Addendum 2 24390.pdf
PDF 9 MB Posted
- Solicitation number
- RFP 171 250000002871 3
- Issued by
- Delta County, Edmore Village, Michigan
About this file
This Addendum No. 2 document is issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division, for the Bay de Noc Community College (Bay College) Manufacturing Innovation Center (MIC) project (File Number 362/24390.CDP). The addendum, issued on August 12, 2025, provides clarifications and supplementary materials to the original Request for Proposal, including a meeting sign-in sheet from a virtual bidders conference held on August 12, 2025, at 2:30 PM, and detailed MIC concept plans with facility location maps and architectural renderings. The proposal due date is Thursday, August 28, 2025. Project Director Chris Parsons coordinates the procurement. The concept plans detail the Manufacturing Innovation Center located in Building 1000 at 2001 N. Lincoln Road, Escanaba, Michigan 49829, showing the facility layout with welding areas (containing multiple weld booths), grinding stations, classrooms, metallurgy laboratories, machining cells, shipping and receiving areas, and support facilities totaling approximately 7,096 square feet of existing welding storage space.
The addendum identifies two priority renovation phases for the facility. Priority 1 improvements include heating and cooling upgrades, fire suppression systems, epoxy flooring, electrical service upgrades, new dividing walls, entry doors, and interior finishes with bathroom updates. Priority 2 enhancements encompass an expanded metallurgy laboratory, additive manufacturing and CAD laboratory with 3D printing capabilities, expanded weld testing and failure laboratory, renovated metal working and machining cells, and revised shipping and receiving operations. Additionally, the project introduces new welding fabrication areas including fixturing and gantry crane systems to support workforce and credit curriculum requirements. The bidders conference included representatives from multiple architectural and engineering firms, including Wickwire Solutions, U.P. Engineers and Architects, Colliers, DS Architects, Straub Pettitt Mann Architecture, OHM Advisors, Matrix Consulting Engineers, Sidock Group, Lookout Architecture, Partners in Architecture, MacMillan Associates, and Dynamic Design Group, along with Bay de Noc Community College and DTMB personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| Capital Outlay Design Manual.pdf | ||
| Project Statement 24390.pdf | ||
| Addendum 1 24390.pdf | ||
| RFP 24390.pdf | ||
| MIC Concept Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 2
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
08/12/25
PROJECT NAME
Bay de Noc Community College (Bay College) Manufacturing Innovation Center (MIC)
FILE NUMBER
362/24390.CDP
PROJECT DIRECTOR
Chris Parsons
PROPOSAL DUE DATE:
Thursday, 08/28/25
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Attached:
1. Meeting sign in sheet.
2. MIC Concept Plans with facility location (Building 1000) and photos added.
http://www.buy4michigan.com/
MEETING SIGN IN SHEET
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division
PROJECT DESCRIPTION/LOCATION
Bay de Noc Community College (Bay College) Manufacturing Innovation Center (MIC)
DATE
08/12/25
FILE NUMBER
362/24390.CDP
TIME
2:30 PM
MEETING PLACE
Virtual Teams Meeting
PRINT YOUR NAME
AGENCY/COMPANY
E-MAIL / PHONE
John Paramski
Wickwire jparamski@wickwiresolutions.com 906-284-
Aaron Janke
U.P. Engineers and Architects ajanke@upea.com 906-315-1332
David Moss
Colliers david.moss@collierseng.com 517-827-8697
Allison Miller
DS Architects
Allison@dsarchitects.com 248-605-2030
Kari Charboneau
DS Architects kari@dsarchitects.com 248-605-2030
Stuart Pettitt
Straub Pettitt Mann Architecture spettitt@straubpettittmann.com 248-658-7777
Jared Hyrkas
OHM Advisors jared.hyrkas@ohm-advisors.com 906-696-7104
Sam Merritt
Matrix Consulting Engineers smerritt@matrixceinc.com 517-487-2511
Tim Miller
Sidock Group tmiller@sidockgroup.com 989-705-8400
Kenneth King
Lookout Architecture ken@lookoutarchitecture.com 231-252-6285
Michael Malone
Partners in Architecture mmalone@partnersinarch.com 586-469-3600
Jeremiah Gourd
MacMillan Associates jgourd@macmillanassociates.com 989-894-4300
Jason Campbell
Dynamic Design Group jason@ddgi-ddm.com 906-786-3300
Lynn Martinson
Bay De Noc
James Cousino
Steven Carlson
Cindy Gallagher
Penny Pavlat
McKenzie Fox-Potter
Chris Parsons
DTMB-DCD
parsonsc5@michigan.gov 517-256-5677
D
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu ri ng
In no va ti on C en te r
D A
T E
/1 2/
F a c ili ty
L o c a ti o n
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu va ti on C en te r
D A
T E
/1 2/
W e ld in g
F ab ri ca ti o n A re a
P ro p o s ed
New Fabrication Area Including Fixturing and Gantry to support Workforce and Credit Curriculum Including courses required for
24068
8"2'-5 9/16"3'-2 15/16"1 13/16"1 7/8" 2 3/8"2 7/16"1 7/16"1 3/8"1/8"1 1/8"5/16"7/8"7/16"1 1/4"1 1/16"1 1/2"1"1" 4"1"1 1/2"1" 8"1"1 1/2"1" 4"1"1"2 9/16"1 3/16"1/2" 7/8"1/4"1 3/16"1/8"1 3/8"1 7/16" 2 3/8"2 3/8"1 15/16"1 13/16" 3'-4 15/16"2'-3 9/16"8" 3'-8"
2"2"2" 3'-10"
2" 2'-2"
8" 70'-8"
8"
'-4
'-8
35' 63'-6"
EXIT
EXIT
EXIT
WOMEN
96 sq. ft.
MEN
96 sq. ft.
MECH.
1023B 128 sq. ft.
JANITOR
SHOP TOOLS AND ACCESSORIES
METAL INVENTORY /
SUPPLIES ELECTRICAL EQUIPT / SERVICE
EQUIPME
NT
EQUIP'T
COMPRESSOR
WORK BENCH
W L
D R
G R
IN
D
'G T
A B
L E
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
T A
B L
E
WELD
BOOTH
W L
D R
WELD
BOOTH
P C
W
WELD
BOOTH
W L
D R
WELD
BOOTH
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
T A
B L
E G
R
IN
D 'G
TA
B
L E
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
W L
D R
W L
D R
W L
D R
W L
D R
W L
D R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
CLASSROOM
915 sq. ft.
CLASSROM
978 sq. ft.
EQUIP. CRIB
384 sq. ft.
GRIND.
172 sq. ft. WELDING
3578 sq. ft.
WELDING
3402 sq. ft.
GRIND.
172 sq. ft.
EQUIP. CRIB
460 sq. ft.
SUPPLY
152 sq. ft.
54 sq. ft.
OFFICE
109 sq. ft.
OFFICE
109 sq. ft.
METALLURGY
298 sq. ft.
WOMEN
149 sq. ft.
MEN
149 sq. ft.
EXIT
EXIT
EXIT
EXIT
EM
ER
G.
EQUIP.
FOUNTAIN
FENCED WELDING STORAGE
7096 sq. ft.
YOU ARE HERE
MACHINING
Revised Shipping App. 2500 Sq Ft
Innovation and Collaboration Space App. 5000 Sq Ft
Shipping Office
D
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu va ti on C en te r
D A
T E
/1 2/
P ro p o se d I n n o va ti o n C en te r R e n o v a ti o n
Renovated Innovation Center:
Heating and Cooling Upgrades Fire suppression Epoxy floors Electrical Upgrades in Service New dividing walls New entry doors Paint and interior finishes Update bathrooms New interior and Exterior doors Create Opening Between Innovation Center and Welding Fire Door Between Innovation Center and Welding Area
Expanded Metallurgy Laboratory
Additive manufacturing and CAD Laboratory (3D Printing)
Expanded Weld Testing and Failure Laboratory
Renovated Metal Working and Machining Cells
Revised Shipping and Receiving including new Office
Priority 1
Priority 2
9'
-4
4 7/8" 9'-7 1/8"
OFFICE
1023A 534 sq. ft.
SHIPPING & RECEIVING
6858 sq. ft.
WOMEN
96 sq. ft.
MEN
96 sq. ft.
MECH.
1023B 128 sq. ft.
JANITOR
SHOP TOOLS AND ACCESSORIES
METAL INVENTORY /
SUPPLIES ELECTRICAL EQUIPT / SERVICE
EQUIP'T
COMPRESSOR
WORK BENCH
LINE BURNER METAL / SUPPLIES
W L
D R
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
T A
B L
E G
R
IN
D 'G
T A
B L
E
WELD
BOOTH
W L
D R
WELD
BOOTH
P C
W
WELD
BOOTH
W L
D R
WELD
BOOTH
G R
IN
D
'G T
A B
LE
G
R
IN
D 'G
TA
B
L E
G R
IN
D
'G T
A B
L E
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
W L
D R
W L
D R
W L
D R
W L
D R
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
CLASSROOM
915 sq. ft.
CLASSROM
978 sq. ft.
EQUIP. CRIB
384 sq. ft.
GRIND.
172 sq. ft.
WELDING
3578 sq. ft.
WELDING
3402 sq. ft.
GRIND.
172 sq. ft.
EQUIP. CRIB
460 sq. ft.
SUPPLY
152 sq. ft.
54 sq. ft.
OFFICE
109 sq. ft.
OFFICE
109 sq. ft.
METALLURGY
298 sq. ft.
WOMEN
149 sq. ft.
MEN
149 sq. ft.
E Q
U
IP.
FOUNTAIN
FENCED WELDING STORAGE
7096 sq. ft.
MACHINING
Existing
Fabrication Table (NEW) With Fixturing
Fabrication Table (NEW) With Fixturing
New Gantry Crane
D
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu va ti on C en te r
D A
T E
/1 2/
P h o to s
View A
View A
View B
View B
View C
View C
View D
View D
Street View
-4
4 7/8" 9'-7 1/8"
OFFICE
1023A 534 sq. ft.
SHIPPING & RECEIVING
6858 sq. ft.
WOMEN
96 sq. ft.
MEN
96 sq. ft.
MECH.
1023B 128 sq. ft.
JANITOR
SHOP TOOLS AND ACCESSORIES
METAL INVENTORY /
SUPPLIES ELECTRICAL EQUIPT / SERVICE
EQUIP'T
COMPRESSOR
WORK BENCH
LINE BURNER METAL / SUPPLIES
W L
D R
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
T A
B L
E G
R
IN
D 'G
T A
B
LE
WELD
BOOTH
W L
D R
WELD
BOOTH
P C
W
WELD
BOOTH
W L
D R
WELD
BOOTH
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
T A
B L
E G
R
IN
D 'G
T A
B L
E
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
W L
D R
W L
D R
W L
D R
W L
D R
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
CLASSROOM
915 sq. ft.
CLASSROM
978 sq. ft.
EQUIP. CRIB
384 sq. ft.
GRIND.
172 sq. ft.
WELDING
3578 sq. ft.
WELDING
3402 sq. ft.
GRIND.
172 sq. ft.
EQUIP. CRIB
460 sq. ft.
SUPPLY
152 sq. ft.
54 sq. ft.
OFFICE
109 sq. ft.
OFFICE
109 sq. ft.
METALLURGY
298 sq. ft.
WOMEN
149 sq. ft.
MEN
149 sq. ft.
E Q
U
IP.
FOUNTAIN
FENCED WELDING STORAGE
7096 sq. ft.
MACHINING
Existing
Fabrication Table (NEW) With Fixturing
Fabrication Table (NEW) With Fixturing
New Gantry Crane
D
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu va ti on C en te r
D A
T E
/1 2/
P h o to s
View E
View E
View F
View F
View G
View G
-4
4 7/8" 9'-7 1/8"
OFFICE
1023A 534 sq. ft.
SHIPPING & RECEIVING
6858 sq. ft.
WOMEN
96 sq. ft.
MEN
96 sq. ft.
MECH.
1023B 128 sq. ft.
JANITOR
SHOP TOOLS AND ACCESSORIES
METAL INVENTORY /
SUPPLIES ELECTRICAL EQUIPT / SERVICE
EQUIP'T
COMPRESSOR
WORK BENCH
LINE BURNER METAL / SUPPLIES
W
LD
R
G R
IN
D
'G T
A B
L E
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
TA
B
L E
WELD
BOOTH
W
LD
R
WELD
BOOTH
P C
W
WELD
BOOTH
W
LD
R
WELD
BOOTH
G R
IN
D
'G T
A B
L E
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
TA
B
L E
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
W
LD
R
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
W L
D R
W L
D R
W L
D R
W L
D R
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
CLASSROOM
915 sq. ft.
CLASSROM
978 sq. ft.
EQUIP. CRIB
384 sq. ft.
GRIND.
172 sq. ft.
WELDING
3578 sq. ft.
WELDING
3402 sq. ft.
GRIND.
172 sq. ft.
EQUIP. CRIB
460 sq. ft.
SUPPLY
152 sq. ft.
54 sq. ft.
OFFICE
109 sq. ft.
OFFICE
109 sq. ft.
METALLURGY
298 sq. ft.
WOMEN
149 sq. ft.
MEN
149 sq. ft.
E Q
U
IP
FOUNTAIN
FENCED WELDING STORAGE
7096 sq. ft.
MACHINING
Existing
Fabrication Table (NEW) With Fixturing
Fabrication Table (NEW) With Fixturing
New Gantry Crane
D
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu va ti on C en te r
D A
T E
/1 2/
P h o to s
Main Panel Locations
-4
4 7/8" 9'-7 1/8"
OFFICE
1023A 534 sq. ft.
SHIPPING & RECEIVING
6858 sq. ft.
WOMEN
96 sq. ft.
MEN
96 sq. ft.
MECH.
1023B 128 sq. ft.
JANITOR
SHOP TOOLS AND ACCESSORIES
METAL INVENTORY /
SUPPLIES ELECTRICAL EQUIPT / SERVICE
EQUIP'T
COMPRESSOR
WORK BENCH
LINE BURNER METAL / SUPPLIES
W L
D R
G R
IN
D
'G
TA
B L
E G
R
IN
D 'G
TA
B
L E
G R
IN
D
'G T
A B
L E
WELD
BOOTH
W L
D R
WELD
BOOTH
P C
W
WELD
BOOTH
W L
D R
WELD
BOOTH
G R
IN
D
'G T
A B
LE
G
R
IN
D 'G
TA
B
L E
G R
IN
D
'G T
A B
L E
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
WELD
BOOTH
W L
D R
W L
D R
W L
D R
W L
D R
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
WELD
BOOTH
W L
D R
CLASSROOM
915 sq. ft.
CLASSROM
978 sq. ft.
EQUIP. CRIB
384 sq. ft.
GRIND.
172 sq. ft.
WELDING
3578 sq. ft.
WELDING
3402 sq. ft.
GRIND.
172 sq. ft.
EQUIP. CRIB
460 sq. ft.
SUPPLY
152 sq. ft.
54 sq. ft.
OFFICE
109 sq. ft.
OFFICE
109 sq. ft.
METALLURGY
298 sq. ft.
WOMEN
149 sq. ft.
MEN
149 sq. ft.
E Q
U
IP.
FOUNTAIN
FENCED WELDING STORAGE
7096 sq. ft.
MACHINING
Existing
Fabrication Table (NEW) With Fixturing
Fabrication Table (NEW) With Fixturing
New Gantry Crane
D
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu va ti on C en te r
D A
T E
/1 2/
P h o to s
View A View B
View C
View C
View A View B
R A
W N
B Y
C o u si n o
S H
E E
T N
U M
B E
R
© 2021
N O
T T
O S
C A
L E
N . L in c o ln
R d
E sc an a b a, M
I
M an uf ac tu va ti on C en te r
D A
T E
/1 2/
E x am p le
F le xi b le C en te r (K el lo g g
Open Flexible Manufacturing and Technology Center - Concept
(Allows Adaptability for Evolving Industrial Training Needs - Non Fixed Equipment)
Bus Bar Electrical Provide Expansion
Industrial Epoxy Flooring
Face Walls and Re-Paint Facility
Up-Dated Lighting Thru-Out
Up-dated
HVAC
Reference Only For Illustration
Reference Only For Illustration
Up-dated Fire Suppression
File details come from the government source that posted it. Updated .