About this file

This scope of work document outlines requirements for a design-build project to repair and renovate Building 43 at the Fort Harrison VA Medical Center in Montana. Key requirements include finalizing 35% design plans, performing repairs and renovations to systems like HVAC, electrical, architectural, fire protection and security. The work must preserve the building's historic character. Additional tasks involve installing new plumbing fixtures, furniture, and HVAC equipment. Electrical service will be entirely replaced. Physical access control, fire protection and two means of egress are required. Telecommunications and fiber optic infrastructure must be provided to support bandwidth needs. The design-build team must provide design services, construction documents, cost estimates and construction. Submissions are due 45, 115 and 145 days after contract award with 406 days for construction. The period of performance, quality assurance and qualifications are also outlined.

View the file

Other files

File Type Posted
36C25924R0030 0001.docx DOCX document
Drawings with basement.pdf PDF
Master Specifications.pdf PDF
Site Utility.pdf PDF
Past Performance Questionnaire.pdf PDF
Structural REPORT.pdf PDF
DB Construction Experience Sheet.docx DOCX document
36C25924R0030.docx DOCX document
Partial 1 line.pdf PDF
LOS Certificate.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA HVAC DESIGN MANUAL - ROOM DATA SHEETS - ROOM TYPE COMPARISON

VA BUILDING CLASSIFICATION ROOM NAME

INDOOR

TEMPERATURE

INDOOR

RELATIVE

HUMIDITY

MIN

TOTAL

ACH

MIN OA

ACH

ROOM AIR ROOM AIR

BALANCE INDIVIDUAL

ROOM

CONTROL

MAX

NOISE

LEVEL

NC

COOL HEAT

% RH

MAX

%RH

MIN

RETURN

EXHAUST-GENERAL

EXHAUST-SPECIAL

(+) POSITIVE

(++) DOUBLE

POSITIVE

(-) NEGATIVE

(--) DOUBLE

NEGATIVE

(o) NEUTRAL

°F °F TEMP FLOW

Non-Patient - Miscellaneous Vestibule N/A 50 N/A N/A N/A N/A N/A (+) YES CV 40 Non-Patient - Miscellaneous Corridor 75 70 60 20 4 2 RETURN (+) YES VAV 40 Non-Patient - Miscellaneous Storage Room N/A N/A N/A N/A 4 N/A RETURN ( + ) NO CV 40

Non-Patient - Miscellaneous XXYYC: Satellite Telephone/Communications closet 68 68 N/A N/A 6 N/A RETURN (o) YES CV 40

Non-Patient - Miscellaneous Office 75 70 60 20 4 2 RETURN (o) YES VAV 35

Non-Patient - Miscellaneous Sattellite and Main Electrical Rooms with Internal Heat Gain 86 40 N/A N/A N/A Notes:

44 - 47 RETURN ( o ) YES CV 45

Non-Patient - Miscellaneous Engineering Control Center Room 75 70 60 30 4 2 RETURN ( + ) YES CV 40 Non-Patient - Miscellaneous Stairs N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 40 Non-Patient - Miscellaneous Conference 75 70 60 30 4 2 RETURN (o) YES VAV 35 Non-Patient - Miscellaneous Air Handling Equipment Rooms 84 50 N/A N/A 6 2 RETURN ( o ) YES CV 45 Non-Patient - Miscellaneous Waiting Room 75 70 60 30 6 2 RETURN (o) YES VAV 35 Non-Patient - Miscellaneous Kitchenette / Breakroom 75 70 60 30 6 N/A RETURN (o) YES VAV 35

DESIGN DEVELOPMENT (35%) - MINIMUM ROOM AIR FLOWS (BASED ON ACH)

FLOOR ZONE ROOM # ROOM NAME

35%

AREA HEIGHT 2-ACH

AIRFLOW

4-ACH

AIRFLOW

6-ACH

AIRFLOW

10-ACH

AIRFLOW

ft^2 ft CFM CFM CFM CFM

1st H A OPEN AREA 130 12 55 105 160 260 1st --- B / B LIFT 23 20 20 35 50 80 1st --- C / BC STAIR 91 17 55 105 155 260 1st H D BREAKROOM 99 8 30 55 80 135 1st --- E WOMEN 53 8 15 30 45 75 1st --- F MEN 35 8 10 20 30 50 1st H G ALCOVE 32 8 10 20 30 45 1st H H HALL 266 9 80 160 240 400 1st J J TRAINING 300 10 100 200 300 500 1st K K CONFERENCE 164 10 55 110 165 275 1st L L WAITING 110 10 40 75 110 185 1st M M TRAINING 605 10 205 405 605 1010

BASEMENT --- BA CRAWLSPACE 132 8 40 75 110 180

BASEMENT --- BD RESTROOM 63 8 20 35 55 85

BASEMENT BE BE CIRCULATION 138 8 40 75 115 185

BASEMENT --- BF HAC 35 8 10 20 30 50

BASEMENT --- BG FIRE PUMP 29 8 10 20 25 40

BASEMENT BH BH CORRIDOR 145 8 40 80 120 195

BASEMENT --- BJ STORAGE 30 8 10 20 25 40

BASEMENT --- BK ELECTRICAL 30 8 10 20 25 40

BASEMENT BL BL MECHANICAL 194 8 55 105 160 260

BASEMENT --- BM MECH. SHAFT 15 8 5 10 15 20

BASEMENT BN BN TELECOM 137 8 40 75 110 185

BASEMENT BP BO COPY 46 8 15 25 40 65

BASEMENT BP BP BREAKROOM 64 8 20 35 55 90

BASEMENT BH BQ HALL 56 8 15 30 45 75

BASEMENT BR BR TRAINING 270 8 75 145 220 360

BASEMENT BT BT TRAINING 209 8 60 115 170 280

TOTALS 2308 --- 1140 2205 3290 5425

EXHAUST TOTAL 260

OUTSIDE AIR TOTALS 2485

DESIGN DEVELOPMENT (35%) - VENTILATION LOADS

ROOM # ROOM NAME

35%

AREA

@ 12 BTU/

SQ. FT

@ 15 BTU/

SQ. FT

ft^2 BTU BTU

A STORAGE 39 468 585

B CONFERENCE 167 2004 2505

C HALL 72 864 1080

D BREAKROOM 62 744 930

E TRAINING 316 3792 4740

F OFFICE 150 1800 2250

G WAITING 151 1812 2265

H VEST. 25 300 375

J TRAINING 635 7620 9525

K HALL 190 2280 2850

L ALCOVE 32 384 480

M MEN 38 456 570

N WOMEN 56 672 840

P STAIR 59 708 885

B001 BASEMENT 1992 23904 29880

VENTILATION TOTALS

BTUH 47808 59760

MBH 47.808 59.76

TONs 3.984 4.98

TYPE HEATING COOLING

VA HVAC Design Manual - Room Type Comparison Table
Fort Harrison - Minimum ACH Chart