MIC Concept Plans.pdf

PDF 3 MB Posted

Attached to
362/24390. CDP; BaydeNoc CC-Manufacturing Innov Ctr State and local contract opportunity
Solicitation number
RFP-171-250000002871-3
Issued by
Delta County, Edmore Village, Michigan

About this file

The document is a six-page architectural and planning proposal for a Manufacturing Innovation Center renovation project by Bay College, located at 2001 N. Lincoln Rd. in Escanaba, Michigan. The project aims to modernize and expand manufacturing training facilities, with comprehensive renovations including upgrading existing welding, shipping, and machining spaces, adding new laboratories for additive manufacturing, CAD, and metallurgy, and implementing flexible manufacturing concepts. The renovation plans involve reconfiguring approximately 7,096 square feet of existing space, with proposed improvements including heating and cooling upgrades, fire suppression systems, epoxy floors, electrical upgrades, new interior walls, doors, and finishes.

The project involves strategic partnerships with multiple technology and manufacturing organizations, including certification bodies like NIMS and ACA, automation partners such as Rockwell Automation and Amatrol, additive manufacturing partners like SolidWorks and Stratasys, and academic collaborations with institutions including Lake Superior State University and Michigan Technological University. The renovation concept emphasizes flexible manufacturing capabilities, incorporating advanced technologies like large robotic welding arms, collaborative robots (cobots), CNC manufacturing cells, 3D printers, simulation stations, and PLC programming simulators. The project is dated for implementation by 10/20/2024 and is part of a capital budget initiative to enhance manufacturing education and training infrastructure.

View the file

Other files for this state and local contract opportunity

Other files attached to 362/24390. CDP; BaydeNoc CC-Manufacturing Innov Ctr, newest first.
File Type Posted
Capital Outlay Design Manual.pdf PDF
Project Statement 24390.pdf PDF
RFP 24390.pdf PDF
Addendum 1 24390.pdf PDF
Addendum 2 24390.pdf PDF
SAMPLE Billable Rate Contract (Rev 04-25).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8" 2'-5 9/16"3'-2 15/16"1 13/16"1 7/8" 2 3/8"2 7/16"1 7/16"1 3/8"1/8"1 1/8" 5/16"7/8"7/16"1 1/4"1 1/16"1 1/2"1"1" 4"1"1 1/2"1"8"1"1 1/2"1" 4"1"1"2 9/16"1 3/16"1/2"7/8"1/4"1 3/16"1/8"1 3/8"1 7/16" 2 3/8"2 3/8"1 15/16"1 13/16" 3'-4 15/16"2'-3 9/16"8" 3'-8"

2"2"2" 3'-10"

2" 2'-2"

8" 70'-8"

8"

'-4

1'-1 5/16" 3" 4' 4' 4' 4' 7'-0 3/4"

4 1/2"6 1/2" 4 1/2"3'-6 15/16"4 7/8" 9'-7 1/8"

4 7/8" 1'-6" 9 3/4" 2'-8" 3 5/16" 2'-10 1/4"1 3/4"1 13/16"3 1/8" 2'-8 7/16"7 5/8"

12'-7 5/8" 11'-4 3/16" 27'-4 7/8" 5' 1"

5' 1"

5' 1"

5' 1"

5' 1"

5' 1"

5' 1"

5' 15'-11 3/8"

4 7/8" 9'-7 1/8"

EXIT

EXIT

EXIT

EXIT

EXIT

OFFICE

1023A 534 sq. ft.

SHIPPING & RECEIVING

6858 sq. ft.

WOMEN

96 sq. ft.

MEN

96 sq. ft.

MECH.

1023B 128 sq. ft.

STORAGE

1023C 200 sq. ft.

OFFICE /

DECK

143 sq. ft.

1ST FLOOR

2ND FLOOR

JANITOR

SHOP TOOLS AND ACCESSORIES

METAL INVENTORY /

SUPPLIES ELECTRICAL EQUIPT / SERVICE

EQUIPME

NT

EQUIP'T

COMPRESSOR

WORK BENCH

LINE BURNER METAL / SUPPLIES

W

LD

R

G R

IN

D

'G

TA

BL

E

G R

IN

D

'G

TA

BL

E

G R

IN

D

'G

TA

BL

E

WELD

BOOTH

W

LD

R

WELD

BOOTH

PC

W

WELD

BOOTH

W

LD

R

WELD

BOOTH

G R

IN

D

'G

TA

BL

E

G R

IN

D

'G

TA

BL

E

G R

IN

D

'G

TA

BL

E

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

WELD

BOOTH

WELD

BOOTH

WELD

BOOTH

WELD

BOOTH

W

LD

R

W

LD

R

W

LD

R

W

LD

R

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

CLASSROOM

915 sq. ft.

CLASSROM

978 sq. ft.

EQUIP. CRIB

384 sq. ft.

GRIND.

172 sq. ft. WELDING

3578 sq. ft.

WELDING

3402 sq. ft.

GRIND.

172 sq. ft.

EQUIP. CRIB

460 sq. ft.

SUPPLY

152 sq. ft.

54 sq. ft.

OFFICE

109 sq. ft.

OFFICE

109 sq. ft.

METALLURGY

298 sq. ft.

WOMEN

149 sq. ft.

MEN

149 sq. ft.

EXIT

EXIT

EXIT

EXIT

EM

ER

G.

EQ

U

IP.

FOUNTAIN

FENCED WELDING STORAGE

7096 sq. ft.

YOU ARE HERE

MACHINING

Existing

D

R

AW

N B

Y:

C ou si no

SH

EE

T N

U M

BE

R

© 2021

N O

T

TO

S C

AL

E

N . L in co ln R d.

Es ca na ba , M

I

M an uf ac tu ri ng

In no va ti on C en te r

D

AT

E:

0/

/2

Ex is tin g W el di ng Fa ci lit y an d Sh ip pi

Existing Shipping and Receiving to Be Renovated

Demo Existing Shipping Office

Renovate Interior Office and Labs

Weld Shop Booths to remain

Renovate Cribbing and Machining for Growth and Function

Equipment Layout to be Modified for Function

New Opening and Fire Door

Renovate classroom for CAD and Additive Lab

Overview of Welding and Shipping Building Renovation -Capital Budget for Manufacturing Innovation Center-

20068

'-4

34'-11 1/4"

EXIT

EXIT

EXIT

WOMEN

96 sq. ft.

MEN

96 sq. ft.

MECH.

1023B 128 sq. ft.

JANITOR

W O

R

K BEN

C H

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

WELD

BOOTH

W

LD

R

CLASSROOM

915 sq. ft.

CLASSROM

978 sq. ft.

WELDING

3402 sq. ft.

54 sq. ft.

OFFICE

109 sq. ft.

OFFICE

109 sq. ft.

METALLURGY

298 sq. ft.

WOMEN

149 sq. ft.

MEN

149 sq. ft.

EXIT

EXIT

EXIT

EXIT

EM

ER

G.

EQ

U

IP.

FOUNTAIN

FENCED WELDING STORAGE

7096 sq. ft.

YOU ARE HERE

Revised Shipping App. 1800 Sq Ft

Innovation and Collaboration Space App. 5000 Sq Ft

Shipping Office

D

R

AW

N si no

SH

EE

T N

U M

BE

R

© 2021

N O

T

TO

S C

AL

E

N . L in co ln R d.

Es ca na ba , M

I

M an uf ac tu va ti on C en te r

D

AT

E:

0/

/2

Pr op os ed In no va tio n

C en te r R en ov at io n

Renovated Innovation Center:

Heating and Cooling Upgrades Fire suppression Epoxy floors Electrical Upgrades in Service New dividing walls New entry doors Paint and interior finishes Update bathrooms New interior and Exterior doors

Expanded Metallurgy Laboratory

Additive manufacturing and CAD Laboratory (3D Printing)

Expanded Weld Testing and Failure Laboratory

Renovated Metal Working and Machining Cells

Revised Shipping and Receiving including new Office

Flexible Manufacturing Innovation Center Space

D

R

AW

N si no

SH

EE

T N

U M

BE

R

© 2021

N O

T

TO

S C

AL

E

N . L in co ln R d.

Es ca na ba , M

I

M an uf ac tu va ti on C en te r

D

AT

E:

0/

/2

M fg In no va tio n

C en te r

- P ar tn er s

Certifying Bodies Manufacturing and Automation Partners

Additive Manufacturing and CAD/CAM Partners

Professional Alliances

Accreditation Pursuit

University Partnerships Articulations

R

AW

N si no

SH

EE

T N

U M

BE

R

© 2021

N O

T

TO

S C

AL

E

N . L in co ln R d.

Es ca na ba , M

I

M an uf ac tu va ti on C en te r

D

AT

E:

0/

/2

Fl ex ib le M fg

C on ce pt s

CNC with Robotic Loading

Welding Lab Re-configure For Added Automation

Simulation Expansion for Programming

Revitalized Manual Machining Core

R

AW

N si no

SH

EE

T N

U M

BE

R

© 2021

N O

T

TO

S C

AL

E

N . L in co ln R d.

Es ca na ba , M

I

M an uf ac tu va ti on C en te r

D

AT

E:

0/

/2

Fl ex ib le M fg

A ut om at io n

C on ce pt

Large Robotic Welding or Manufacturing Arm

Welding or Manufacturing Collaborative Robots (Cobots)

Simulation and CAD/CAM Stations

Systems Integration and Assembly

PLC and Programming Simulators

Additive Manufacturing 3D Printers CNC Manufacturing Cell

Robotic Load

R

AW

N si no

SH

EE

T N

U M

BE

R

© 2021

N O

T

TO

S C

AL

E

N . L in co ln R d.

Es ca na ba , M

I

M an uf ac tu va ti on C en te r

D

AT

E:

0/

/2

Ex am pl e Fl ex ib le C en te r ( K el lo gg

Open Flexible Manufacturing and Technology Center - Concept

(Allows Adaptability for Evolving Industrial Training Needs - Non Fixed Equipment)

Bus Bar Electrical Provide Expansion

Industrial Epoxy Flooring

Face Walls and Re-Paint Facility

Up-Dated Lighting Thru-Out

Up-dated

HVAC

Reference Only For Illustration

Reference Only For Illustration

Up-dated Fire Suppression

File details come from the government source that posted it. Updated .