About this file
This is a design and construction document package issued by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration, for roof replacement work at the MDOC Alger Correctional Facility located in Wetmore, Michigan. The project involves roof replacements for two structures: the 300 Building with an existing area of 23,592 square feet and the Spruce Housing Unit with an existing area of 14,315 square feet. The work scope includes removal of existing roofing membranes down to the insulation layer, inspection of existing insulation, installation of new 60-mil multi-ply fully-adhered EPDM roofing membrane, replacement of roof drains with new cast iron units, remedial repairs to existing roof penetrations, and installation of new metal flashings and counterflashings. The project must comply with the 2021 Michigan Building Code, 2021 Michigan Rehabilitation Code, 2012 NFPA Life Safety Code, and applicable mechanical, plumbing, and electrical codes. The drawings indicate the project reached 50 percent owner review on December 18, 2025, 90 percent owner review on February 6, 2026, and 100 percent owner review on February 27, 2026, with the bidding phase initiated on March 20, 2026. All existing mechanical and plumbing vents, roof access features, HVAC equipment, exhaust vents, electrical conduit, and satellite dish installations are to remain operational and in place during construction, with coordination required to temporarily disconnect and reconnect equipment as necessary.
The project specifications require that the installing contractor be a QA Master Contractor certified by the roofing membrane manufacturer and include provisions for proper drainage maintenance, temporary weather protection to maintain occupied building conditions, field verification of all dimensions and existing conditions, coordination with facility ownership for dumpster placement and staging areas, and daily removal of roof debris. All existing roof drain systems must remain fully operational throughout the re-roofing process, and the contractor is responsible for ensuring proper storage of materials intended for reuse, with replacement at no cost to the owner for any missing or damaged items. The design and construction package indicates this is a state-funded renovation project with work to be performed under Michigan construction code authority with the Bureau of Construction Codes and Bureau of Fire Services as the authority having jurisdiction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FILE NO.: 472/25266.JBB
ACCOUNTING TEMPLATES:
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
ADAM P. LACH, RA, DIRECTOR
CODE INFORMATION
PROJECT NAME:
AUTHORITY HAVING
JURISDICTION (AHJ):
GOVERNING CODE:
OCCUPANCY TYPE:
CONSTRUCTION TYPE:
RENOVATION (W0RK) AREA:
TOTAL EXISTING BUILDING AREA:
DOC / ALGER CORRECTIONAL FACILITY, ROOF REPLACEMENTS, WETMORE, MICHIGAN
STATE OF MICHIGAN BUREAU OF CONSTRUCTION CODES AND BUREAU OF FIRE SERVICES
• 2021 MICHIGAN BUILDING CODE (2021 IBC AMENDED)
• 2021 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS (2021 IEBC AMENDED)
• 2012 NFPA LIFE SAFETY CODE PLUS MICHIGAN AMENDMENTS (2012 NFPA 101 AMENDED)
• 2021 MICHIGAN MECHANICAL CODE (2021 IMC AMENDED)
• 2021 MICHIGAN PLUMBING CODE (2021 IPC AMENDED)
• 2023 MICHIGAN ELECTRICAL CODE (2023 NFPA 70 AMENDED)
• 2021 MICHIGAN ENERGY CODE (2021 IECC AMENDED)
300 BUILDING = I - 3, INSTITUTIONAL, CONDITION 2
SPRUCE HOUSING UNIT = I - 3, INSTITUTIONAL, CONDITION 4
300 BUILDING = MBC TYPE II-B / NFPA TYPE II (000), NON-SPRINKLERED (EXISTING)
SPRUCE HOUSING UNIT = MBC TYPE II-B / NFPA TYPE II (000), NON-SPRINKLERED (EXISTING)
300 BUILDING = N/A (REPLACE EXISTING ROOF)
SPRUCE HOUSING UNIT = N/A (REPLACE EXISTING ROOF)
300 BUILDING = 23,592 SF
SPRUCE HOUSING UNIT = 14,315 SF
CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SECTIONS OF
THE GOVERNING CODES AND ALL APPLICABLE REFERENCES TO
OTHER CODES AND STANDARDS. THE MORE RESTRICTIVE PROVISION
SHALL GOVERN WHERE APPLICABLE CODE REQIRMENTS DIFFER.
THIS IS NOT A COMPLETE OR COMPREHENSIVE LIST OF ALL CODE
REQUIREMENTS FOR THE SCOPE OF WORK. THE FOLLOWING IS ONLY
A SUMMERY OF SELECT CODE SECTIONS CONSIDERED RELEVENT TO
GUIDE THE DESIGN OF THE PROJECT.
CHAPTER APPLICATION / REQUIREMENT SUPPORT / NOTES / CALCULATIONS
IEBC Chapter 6 Classification of Work
Alteration - Level 1 Section 603
REFERENCE
Chapter 7 shall apply. 300 Building - Roof Replacement Spruce Housing Unit - Roof Replacement
IEBC Chapter 7 Fire Protection Section 703
Renovation shall maintain the current level of fire protection provided.
300 Building - Existing building does contain a fire protection system.
Spruce Housing Unit - Existing building does contain a fire protection system.
Reroofing Section 705
Roof shall meet Section 705.1 including Sections of MBC Chapter 15 and other applicable Sections of Chapter 15.
300 Building - Existing building does provide overflow scuppers, as well as roof drains.
Spruce Housing Unit - Existing building does provide overflow scuppers, as well as roof drains.
33 G5
30 65
17 139
55 52
32 180
14 12
CEDARVILLE
HESSEL
WHITEFISH
POINT
SAULT
STE
MARIE
NATIONAL PARK
ISLE ROYALE
NORWAY
MARENISCO
WHITE PINE
BERGLAND
NEWBERRY
SILVER
CITY
BESSEMER
IRONWOOD
WAKEFIELD
GREEN BAY
GWINN
HERMANSVILLE
MENOMINEE
IRON MOUNTAIN
VULCAN
CASPIAN
TROUT
WATERSMEET
CREEK
CROSSING
MASS
CITY
BRUCE
ONTONAGON
ROCKLAND BARAGA
ARNHEIM
CRYSTAL
FALLS
ISHPEMING
MICHIGAMME
L'ANSE
AURA
SKANEE
MARQUETTE
NEGAUNEE
MANISTIQUE
ESCANABA
FAYETTE
GARDEN
MUNISING
CURTIS
CITY
GOULD
HARBOR
CALUMET
RIPLEYHOUGHTON
CHASSELL
HANCOCK
DELAWARE
LAKE
LINDEN
LAURIUM
EAGLE
HARBOR
COPPER
MACKINAC
ISLAND
IGNACE
ST
INDIAN
RIVER
CHEBOYGAN
MACKINAW CITY
PELSTON
ONAWAY
GAYLORD
PETOSKEY
CHARLEVOIX
MANCELONA
KALKASKA
TRAVERSE
CITY
EMPIRE
ELBERTA
ARCADIA
MANISTEE
SCOTTVILLE
BALDWINLUDINGTON
SHELBY
BIG RAPIDS
MOUNT
PLEASANT
CADILLAC
GRAYLING
EAST
TAWAS
ROSCOMMON
LACHINE ALPENA
WOLVERINE
ATLANTA
ROGERS CITY
ALANSON
CROSS
VILLAGE
BOYNE CITY
BELLAIRE
JORDAN
E.
EASTPORTNORTHPORT
LELAND
BUCKLEY
FIFE
LAKE
FRANKFORT
MESICK
MANTON
BEAR
LAKE
LILLEY
HESPERIA
WHITE
CLOUD
EVART
REMUS
MIDLAND
SAGINAW
BAY
CITY
HARRISVILLE
CURRAN
MIO
OSCODA
TAWAS CITY
WEST
BRANCH
STANDISH
GLADWIN
McBAIN
LAKE CITY
CLARE
CARO
TROUT LAKE
BREVORT
IRON RIVERBRULE
WASHBURN
POPLAR
ASHLAND
PORT WING BAYFIELD
ODARRAH
MELLEN
UPSON
HURLEY
GLIDDEN
PARK FALLS
CLAM LAKE
MERCER
PRESQUE
ISLE
LAND O'LAKES
EAGLE
RIVER
PHELPS
FLORENCE
NIAGRA
CRANDON
SUPERIOR
HAYWARD
MINONG
CABLE
SHELL LAKE
GRANTSBURG
BALSAM
LAKE BARRON
MENOMONIE
DURAND
ALMA
WHITEHALL
BLACK
RIVER
FALLS
SPARTA
LA CROSSE
FRIENDSHIP
MONTELLO
WAUTOMA
GREEN
LAKE
FOND DU LAC
OSHKOSH
APPLETON
DE PERE
GREEN BAY
KEWAUNEE
STURGEON BAY
MARINETTE
OCONTO
SHAWANO
KESHENA
WAUSAU
STEVENS
POINT
WAUPACA
RHINELANDERPHILIPS
MEDFORD
MERRILL
ANTIGO
EAU CLARE
LADYSMITH
THREE
LAKES
MICHIGAN
WISCONSIN
LAKE
MICHIGAN
LAKE
SUPERIOR
HURON
LAKE
100 PORTAGE STREET
HOUGHTON, MI 49931
P (906) 482-4810 F (906) 482-9799
1 2 3 4 5
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
U.P. ENGINEERS &
ARCHITECTS, INC.
2906 N. STEPHENSON AVE, SUITE 2
IRON MOUNTAIN, MI 49801
P (906) 779-0937 F (906) 779-0947
424 S. PINE ST.
ISHPEMING, MI 49849
P (906) 485-1011 F (906) 485-1013
1701 DUNLAP AVE., SUITE 8
MARINETTE, WI 54143
P (715) 732-4188 F (715) 732-4189
707 ASHMUN STREET
SAULT STE. MARIE, MI 49783
P (906) 635-0511 F (906) 635-0612
PR
OJ
EC
T
NO
w w w .u pe a.
co m
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
IS
SU
ED
F
O R
D
AT
E:
FI
LE
N O.
: 7
/25
4.J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- A lg er
C F
C oo le r-
Fr ee ze r a nd R oo f R ep la ce m en t\D w gs
\R oo f R ep la ce m en ts \3
B ui ld in g\
M
-0
_A lg er
C F
Bl dg
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:4
PM
ROOF REPLACEMENTS
MDOC / ALGER CORRECTIONAL FACILITY
INDUSTRIAL PARK DRIVE, WETMORE, MI 49895
G001
COVER SHEET
RO
OF
R
EP
LA
CE
ME
NT
S
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
PROJECT LOCATION
PROJECT VICINITY MAP
FILE NO. MDOC 472/25266.JBB
SHEET INDEX
NUMBER SHEET NAME
G001 COVER SHEET
G002 ABBREVIATIONS AND SYMBOLS
A100 300 BUILDING - DEMOLITION ROOF PLAN
A101 300 BUILDING - PROPOSED ROOF PLAN
A110 300 BUILDING - ROOF DETAILS
A200 SPRUCE HOUSING UNIT - DEMOLITION ROOF PLAN
A201 SPRUCE HOUSING UNIT - PROPOSED ROOF PLAN
A210 SPRUCE HOUSING UNIT - ROOF DETAILS
O W
NE
R
RE
VI
EW
/1 8/
O W
NE
R
RE
VI
EW
/0 6/
0%
O W
NE
R
RE
VI
EW
/2 7/
LA
RA
R
EV
IE
W
/2
7/
BI
DD
IN
G
/2 0/
A301
BUILDING SECTION
A301
WALL SECTION
A301
DETAIL SECTION
DETAIL NUMBER
SHEET NUMBER
A201
ELEVATION
ELEVTION
NUMBER
SHEET NUMBER
A301
CALLOUT
DETAIL NUMBER
SHEET NUMBER
1 TITLE
1/8" = 1'-0"
DETAIL NAMEDETAIL NUMBER
DETAIL SCALE
TAG
IDENTIFICATION
DOOR IDENTIFICATION NUMBER
WINDOW IDENTIFICATION NUMBER
OFFICE ROOM IDENTIFICATION NUMBERROOM NAME
ROOM NUMBER
SYMBOL IDENTIFICATION
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 7
/25
4J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- A lg er
C F
C oo le r-
Fr ee ze r a nd R oo f R ep la ce m en t\D w gs
\R oo f R ep la ce m en ts \3
B ui ld in g\
M
-0
_A lg er
C F
Bl dg
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:4
PM
G002
ABBREVIATIONS
AND SYMBOLS
RO
OF
R
EP
LA
CE
ME
NT
S
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
ABBREVIATIONS
A/C AIR CONDITIONING
AB ANCHOR BOLT
AC ACOUSTIC/ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECT/ARCHITECTURAL
BBR BASEBOARD RADIATION
BD BOARD
BDRY BOUNDARY
BF BARRIER FREE
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
C/C CENTER TO CENTER
CA COMPRESSED AIR
CB CATCH BASIN
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CLT CLOSET
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CW COLD WATER
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DN DOWN
DR DOOR
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EF EXHAUST FAN
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
EP EPOXY
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXP EXPANSION
EXT EXTERIOR
EXTG EXISTING
FA FIRE ALARM
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISH FLOOR ELEVATION
FIN FINISHED
FLR FLOOR
FT FOOT OR FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GT GROUT
GWB GYPSUM WALL BOARD
HB HOSE BIBB
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HPDL HIGH PRESSURE DECORATIVE LAMINATE
HTR HEATER
HVAC HEATING / VENTILATION / AIR CONDITIONING
HW HOT WATER
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH/INCHES
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JC JANITOR CLOSET
JST JOIST
JT JOINT
KD KNOCKDOWN
KOP KNOCKOUT PANEL
KP KICKPLATE
LAM LAMINATE
LAV LAVATORY
LB POUND
LEV LEVEL
LF LINEAR FOOT/FEET
LL LIVE LOAD
LT LIGHT
LTG LIGHTING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MET METAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
O/O OUT TO OUT
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPG OPENING
OPP OPPOSITE
OSB OREIENTED STRAND BOARD
OZ OUNCE
PC PRECAST
PL PLATE
PLAM PLASTIC LAMINATE
PNL PANEL
PNT PAINT
PR PAIR
PREFIN PREFINISHED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PWD PLYWOOD
QT QUARRY TILE
QTY QUANTITY
R RADIUS
RC RESILIENT CHANNEL
RD ROOF DRAIN
REF REFRIDGERATOR
REINF REINFORCE
RM ROOM
RO ROUGH OPENING
RTU ROOF TOP UNIT
S SOUTH
S & V STAIN & VARNISH
SAN SANITARY
SCHED SCHEDULE
SF SQUARE FOOT/FEET
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STL STEEL
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYS SYSTEM
TEL TELEPHONE
TEMP TEMPERATURE
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V VENT
VB VINYL BASE
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THRU ROOF
VWC VINYL WALL COVERING
W/W WALL TO WALL
W_x_ WIDE FLANGE SECTION
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WWF WELDED WIRE FABRIC
CENTERLINE
# NUMBER
& AND
/ PER
@ AT
L ANGLE
x BY (AS IN 2x4)
± PLUS OR MINUS
Ø DIAMETER
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
EXISTING RIDGE
EX
IS
TI
NG
R
ID
GE
1 1
8 8
DEMOLITION KEYNOTES -
REMOVE EXISTING ROOFING MEMBRANE DOWN TO INSULATION. INSPECT INSULATION
PRIOR TO INSTALLING NEW ROOFING MEMBRANE AND REPORT ANY SATURATED
INSULATION, DISCREPANCIES AND / OR CONFLICTS TO THE ARCHTECT.
2 EXISTING MECHANICAL / PLUMBING VENT TO REMAIN.
3 EXISTING ROOF DRAIN TO BE REPLACED WITH NEW CAST IRON ROOF DRAIN. IF CAST
IRON IS NOT AVAILABLE, RE-USE EXISTING CAST IRON ROOF DRAIN.
4 EXISTING OVERFLOW SCUPPER TO REMAIN (APPRX. 8" WIDE x 4" TALL).
5 EXISTING ROOF ACCESS HATCH TO REMAIN.
6 EXISTING (WALL MOUNTED) ROOF ACCESS DOOR TO REMAIN.
7 REMOVE AND DISPOSE OF EXISTING 24" x 24" x 2" THICK CONCRETE PAVERS.
8 EXISTING PARAPET MOUNTED ELECTRICAL CONDUIT (FOR FUTURE CAMERA) TO REMAIN.
9 EXISTING ROOF VENTILATOR UNIT w/ CURB TO REMAIN.
10 EXISTING HVAC SUPPORT CURBS TO REMAIN.
11 EXISTING MECHANICAL UNIT w CURB TO REMAIN.
12 EXISTING EXHAUST VENT TO REMAIN. EXTEND VENT TO 1' - 4" (MIN) ABOVE FINISHED
ROOF, TYIPCAL AT ALL VENT PIPES.
13 EXISTING METAL SATELLITE DISH FRAME w/ 3" CONDUIT TO REMAIN.
14 EXISTING ROOF MOUNTED HVAC EQUIPMENT ON CURBS TO REMAIN.
ROOF DEMOLITION AND GENERAL CONSTRUCTION NOTES
1. GENERAL CONTRACTOR TO COORDINATE ALL WORK WITH OWNER.
2. WORK LABELED NOT IN CONTRACT (NIC), OR OTHERWISE NOT NOTED, IS NOT IN CONTRACT FOR
ANY ARCHITECTURAL IMPROVEMENTS.
3. GENERAL CONTRACTOR AND THEIR SUB-CONTRACTORS SHALL VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS WITH CONDITIONS SHOWN IN THE CONTRACT DOCUMENTS AND SHALL REPORT
ANY DEVIATIONS, DISCREPANCIES AND / OR CONFLICTS TO THE ARCHITECT.
4. EXISTING ROOF DRAIN SYSTEMS ARE TO REMAIN FULLY OPERATIONAL / FUNCTIONAL DURING THE
RE-ROOFING AND THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY PROTECTION
DURING DEMOLITION AND RENOVATION ACTIVITIES.
5. EXISTING ROOF DRAINS ARE TO BE CLEANED AND MAINTAINED FREE OF DEBRIS DURING RE-
ROOFING. ALL DRAIN DOMES / CAPS TO BE RE-INSTALLED.
6. EXISTING ROOFING SYSTEM IS TO BE REMOVED DOWN TO THE INSULATION. PREPARE SURFACE
FOR NEW ROOFING SYSTEM.
7. EXISTING ROOF PENETRATIONS TO REMAIN. IN THE EVENT THAT ANY EXISTING VENT PIPING, STRUCTURAL SUPPORTS & MECHANICAL EQUIPMENT WILL NOT BE RE-USED, ITEMS ARE TO BE
REMOVED AND DISCARDED. REPAIR ROOF DECKING / INSULATION AND INSTALL NEW ROOFING
SYSTEM.
8. PERFORM REMEDIAL REPAIRS AS NECESSARY TO EXISTING ROOF PENETRATIONS, PENETRATION
POCKETS, VENT PIPING, CONDUIT AND ROOF CURBS THAT ARE TO REMAIN TO RECEIVE NEW
ROOFING SYSTEM.
9. INSPECT EXISTING ROOFING INSULATION AND COVER BOARD AND REPORT ANY INSULATION
SATURATION, BLISTERS, BUCKLES, OR OTHER SURFACE IRREGULARITIES TO THE ARCHITECT.
10. EXISTING MISCELLANEOUS DEBRIS, ETC. ON THE ROOF IS TO BE REMOVED AND DISCARDED ON A
DAILY BASIS. COORDINATE DISPOSAL WITH OWNER.
11. ALL DIMENSIONS, EQUIPMENT, PIPES, ETC. ARE TO BE FIELD VERIFIED.
12. CONTRACTOR SHALL ENSURE PROPER STORAGE OF ANY MATERIALS / EQUIPMENT INTENDED TO
BE REUSED OR REINSTALLED. ANY MISSING OR DAMAGED ITEMS DUE TO IMPROPER STORAGE,
OR BY CONTRACTORS ACTIVITIES, SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO
THE OWNER.
13. CONTRACTOR SHALL PROVIDE TEMPORARY WEATHER PROOFING AT ALL TIMES, SUCH THAT THE
BUILDING SHALL REMAIN OCCUPIED AND OPERATIONAL AND IN WEATHERTIGHT CONDITION
DURING DEMOLITION AND RE-ROOFING.
* = APPROXIMATE LOCATION FOR
BUILDING ACCESS LOCATIONS
DURING CONSTRUCTION
1 SALLY PORT ENTRY GATE
2 SECURITY GATE
3 HOUSING UNIT 6 - SPRUCE
4 BUILDING 300 ROOFS
2 WAYFINDING
KEYNOTE LEGEND
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 7
/25
4J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- A lg er
C F
C oo le r-
Fr ee ze r a nd R oo f R ep la ce m en t\D w gs
\R oo f R ep la ce m en ts \3
B ui ld in g\
M
-0
_A lg er
C F
Bl dg
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:4
PM
A100
300 BUILDING -
DEMOLITION
ROOF PLAN
RO
OF
R
EP
LA
CE
ME
NT
S
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
NORTH
1" = 10'-0"A1 DEMOLITION ROOF PLAN
O W
N
ER
R
EV
IE
W
/1
8/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
NO SCALE
WAYFINDING MAP
EXISTING RIDGE
EX
IS
TI
NG
R
ID
GE
2'
- 0
193' - 0"
100' - 0" 93' - 0"
23' - 0" 70' - 0"
2'
- 0
100' - 0" 22' - 11" 70' - 1"
1'
- 0
1'
- 0
1'
- 0
1'
- 0
TAPERED:
1/8 " / F
T.
TAPERED:
1/8" / FT.
EX
IS
TI
NG
R
ID
GE
1 1
1 1
3 3
8 8
C2 A110
B2 A110
TAPERED:
1/8" / FT.
TAPERED:
1/8 " / F
T.
TAPERED:
1/8" / FT.TAPERED:
1/8 " / F
T.
TAPERED:
1/8" / FT.
TAPERED:
1/8 " / F
T.
TAPERED:
1/8" / FT.
0"
20' - 0"
20' - 0"
TAPERED:
1/8 " / F
T.
0"
TAPERED:
1/8" / FT.
20' - 0"20' - 0"
20' - 0"
20' - 0"
TAPERED:
1/8 " / F
T.
0"
0"
PROPOSED ROOF KEYNOTES -
1 PROPOSED MULTI-PLY FULLY-ADHERED 60 MIL. REINFORCED RUPTURE RESISTANT EPDM MEMBRANE INSTALLED
OVER EXISTING RIGID INSULATION AND EXISTING SLOPED METAL DECK.
2 EXISTING MECH / PLUMB VENT TO REMAIN. PROVIDE NEW BOOT, CLAMPING RING, AND SEALANT.
3 EXISTING ROOF DRAIN TO BE REPLACED. PROVIDE NEW ROOF DRAIN, DOME, AND CLAMPING RING, TYPICAL.
4 EXISTING OVERFLOW SCUPPER TO REMAIN (APPROX. 8" WIDE x 4" HIGH).
5 EXISTING ROOF ACCESS HATCH TO REMAIN.
6 EXISTING (WALL MOUNTED) ROOF ACCESS DOOR TO REMAIN.
7 PROPOSED 30" x 30" EPDM WALKWAY PADS.
8 EXISTING PARAPET MOUNTED ELECTRICAL CONDUIT (FOR FUTURE CAMERA) TO REMAIN.
9 EXISTING ROOF VENTILATOR UNIT w/ 103" x 55" x 12" TALL CURB TO REMAIN.
10 EXISTING ROOF VENTILATOR UNIT w/ 38" x 55" x 12" TALL CURB TO REMAIN.
11 EXISTING 6" x 4" HVAC SUPPORT CURBS TO REMAIN.
12 EXISTING MECHANICAL HVAC UNIT w/ 44" x 24" x 12" TALL CURB TO REMAIN.
13 EXISTING MECHANICAL HVAC UNIT w/ 44" x 20" x 12" TALL CURB TO REMAIN.
14 EXISTING 9"Ø EXHAUST VENT TO REMAIN.
15 EXISTING EXHAUST VENT w/ 20" x 20" x 12" TALL CURB TO REMAIN.
16 EXISTING EXHAUST VENT w/ 20" x 20" x 10" TALL CURB TO REMAIN.
17 EXISTING METAL SATELLITE DISH FRAME w/ 3" CONDUIT TO REMAIN. COMPONENTS SHALL REMAIN ACTIVE DURING
THE ROOF REPLACEMENT PROCESS.
EXISTING ROOF MOUNTED HVAC EQUIPMENT ON CURBS TO REMAIN. TEMPORARILY DISCONNECT POWER & DUCTWORK AS REQUIRED DURING THE ROOF REPLACEMENT PROCESS. REINSTALL CURBS IN SAME LOCATION AND
RECONNECT POWER & DUCTWORK.
GENERAL CONSTRUCTION NOTES
1. ALL DIMENSIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS
PRIOR TO ORDERING ANY MATERIALS.
2. CONTRACTOR SHALL COORDINATE WITH OWNER PLACEMENT OF DUMPSTER AND LOCATION OF
STAGING AREA.
3. CONTRACTOR IS REQUIRED TO REMOVE ALL DEBRIS AND TO RESTORE ALL SITE FEATURES,
INCLUDING WALKS, DRIVES AND GRASS AREAS, DISTURBED BY THEIR WORK.
4. CONTRACTOR SHALL VERIFY NUMBER AND LOCATION OF ALL VENT STACKS, ROOF STRUCTURES, ROOF DRAINS, CONDUIT AND ANY OTHER OBJECTS OR OBSTRUCTIONS ON THE ROOF THAT WILL
AFFECT THE WORK.
5. ALL EXISTING CONCRETE WALKWAY PADS ARE TO BE REMOVED BY THE CONTRACTOR AND TO
BECOME THE PROPERTY OF THE CONTRACTOR.
6. ALL ROOF DRAINS SHALL REMAIN FULLY OPERATIONAL AT ALL TIMES DURING CONSTRUCTION.
7. DRAWINGS ARE DIAGRAMMATICAL. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, CONDITIONS AND
OBSTRUCTIONS THAT MAY AFFECT THE WORK.
8. PROVIDE NEW PREFINISHED METAL FASCIA AT PERIMETER OF ALL NEW WORK.
9. SADDLES SHALL BE PROVIDED IN VALLEYS BETWEEN ROOF DRAINS.
10. ROOF CRICKETS SHOULD BE LOCATED ON THE HIGH SIDE OF CURBS.
11. SLOPES SHOWN ARE EXISTING, CONTRACTOR TO VERIFY IN FIELD.
12. MEMBRANE SHALL BE SINGLE PLY, 60-MIL, FULLY ADHERED ROOFING MEMBRANE, COLOR BLACK.
13. ALL SYSTEM MATERIALS SHALL BE APPROVED BY THE MANUFACTURER.
14. INSTALLING CONTRACTOR SHALL BE A QA MASTER CONTRACTOR, AS CERTIFIED BY THE
MANUFACTURER FOR THEIR PROVEN EXPERIENCE AND HIGH QUALITY INSTALLATIONS.
ALL OTHER CONDITIONS OF SPECIFICATION 07 53 03 SHALL APPLY.
* = APPROXIMATE LOCATION FOR
BUILDING ACCESS LOCATIONS
DURING CONSTRUCTION
1 SALLY PORT ENTRY GATE
2 SECURITY GATE
3 HOUSING UNIT 6 - SPRUCE
4 BUILDING 300 ROOFS
2 WAYFINDING
KEYNOTE LEGEND
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 7
/25
4J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- A lg er
C F
C oo le r-
Fr ee ze r a nd R oo f R ep la ce m en t\D w gs
\R oo f R ep la ce m en ts \3
B ui ld in g\
M
-0
_A lg er
C F
Bl dg
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:4
PM
A101
300 BUILDING -
PROPOSED ROOF
PLAN
RO
OF
R
EP
LA
CE
ME
NT
S
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
1" = 10'-0"A1 PROPOSED ROOF PLAN
NORTH
O W
N
ER
R
EV
IE
W
/1
8/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
OVERLAP
6" MIN.
MULTI-PLY FULLY-ADHERED
60 MIL. REINFORCED RUPTURE
RESISTANT EPDM MEMBRANE
MULTI-PLY FULLY-ADHERED
60 MIL. REINFORCED RUPTURE
RESISTANT EPDM MEMBRANE
PRIMER / ADHESIVE
EPDM SEAM TAPE
PRIMER / ADHESIVE NOTE: SPLICE AREA MUST BE
CLEAN PRIOR TO ATTACHMENT
Center Line of Conduit
COUNTERFLASHING
FULLY-ADHERED EPDM ROOFING
SYSTEM ON PROPOSED R-35 RIGID
INSULATION ON EXISTING METAL DECK
2x6 TREATED
WOOD BLOCKING
MI
N.8"
LAP
SEALANT
EXISTING CONDUIT
EXISTING METAL ROOF DECK
EXISTING RIGID INSULATION
Center Line of Conduit
EXISTING 1-1/2"Ø UP TO 6"Ø VENT PIPE
WATER TIGHT NOSE CLAMP
FULLY-ADHERED EPDM ROOFING SYSTEM
ON EXISTING RIGID INSULATION ON
EXISTING METAL DECKING
25GA. GALVANIZED STEEL FLASHING
BY ROOFING CONTRACTOR
WATER
CUT-OFF MASTIC
4"
MI
N.
1'
- 0
EXISTING METAL ROOF DECK
EXISTING VENT PIPE
MI
N.
1'
- 4
MI
N.8"
LAP
SEALANT
Center Line of Pipe
24GA. GALVANIZED STEEL COUNTER-
FLASHING BY ROOFING CONTRACTOR
FULLY-ADHERED EPDM ROOFING SYSTEM
ON PROPOSED R-35 RIGID INSULATION ON
EXISTING METAL DECKING
GALVANIZED STEEL COUNTERFLASHING BY
ROOFING CONTRACTOR
WATER CUT-OFF MASTIC w/
WATER TIGHT NOSE CLAMP
EXISTING METAL ROOF DECK
EXISTING VENT PIPE
EXIST'G INSULATION
EXIST'G METAL DECK
EXIST'G INSULATION
EXIST'G METAL DECK
5" FLASHINGBONDING ADHESIVE
CONTINUOUS
BEAD OF LAP
SEALANT
9" FORMFLASH
CONTINUOUS BEAD OF
LAP SEALANT EPDM MEMBRANE
2" 2"
EXIST'G INSUL.
SUBSTRATE
EPDM ROOFING MEMBRANE
3" SPLICE TAPE
CONTINUOUS BEAD OF
WATERBLOCK
FIELD INSULATED
CURB
GASKETED
FASTENER
12" O.C. MAX
BONDING ADHESIVE
WOOD NAILER
PT WOOD NAILER
1 1/4" HOT DIPPED GALVANIZED
ROOF @ 12" O.C. MAX.
METAL COUNTERFLASHING
3" MIN. FACE
R.T.U.
BONDING ADHESIVE
EPDM ROOFING MEMBRANE
EX
IS
TI
NG
C
UR
B
HE
IG
HT
EXIST'G INSUL.PT WOOD NAILER
EXISTING BRICK VENEER
MI
NI
M
UM
1'
- 0
EXISTING
INSULATION
PROPOSED EPDM
ROOFING MEMBRANE
CONTINUOUS SEALANT
COUNTERFLASHING, 24 GAUGE
(MIN.) w/ APPROVED FASTENERS @
6" O.C. (MAX.)
CONTINUOUS CAULKING
EXISTING
METAL DECK
EDGE OF DEPRESSED AREA
EXISTING
ROOF DECK
EXISTING
INSUL.
PROPOSED EPDM ROOFING
MEMBRANE ON EXISTING RIGID INSUL.
PROPOSED ROOF DRAIN
w/ CAST IRON DOME CAP
EXTEND EPDM MEMBRANE BEYOND
INSIDE OF CLAMPING RING, TYP.
APPROVED SEALANT
PROVIDE NEW CLAMPING RING AT
CONNECTION TO EXISTING PIPING
VE
RI
FY
4"
A110 C1
CONTINUE PROPOSED EPDM MEMBRANE
OVER EXISTING MASONRY WALL
EXISTING OVERFLOW
SCUPPER BOX TO REMAIN
PROPOSED EPDM MEMBRANE
OVER EXISTING INSULATION
EXISTING METAL DECK
PROVIDE FLEXIBLE
MEMBRANE FLASHING
OVER EXISTING SHEET
METAL OVERFLOW BOX
PROVIDE SEALANT
AROUND EXISTING
OVERFLOW BOX
1/
2"
FIELD VERIFY
10" (+/-)
3"
PROPOSED EPDM
MEMBRANE OVER
EXISTING MASONRY WALL
SEALANT
METAL PARAPET
CAP FLASHING
TAPERED RIGID INSUL.
CARRY EPDM ROOFING
MEMBRANE OVER TOP
OF PARAPET
WOOD BLOCKING
COUNTERFLASHING
ANCHOR BAR w/ FASTENERS
DRIP EDGE
SEALANT
EXISTING BRICK VENEER
CO
NT
IN
UO
US
A
LO
NG
T
HI
S W
AL
L
1'
- 9
TO
E
XS
TI
NG
A
CC
ES
S
DO
OR
2'
- 0
EXISTING BRICK VENEER
EXISTING INSUL.
PROPOSED EPDM ROOFING MEMBRANE
REFER TO SECTION @ TERMINATION
BAR, THIS SHEET, FOR MORE INFO
EXISTING ROOF
ACCESS DOOR
EXISTING CONC. DECK
ON EXISTING STEEL
DECKING
EXISTING STEEL JOISTS
EXISTING
MASONRY WALL
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 7
/25
4J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- A lg er
C F
C oo le r-
Fr ee ze r a nd R oo f R ep la ce m en t\D w gs
\R oo f R ep la ce m en ts \3
B ui ld in g\
M
-0
_A lg er
C F
Bl dg
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:4
PM
A110
300 BUILDING -
ROOF DETAILS
RO
OF
R
EP
LA
CE
ME
NT
S
MD
OC
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
M D
O C
/ A
LG
ER
C
O R
R
EC
TI
O
N
AL
F
AC
IL
IT
Y
6" = 1'-0"D5 EPDM SEAM DETAIL
1 1/2" = 1'-0"C5 ROOF CONDUIT PENETRATION DETAIL
1 1/2" = 1'-0"B5 ROOF DETAIL @ LARGE VENT PIPE
1 1/2" = 1'-0"A5 ROOF DETAIL @ SMALL VENT PIPE
6" = 1'-0"A3 TYPICAL VENT THROUGH ROOF DEATIL
6" = 1'-0"B3 TYPICAL ROOF CURB DETAIL
3" = 1'-0"C3 SECTION @ TERMINATION BAR
3" = 1'-0"A2 SECTION @ ROOF DRAIN
1 1/2" = 1'-0"C2 WALL SECTION @ SCUPPER
3" = 1'-0"C1 TYPICAL PARAPET DETAIL
1 1/2" = 1'-0"B2 SECTION @ ROOF ACCESS
O W
N
ER
R
EV
IE
W
/1
8/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
2 12 2
3 43 43 44 3
4 3
3 3
34 2
2 2
3 4
9 9
CONCRETE PLANK DECK
(CONSTRUCTION TYPE)
STEEL DECKING
(CONSTRUCTION TYPE)
CONCRETE PLANK DECK
(CONSTRUCTION TYPE)
STEEL DECKING
(CONSTRUCTION TYPE)
DEMOLITION ROOF KEYNOTES (PVC) -
REMOVE EXISTING PVC ROOFING MEMBRANE DOWN TO INSULATION. INSPECT
INSULATION PRIOR TO INSTALLING NEW ROOF AND REPORT ANY SATURATED
INSULATION, DISCREPANCIES AND / OR CONFLICTS TO THE ARCHTECT.
2 EXISTING MECHANICAL / PLUMBING VENT TO REMAIN.
3 EXISTING ROOF DRAIN TO BE REPLACED.
4 EXISTING OVERFLOW SCUPPER TO REMAIN (APPRX. 8" WIDE x 4" TALL).
5 EXISTING ROOF ACCESS HATCH TO REMAIN.
6 EXISTING ROOF ACCESS HATCH TO REMAIN.
7 REMOVE AND DISPOSE OF EXISTING WALKWAY PADS.
8 EXISTING PARAPET MOUNTED ELECTRICAL CONDUIT (FOR FUTURE CAMERA) TO REMAIN.
9 EXISTING ROOF VENTILATOR UNIT w/ CURB TO REMAIN.
10 EXISTING HVAC SUPPORT CURBS TO REMAIN.
11 EXISTING MECHANICAL UNIT w CURB TO REMAIN.
12 EXISTING EXHAUST VENT w/ CURB TO REMAIN.
* = APPROXIMATE LOCATION FOR
BUILDING ACCESS LOCATIONS
DURING CONSTRUCTION
1 SALLY PORT ENTRY GATE
2 SECURITY GATE
3 HOUSING UNIT 6 - SPRUCE
4 BUILDING 300 ROOFS
2 WAYFINDING KEYNOTE
LEGEND
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 7
/25
4J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \R oo f R ep la ce m en ts
\S pr uc e
H ou si ng
U ni t 6 \M
-0
_A lg er C
F H sg U ni t 6
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:0
PM
A200
SPRUCE HOUSING
UNIT -
DEMOLITION
ROOF PLAN
RO
OF
R
EP
LA
CE
ME
NT
S
DO
C
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
DO
C
AL
G
ER
C O
R
RE
CT
IO
N
AL
F
AC
IL
IT
Y
NORTH
1/8" = 1'-0"A1 DEMOLITION ROOF PLAN
O W
N
ER
R
EV
IE
W
/1
8/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
7 7
111213
TA
PERED
1/8 " P
ER FT.
TA
PERED
1/8 " P
ER FT
CONCRETE PLANK ROOF DECK
CONSTRUCTION TYPE
STEEL DECKING
CONSTRUCTION TYPE
CONCRETE PLANK ROOF DECK
CONSTRUCTION TYPE
STEEL DECKING
CONSTRUCTION TYPE
16 16
~ 9" THICK
INSULATION
AT THIS POINT ~ 9" THICK
INSULATION
AT THIS POINT
1/8" : 12" TAPERED, TYPICAL
~ 3" THICK
INSULATION
AT DRAINS,
TYPICAL
~ 3" THICK
INSULATION
AT DRAINS,
TYPICAL
PROPOSED ROOF KEYNOTES (EPDM) -
1 PROPOSED MULTI-PLY FULLY-ADHERED 60 MIL. REINFORCED RUPTURE RESISTANT EPDM MEMBRANE OVER EXISTING RIGID INSULATION & EXISTING CONCRETE OR STEEL ROOF DECK (WHERE OCCURS, SEE PLAN).
2 EXISTING MECH / PLUMB VENT TO REMAIN, PROVIDE NEW BOOT, CLAMPING RING & SEALANT.
3 EXISTING ROOF DRAIN TO BE REPLACED. PROVIDE NEW ROOF DRAIN, DOME, AND CLAMPING RING, TYIPCAL.
4 EXISTING OVERFLOW SCUPPER TO REMAIN (APPROX. 8" WIDE x 4" HIGH).
5 EXISTING ROOF ACCESS LADDER TO REMAIN. PROVIDE NEW 30"x30" WALKWAY PAD AT LANDINGS.
6 EXISTING ROOF HATCH TO REMAIN.
7 PROPOSED EPDM WALKWAY PADS (30" x 30" PADS).
8 EXISTING ROOF VENTILATOR UNIT w/ 54" x 54" x 10" TALL CURB TO REMAIN.
9 EXISTING ROOF VENTILATOR UNIT w/ 36" x 24" x 6" TALL CURB TO REMAIN.
10 EXISTING ROOF VENTILATOR UNIT w/ 34" x 22" x 9" TALL CURB TO REMAIN.
11 EXISTING EXHAUST VENT w/ 40" x 28" 10" TALL CURB TO REMAIN.
12 EXISTING EXHAUST VENT w/ 31" x 31" 12" TALL CURB TO REMAIN.
13 ONE (1) EXISTING 3/4"Ø CONDUIT & ONE (1) 7/8"Ø WALL MOUNTED METAL CONDUIT TO REMAIN. EXISTING CONDUIT
SHALL REMAIN ACTIVE & UNDISTURBED DURING THE RE-ROOFING PROCESS.
14 TWO (2) EXISTING 1"Ø ELEC. CONDUIT & ONE (1) 2-1/2"Ø ELEC. CONDUIT FOR SECURITY CAMERAS TO REMAIN.
EXISTING CAMERAS SHALL REMAIN OPERATIONAL DURING THE RE-ROOFING PROCESS.
15 EXISTING EXHAUST FAN w/ 20" x 20" x 19" TALL CURB TO REMAIN.
16 EXISTING EXHAUST FAN w/ 19" x 19" x 24" TALL CURB TO REMAIN.
* = APPROXIMATE LOCATION FOR
BUILDING ACCESS LOCATIONS
DURING CONSTRUCTION
1 SALLY PORT ENTRY GATE
2 SECURITY GATE
3 HOUSING UNIT 6 - SPRUCE
4 BUILDING 300 ROOFS
2 WAYFINDING KEYNOTE
LEGEND
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 7
/25
4J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \R oo f R ep la ce m en ts
\S pr uc e
H ou si ng
U ni t 6 \M
-0
_A lg er C
F H sg U ni t 6
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:0
PM
A201
SPRUCE HOUSING
UNIT - PROPOSED
ROOF PLAN
RO
OF
R
EP
LA
CE
ME
NT
S
DO
C
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
DO
C
AL
G
ER
C O
R
RE
CT
IO
N
AL
F
AC
IL
IT
Y
NORTH
1/8" = 1'-0"A1 PROPOSED ROOF PLAN
O W
N
ER
R
EV
IE
W
/1
8/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
OVERLAP
6" MIN.
MULTI-PLY FULLY-ADHERED
60 MIL. REINFORCED RUPTURE
RESISTANT EPDM MEMBRANE
MULTI-PLY FULLY-ADHERED
60 MIL. REINFORCED RUPTURE
RESISTANT EPDM MEMBRANE
PRIMER / ADHESIVE
EPDM SEAM TAPE
PRIMER / ADHESIVE NOTE: SPLICE AREA SHALL BE
CLEAN PRIOR TO ATTACHMENT
CENTER LINE
OF CONDUIT
COUNTERFLASHING
FULLY-ADHERED EPDM ROOFING
SYSTEM ON EXISTING TAPERED
RIGID INSULATION
MI
N.8"
LAP
SEALANT
2x6 TREATED
WOOD BLOCKING
EXISTING CONDUIT
EXISTING CONCRETE DECK OR
STEEL ROOF DECK (WHERE
OCCURS), SEE PROPOSED PLAN
Center Line of Conduit
EXISTING 1-1/2"Ø UP TO 6"Ø VENT PIPE
WATER TIGHT NOSE CLAMP
FULLY-ADHERED EPDM ROOFING SYSTEM
ON EXISTING TAPERED RIGID INSULATION
25GA. GALVANIZED STEEL FLASHING
BY ROOFING CONTRACTOR
WATER
CUT-OFF MASTIC
8"
MI
N.
1'
- 4
EXISTING CONCRETE DECK OR STEEL ROOF
DECK (WHERE OCCURS), SEE PROPOSED PLAN
EXISTING VENT PIPE
MI
N.
1'
- 4
MI
N.8"
LAP
SEALANT
CENTER LINE OF PIPE
EXISTING CONCRETE DECK OR
STEEL ROOF DECK (WHERE
OCCURS), SEE PROPOSED PLAN
EXISTING VENT PIPE
24GA. GALVANIZED STEEL COUNTER-
FLASHING BY ROOFING CONTRACTOR
FULLY-ADHERED EPDM ROOFING SYSTEM
ON EXISTING TAPERED RIGID INSULATION
GALVANIZED STEEL COUNTERFLASHING BY ROOFING CONTRACTOR
WATER CUT-OFF MASTIC w/ WATER TIGHT NOSE CLAMP
EPDM ROOFING MEMBRANE
3" SPLICE TAPE
CONTINUOUS BEAD OF
WATERBLOCK
FIELD INSULATED
CURB
GASKETED
FASTENER
12" O.C. MAX
BONDING ADHESIVE
WOOD NAILER
1 1/4" HOT DIPPED GALVANIZED
ROOF @ 12" O.C. MAX.
METAL COUNTERFLASHING
3" MIN. FACE
R.T.U.
BONDING ADHESIVE
EPDM ROOFING MEMBRANE
EX
IS
TI
NG
C
UR
B
HE
IG
HT
EXIST'G INSUL.PT WOOD NAILER
EXIST'G INSUL.PT WOOD NAILER
EXIST'G CONC.
OR METAL DECK
EXISTING BRICK VENEER
EX
IS
TI
NG
6"
EXISTING RIGID
INSUL. TO REMAIN
PROPOSED EPDM
ROOFING MEMBRANE
CONTINUOUS SEALANT
COUNTERFLASHING, 24 GAUGE
(MIN.) w/ APPROVED FASTENERS @
6" O.C. (MAX.)
CONTINUOUS CAULKING
EXISTING CONC. OR
METAL DECKING
EXISTING CONC.
OR METAL DECK
EXIST'G INSUL.
5" FLASHINGBONDING ADHESIVE
CONTINUOUS
BEAD OF LAP
SEALANT
9" FORMFLASH
CONTINUOUS BEAD OF
LAP SEALANT EPDM MEMBRANE
2" 2"
EXIST'G INSUL.
EXIST'G INSUL.EXIST'G INSUL.
EXIST'G INSUL.EXIST'G INSUL.
EXISTING CONC.
OR METAL DECK
EDGE OF DEPRESSED AREA
EXISTING CONCRETE DECK OR STEEL ROOF DECK
(WHERE OCCURS), SEE PROPOSED PLAN
EXISTING INSUL.
PROPOSED EPDM ROOFING
MEMBRANE ON EXISTING RIGID
INSUL.
PROPOSED ROOF DRAIN w/
CAST IRON DOME CAP
EXTEND EPDM MEMBRANE BEYOND
INSIDE OF CLAMPING RING, TYP.
APPROVED SEALANT
PROVIDE NEW CLAMPING RING AT
CONNECTION TO EXISTING PIPING
4"
EXISTING TAPERED
RIGID INSULATION
TO REMAIN
EXISTING CONCRETE DECK OR
STEEL DECKING (WHERE OCCURS),
SEE PROPOSED PLAN
PROPOSED EPDM
ROOFING MEMBRANE
EXISTING WOOD NAILER /
BLOCKING TO REMAIN
CARRY EPDM ROOFING
MEMBRANE OVER TOP OF WALL
SEALANT
PROPOSED METAL 2-PIECE
COUNTERFLASHING
1 2 3 4 5
D
C
B
A
D
C
B
A
© U.P. Engineers & Architects, Inc.
PR
OJ
EC
T
NO
DR
AW
N
BY
CH
EC
KE
D:
AP
PR
OV
ED
DE
SI
GN
ED
B Y:
w w w .u pe a.
co m
IS
SU
ED
F
O R
D
AT
E:
1 2 3 4 5
FI
LE
N O.
: 7
/25
4J
BB
FI
LE
N O.
: 4
/25
6.J
BB
P:
\M
-0
D
TM
B- Al ge r C
F C oo le r- Fr ee ze r a nd
R oo f R ep la ce m en t\D w gs \R oo f R ep la ce m en ts
\S pr uc e
H ou si ng
U ni t 6 \M
-0
_A lg er C
F H sg U ni t 6
R oo f R ep la ce m en t_ R
.rv t
3/
/2
2:
:0
PM
A210
SPRUCE HOUSING
UNIT - ROOF
DETAILS
RO
OF
R
EP
LA
CE
ME
NT
S
DO
C
/ A
LG
ER
C
OR
RE
CT
IO
NA
L
FA
CI
LI
TY
IN
DU
ST
RI
AL
P
AR
K
DR
IV
E, W
ET
MO
RE
, M
I 4
M
-0
R M
A
JH
R R
M A
R M
A
RO
O
F R
EP
LA
C
EM
EN
TS
DO
C
AL
G
ER
C O
R
RE
CT
IO
N
AL
F
AC
IL
IT
Y
6" = 1'-0"D5 EPDM SEAM DETAIL
1 1/2" = 1'-0"C5 ROOF CONDUIT PENETRATION DETAIL
1 1/2" = 1'-0"B5 ROOF DETAIL @ LARGE VENT PIPE
1 1/2" = 1'-0"A5 ROOF DETAIL @ SMALL VENT PIPE
6" = 1'-0"B3 TYPICAL ROOF CURB DETAIL
3" = 1'-0"C3 SECTION @ REGLET
6" = 1'-0"A3 TYPICAL VENT THROUGH ROOF DETAIL
3" = 1'-0"A2 SECTION @ ROOF DRAIN
3" = 1'-0"B2 TYPICAL PARAPET DETAIL
O W
N
ER
R
EV
IE
W
/1
8/
O
W N
ER
R
EV
IE
W
/0 6/
0%
O W
N
ER
R
EV
IE
W
/2
7/
LA
R A
R
EV
IE
W
/2
7/
BI
D D
IN
G
/2
0/
File details come from the government source that posted it. Updated .