MH-101_MECHANICAL DEMOLITION AND NEW WORK PART PLANS.pdf

PDF 468 KB Posted

Attached to
Y1DA--632-22-137 Glycol Upgrade for Preheat Hot Water System
Solicitation number
36C24222Q1128
Issued by

View the file

Other files

File Type Posted
36C24222Q1128 0001.docx DOCX document
010000_GENERAL REQUIREMENTS.pdf PDF
232113 HYDRONIC PIPING.pdf PDF
013323_SHOP DRAWINGS PRODUCT DATA AND SAMPLES.pdf PDF
013526 SAFETY REQUIREMENTS.pdf PDF
MH-001 MECHANICAL NOTES LEGENDS ABBREVAITIONS AND SCHEDULES.pdf PDF
36C24222Q1128_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GLYCOL UPGRADE FOR PREHEAT

HOT WATER SYSTEM

79 Middleville Rd, Northport, NY 11768

632-22-137

B200N

JUNE 6, 2022 KNRevisions: Date:

200N

JD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

GLYCOL UPGRADE FOR PREHEAT

HOT WATER SYSTEM

79 Middleville Rd, Northport, NY 11768

632-22-137

B200N

JUNE 6, 2022 KNRevisions: Date:

200N

JD

MH-101

BASEMENT MECHANICAL

DEMOLITION AND NEW WORK

PART PLANS

FULLY SPRINKLERED

SCALE:01 BASEEMENT DEMOLITION PART PLAN

1/4" =1'-0" SCALE:02 BASEMENT NEW WORK PART PLAN

1/4" =1'-0"

JD

AutoCAD SHX Text

XP-6

AutoCAD SHX Text

XP-1

AutoCAD SHX Text

XP-2

AutoCAD SHX Text

XP-3

AutoCAD SHX Text

XP-4

AutoCAD SHX Text

XP-5

AutoCAD SHX Text

XAS

AutoCAD SHX Text

XHX-6

AutoCAD SHX Text

XHX-5

AutoCAD SHX Text

XBPCV

AutoCAD SHX Text

XGMT

AutoCAD SHX Text

XDWH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XDCW

AutoCAD SHX Text

XDMW

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XGPHWR

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XPGHWR

AutoCAD SHX Text

TAGGED NOTES

AutoCAD SHX Text EXISTING PREHEAT GLYCOL HEATING WATER TO AH-1, AH-2. AH-3, AH-4 IN PENTHOUSE MER, BUILDING 200N. SYSTEM IS CURRENTLY FILLED WITH WATER ONLY. DRAIN PREHEAT GLYCOL HEATING WATER SYSTEM IN ITS ENTIRETY FROM PENTHOUSE TO BASEMENT INCLUDING PREHEAT COILS AT AH-1, AH-2. AH-3, AH-4 IN PENTHOUSE AND P-1, P-2, HX-1, HX-2 IN BASEMENT MER. VENT SYSTEM AT PENTHOUSE WHILE DRAINING.

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING PREHEAT GLYCOL HEATING WATER PUMP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING PREHEAT HEATING WATER PUMP

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING REHEAT HEATING WATER PUMP

AutoCAD SHX Text

AutoCAD SHX Text

REMOVE EXISTING GYCOL MAKE-UP SYSTEM, RETURN TO OWNER.

AutoCAD SHX Text

AutoCAD SHX Text CAP OFF EXISTING GLYCOL CONNECTION TO EXISTING PREHEAT GLYCOL HEATING WATER RETURN PIPING.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XAS

AutoCAD SHX Text

XHX-4

AutoCAD SHX Text

XHX-3

AutoCAD SHX Text

AutoCAD SHX Text

XDCW

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWR

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

XBPCV

AutoCAD SHX Text 3"

AutoCAD SHX Text

EXISTING EYEWASH STATION

AutoCAD SHX Text

AutoCAD SHX Text

XPHWS

AutoCAD SHX Text

XPHWR

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING PREHEAT HEATING WATER SUPPLY AND RETURN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XAS

AutoCAD SHX Text

XHX-2

AutoCAD SHX Text

XHX-1

AutoCAD SHX Text

AutoCAD SHX Text

XDCW

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWR

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

XBPCV

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING REHEAT HEATING WATER SUPPLY AND RETURN

AutoCAD SHX Text

AutoCAD SHX Text

XHWS

AutoCAD SHX Text

XHWR

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text

DISCONNECT COLD WATER MAKE UP TO PREHEAT GLYCOL HEATING WATER SYSTEM.

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING STEAM PRESSURE REDUCING STATION

AutoCAD SHX Text

MER EO-54

AutoCAD SHX Text

XP-6

AutoCAD SHX Text

XP-1

AutoCAD SHX Text

XP-2

AutoCAD SHX Text

XP-3

AutoCAD SHX Text

XP-4

AutoCAD SHX Text

XP-5

AutoCAD SHX Text

XAS

AutoCAD SHX Text

XHX-6

AutoCAD SHX Text

XHX-5

AutoCAD SHX Text

XBPCV

AutoCAD SHX Text

GMT-1

AutoCAD SHX Text

XDWH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XDCW

AutoCAD SHX Text

XDMW

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XGPHWR

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XPGHWS

AutoCAD SHX Text

XPGHWR

AutoCAD SHX Text

TAGGED NOTES

AutoCAD SHX Text

NEW GLYCOL MAKE-UP SYSTEM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text INSTALL BALL VALVE WITH CAPPED 3/4" HOSE CONNECTION AT PREHEAT GLYCOL HEATING WATER PIPE STUB AND AT CHECK VALVE.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XAS

AutoCAD SHX Text

XHX-4

AutoCAD SHX Text

XHX-3

AutoCAD SHX Text

AutoCAD SHX Text

XDCW

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWR

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

XBPCV

AutoCAD SHX Text 3"

AutoCAD SHX Text

XPHWS

AutoCAD SHX Text

XPHWR

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XAS

AutoCAD SHX Text

XHX-2

AutoCAD SHX Text

XHX-1

AutoCAD SHX Text

AutoCAD SHX Text

XDCW

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

XHHWS

AutoCAD SHX Text

XHHWR

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text

AutoCAD SHX Text

XBPCV

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text

XHWS

AutoCAD SHX Text

XHWR

AutoCAD SHX Text CONNECT GLYCOL DISCHARGE PIPE TO EXISTING GLYCOL PREHEAT HEATING WATER RETURN PIPING AT EXISTING STUB. PLUG GLYCOL MAKEUP UNIT INTO NEAREST WALL OUTLET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text CHARGE PREHEAT GLYCOL HEATING WATER SYSTEM WITH 30% SOLUTION OF PROPYLENE GLYCOL (APPROXIMATELY 1,000 GALLONS OF 30% SOLUTION) IN ITS ENTIRETY FROM BASEMENT TO PENTHOUSE INCLUDING PREHEAT COILS AT AH-1, AH-2. AH-3, AH-4 IN PENTHOUSE AND P-1, P-2, HX-1, HX-2 IN BASEMENT MER. VENT SYSTEM AT PENTHOUSE WHILE WHILE FILLING. AFTER CONFIRMING SYSTEM IS COMPLETELY FULL IN EVERY RESPECT AND FREE OF AIR, TEST SYSTEM FLOW WITH EXISTING PUMP P-1 IN BASEMENT MER. CONTRACTOR SHALL PROVIDE THE MEANS OF FILLING THE SYSTEM INCLUDING A PUMP AND ALL APPURTENANCES. THE NEW GLYCOL MAKE-UP SYSTEM PUMP IS NOT TO BE USED FOR FILLING SYSTEM. TEST OPERATION OF NEW GLYCOL MAKE-UP SYSTEM TO KEEP SYSTEM PROPERLY CHARGED.

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING EYEWASH STATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING STEAM PRESSURE REDUCING STATION

AutoCAD SHX Text

MER EO-54

Sheets and Views
M-101

File details come from the government source that posted it. Updated .