This is a Buy America Certification Form for the Town of Morris, Connecticut East Street Housing Site Infrastructure Project, a Community Development Block Grant (CDBG) funded undertaking. The form documents compliance with the Build America, Buy America Act (BABAA) requirements for federally funded infrastructure projects with aggregate funding of $250,000 or more. The project encompasses site infrastructure development for eight units of affordable housing across two buildings, including clearing, erosion control, grading, stormwater management systems, septic system installation, electrical conduits and transformer vault, site lighting, sidewalks, dumpster pad construction, and road and parking preparation. Sealed bids are due by 2:00 P.M. on Wednesday, March 18, 2026, with a mandatory pre-bid meeting scheduled for Wednesday, March 4, 2026 at 1:00 P.M. at the project site located at 103 East Street, Morris, Connecticut. The Morris Housing Authority will serve as the owner and manager upon project completion.
The certification form requires all iron, steel, specific construction materials including non-ferrous metals, lumber, composite building materials, and plastic and polymer-based products to be produced in the United States, with manufactured products containing at least 55 percent domestic content by cost. For FY2025 funded projects and forward, all construction materials must be manufactured entirely in the United States. The prime contractor is responsible for ensuring all subcontractors, manufacturers, and suppliers comply with BABAA requirements and must provide evidence of compliance upon request by the Department of Housing or HUD. An itemized cost estimate identifying all materials subject to BABA is required prior to contract signing. The project is funded through CDBG resources, and bidders must provide 100% Performance and Payment Bonds while complying with federal and state prevailing wage requirements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4-16
East Street Housing Site Infrastructure, Morris, CT
Buy America Certification Form
PURPOSE: The “Buy America Certification Form” is used to certify that, as required by federal law, all of the iron, steel (for FY23 funded projects and forward), specific construction materials – non-ferrous metals, lumber, composite building materials, plastic and polymer based pipe and tube (for FY24 funded projects and forward), all construction materials, including manufactured products (for FY25 funded projects and forward) utilized in federally funded projects with an aggregate of $250,000 or more funds, including HUD CDBG funds, are produced in the
United States in a manner that complies with the Build America, Buy America Act, unless an applicable waiver applies or is granted by the Made in America Office of Management and Budget (MIAO).
GENERAL INFORMATION: BABA guidance requires the following Buy America preference: 1) All iron and steel used in the project are produced in the United States. This means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States; 2) All listed manufactured products used in the project are produced in the United States. This means the manufactured product was manufactured in the
United States, and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and, for FY 2025 funded projects forward 3) All (listed and non-listed) construction materials are manufactured in the United States. This means that all manufacturing processes for the construction material occurred in the United States. The Build America, Buy
America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project.
Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.
CERTIFICATION: I hereby certify the materials to be installed pursuant to the attached Bid Submittal conform to the
Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act
(“IIJA”), Pub. L. 177-58. Signing this document does not relieve the signee of providing evidence of compliance upon request by DOH or HUD.
Prime Contractor:
Name Signature Date
Phone Number: Email:
The Prime Contractor is responsible for all subcontractors and for ensuring that all manufacturers and suppliers certify materials with the understanding that those certifying the material assume full legal responsibility of the material and are subject to providing documentation verifying the material meets all requirements upon demand.
Any additional materials needed for the project should be itemized, specify if BABA applies, and then certified by the engineer and submittal to DOH with an official Change Order.
Attach the itemized cost estimate that identifies all materials subject to BABA, if available at this time. It will be required prior to contract signing.
File details come from the government source that posted it. Updated .