MH-7-R-01 - MECHANICAL - NEW WORK - BUILDING 7 - ROOF.pdf
PDF 300 KB Posted
- Attached to
- Y1DA--Upgrade AHU's and Water-Cooled Equipment
- Solicitation number
- 36C24221B0040
About this file
This notice solicits bids for project number 561-19-130 to upgrade air handling units and water-cooled equipment at the VA New Jersey Healthcare System East Orange campus. The scope of work includes replacing deficient HVAC equipment in buildings 1 and 7, along with related connections, as shown in the architectural and engineering drawings and specifications. Bidders must provide all necessary professional construction services, including submittals and as-built drawings, to complete the upgrades using approved materials and skilled labor. The project must be completed within 328 calendar days of the notice to proceed. Bids are due on or around June 4, 2021 as detailed in solicitation number 36C24221B0040 when posted to SAM.gov. This service-disabled veteran owned small business set-aside contract has a cost estimate between $2-5 million and requires bonding. Bidders must be registered in SAM.gov and VIP.vetbiz.gov as an SDVOSB at time of offer and award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24221B0040 0001.docx | DOCX document | |
| M-004 - MECHANICAL - AHU SCHEDULES.pdf | ||
| 36C24221B0040_1.docx | DOCX document | |
| Drawings MEPF - 561-19-130.pdf | ||
| MD-7-R-01 - MECHANICAL - DEMOLITION - BUILDING 7 - ROOF.pdf | ||
| VHA MASTER SPECIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW
AHU-7B
NEW
AHU-7C
BLDG 7 - ROOF
EX FAN
EX FAN
"x
"x
24"x24"
2 2
DD
A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.
THE SCALE, WHEN INDICATED IS INTENDED FOR GENERAL REFERENCE
ONLY.
B. SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH THE
OWNERS REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE OF ONE
WEEK. THIS TIME LENGTH MAY BE LONGER OR SHORTER FOR SOME
SHUTDOWNS AND SHALL BE AT THE OWNERS DISCRETION.
C. ANY EXISTING PIPE OR DUCT INSULATION THAT IS DAMAGED DURING
CONSTRUCTION SHALL BE REMOVED AND REPLACED WITH NEW
INSULATION TO MATCH ADJACENT INSULATION AND COVERING.
D. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.
E. MECHANICAL CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT TO
REMAIN AS REQUIRED TO COORDINATE INSTALLATION OF NEW WORK.
F. PROVIDE TEST AND BALANCE OF EXISTING AIR AND HYDRONIC SYSTEMS
SERVING THIS AREA PRIOR TO DEMOLITION. PROVIDE REPORT TO
ENGINEER.
G. ALL EXISTING CONTROLS COMPONENTS AND CONTROLS WIRING WITHIN
THE LIMITS OF CONSTRUCTION SHALL REMAIN. IF COMPONENTS NEED TO
BE REMOVED DURING CONSTRUCTION IN THIS AREA TO FACILITATE THE
INSTALLATION OF NEW WORK, THEN THE COMPONENTS SHALL BE
REINSTALLED TO A FUNCTIONAL CONDITION BEFORE PROJECT
COMPLETION.
H. ALL DUCTS, PIPE, AND EQUIPMENT SHALL BE LATERALLY RESTRAINED TO
COMPLY WITH STATE BUILDING CODE.
I. BEFORE FABRICATING ANY SHEET METAL DUCTWORK, COORDINATE
LOCATION AND SIZE WITH SPRINKLER & PLUMBING PIPING, CONDUITS,
LIGHT FIXTURES, STRUCTURAL, ETC. PLANS ARE SCHEMATIC AND ARE
NOT SHOP DRAWINGS. SUBMIT DUCTWORK COORDINATION DRAWINGS,
AS SPECIFIED.
J. BEFORE SUBMITTING SHOP DRAWINGS, COORDINATE VOLTAGES
AVAILABLE FOR MECHANICAL EQUIPMENT AND PROVISION OF ALL
STARTERS AND DISCONNECT SWITCHES WITH ELECTRICAL CONTRACTOR.
K. ALL EQUIPMENT SHALL BE U.L. LISTED.
L. THE ELECTRICAL CONTRACTOR SHALL CONNECT ALL MECHANICAL
EQUIPMENT; PROVIDE DISCONNECTS, WIRING AND CONDUIT, INSTALL
STARTERS, AND MOUNT AND WIRE VFD, UNLESS OTHERWISE NOTED.
M. PROVIDE FIRE CAULKING OR OTHER APPROVED FIRESTOP SYSTEM AT ALL
MECHANICAL PIPING PENETRATIONS OF RATED ASSEMBLY WITHIN THE
LIMITS OF CONSTRUCTION (NEW AND EXISTING).
N. DUCTWORK SIZES MAY VARY DUE TO LIMITED ACCESS AND INSULATION.
DUCTWORK SIZES SHOULD BE CONFIRMED BY THE CONTRACTOR PRIOR
TO ANY DUCTWORK FABRICATION.
O. 14 DAYS NOTICE OF ALL SHUTDOWNS SHALL BE GIVEN TO THE VA, WITH
WRITTEN VA APPROVAL PRIOR TO STARTING THE WORK. CONTRACTOR
SHALL SUBMIT A CONTINGENCY PLAN TO DEAL WITH ALL SHUTDOWNS
THAT EXCEED 24 HOURS.
P. TEMPORARY COOLING UNITS MAY BE REQUIRED DURING THE INSTALL OF
THE NEW EQUIPMENT, COST SHALL BE INCOPORATED IN THE BID PRICE.
Q. ALL WORK SHALL BE PHASED TO PROVIDE MINIMUM DOWN TIME, AS
STIPULATED BY THE VA STAFF.
GENERAL NOTES
NEW RTU SHALL MATCH EXISTING UNIT DIMENSIONS. EXISTING CURB TO BE
RE-USED.
MODIFY DUCTWORK CONNECTIONS TO PROVIDE PROPER TRANSISTION TO
EXISTING DUCTWORK.
PATCH DUCT AND INSULATE WHERE COIL IS REMOVED.
PROVIDE DUCT SMOKE DETECTORS TIED INTO THE EXISTING FIRE ALARM
SYSTEM IN THE SUPPLY AND RETURN AIR DUCTS.
CONTRACTOR TO PROVIDE PROTECTION DURING DEMOLITION AND
INSTALLATION OF AHU-7B AND AHU-7C.
NEW WORK KEYED NOTES
AREA OF
WORK
KEY PLAN
GRAPHIC SCALE
( in Feet )
1 inch = 20 ft.
20 2010 40 800
GRAPHIC SCALE
( in Feet )
1 inch = 8 ft.
8 84 16 32
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT STAMPPROGRAM MANAGER
321 4 5 6 7 8 9 10
ENGINEER OF RECORD
Charlotte Engineers, LLP 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves
M L o c a l R e v it F ile s \R e v it
\4
C
E C e n tr a l M o d e l.
rv t
/1
/2
:0
:3
A
M
MH-7-R-01
MECHANICAL - NEW WORK -
BUILDING 7 - ROOF
VAMC EAST ORANGE AHU &
WATER-COOLED EQUIPMENT
UPGRADES
EAST ORANGE, NEW JERSEY
561-19-130
3/11/2021 GAT DON
FULLY SPRINKLERED
1/8" = 1'-0"
MECHANICAL - NEW WORK - ROOF
Revisions: Date:
ADDENDUM 1 5/10/2021
| Sheets |
| M-004 - MECHANICAL - AHU SCHEDULES |
| MD-7-R-01 - MECHANICAL - DEMOLITION - BUILDING 7 - ROOF |
| MH-7-R-01 - MECHANICAL - NEW WORK - BUILDING 7 - ROOF |
File details come from the government source that posted it. Updated .