14) Response to Questions 1 - RFP MG 09272024.pdf
PDF 232 KB Posted
- Attached to
- Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets Federal contract opportunity
- Solicitation number
- MG-09272024
- Issued by
- Department of Energy
About this file
This document is a response to questions regarding RFP MG-09272024 for the Advanced Light Source Upgrade (ALS-U) Storage Ring "Hard Bend" (HBEND) Magnets. The RFP was issued by the Lawrence Berkeley National Laboratory (LBNL), which is part of the Department of Energy.
The RFP includes two work packages. Work Package 1 covers the full HBEND magnet assemblies, including the adjuster plates and tuning hardware. Work Package 2 only covers the magnet core assemblies, without the adjuster plates. Offerors can submit proposals for either Work Package 1 or Work Package 2, but not both. The response clarifies that the Upper Magnet Core Assembly (AL-1208-2801) and the Lower Magnet Core Assembly (AL-1195-4932) are included in both work packages. The RFP has a proposal due date of October 28, 2024.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LBNL Response to Questions 01 Re: LBNL RFP MG-09272024 – 10/17/2024
1. This question pertains to suppliers that intend to submit a proposal to fill LBNL’s magnet assembly need (only). This requirement appears to be covered by Work Package 2. Is it OK if the supplier only submits a proposal for Work Package 2 in response to your RFP?
LBNL Response: Yes. Per the RFP, Section 1 “The offerors can submit proposals for either of the two work packages (not both), as described in the Statement of Work (SOW) AL-1685-4598 Titled Statement of Work for the ALS-U Storage Ring HBEND Magnets Revision B, dated, 09/12/2024, Section 2.1.”
2. If submitting a proposal to Work Package 2 only, it seems not all magnet assemblies are part of Work Package 2. Please clarify what is included in Work Package 2 and what is not. Reviewing your RFP, we concluded the packages covers the following scope with respect to magnet assemblies:
Work Package 1 covers the magnet assemblies in the chart below, including the ones in the left-hand column (such as Lower Adjuster Plate Assembly, etc):
LBNL Response (part 1): Both Work package 1 and Work package 2 require the delivery of one each AL-1208-2802 – Upper magnet core assembly and AL- 1195-4932 – Lower magnet core assembly. Correcting the graphics in the question, it would appear as below:
WORK PACKAGE 1:
*The full HBEND magnet assemblies include the adjuster plates and tuning the hardware
AL-1208-2801
Upper Magnet Core Assembly
Verification
AL-1195-4932
Lower Magnet Core Assembly
Verification
AL-1615-8572
HBEND Full
Assembly First Article
AL-1615-8572
HBEND Full Assembly
Production
Phase 1 Work package 1
Phase 2 Work package 1
Phase 2 Work package 1 One full HBEND magnet assembly* - First Article Seven full HBEND magnet assemblies* - Production
Phase 1 Work package 1 One Upper Magnet Core Assembly & One Lower Magnet Core Assembly
VERIFICATION PHASE
Work package 2 only covers the magnet assemblies in the chart below:
- The Upper and Lower Magnet Core assemblies are included.
- The Lower Adjuster Plate Assembly, etc, are not included.
WORK PACKAGE 2:
AL-1208-2801 Upper Magnet Core Assembly
Verification
AL-1195-4932 Lower Magnet Core Assembly
Verification
AL-1208-2801 Upper Magnet Core Assembly
(QTY 1) AND AL-1195-4932
Lower Magnet Core
Assembly (QTY 1) First Article
AL-1208-2801 Upper Magnet Core Assembly
(QTY 7) AND AL-1195-4932
Lower Magnet Core
Assembly (QTY 7) Prodution
Phase 1 Work package 2
Phase 2 Work package 2
Phase 2 Work package 2 One each Upper Magnet and Lower Magnet Core Assemblies -First Article Seven each Upper Magnet and Lower Magnet Core Assemblies -Production
Phase 1 Work package 2 One Upper Magnet Core Assembly & One Lower Magnet Core Assembly
VERIFICATION PHASE
Is this understanding, correct?
LBNL Response (Part 2): The magnet-only work package is for the magnet cores only, no adjuster plates, this is a correct statement.
LBNL Additional Clarification
For suppliers that want to submit a proposal for Work Package 1, items 002 and 003 for both Work Packages 1 and 2 are the same - Magnet cores only, no adjuster plates.
File details come from the government source that posted it. Updated .