MH-7-R-01 - MECHANICAL - NEW WORK - BUILDING 7 - ROOF.pdf

PDF 300 KB Posted

Attached to
Y1DA--Upgrade AHU's and Water-Cooled Equipment
Solicitation number
36C24221B0040
Issued by

About this file

This notice solicits bids for project number 561-19-130 to upgrade air handling units and water-cooled equipment at the VA New Jersey Healthcare System East Orange campus. The scope of work includes replacing deficient HVAC equipment in buildings 1 and 7, along with related connections, as shown in the architectural and engineering drawings and specifications. Bidders must provide all necessary professional construction services, including submittals and as-built drawings, to complete the upgrades using approved materials and skilled labor. The project must be completed within 328 calendar days of the notice to proceed. Bids are due on or around June 4, 2021 as detailed in solicitation number 36C24221B0040 when posted to SAM.gov. This service-disabled veteran owned small business set-aside contract has a cost estimate between $2-5 million and requires bonding. Bidders must be registered in SAM.gov and VIP.vetbiz.gov as an SDVOSB at time of offer and award.

View the file

Other files

File Type Posted
36C24221B0040 0001.docx DOCX document
M-004 - MECHANICAL - AHU SCHEDULES.pdf PDF
36C24221B0040_1.docx DOCX document
Drawings MEPF - 561-19-130.pdf PDF
MD-7-R-01 - MECHANICAL - DEMOLITION - BUILDING 7 - ROOF.pdf PDF
VHA MASTER SPECIFICATIONS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW

AHU-7B

NEW

AHU-7C

BLDG 7 - ROOF

EX FAN

EX FAN

"x

"x

24"x24"

2 2

DD

A. THE DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES.

THE SCALE, WHEN INDICATED IS INTENDED FOR GENERAL REFERENCE

ONLY.

B. SHUTDOWNS SHALL BE COORDINATED AND APPROVED THROUGH THE

OWNERS REPRESENTATIVE AND WILL REQUIRE ADVANCE NOTICE OF ONE

WEEK. THIS TIME LENGTH MAY BE LONGER OR SHORTER FOR SOME

SHUTDOWNS AND SHALL BE AT THE OWNERS DISCRETION.

C. ANY EXISTING PIPE OR DUCT INSULATION THAT IS DAMAGED DURING

CONSTRUCTION SHALL BE REMOVED AND REPLACED WITH NEW

INSULATION TO MATCH ADJACENT INSULATION AND COVERING.

D. CONSTRUCTION DEBRIS SHALL BE REMOVED DAILY.

E. MECHANICAL CONTRACTOR SHALL RELOCATE EXISTING EQUIPMENT TO

REMAIN AS REQUIRED TO COORDINATE INSTALLATION OF NEW WORK.

F. PROVIDE TEST AND BALANCE OF EXISTING AIR AND HYDRONIC SYSTEMS

SERVING THIS AREA PRIOR TO DEMOLITION. PROVIDE REPORT TO

ENGINEER.

G. ALL EXISTING CONTROLS COMPONENTS AND CONTROLS WIRING WITHIN

THE LIMITS OF CONSTRUCTION SHALL REMAIN. IF COMPONENTS NEED TO

BE REMOVED DURING CONSTRUCTION IN THIS AREA TO FACILITATE THE

INSTALLATION OF NEW WORK, THEN THE COMPONENTS SHALL BE

REINSTALLED TO A FUNCTIONAL CONDITION BEFORE PROJECT

COMPLETION.

H. ALL DUCTS, PIPE, AND EQUIPMENT SHALL BE LATERALLY RESTRAINED TO

COMPLY WITH STATE BUILDING CODE.

I. BEFORE FABRICATING ANY SHEET METAL DUCTWORK, COORDINATE

LOCATION AND SIZE WITH SPRINKLER & PLUMBING PIPING, CONDUITS,

LIGHT FIXTURES, STRUCTURAL, ETC. PLANS ARE SCHEMATIC AND ARE

NOT SHOP DRAWINGS. SUBMIT DUCTWORK COORDINATION DRAWINGS,

AS SPECIFIED.

J. BEFORE SUBMITTING SHOP DRAWINGS, COORDINATE VOLTAGES

AVAILABLE FOR MECHANICAL EQUIPMENT AND PROVISION OF ALL

STARTERS AND DISCONNECT SWITCHES WITH ELECTRICAL CONTRACTOR.

K. ALL EQUIPMENT SHALL BE U.L. LISTED.

L. THE ELECTRICAL CONTRACTOR SHALL CONNECT ALL MECHANICAL

EQUIPMENT; PROVIDE DISCONNECTS, WIRING AND CONDUIT, INSTALL

STARTERS, AND MOUNT AND WIRE VFD, UNLESS OTHERWISE NOTED.

M. PROVIDE FIRE CAULKING OR OTHER APPROVED FIRESTOP SYSTEM AT ALL

MECHANICAL PIPING PENETRATIONS OF RATED ASSEMBLY WITHIN THE

LIMITS OF CONSTRUCTION (NEW AND EXISTING).

N. DUCTWORK SIZES MAY VARY DUE TO LIMITED ACCESS AND INSULATION.

DUCTWORK SIZES SHOULD BE CONFIRMED BY THE CONTRACTOR PRIOR

TO ANY DUCTWORK FABRICATION.

O. 14 DAYS NOTICE OF ALL SHUTDOWNS SHALL BE GIVEN TO THE VA, WITH

WRITTEN VA APPROVAL PRIOR TO STARTING THE WORK. CONTRACTOR

SHALL SUBMIT A CONTINGENCY PLAN TO DEAL WITH ALL SHUTDOWNS

THAT EXCEED 24 HOURS.

P. TEMPORARY COOLING UNITS MAY BE REQUIRED DURING THE INSTALL OF

THE NEW EQUIPMENT, COST SHALL BE INCOPORATED IN THE BID PRICE.

Q. ALL WORK SHALL BE PHASED TO PROVIDE MINIMUM DOWN TIME, AS

STIPULATED BY THE VA STAFF.

GENERAL NOTES

NEW RTU SHALL MATCH EXISTING UNIT DIMENSIONS. EXISTING CURB TO BE

RE-USED.

MODIFY DUCTWORK CONNECTIONS TO PROVIDE PROPER TRANSISTION TO

EXISTING DUCTWORK.

PATCH DUCT AND INSULATE WHERE COIL IS REMOVED.

PROVIDE DUCT SMOKE DETECTORS TIED INTO THE EXISTING FIRE ALARM

SYSTEM IN THE SUPPLY AND RETURN AIR DUCTS.

CONTRACTOR TO PROVIDE PROTECTION DURING DEMOLITION AND

INSTALLATION OF AHU-7B AND AHU-7C.

NEW WORK KEYED NOTES

AREA OF

WORK

KEY PLAN

GRAPHIC SCALE

( in Feet )

1 inch = 20 ft.

20 2010 40 800

GRAPHIC SCALE

( in Feet )

1 inch = 8 ft.

8 84 16 32

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT STAMPPROGRAM MANAGER

321 4 5 6 7 8 9 10

ENGINEER OF RECORD

Charlotte Engineers, LLP 5838 Monroe Road Charlotte, NC 28212 704-531-3000 Michael Eaves

M L o c a l R e v it F ile s \R e v it

\4

C

E C e n tr a l M o d e l.

rv t

/1

/2

:0

:3

A

M

MH-7-R-01

MECHANICAL - NEW WORK -

BUILDING 7 - ROOF

VAMC EAST ORANGE AHU &

WATER-COOLED EQUIPMENT

UPGRADES

EAST ORANGE, NEW JERSEY

561-19-130

3/11/2021 GAT DON

FULLY SPRINKLERED

1/8" = 1'-0"

MECHANICAL - NEW WORK - ROOF

Revisions: Date:

ADDENDUM 1 5/10/2021

Sheets
M-004 - MECHANICAL - AHU SCHEDULES
MD-7-R-01 - MECHANICAL - DEMOLITION - BUILDING 7 - ROOF
MH-7-R-01 - MECHANICAL - NEW WORK - BUILDING 7 - ROOF

File details come from the government source that posted it. Updated .