ 0.50%

St ru ct ur e

2.

8)

N Y

O

PL

A

ST

S T

R U

C T

U R

E W

IT

H

G R

A T

E

IN

LE

T

T O

P

ST

A :4

+6 2.

R

IM

:6

.7

IN

V

IN

N

6.

4" in ch

H P

ST

O

R M

P P

IN

V

O U

T

S) :5

.9

" 2 in ch

H P

ST

O

R M

P P

Pipe - (2.7) 77' of 24" HP STORM PP @ 0.50%Pipe - (4.3)

58' of 18" Reinforced Concrete Pipe @ 0.45%

St ru ct ur e

2.

3)

G R

A T

E

IN

LE

T

ST

A

:0 +6

5.

R

IM

:6

.2

IN

V

IN

S) :6

.10

" 1 in ch H

P

ST

O R

M P

P

IN

V

O U

T

W

9.

" 1 in ch

H P

ST

O

R M

P P

St ru ct ur e

2.

4)

G R

A T

E

IN

LE

T

ST

A

:1+

.5

R

IM

:6

.7

IN

V

IN

E

9.

" 1 in ch

H P

ST

O

R M

P P

IN

V

O U

T

S) :5

.5

" 1 in ch

H P

ST

O

R M

P P

St ru ct ur e

2.

7)

PE

D

E

ST

R

IA

N G

R A

T E

IN

LE

T

ST

A :3

+8 6.

R

IM

:6

.3

IN

V

IN

E

7.

4" in ch

H P

ST

O

R M

P P

IN

V

IN

N

8.

" 1 in ch

H P

ST

O

R M

P P

IN

V

O U

T

S) :5

.8

" 2 in ch

H P

ST

O

R M

P P

Pipe - (2.6) 89' of 18" HP STORM PP @ 0.50%

St ru ct ur e

2.

6)

ST

O

R M

JU

N

C T

IO

N

B O

X

ST

A :2

+9 7.

R

IM

:6

.8

IN

V

IN

N

8.

" 1 in ch H

P

ST

O R

M P

P

IN

V

O U

T

S) :5

.8

" 1 in ch

H P

ST

O

R M

P P

Pipe - (2.5) 96' of 18" HP STORM PP @ 0.40%

St ru ct ur e

2.

5)

G R

A T

E

IN

LE

T

ST

A

:2 +0

1.3

R

IM

:6

.7

IN

V

IN

N

9.

" 1 in ch

H P

ST

O

R M

P P

IN

V

O U

T

S) :5

.3

" 1 in ch

H P

ST

O

R M

P P

Pipe - (2.4) 45' of 18" HP STORM PP @ 0.40%

Pipe - (10)

STA: 6+22.10

TOP EL: 596.97

BOTTOM EL: 596.25

SS Pipe - (1)

STA: 1+35.20

TOP EL: 598.54

BOTTOM EL: 597.78

SS Pipe - (1)

STA: 2+32.25

TOP EL: 598.11

BOTTOM EL: 597.35

Pipe - (5.1) 44' of 15" HP STORM PP @ 0.50%

Pipe - (4.1) 56' of 15" HP STORM PP @ 0.45%

St ru ct ur e

4.

1)

G R

A T

E

IN

LE

T

ST

A

:0 +0

0.

R

IM

:6

.9

IN

V

O U

T

N

0.

" 1 in ch

H P

ST

O

R M

P P

St ru ct ur e

4.

4)

ST

O

R M

JU

N

C T

IO

N

B O

X W

IT

H

S O

LI

D

L

ID

ST

A

:2 +4

6.

R

IM

:6

.7

IN

V

IN

E

9.

" 1 in ch

C on cr et e Pi pe

IN

V

O U

T

W

8.

" 1 in ch

C or ru ga te d

M et al P ip e

A

B

D

E

A

B

C

D

E

654321

7654321

DRAWING TITLE

DATES

SHEET

M

IL

IT

AR

Y M

U

SE

U M

E

XP

AN

SI

O N

JO

H

N H

U N

T

PA

R K

C

IT

Y O

F H

U N

TS

VI

LL

E

S

TE

VE

H

ET

TI

N G

ER

D

R

IV

E

SW

H U

N

TS

VI

LL

E, A

LA

BA

M A

2024-001

PROJECT NUMBER

SEAL

C

PHONE: (256) 427-5280

P.O. BOX 308

HUNTSVILLE, ALABAMA 35804-0308

GENERAL SERVICES

CITY OF HUNTSVILLE

P.O. BOX 2612

HUNTSVILLE, AL 35804

(256) 429-9150 jmphillipseng@gmail.com

JMPE PROJECT NO. 24007

FOR BID 05.29.2025

STORM PROFILES

C5.1

E le va ti on

E levation

Station

(STORM) - (7) PROFILE

-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+50

E le va ti on

E levation

Station

(STORM) - (6) PROFILE

-0+50 0+00 1+001+00

EXISTING GRADE

PROPOSED GRADE

SCALE: 1" = 50' HORIZONTAL

1" = 5' VERTICAL

LEGEND

Pipe - (7.1) 50' of 15" HP STORM PP @ 0.50%

Pipe -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .