MIC Concept Plans.pdf
PDF 3 MB Posted
- Solicitation number
- RFP 171 250000002871 3
- Issued by
- Delta County, Edmore Village, Michigan
About this file
This document is a concept plan for the Manufacturing Innovation Center located at 2001 N. Lincoln Road, Escanaba, Michigan 49829. The project encompasses a comprehensive renovation of an existing welding facility and shipping building designed to enhance manufacturing education and training capabilities. The facility includes multiple specialized spaces: welding areas (approximately 6,980 square feet across two floors), grinding stations, classrooms (915 and 978 square feet), metallurgy laboratory (298 square feet), equipment cribbing areas, machining cells, and associated support spaces including offices, restrooms, and storage. The proposed renovation introduces approximately 5,000 square feet of new innovation and collaboration space, along with a revised shipping and receiving area of approximately 1,800 square feet. Key improvements include heating and cooling upgrades, fire suppression system installation, epoxy flooring, electrical service upgrades, new dividing walls and doors, updated bathrooms, paint and interior finishes, and expanded laboratory facilities for weld testing and additive manufacturing.
The facility design incorporates flexible manufacturing concepts including CNC machinery with robotic loading, collaborative robots (cobots), simulation and CAD/CAM stations, additive manufacturing with 3D printers, systems integration and assembly areas, PLC and programming simulators, and a revitalized manual machining core. The renovation supports partnerships with certifying bodies, manufacturing and automation partners, additive manufacturing and CAD/CAM partners, and professional alliances while pursuing accreditation and university partnerships with articulation agreements. The concept plan demonstrates a commitment to modernizing technical education infrastructure to meet evolving industrial training demands through adaptable, non-fixed equipment configurations that allow for future technological integration and curriculum expansion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 24390.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| Capital Outlay Design Manual.pdf | ||
| Project Statement 24390.pdf | ||
| Addendum 1 24390.pdf | ||
| RFP 24390.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8" 2'-5 9/16"3'-2 15/16"1 13/16"1 7/8" 2 3/8"2 7/16"1 7/16"1 3/8"1/8"1 1/8" 5/16"7/8"7/16"1 1/4"1 1/16"1 1/2"1"1" 4"1"1 1/2"1"8"1"1 1/2"1" 4"1"1"2 9/16"1 3/16"1/2"7/8"1/4"1 3/16"1/8"1 3/8"1 7/16" 2 3/8"2 3/8"1 15/16"1 13/16" 3'-4 15/16"2'-3 9/16"8" 3'-8"
2"2"2" 3'-10"
2" 2'-2"
8" 70'-8"
8"
'-4
1'-1 5/16" 3" 4' 4' 4' 4' 7'-0 3/4"
4 1/2"6 1/2" 4 1/2"3'-6 15/16"4 7/8" 9'-7 1/8"
4 7/8" 1'-6" 9 3/4" 2'-8" 3 5/16" 2'-10 1/4"1 3/4"1 13/16"3 1/8" 2'-8 7/16"7 5/8"
12'-7 5/8" 11'-4 3/16" 27'-4 7/8" 5' 1"
5' 1"
5' 1"
5' 1"
5' 1"
5' 1"
5' 1"
5' 15'-11 3/8"
4 7/8" 9'-7 1/8"
EXIT
EXIT
EXIT
EXIT
EXIT
OFFICE
1023A 534 sq. ft.
SHIPPING & RECEIVING
6858 sq. ft.
WOMEN
96 sq. ft.
MEN
96 sq. ft.
MECH.
1023B 128 sq. ft.
STORAGE
1023C 200 sq. ft.
OFFICE /
DECK
143 sq. ft.
1ST FLOOR
2ND FLOOR
JANITOR
SHOP TOOLS AND ACCESSORIES
METAL INVENTORY /
SUPPLIES ELECTRICAL EQUIPT / SERVICE
EQUIPME
NT
EQUIP'T
COMPRESSOR
WORK BENCH
LINE BURNER METAL / SUPPLIES
W
LD
R
G R
IN
D
'G
TA
BL
E
G R
IN
D
'G
TA
BL
E
G R
IN
D
'G
TA
BL
E
WELD
BOOTH
W
LD
R
WELD
BOOTH
PC
W
WELD
BOOTH
W
LD
R
WELD
BOOTH
G R
IN
D
'G
TA
BL
E
G R
IN
D
'G
TA
BL
E
G R
IN
D
'G
TA
BL
E
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
W
LD
R
W
LD
R
W
LD
R
W
LD
R
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
CLASSROOM
915 sq. ft.
CLASSROM
978 sq. ft.
EQUIP. CRIB
384 sq. ft.
GRIND.
172 sq. ft. WELDING
3578 sq. ft.
WELDING
3402 sq. ft.
GRIND.
172 sq. ft.
EQUIP. CRIB
460 sq. ft.
SUPPLY
152 sq. ft.
54 sq. ft.
OFFICE
109 sq. ft.
OFFICE
109 sq. ft.
METALLURGY
298 sq. ft.
WOMEN
149 sq. ft.
MEN
149 sq. ft.
EXIT
EXIT
EXIT
EXIT
EM
ER
G.
EQ
U
IP.
FOUNTAIN
FENCED WELDING STORAGE
7096 sq. ft.
YOU ARE HERE
MACHINING
Existing
D
R
AW
N B
Y:
C ou si no
SH
EE
T N
U M
BE
R
© 2021
N O
T
TO
S C
AL
E
N . L in co ln R d.
Es ca na ba , M
I
M an uf ac tu ri ng
In no va ti on C en te r
D
AT
E:
0/
/2
Ex is tin g W el di ng Fa ci lit y an d Sh ip pi
Existing Shipping and Receiving to Be Renovated
Demo Existing Shipping Office
Renovate Interior Office and Labs
Weld Shop Booths to remain
Renovate Cribbing and Machining for Growth and Function
Equipment Layout to be Modified for Function
New Opening and Fire Door
Renovate classroom for CAD and Additive Lab
Overview of Welding and Shipping Building Renovation -Capital Budget for Manufacturing Innovation Center-
20068
'-4
34'-11 1/4"
EXIT
EXIT
EXIT
WOMEN
96 sq. ft.
MEN
96 sq. ft.
MECH.
1023B 128 sq. ft.
JANITOR
W O
R
K BEN
C H
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
CLASSROOM
915 sq. ft.
CLASSROM
978 sq. ft.
WELDING
3402 sq. ft.
54 sq. ft.
OFFICE
109 sq. ft.
OFFICE
109 sq. ft.
METALLURGY
298 sq. ft.
WOMEN
149 sq. ft.
MEN
149 sq. ft.
EXIT
EXIT
EXIT
EXIT
EM
ER
G.
EQ
U
IP.
FOUNTAIN
FENCED WELDING STORAGE
7096 sq. ft.
YOU ARE HERE
Revised Shipping App. 1800 Sq Ft
Innovation and Collaboration Space App. 5000 Sq Ft
Shipping Office
D
R
AW
N si no
SH
EE
T N
U M
BE
R
© 2021
N O
T
TO
S C
AL
E
N . L in co ln R d.
Es ca na ba , M
I
M an uf ac tu va ti on C en te r
D
AT
E:
0/
/2
Pr op os ed In no va tio n
C en te r R en ov at io n
Renovated Innovation Center:
Heating and Cooling Upgrades Fire suppression Epoxy floors Electrical Upgrades in Service New dividing walls New entry doors Paint and interior finishes Update bathrooms New interior and Exterior doors
Expanded Metallurgy Laboratory
Additive manufacturing and CAD Laboratory (3D Printing)
Expanded Weld Testing and Failure Laboratory
Renovated Metal Working and Machining Cells
Revised Shipping and Receiving including new Office
Flexible Manufacturing Innovation Center Space
D
R
AW
N si no
SH
EE
T N
U M
BE
R
© 2021
N O
T
TO
S C
AL
E
N . L in co ln R d.
Es ca na ba , M
I
M an uf ac tu va ti on C en te r
D
AT
E:
0/
/2
M fg In no va tio n
C en te r
- P ar tn er s
Certifying Bodies Manufacturing and Automation Partners
Additive Manufacturing and CAD/CAM Partners
Professional Alliances
Accreditation Pursuit
University Partnerships Articulations
R
AW
N si no
SH
EE
T N
U M
BE
R
© 2021
N O
T
TO
S C
AL
E
N . L in co ln R d.
Es ca na ba , M
I
M an uf ac tu va ti on C en te r
D
AT
E:
0/
/2
Fl ex ib le M fg
C on ce pt s
CNC with Robotic Loading
Welding Lab Re-configure For Added Automation
Simulation Expansion for Programming
Revitalized Manual Machining Core
R
AW
N si no
SH
EE
T N
U M
BE
R
© 2021
N O
T
TO
S C
AL
E
N . L in co ln R d.
Es ca na ba , M
I
M an uf ac tu va ti on C en te r
D
AT
E:
0/
/2
Fl ex ib le M fg
A ut om at io n
C on ce pt
Large Robotic Welding or Manufacturing Arm
Welding or Manufacturing Collaborative Robots (Cobots)
Simulation and CAD/CAM Stations
Systems Integration and Assembly
PLC and Programming Simulators
Additive Manufacturing 3D Printers CNC Manufacturing Cell
Robotic Load
R
AW
N si no
SH
EE
T N
U M
BE
R
© 2021
N O
T
TO
S C
AL
E
N . L in co ln R d.
Es ca na ba , M
I
M an uf ac tu va ti on C en te r
D
AT
E:
0/
/2
Ex am pl e Fl ex ib le C en te r ( K el lo gg
Open Flexible Manufacturing and Technology Center - Concept
(Allows Adaptability for Evolving Industrial Training Needs - Non Fixed Equipment)
Bus Bar Electrical Provide Expansion
Industrial Epoxy Flooring
Face Walls and Re-Paint Facility
Up-Dated Lighting Thru-Out
Up-dated
HVAC
Reference Only For Illustration
Reference Only For Illustration
Up-dated Fire Suppression
File details come from the government source that posted it. Updated .