This performance work statement outlines requirements for intrusion detection system statewide monitoring services. The Maryland Army National Guard requires 24/7 monitoring of 32 alarm panels across 25 facilities, including one sensitive compartmented information facility. The contractor must provide both cellular and landline monitoring, comply with UL 827 and 2050 standards, and respond to alarms within two minutes. The contractor will also submit monthly reports and cell phone test results. The period of performance is one base year plus four option years. The contractor must transition services smoothly and have UL certification, background checks on personnel, and meet security requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Intrusion Detection System (IDS)

Statewide Monitoring Services

W912K6-23-Q-0047

Vision Statement

1 Introduction

1.1 Mission

1.2 Background

1.3 Scope

2 General Requirements

2.1 Non-Personal Services

2.2 Business Relations

2.3 Contract Administration and Management

2.3.1 Contract Management

2.3.2 Contract Administration

2.3.3 Personnel Administration

2.4 Subcontract Management

2.5 Contractor Personnel, Disciplines, and Specialties

2.6 Location and Hours of Work

2.7 Travel / Temporary Duty (TDY)

3 Performance Requirements

3.1 Monitoring will consist of both cellular and land lines. 24-hour continuous monitoring coverage for all 32 panels at 25 sites

4 Special Requirements

4.1 Security and Safety

4.1.1 Security

4.1.2 Safety

4.2 Transition

4.3 Government Furnished Materials

4.4 Environmental Requirements

4.5 Applicable Directives

4.6 Quality

4.6.1 Quality Control

4.6.2 Quality Assurance Surveillance Plan (QASP)

5 Deliverables

Performance Work Statement (PWS) Intrusion Detection System (IDS) Statewide Monitoring Services Statewide Vault Monitoring

Vision Statement

To provide daily UL Certified Monitoring Service for selected arms and supply rooms of the Maryland Army National Guard, and 1 existing Sensitive Compartmented Information Facility (SCIF) covering a year period (12 months, 1 base year and 4 option years).

1 Introduction The Maryland Army National Guard has a requirement to provide 24/7 monitoring services to limited access rooms that include the arms and ammunition rooms of select facilities, and 1 existing SCIF.

1.1 Mission

The Maryland Army National Guard serves both a State and Federal Mission to provide community support when called upon by its citizens as well as training readiness in defense of the Nation.

1.2 Background

The current monitoring contract is in place. The successful contractor will be required to transition to full monitoring compliance. Current Vendor cannot lock out equipment from loss of contract as the equipment is owned by the MDARNG.

1.3 Scope

The project is to include, but not limited to twenty-five (25) different locations and thirty-two (32) systems plus the SCIF system, with option of adding future sites/systems or moving accounts to different sites at the same per system price (details on the quantity of thirty-two (32) is listed on – “5 Deliverable” – Quantity). Monitoring would be for the intrusion detection system (IDS) which consist of multi-zone, multi-area configuration. Per federal regulation Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities Version 1.5.1 dated July 21, 2021 (ICD 705), doors and interior areas of a SCIF through which reasonable access could be gained, including walls common to areas not protected at the SCI level, shall be protected by an IDS when not occupied. All installed components for the SCIF will comply with Underwriters Laboratories (UL) Standard for National Industrial Security Systems for the Protection of Classified Material, UL 2050. Installation shall comply with an Extent 3 installation as referenced in UL 2050. IDS monitoring company for the SCI facility must be UL2050 certified. Areas of a SCIF through which reasonable access could be gained, including walls common to areas not protected at the SCI level, shall be protected by IDS consisting of UL 639 listed motion sensors and UL 634 listed High Security Switches (HSS) that meet UL Level II requirements and/or other AO-approved equivalent sensors. All new SCIF accreditations shall use UL Level II HSS. Existing UL Level I HSS are authorized until major IDS modifications/upgrades are made. Notification of the proper authorities and providing system information on a schedule or on demand basis to authorized personnel.

Contractor shall meet requirements listed in this document. Contract will be for one year with four option years. Bid should be on a per month, per panel or mission essential vulnerable area location, with the basis for complete service as listed in the requirements of this document.

2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.

2.1 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

2.2 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

2.3.1 Contract Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at each of the facilities listed below and the contractor's corporate offices.

2.3.2 Contract Administration

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.3.3 Personnel Administration

The contractor shall provide the following management and support as required. The contractor shall provide for employees during designated Government non-workdays or other periods where Government offices are closed due to weather or security conditions. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks. The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs). Proposal costs will be all inclusive.

2.4 Subcontract Management

The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Procuring Contracting Officer (PCO) or Contracting Officer Representative (COR). Cross teaming may or may not be permitted.

2.5 Contractor Personnel, Disciplines, and Specialties

The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor categories as defined in the Labor Categories document (see attachment), labor rates, and man-hours utilized in the performance of each requirement issued hereunder will be the minimum necessary to accomplish the task; see sections 3 and 4.5 below for addition information.

The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

2.6 Location and Hours of Work

Accomplishment of the results contained in this PWS requires work at each of the listed facilities below and at contractor’s facilities. Normal workdays are Tuesday through Friday except US Federal Holidays. Workers typically work ten (10) hours per day, 40 hours per week. Flextime workers start not earlier than 0600 and not later than 0900. Core hours of work are from 0800 to 1500 daily. All employees are expected to be available during core hours. The contractor will provide full time monitoring services 24 hours a day, seven days a week.

2.7 Travel / Temporary Duty (TDY)

Contractor’s price will include total costs for performance of the requirements.

3 Performance Requirements The following section specifies the Performance Objectives and Performance Elements for the contract.

3.1 Monitoring will consist of both registered cellular service and land lines. Panels will be monitored 24 hours per day, 7 days per week. The full numbers of panels which require monitoring are 32 for arms and supply rooms, and 1 existing SCIF. The total numbers of facility locations are 25 sites. Some site locations have more than one (1) panel to monitor.

Performance Standards

a) Standard (STD): Contractor must provide coverage to all sites continuously for a full year.

Acceptable Quality Limit (AQL): 100% of the time

3.2 The contractor shall comply with Underwriters Laboratories (UL) 827 & (UL) 2050 Standard for Safety Central Station Alarm Services.

a) STD: Contractor must maintain compliance with UL standard.

AQL: 100% of the time

3.3 Contractor shall provide for Test Timers on a daily, weekly, or monthly schedule as required.

a) STD: Contractor must comply within industry standard.

Contractor shall provide immediate notification of troubled conditions to the site POC(s) recorded at the time of programming not less than 2 minutes from incident for all IDS panels……For the SCIF the monitoring station or PCU shall identify and display activated sensors, with immediate and continuous alarm annunciations for the following conditions: Intrusion Detection, Failed Sensor, Tamper Detection, Maintenance Mode (a maintenance message displayed in place of an alarm) IDE Sensor Points shunted or masked during maintenance mode. The monitoring station must have the ability to see a change in power status (AC or backup).

a) STD: Contractor shall comply with notification requirements. Contract POC’s will be issued at time of award.

AQL: 100% of the time

3.4 Contractor shall have redundant communication and power systems to assure receipt of alarm signals.

a) STD: Contractor must be equipped to perform in compliance with this requirement.

3.5 In the event of an alarm, contractor shall first attempt to notify location specific POC(s), if unable to locate specific POC(s), contractor will then notify proper authorities, followed by the MDARNG ESS Supervisor.

a) STD: Contractor compliance with this requirement impacts adequacy of response.

3.6 Contractor shall perform cell phone tests.

a) STD: Contractor compliance with this requirement impacts adequacy of response. Test results will be sent to the MDARNG ESS Staff via online secure file sharing site.

AQL: 100% of the time

3.7 Contractor shall provide monthly activity reports for each IDS system via email, fax, or regular mail to the appropriate agency personnel, (COR, MDARNG ESS Staff) no later than 24 hours from the date of the request for said information. For the SCIF, the contractor will provide an in-person inspection at least once a quarter. Per Intelligence Community Directive 705 and UL2050 installation and testing of the IDS shall be performed by U.S companies using U.S citizens. All IDS equipment will be tested per ICD 705 requirements to include full testing of all sensors, monitors, and door switches.

The test will provide written confirmation that the monitoring company has real time visibility of all zones and equipment, as well as proper notification procedures to the SCI indoctrinated personnel annotated. A tamper test will also be performed on all applicable equipment. A record of the test and any deficiencies will be provided to the Maryland Army National Guard G2 within 24 hours if deficiencies exist and 72 hour is no deficiencies are noted.

a) STD: Contractor compliance with these requirements provide MDARNG oversight of contractor performance and internal controls of respective facility asset.

AQL: 100% of the time

3.8 Contractor shall be required to put system “on test” at any time for a specific time, when notified by an authorized person.

Performance Standards

a) STD: Contractor compliance with this requirement provides MDARNG internal controls of respective facility asset.

AQL: 100% of the time

3.9 Contractor shall provide two toll free numbers for reporting. Central station shall have multiple redundancies for phone communication, fiber backed up by traditional copper wire.

Performance Standards

a) STD: Contractor compliance with this requirement provides assurance of adequate monitoring from system failures.

AQL: 100% of the time

3.10 Contractor shall provide an individual 800 number for our accounts (our own 800 number).

Performance Standards

a) STD: Contractor compliance with this requirement provides assurance of adequate monitoring of MDARNG systems.

AQL: 100% of the time

3.11 Contractor shall have personnel on duty to answer calls 24 hours a day. For the SCIF, repairs shall be initiated by a service technician within 4 hours of the receipt of a trouble signal or a request for service. If the Contractor repairs or replaces equipment, the repair fees will be paid for with a Government Purchase Card (GPC), not to exceed $2500.

Performance Standards

a) STD: Contractor compliance with this requirement provides assurance of adequate monitoring of MDARNG systems.

3.12 Contractor shall have an opening and closing report available for no additional fee upon request.

a) STD: Contractor compliance with this requirement.

3.13 On order, contractor shall provide the MDARNG the ability to add and remove sites when needed.

Performance Standards

a) STD: Contractor compliance with this requirement provides MDARNG the ability to brings additional sites online and take other sites off-line.

AQL: 100% of the time

4 Special Requirements See section 4.5 below.

4.1 Security and Safety

This section describes the security and safety for this effort. The following sub-sections provide details of various considerations on this effort.

4.1.1 Security (statement 4.1.1 is currently not included)

DD Forms 254: Overarching security requirements and Contractor access to classified information shall be as specified in the basic DD Form 254, which will be further identified in the DD Form 254 for each TO, as required. All contractor personnel with access to unclassified information systems, including e-mail, shall have at a minimum a favorable National Agency Check (NAC).

Visitor Group Security Agreement. The contractor shall sign a Contractor Visitor Group Security Agreement to protect classified information involved in performance under this contract or Task Order. The Agreement will outline responsibilities in the following areas: Contractor security supervision; Standard Practice Procedures; access, accountability, storage, and transmission of classified material; marking requirements; security education; personnel security clearances;

reports; security checks; security guidance; emergency protection; protection of government resources; DD Forms 254; periodic security reviews; and other responsibilities, as required.

Antiterrorism Level 1 Training: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:

http://jko.jten.mil. Contractors must enroll in the Non-CAC portal.

Access and general protection policy and procedures: Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For contractors that do not require a CAC but require access to a DoD facility or installation: Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/ AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.

iWATCH Army Training: The contractor and all associated subcontractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 20 calendar days of contract award and within 10 calendar days of new employees commencing performance, with the results reported to the COR NLT 25 calendar days after contract award.

OPSEC Training: Per AR 530-1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 20 calendar days of their reporting for duty and annually thereafter. Contractor/Non-CAC OPSEC training can be found at https://securityawareness.usalearning.gov/opsec/index.htm.

4.1.2 Safety

Contractor Compliance: The contractor and its subcontractors shall comply with Public Law 91- 596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E). These requirements shall be incorporated into the contractors’ safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation shall participate in the local VPP. Information on the VPP is available at http://www.osha.gov/dcsp/vpp/index.html.

Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government personnel and to cooperate in any resulting safety investigation. The contractor shall notify (via telephone) the cognizant contracting officer, the contracting officer’s representative, and/or other applicable members within four (4) hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety https://securityawareness.usalearning.gov/opsec/index.htm http://www.osha.gov/dcsp/vpp/index.html office. Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant contracting officer, the contracting officer’s representative, and/or the cognizant program manager, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.

4.2 Transition

The contractor shall prepare a transition plan, as part of this proposal which results in 100% compliant monitoring of the 25 sites and 35 panels listed. Contractor will keep the Government fully informed of status throughout the transition period. Throughout the phase-in/phase-out periods, it is essential that attention be given to minimize interruptions or delays to work in progress that would impact the mission. The contractor must plan for the transfer of work control, delineating the method for processing and assigning tasks during the phase-in/phase-out periods.

4.3 Government Furnished Materials

The Government will make available the following materials, office space, communications capability and information on the dates specified, for use by the contractor in the performance of this contract.

1. Existing VISTA 128BP & 128BPT Panel(s) with TG7 (Cellular) at the 25 locations

2. Existing SCIF system consist of Bosch 9512G Panel.

3. All Facilities identified below as inclusive of this contract.

4. Future upgrades to existing and new installs will consist of Bosch 9512G Panel(s) with TG7 (Cellular) cell back up.

4.4 Environmental Requirements

The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non-mandatory is the contractors' option.

Mandatory compliance = (NA)

Non-Mandatory document= (NA)

4.5 Applicable Directives

The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non-mandatory is the contractors' option.

Mandatory compliance (As Follows)

1) Contractor shall provide documentation of UL certification.

2) Contractor shall have background checks conducted on all personnel handling the monitoring service.

3) Contractor shall provide authorized person access to account information over a secure network.

4) Contractor shall demonstrate ability to handle high security installations such as vaults.

5) Contractor shall be a current Department of Defense monitoring station.

6) Contractor shall be able to receive a module of Contact ID Codes designed specifically for these installations

7) Contractor shall provide one permanent free account for testing and shop use.

8) Contract shall provide registered cellular service.

9) Contractor shall be able to receive signal from a back-up cellular service

10) Contractor shall allow tours of the facility at any time

11) If the contactor also provides answering services, this service shall be provided separately from monitoring services in a different location. This location shall be either in a different room in the facility or a different building.

12) Personnel shall not be providing answering services while monitoring alarms

13) For SCIF IDS monitoring

A. Contractor shall provide a monitoring station that is government-managed or one of the following in accordance with UL 2050:

a) AO-operated monitoring station.

b) Government contractor monitoring station (formerly called a proprietary central station).

c) National industrial monitoring station.

d) Cleared commercial central station (see NISPOM, Chap. 5).

B. Monitoring station employees shall be eligible to hold a U.S. SECRET clearance.

C. Monitoring station operators shall be trained in system theory and operation to effectively interpret system incidents and take appropriate response action.

D. Records shall be maintained shall be maintained in accordance with Chapter 12 section L.

E. Repairs shall be initiated by a service technician within 4 hours of the receipt of a trouble signal or a request for service.

Non-Mandatory document = NA

4.6 Quality

This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.

4.6.1 Quality Control

The Contractor shall develop a Delivery Order Quality Control Program (QCP) and maintain an effective QCP to ensure services are performed in accordance with the Indefinite Delivery/Indefinite Quantity (IDIQ) contract and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is how they assure themselves that their work complies with the requirement of the contract.

The finalized QCP will be accepted by the Government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."

4.6.2 Quality Assurance Surveillance Plan (QASP)

The Government shall monitor the Contractors performance under this Delivery Order in accordance with the Governments QASP.

5 Deliverables The contractor shall provide deliverables as specified below:

Number Name Frequency Quantity

A01 Locations Daily 32 panels

Provide 827 via land line and cellular service for all locations except A27, Laurel Armory, Odell Road, Laurel, MD 20708 (SCIF). A27 will receive monitoring in accordance with UL 2050 extent 3 standards and ICD 705 standards. The alternate line for location A27 WILL NOT be cellular or Radio Frequency based.

Provide daily, 24-hour, intrusion detection system (IDS) panel monitoring both via land line and cellular service (except location A27).

Monitoring service should consist of multi-zone, multi-area configuration, notification to the proper authorities, and provides system specific information on a schedule or on demand basis to authorized personnel.

Sites will be monitored as a single location, panels are individual alarms systems (panels) at each location.

A02 Adelphi Armory, Powder Mill Road, Adelphi, MD 20783 Daily 2 *Provide daily, 24-hour, intrusion detection system (IDS) panel monitoring both via land line and cellular service for one panel at this site. Monitoring service should consist of multi-zone, multi-area configuration, notification to the proper authorities, and provides system specific information on a schedule or on demand basis to authorized personnel. (Same description on following locations)

A03 Annapolis Armory, Willow Street, Annapolis, MD 21401 Daily 1

*Provide daily, 24-hour, intrusion detection system (IDS) panel monitoring both via land line and cellular service for one panel at this site. Monitoring service should consist of multi-zone, multi-area configuration, notification to the proper authorities, and provides system specific information on a schedule or on demand basis to authorized personnel.

A04 Cade Armory, Winchester Street, Baltimore, MD 21216 Daily 1

A05 Camp Fretterd Amory, Rue St Lo Drive, Reisterstown, MD Daily 1 21136

*Provide daily, 24-hour, intrusion detection system (IDS) panel monitoring both via land line and cellular service for one panel at this site. Monitoring service should consist of multi-zone, multi-area configuration, notification to the proper

A06 Camp Fretterd DOIM, Hanover Pike, Reisterstown, MD 21136

Daily 1 should consist of multi-zone, multi-area configuration, notification to the proper

A07 MG Linda L. Singh Readiness Center, Sykesville Road, Sykesville, MD 21784

A08 Cheltenham Armory, Surratts Road, Cheltenham, MD Daily 1 20623

A09 Dundalk Armory, Northpoint Boulevard, Dundalk, MD 21222 Daily 2

A10 Easton Armory, Ocean Gateway, Easton, MD 21601 Daily 1

A11 Aberdeen Proving Ground, Nike Road, Aberdeen, MD 21010 Daily 1 authorities, and provides system specific information on a schedule or on demand basis to authorized personnel.

A12 PAX River, Pine Hill Road, PAX River, MD Daily 2 20653

A13 Fifth Regiment Armory, 29th Division Street, Baltimore, Daily 1

MD 21201

A14 Frederick Armory, Old National Pike, Frederick, MD 21701 Daily 1 should consist of multi-zone, multi-area configuration, notification to the proper

A15 Glen Burnie Armory, Dorsey Road, Glen Burnie, MD Daily 1 21061

A16 Blum Military Reservation, Notchcliff Road, Glen Arm, MD 21057

Daily 2 should consist of multi-zone, multi-area configuration, notification to the proper

A17 Hagerstown Armory, Roxbury Road, Hagerstown, MD Daily 1 21740

A18 Havre de Grace Military Reservation, Old Bay Lane, Havre Daily 3 de Grace, MD 21078 should consist of multi-zone, multi-area configuration, notification to the proper

A19 La Plata Armory, Rose Hill Road, La Plata, MD 20646 Daily 1

A20 Laurel Armory, Odell Road, Laurel, MD 20708 Daily 1 should consist of multi-zone, multi-area configuration, notification to the proper

A21 Olney Readiness Center, Riggs Rd, Gaithersburg, MD Daily 1 20882

A22 Parkville Armory, Putty Hill Avenue, Parkville, MD 21236 Daily 1 should consist of multi-zone, multi-area configuration, notification to the proper

A23 Ruhl Armory, York Road, Towson, MD 21204 Daily 1

A24 Salisbury Armory, Ocean Gateway, Salisbury, MD 21801 Daily 1

A25 Westminster Armory, Hahn Road, Westminster, MD 21157 should consist of multi-zone, multi-area configuration, notification to the proper

A26 White Oak Armory, Cherry Hill Road, Silver Spring, MD 20904

Daily 2 should consist of multi-zone, multi-area configuration, notification to the proper

A27 Laurel Armory, Odell Road, Laurel, MD 20708 (SCIF) Daily 1

*Provide daily, 24-hour, intrusion detection system (IDS) panel monitoring for one panel at this site (SCIF). No cellular transmission is authorized for this location. Monitoring service should consist of multi-zone, multi-area configuration, notification to the proper authorities, and provides system specific information on a schedule or on demand basis to authorized personnel. All certification and monitoring will comply with UL2050 certification and ICD 705.01 physical and technical security standards.

END

Vision Statement
1 Introduction
1.1 Mission
1.2 Background
1.3 Scope
2 General Requirements
2.1 Non-Personal Services
2.2 Business Relations
2.3 Contract Administration and Management
2.3.1 Contract Management
2.3.2 Contract Administration
2.3.3 Personnel Administration
2.4 Subcontract Management
2.5 Contractor Personnel, Disciplines, and Specialties
2.6 Location and Hours of Work
2.7 Travel / Temporary Duty (TDY)
3 Performance Requirements
4 Special Requirements
4.1 Security and Safety
4.1.2 Safety
4.2 Transition
4.3 Government Furnished Materials
4.4 Environmental Requirements
4.5 Applicable Directives
Mandatory compliance (As Follows)
4.6 Quality
4.6.1 Quality Control
4.6.2 Quality Assurance Surveillance Plan (QASP)
5 Deliverables
END