The document is a presentation by the Greater Orlando Aviation Authority (GOAA) for an Industry Day regarding the Consolidated Rental Car (ConRAC) Facilities and Access Improvements Program at Orlando International Airport (MCO). The presentation outlines plans for a comprehensive $2 billion program to develop a new consolidated rental car facility, including ready/return spaces, customer service areas, quick turnaround areas, and associated access roadway improvements. The project timeline indicates procurement will start in Q4 2024/Q1 2025, with design beginning in Q4 2025, construction starting in 2026-2027, and substantial completion targeted for 2030-2031, with the ConRAC expected to open in 2031.
The program aims to address current operational inefficiencies by creating a centralized facility for ten rental car brands currently spread across multiple terminal locations. The proposed site is near Terminal C and will include a 6-level facility with approximately 5,500 ready/return spaces totaling around 2 million square feet, plus additional levels for public or employee parking. The facility is designed to accommodate projected passenger growth, with facility requirements based on scenarios ranging from 50 million to 110 million annual passengers. The procurement will utilize a design-build or progressive design-build method, with qualifications-based selection and a potential price component. Funding and delivery will be managed through staggered procurements for Program Management and Oversight (PMO) and Design/Build services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Consolidated Rental Car (ConRAC) Facilities and Access Improvements
Industry Day October 4, 2024, 2:30‐3:30 p.m.
Where (in‐person location): HILTON Orlando, 6001 Destination Parkway, Orlando, FL 32819
Virtual (TEAMS Meeting): Access information through OpenGov, https://procurement.opengov.com/portal/goaa
Agenda
ConRAC Facilities and Access Improvements – Industry Day 2
1. Meeting Purpose
2. Introduction of Participants
3. Background
4. Program History, Description, and Objectives
5. Existing Conditions and Constraints
6. Current and Future Needs
7. Preferred ConRAC Site
8. Program Overview and Scope
9. Delivery Methods
10. Timeline
11. Budget
12. Questions and Open Discussion
Meeting Purpose
ConRAC Facilities and Access Improvements – Industry Day 3
• The Greater Orlando Aviation Authority is holding this Industry Day to provide information regarding an upcoming airport facilities and ground transportation program for MCO that will soon be advertised (as two separate solicitations) for the following:
Program Management and Oversight (PMO) Services
Design/Build Services
• Interested parties are invited to attend this non‐mandatory meeting, in person or virtually, to learn more about the program.
Introduction of Participants
ConRAC Facilities and Access Improvements – Industry Day 4
• Greater Orlando Aviation Authority – Owner
• Kevin Thibault – Chief Executive Officer
• Yovannie Rodriguez – Executive Vice President, Chief Administrative Officer
• Anthony Davit – Executive Vice President, Chief Operating Officer
• Bradley Friel – Senior Vice President, Multimodal Planning and Environmental
• Max Marble – Senior Vice President, Capital Programs
• Scott Shedek – Vice President, Construction
• Robert Furr – Vice President, Engineering and Architecture
• Torie Brooks – Assistant Vice President, Construction
• Elecia Mitchell – Project Coordinator/Recording Secretary
Background – Evidence of Need
Recent Trends in Passenger Activity Growth:
FY22: 48.6 Million Annual Passengers (42.5% year‐over‐year growth)
FY23: 56.0 Million Annual Passengers (15.1% year‐over‐year growth) Rolling 12‐months as of July 2024: 58.7 Million Annual Passengers
(6.6% year‐over‐year growth)
Existing Rental Car Facilities have capacity shortfalls in the following areas:
Rental Car Return spaces, Quick Turnaround Area (QTA), and Vehicle Storage
Existing Rental Car Facilities also have operational efficiencies characterized by the following:
Distance to on‐airport and off‐airport heavy maintenance facilities
Distance to off‐airport storage for fleet inventory control
Shuttle distance between Terminals A and B
ConRAC Facilities and Access Improvements – Industry Day 5
MCO is the largest rental car market in the world, with most of the major car rental companies located on‐airport, without the need for a shuttle bus to pick up a rental car.
The on‐airport rental car companies are located in:
• Terminal A, Level 1
• Terminal B, Level 1
• Terminal C, Level 4
MCO Today:
ConRAC Facilities and Access Improvements – Industry Day 6
Background
• Reduced traffic congestion on terminal area roads and curbs
• Opportunity to repurpose existing rental car areas within the existing terminal garages for public parking
• Reduced customer confusion and improved wayfinding
• More efficient rental car operations, for customers and the rental car companies
Benefits of a Consolidated Rental Car Facility (ConRAC) for MCO include:
Existing Rental Car Facilities and Proposed Program Ricondo & Associates
ConRAC Facilities and Access Improvements – Industry Day 7
ConRAC Facilities and Access Improvements – Industry Day 8
Program History
FALL 2023: Site Selection Study was initiated, including projected 20‐year rental car facility requirements.
WINTER 2024: Program Criteria Manual (PCM) will be finalized containing the 20‐year rental requirements, preferred site, and an illustrative ConRAC facilities concept.
PCM Contents include, among other reference information, the following:
• Project Background
• Forecasts
• Facility Requirements
• Site Identification and Evaluation (including Roadway Analysis)
• Refinement of Preferred Site and Preliminary Concept
Program Description
Consolidated Rental Car Facilities (ConRAC) Program:
Legend: Represents components of the ConRAC Program anticipated to be part of the design/build procurement
Represents components of the ConRAC Program may be part of other separate procurements
Terminal Link System
Ready/Return Spaces
Customer Service Area
Quick Turnaround Areas (QTA) and Associated Support
Rental Car Storage Areas
Outbound Roadway and ConRAC Access Improvements
Terminal Link System Improvements
Terminals A/B Circulation and Wayfinding Improvements
ConRAC Facilities and Access Improvements – Industry Day
ConRAC Program Objectives
ConRAC Facilities and Access Improvements – Industry Day 10
Improve the Passenger / Rental Car Customer Experience –an enhanced customer experience with an easy‐to‐use single consolidated location for vehicle rental and return.
Reduce Traffic Congestion – lower daily rental car shuttle bus trips on Jeff Fuqua Boulevard reducing congestion on the terminal area roadways.
Improve Operational Efficiencies – reduce rental car company operating costs while also accommodating full brand family operations and projected future growth within the same secure area.
Provide additional Capacity for Rental Car Operations while Allowing for Existing Terminal Garage and Space Repurposing for Other Needed Uses – explore repurposing or redevelopment of existing rental car facilities for other uses such as public parking and other ground transportation functions once the ConRAC opens.
Protect for Future Expansion – preserve expansion capabilities for serving 20‐year and 30‐year demand growth.
ConRAC Facilities and Access Improvements – Industry Day 11
Existing Conditions and Constraints
• Combination of on‐ and off‐airport storage sites available
• Currently enough remote storage to meet rental car needs (except during extraordinary events)
• Located in various areas and distances from the Terminals
AirportSixt Rent A CarHertz Corp.Avis Budget
Group Enterprise MobilityLOCATION
‐‐‐4.76.6Terminal AA ‐‐1.61.62.1Terminal BB ‐0.020.100.1Terminal CC 2416.112.723.9Wetherbee1 ‐‐‐‐18.5EHI Hangar Blvd2 ‐‐‐17.32.1ABG Hangar Blvd3 ‐10.8‐‐Sixt Bear Rd4 ‐‐12.6‐‐Hertz Butler Nat'l Dr5 7.7‐‐‐‐Hangar Blvd6 5.8‐‐‐‐near Silver Hangar7 35.9‐‐‐‐Heintzelman Blvd8 18.6‐‐‐‐Canal Lot9 2‐‐‐‐Cargo Rd10 7‐‐‐‐South Park Place11 6.3‐‐‐‐West Park Place Lot D12 21‐‐‐‐West Park Place Gold Lot13
106.314.8234.736.351.2Total (acres)
Current and Future Needs
• Four rental car companies (ten brands) operate out of on‐Airport facilities leased from the Aviation Authority.
• Alamo, National, Enterprise, Hertz, Dollar, Thrifty, Avis, Budget, Payless, and SIXT operate ready/return, customer service area, and vehicle service facilities at Terminals A, B, and C (SIXT has service facilities at Terminals A and B only).
ConRAC Facilities and Access Improvements – Industry Day 12
Current Operating Environment
• MCO Rental Car Facility
• Existing Inventory ‐ Includes All Terminals and All Brands
Source: MCO Consolidated Rental Car Facility (CONRAC) Program Criteria Manual, 2024.
COMPONENT EXISTING (2023)
Customer Service
Regular Customer Service Positions 165
Ready/Return Area
Regular Ready Spaces 2,540
Premium Ready Spaces 50
Total Ready Spaces 2,590
Return Spaces 1,159
Total Ready/Return Spaces 3,749
Service Area
Fuel positions (nozzles) 227
Wash bays 33
Maintenance bays 53
Administrative area – service facility (sq ft) 33,029
Overflow vehicle storage spaces 14,714
Stacking/Staging spaces 3,234
Employee Parking Spaces 1,245
Current and Future Needs
• Facility requirements were developed using the linear projected growth rate of rental car transactions.
• A 50 Million Annual Passenger (MAP) baseline demand requirement was determined, as well as requirements for four future demand levels.
• Growth rates and mode share scenarios (a “Decrease in RAC Mode Share” and a “No Change in RAC Mode Share” scenarios) were used to project future facility requirements.
• Site requirements (acreage) also considered spare for future expansion (SF) by 10%, up to
14.3 million SF.
ConRAC Facilities and Access Improvements – Industry Day 13
MCO Rental Car Facility Requirements Years are Representative Estimates for Time of Occurrence
Notes: Decrease in Rental Car (RAC) Mode Share ‐ Passengers increase their shift to other modes such as TNCs and other future technologies and transactions per passenger decreases. No Change in RAC Mode Share Transactions per passenger remain constant at 0.10 through the planning horizon
MAP: Million Annual Passengers
Preferred ConRAC Site
• A total of 7 site locations were identified and considered for the new ConRAC.
• A preferred site was identified through a detailed, multi‐step evaluation process included in the Program Criteria Manual.
PREFERRED SITE
KEY FACTORS:
• Close to Terminal C
• No Terminal Link expansion needed
• Site is expandable
• Accommodates facility requirements
ConRAC Facilities and Access Improvements – Industry Day 14
Program Overview and Scope
Ready/Return Garage:
• 4 Levels (approximately 5,500 ready/return spaces) for Rental Car functions totaling ~2 million SF
• 2 Additional Levels for Public or Employee Parking
QTA Garage:
• 4 Levels, also totaling ~2 million SF
ConRAC Facilities and Access Improvements – Industry Day 15
Consolidated Rental Car Facility (ConRAC) Program
Ready/Return and QTA Garages
Concept Plan & Roadway/Access Improvements
Vehicle Storage (Existing)
Customer Service Area (Final Location To Be Determined)
Ready/Return Garage
Quick Turnaround Area (QTA) Garage
CONRAC Access Improvements
Vehicle Storage
OUTBOUND ROADWAY
IMPROVEMENTS (presently being refined to reflect grade separations at some intersections)
Ground Transportation Plaza
ConRAC Facilities and Access Improvements – Industry Day 16
Ready/Return Garage – Illustrative Concept
ConRAC Facilities and Access Improvements – Industry Day 17
READY/RETURN
GARAGE
6 levels total (4‐rental car uses; 2‐parking)
QTA
GARAGE
4 levels total
Program Overview and Scope Representative Program
Ready/Return Garage
Quick Turnaround
(QTA)
• Comprising approximately 85,000 SF, as shown
• Accommodates customer service counters/workstations and administrative space for each company and their brands
• Final location subject to further evaluation and consideration during design
Program Overview and Scope Customer Service Building
ConRAC Facilities and Access Improvements – Industry Day 18
Existing Terminal C Road Network
ConRAC Facilities and Access Improvements – Industry Day 19
ConRAC Facilities and Access Improvements – Industry Day 20
Proposed Outbound Roadway Improvements
Existing Conditions Proposed Improvements
Roadway Improvements include a realigned and widened Terminal C outbound roadway, and interchange improvements at Jeff Fuqua Blvd and Heintzelman Blvd
ConRAC Facilities and Access Improvements – Industry Day 21
General Scope of Proposed Roadway Improvements (presently being refined)
• Realigned Terminal C outbound roadway
• Preserve the ability to accommodate a future Terminal D and a potential, future south crossfield taxiway
• Grade separation, if possible, for Terminal C outbound traffic and rail tracks presently used by Brightline
• Potential relocation of Terminal C Service Road and its connection to Heintzelman Boulevard
• Potential, dedicated service road for transport of rental car vehicles from remote storage site to ConRAC garages
Rail Tracks (Brightline)
Roadway Improvements include a realigned and widened Terminal C outbound roadway, and interchange improvements at Jeff Fuqua Blvd and Heintzelman Blvd
Terminal C Service Road
ConRAC Facility and Access Improvements – Industry Day 22
Proposed ConRAC Access Roadway Improvements
Existing Conditions Proposed Improvements
Access Improvements include potential grade separated intersection at the existing Terminal C exit and Jeff Fuqua Boulevard, if possible, to enable ingress and egress CONRAC related traffic movements
Title Goes Here
General Scope of Proposed ConRAC Access Roadway Improvements (presently being refined)
Potential grade separated interchange, if possible, to allow for southbound Jeff Fuqua Boulevard movements at the proposed ConRAC Access Entrance Road (currently the existing Terminal C signalized exit road) to occur without conflicts or need for signalization. Rail Tracks (Brightline)
Terminal C Service Road
Access Improvements include grade separated intersection at the existing Terminal C exit and Jeff Fuqua Boulevard to enable ingress and egress CONRAC related traffic movements
ConRAC Facilities and Access Improvements – Industry Day 23
ConRAC Facilities and Access Improvements – Industry Day 24
ConRAC Program Delivery Methods, Timeline and Budget
Greater Orlando Aviation Authority
ConRAC Facilities and Access Improvements – Industry Day 25
ConRAC Facilities and Access Improvements – Industry Day 26
Delivery Methods
Design‐Build or Progressive Design‐Build anticipated
Qualifications based selection with possible price component
Staggered Procurements planned in late CY 2024‐ early CY2025
Design and Construction
Program Management and Oversight (PMO)
Request for Qualifications (RFQ) anticipated
ConRAC Program Timeline (all years referenced represent calendar years)
ConRAC Facilities and Access Improvements – Industry Day 27
Q4 2024 / Q1 2025
Procurement Start – PMO and
Design/Build Firms
Board Award – PMO Contract and
Design/Build Contract
Design Start Construction NTP Substantial Completion
Final Completion/ CONRAC Opens
Q1 2025 / Q3 2025
Q4 2025 2026 – 2027 2030–2031
ConRAC Facilities and Access Improvements – Industry Day 28
Budget ConRAC Program (all components)
Approximately $2 Billion
MCO: The Global Leader in the Evolution of Mobility
ConRAC Facilities and Access Improvements – Industry Day 29
For additional information please email conrac@goaa.org
MCO: The Global Leader in the Evolution of Mobility ConRAC Facilities and Access Improvements – Industry Day