MCMA - RFP - HVAC Upgrades 2026 [FINAL DOC].pdf
PDF 7 MB Posted
- Solicitation number
- RFP MCM 260000001339 1
- Issued by
- Macomb County, Michigan
About this file
This is a Request for Proposal (RFP) issued by Mt. Clemens Montessori Academy, a public charter school located in Mt. Clemens, Michigan, for HVAC system upgrades and related mechanical, electrical, and plumbing work. The Academy is soliciting sealed proposals for the removal and installation of twelve new HVAC units of various types serving classrooms, a multi-purpose room, break room, and clinic, along with all required components and connections. A voluntary walk-through is scheduled for March 5, 2026, at 1:30 PM at the school facility located at 1070 Hampton Road. Prospective bidders may submit written questions by March 9, 2026, and must submit sealed proposals by 12:00 PM on March 13, 2026, to CS Partners at 869 South Old US 23, Brighton, Michigan 48114. The Board approval date is listed as March 19, 2024, though this appears to be a documentation error given the 2026 RFP release date. The project must be completed no later than August 31, 2026, with construction commencing no fewer than seven days after issuance of a notice to proceed. An Alternate 1 bid for boiler replacement is included in the proposal scope. All bids shall remain valid for thirty days following the submission deadline.
Bidders must submit one original, three printed copies, and one electronic copy (USB drive) of their proposal and are required to provide a 5% bid bond based on the project amount and a 100% performance and payment bond upon award. All successful bidders must comply with Michigan prevailing wage requirements under Public Act 10 of 2023 and submit prevailing wage compliance certifications, familial disclosure statements, school safety initiative affidavits, and Iran Economic Sanctions Act certifications with their bids. Bidders must provide three references and shall secure any required permits at their own expense. The Academy is tax-exempt and will provide documentation accordingly. All work must comply with the 2021 Michigan Building Code, Mechanical Code, Energy Code, and the 2023 Michigan Electrical Code/NEC. The successful bidder must provide a one-year workmanship warranty and will be evaluated not solely on cost but on qualifications, experience, and capacity. The Academy reserves the right to accept or reject any or all proposals and is not obligated to award the contract to the lowest bidder. Failure to execute a formal agreement within 14 days of presentation may result in rejection of the selected bidder and proceeding to the next qualified proposal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
Mt Clemens Montessori Academy
HVAC Upgrades 2026
Ashley Lesage School Leader
REQUEST FOR PROPOSAL---THIS IS NOT AN ORDER OR OFFER
IF FOR ANY REASON YOU CANNOT RETURN THIS BID, PLEASE RETURN THIS FORM INDICATING
SO TO ENSURE THAT YOUR NAME MAY BE RETAINED ON OUR BIDDER LIST.
SCHEDULE:
RFP RELEASE: FEBRUARY 26, 2026
VOLUNTARY WALK-THRU: 1:30 PM, MARCH 5, 2026
WALK-THROUGH LOCATION: MT CLEMENS MONTESSORI ACADEMY
1070 HAMPTON RD
MT CLEMENS, MI 48043
PROPOSAL QUESTIONS DEADLINE: MARCH 9, 2026
PROPOSAL SUBMITTAL DEADLINE: MARCH 13, 2026
BOARD APPROVAL: MARCH 19, 2024*
SUBMIT PROPOSAL TO:
CS PARTNERS
869 S OLD US 23
BRIGHTON, MI 48114
MARK PROPOSAL:
MT CLEMENS MONTESSORI ACADEMY
“HVAC UPGRADES 2026”
1070 HAMPTON RD
MT CLEMENS, MI 48043
ATTN: MS ASHLEY LESAGE
The Academy is soliciting sealed proposals for the removal and installation of (12) new HVAC units (various types) and all components and connections including electrical and plumbing needed to complete the project. This project will also include a bid alternate for the boiler replacements as detailed in the proposal.
MT CLEMENS MONTESSORRI ACADEMY
HVAC UPGRADES 2026
SCOPE OF SERVICES (SOS)
GENERAL SPECIFICATIONS:
1. Refer to EXHIBIT “A” for design documents, including drawings and specifications.
2. Contractors shall include all labor, equipment, and materials to accomplish the scope of work presented on the drawings.
3. Base Bid – HVAC for classrooms, multi-purpose room, break room, and clinic including all required general trades, mechanical, electrical, and plumbing.
4. Alternate 1 – Boiler replacement (drawing M1.2) including all required general trades, mechanical, electrical, and plumbing.
REQUIREMENTS OF BIDDER:
1. A VOLUNTARY WALK THROUGH shall be provided to allow contractors to become familiar with the project as described in the schedule above.
2. The successful bidder shall complete and submit the Prevailing Wage, Familial Relationships, School Safety and the Iran Sanctions forms with the bid packet. Failure to execute and include these documents will result in bid rejection.
3. (3) References must be provided by ALL prospective Bidders.
4. Successful bidder shall commence construction no less than (7) days after issuance of a notice to proceed.
5. This project SHALL be completed no later than August 31, 2026.
6. A Bid-bond will be required in the form of 5% of the project amount from each bidder.
7. A Performance and Payment bond on 100% of the bid will be required by the successful bidder.
8. All bids shall be good for thirty (30) days after the proposal submittal deadline.
9. Successful bidder will be required to field verify square footage and conditions.
10. Successful bidder will be required to secure a permit, if required. Permits and associated costs are the contractor’s responsibility.
11. All State of Michigan and local building codes shall be strictly followed.
12. All proposals to be backed by a 1-year workmanship warranty from the contractor.
13. Successful bidder shall fully restore any damage to grass or landscaping caused by any construction and/or materials being delivered to the constructions area(s).
CONTENTS OF PROPOSAL PACKET:
1. Proposal Cover & Schedule Document
2. Scope of Services Document
3. Pricing (ATTACHMENT A)
4. Specifications (EXHIBIT A)
5. Floor Plan of Work Limits (EXHIBIT B)
6. Various Documents (ATTACHMENT B)
GENERAL INFORMATION:
1. CHANGES TO RFP: All additions, corrections or changes to the solicitation documents will be made in the form of a written Change Form as issued by the Academy only. Bidders shall not rely upon interpretations, corrections, or changes made in any other manner, whether by telephone or in person. Additions, corrections, and changes shall not be binding unless made by such a written, signed Change Form. All written, signed Change Forms issued shall become part of the Agreement documents. Change Forms will be sent to all known potential bidders by e-mail.
2. CONTACT INFORMATION: To receive future communications related to this RFP, possible bidders are asked to immediately send contact information by email to David Blackmar, at dblackmar@charterschoolpartners.com failure to do so may limit your ability to submit a complete, competitive Proposal.
3. RIGHT TO WITHDRAW BIDS: By submitting a Proposal in response to this RFP, Bidder agrees to be bound by this
RFP’s terms and conditions. Proposals may be withdrawn by the Bidder without penalty at any time before notification that the Bidder’s Proposal has been selected. However, if the Bidder withdraws after selection of its
Proposal but before executing the Contract for any reason (“Late Withdrawal”), Bidder shall pay liquidated damages to the Academy in an amount equal to five percent (5%) of the amount of the Proposal (“Liquidated
Damages”). The Academy and Bidder intend these Liquidated Damages to constitute compensation and not a penalty. Bidder’s payment of the Liquidated Damages shall be Bidder’s sole liability and entire obligation and the
Academy’s exclusive remedy for Late Withdrawal of Bidder’s Proposal.
4. RFP, PROPOSALS AND ACCEPTANCE DO NOT OBLIGATE: The parties agree that they will not consider either distribution of this RFP or receipt of Proposals by the Academy or even notification of Proposal acceptance by the
Academy as an obligation or commitment by the Academy to either purchase equipment from the Bidder or to enter into a contractual agreement. Rather, the parties understand that the Academy will have no binding obligation until it signs the Contract approved by its legal counsel.
5. TAX-EXEMPT STATUS: The Academy is a tax-exempt entity. A tax-exempt form will be provided to the successful bidder.
6. FOIA: All bids are confidential until the listed bid opening time and date; however, as a public entity, the
Academy is subject to the Michigan Freedom of Information Act (FOIA). Information contained in proposals may be subject to FOIA requests.
7. RESPONSIBILITY: Bidder is solely responsible for ensuring its bid is received by the Academy in accordance with the solicitation requirements, before the date and time specified in this Request, and at the place specified.
mailto:dblackmar@charterschoolpartners.com
8. INSURANCE: The Bidder shall purchase and maintain insurance sufficient to protect it from any and all claims which may arise out of or result from the Bidder’s services related to this RFP and any resultant contract, whether such service be by the Bidder individually or by anyone directly or indirectly employed by Bidder, or by anyone for whose acts Bidder may be liable, including independent contractors. Insurance policies purchased and maintained shall include, but are not limited to, the following:
a. Worker’s compensation insurance for claims under Michigan’s Workers’ Compensation Act or other similar employee benefit act of any other state applicable to an employee in the minimum amount as specified by statute;
b. Employer’s liability insurance, in conjunction with workers’ compensation insurance, for claims for damages because of bodily injury, occupational sickness or disease or death of an employee when workers’ compensation may not be an exclusive remedy, subject to a limit of liability of not less than
$100,000 each incident;
c. Motor vehicle liability insurance required by Michigan law including no-fault coverage for claims arising from ownership, maintenance or use of a motor vehicle with liability limits of not less than $1,000,000 per occurrence. Coverage shall include all owned vehicles, all non-owned vehicles, and all hired vehicles.
d. Commercial General Liability insurance for claims for damages because of bodily injury or death of any person, other than the Bidder’s employees, or damage to tangible property of others, including loss of use, which provides coverage for contractual liability, with a limit of not less than $1,000,000 each occurrence and a mandatory $2,000,000 annual aggregate.
Insurance required shall be in force until acceptance by the Academy of the entire completed work, and shall be written for not less than any limits of liability specified above. Certificates of insurance, acceptable to the
Academy, shall be provided to the Academy no less than ten (10) working days prior to the project start-up.
All Certificates of Insurance and duplicate policies shall contain the following clauses:
1. “It is understood and agreed that thirty (30) days advance written notice of cancellation, nonrenewal, reduction and/or material change in coverage will be mailed to the Academy; and
2. “It is understood and agreed that the following are listed as additional insureds: The Academy, including all elected and appointed officials, all employees and volunteers, all boards, commissions, departments and/or authorities and their board members, employees and volunteers and CS Partner, it’s management consultant firm.”
9. NON-DISCRIMINATION: In the performance of the proposal and resultant contract, bidder agrees not to discriminate against or grant preferential treatment to any individual or group on the basis of race, sex, color, ethnicity, or national origin in the operation of public employment, public education, or public contracting. Bidder shall not discriminate against any employee or applicant for employment to be employed in the submission of this Proposal or in performance of the duties necessitated by an award of the proposed contract with respect to his or her hire, tenure, terms, conditions or privileges of employment, or any matter directly or indirectly related to employment, because of his or her race, color, religion, national origin, ancestry, gender, height, weight, marital status, age, except where a requirement as to age is based on a bona fide occupational qualification, or disability that is unrelated to the individual's ability to perform the duties of a particular job or position. Any breach of this provision will be regarded as a material breach of the contract.
10. PROPOSAL DELIVERY: Proposals must be returned no later than 12:00 pm, March 13, 2026. (No Proposals will be accepted after this time) in a sealed envelope clearly marked:
Mt Clemens Montessori Academy DELIVER TO:
“HVAC Upgrades 2026” CS Partners
1070 Hampton Rd 869 S. Old US 23 (Suite 500)
Mt Clemens, MI 48043 Brighton, MI 48114
Attn: Ashley Lesage
Please provide one (1) original, three (3) printed copies and one (1) electronic copy (USB drive) of the submission delivered to the above stated location. The Academy will accept proposals sent by FAX or Email under extenuating circumstances as approved by the Academy only.
11. PROPOSAL OPENING: There will be a public proposal opening for this RFP at 12:00 pm, October 16th, 2023 and will take place at a designated location on the School campus. (NOT REQUIRED)
12. PROPOSAL REJECTION/ACCEPTANCE: The Academy reserves the right to accept or reject any or all proposals, to waive any irregularities and to make the final determination as to the best low qualified proposal.
The Academy is not required to accept the lowest cost proposal in all or in part. The proposal award will not be based solely upon cost, but will be evaluated based upon criteria formulated around the most important features of the services, of which qualifications, experience or capacity may be overriding factors.
The Academy reserves the right to waive any informalities or immaterial omissions or defects not involving prices, time or changes in the work and to reject any or all proposal, if to do so is deemed in the best interest of the Academy. In no event will an award be made until all necessary investigations are made as to the responsibility and qualification of the bidder to whom is it proposed to make such an award. Any contract awarded to a person or company who is discovered to have been in default or disqualified at the time of the awarding of the contract shall be voidable at the discretion of the Academy.
13. PROPOSAL AWARD: In the event the proposal is awarded by the Academy, a Notice of Intent to Award will be used to notify all bidders of her intent to award the proposal to the Bidder providing the best value to the
Academy.
14. CONTRACT: The Academy’s award of any proposal is subject to and conditioned upon execution of a formal agreement for products and services between the successful bidder and the Academy. In submitting a proposal, the bidder acknowledges that the contents of the RFP will become incorporated within any formal agreement.
This RFP does not include every term and provision which shall be included in the formal agreement. In the event that the bidder fails to execute the formal agreement within 14 days of its presentment by the Academy, the Academy may reject the selected bidder, and proceed to accept another qualified proposal, or reject all proposals.
A copy of a bidder’s suggested terms and conditions may be submitted with bidder’s proposal, however, neither the Academy’s acceptance of any proposal nor award of any contract pursuant to this RFP shall be construed as any definitive acceptance by the Academy of Bidder’s suggested terms and conditions. In the event of a conflict in terms, the order of precedence to resolve the conflict will be as follows: Michigan State law, the terms and conditions of the signed contract, the terms and conditions of the RFP, and last, the Bidder’s Proposal.
15. DISPUTES: In the event a bidder disagrees with the recommendation of the Academy concerning this award, the bidder is required to submit their concern(s) in writing to the Board Attorney within ten (10) business days from the date of the notice of intent to award.
16. QUESTIONS: All questions about this RFP must be received by 5:00 pm, March 9, 2026 in writing, via email, to:
David Blackmar
CS Partners dblackmar@charterschoolpartners.com
Correspondence or inquiries made directly to bidders regarding their proposals from all other persons are to be directed to the person(s) designated above for appropriate review and response. Contact with other Academy staff or School Board members could be reason for disqualification.
Any significant explanation desired by a proposer, regarding the meaning or interpretation of the Request for
Proposals must be requested with sufficient time allowed for a reply to reach all prospective proposers to submit their proposals. Any information given to a prospective bidder concerning the Request for Proposal will be furnished to all prospective bidders as an amendment or addendum to the Request for Proposal, if such information would be of significance to uninformed bidders. The Academy shall make the sole determination as to the significance to uninformed bidders.
ADA ASSISTANCE:
The Academy will provide necessary and reasonable auxiliary aids and services, such as signers for the hearing impaired and audio tapes of printed materials being considered, to individuals with disabilities upon two days’ notice to the Academy. Individuals with disabilities requiring auxiliary aids or services should contact the
Academy by writing or calling.
mailto:dblackmar@charterschoolpartners.com
ATTACHMENT A
PROJECT PRICING
Proposal Sheet for: Mt Clemens Montessori Academy
Contract Price for: “HVAC Upgrades 2026”
Proposal Deadline: 12:00 pm, March 13, 2026
ITEM DESCRIPTION ALT AMOUNT AMOUNT
1) HVAC Upgrades 2026 $
2) Alternate #1 – Boiler Replacement $
GRAND TOTAL $
VENDOR INFORMATION
Company Name: _____________________________________________________________________
Address/City/State/Zip: _______________________________________________________________
Email Address: _______________________________________________________________________
Company website: ____________________________________________________________________
Printed name and title of Authorized Company Representative:
Name
Title
Signature of Authorized Company Representative:
Date: _______________________
9-4-2025 OWNER REVIEW
2-18-2026 BIDDING
DESIGNED BY JAF
DRAWN BY JAF
CHECKED BY JAF
TITLE
PAGE
ME0.1
H
VA
C M
O D
IF
IC
A
TI
O N
S
FO
R
M O
U N
T C
LE
M
EN
S
M O
N
TE
SS
O
R I A
C A
D
EM
Y
H am pt on R d, M t C le m en s, M
I 4
HVAC MODIFICATIONS FOR
MOUNT CLEMENS MONTESSORI ACADEMY
1070 Hampton Rd, Mt Clemens, MI 48043
ENGINEER: TMR ENERGY AND CONSULTING ENGINEERING, LLC
EXHIBIT A
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text DRAWING INDEX: ME0.1 - MECHANICAL AND ELECTRICAL TITLE SHEET M1.1 - FIRST FLOOR MECHANICAL PLAN M1.2 - ALTERNATE 1 BOILER REPLACEMENT M5.1 - SCHEDULES, AND DETAILS M5.2 - MECHANICAL SPECIFICATIONS E1.1 - ELECTRICAL PLAN
AutoCAD SHX Text APPLICABLE CODES: MICHIGAN BUILDING CODE 2021 MICHIGAN MECHANICAL CODE 2021 MICHIGAN ENERGY CODE 2021 MICHIGAN ELECTRICAL CODE / NFPA 70 / NEC 2023
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text
JEFFREY
AutoCAD SHX Text
ALAN
AutoCAD SHX Text
FEASBY
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text 6201052281
SCALE: 1/8"=1'-0"
FIRST FLOOR PLAN - MECHANICAL
M5.1
FOR TWO PACKAGED HVAC UNITS, PROVIDE 4"
CONCRETE SLAB OVER 6" OF 95% COMPACTED
#4-11 BERM/STONE WITH #6 REBAR AT 12" C.C. IN
BOTH DIRECTIONS. PROVIDE 4,000 PSI, 5% AIR
ENTRAINED CONCRETE WITH NO ANTI-FREEZE
ADDITIVES. MAXIMUM 4" SLUMP. SEAL WITH W.R.
MEADOWS BRAND SEAL CURE-25 APPLIED AFTER
FINISHING CONCRETE. CONCRETE SHALL CURE A
FULL 7 DAYS PRIOR TO SETTING ANY EQUIPMENT.
EXTEND SLAB 4" PAST UNIT ON ALL FOUR SIDES.
UV-1 UV-2
CU-1 ON ROOF CU-2 ON ROOF
UV-3
CU-3 ON ROOF
UV-6 UV-7
CU-6 ON ROOF CU-7 ON ROOF
UV-8
CU-8 ON ROOF
UV-9
CU-9 ON ROOF
UV-5UV-4
CU-4 ON ROOF CU-5 ON ROOF
A-275 CFM
S
PI
RA
L
S
PI
RA
L
A-275 CFM
A-275 CFM
A-275 CFM
A-275 CFM
B B
A-275 CFM
S
PI
RA
L
S
PI
RA
L
A-275 CFM
A-275 CFM
A-275 CFM
A-275 CFM
HP-1
IU-1A
IU-1B CONDENSATE DRAIN
REFRIGERANT LINESET
MULTI-ZONE SUPPLEMENTAL COOLING
SYSTEM. SEE DETAIL M5.1 FOR
MOUNTING AND PIPE ROUTING.
HVAC-1 HVAC-2
24x24 THRU WALL
24x24 THRU WALL
16x1616x16
UNIT VENTILATOR FITMENT (SEE SCHEDULE AND ENLARGED
PLANS FOR ADDITIONAL INFORMATION)
UV-1 EXISTING UNIT WIDTH: 73"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 76"
UV-2 EXISTING UNIT WIDTH: 73"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 76"
UV-3 EXISTING UNIT WIDTH: 73"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 76"
UV-4 EXISTING UNIT WIDTH: 64"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 64"
UV-5 EXISTING UNIT WIDTH: 64"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 64"
UV-6 EXISTING UNIT WIDTH: 84"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 88"
UV-7 EXISTING UNIT WIDTH: 73"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 76"
UV-8 EXISTING UNIT WIDTH: 73"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 76"
UV-9 EXISTING UNIT WIDTH: 73"
PROPOSED UNIT WIDTH (WITH ENDCAPS): 76"
HEAVY DUTY RETURN
GRILL. BOTTOM AT 8"
AFF. (TYPICAL OF 2)
SEE ALTERNATE 1 (DRAWING M1.2)
FOR MECHANICAL ROOM DETAILS.
T T
PROVIDE INSULATED BACK
PLATE AND WIRE GUARD
FOR THERMOSTAT. (TYP
OF 2 IN GYM)
EXISTING DUCTED RELIEF SYSTEM
TO REMAIN. (TYPICAL)
RELIEF HOOD ON ROOF TO
REMAIN. (TYPICAL OF 2)
EXISTING AIR HANDLING UNIT PROVIDES
VENTILATION TO THESE AREAS AND
SHALL RUN DURING OCCUPIED HOURS.
MINI-SPLIT IS FOR SUPPLEMENTAL
COOLING ONLY.
2 1/2" NG
EXISTING NATURAL GAS
LINE. VERIFY PRESSURE OF
7-14" WC BEING DELIVERED.
EXISTING GAS METER AND REGULATOR SET TO
DELIVER 1,660,000 BTU/HR FOR EXIST AND NEW
EQUIPMENT. NO ADDITIONAL LOAD ADDED.
1" NG
1 1/4" NG
1" NG
T T T
T T
T T T T
THERMOSTAT WIRING - ROUTE
FROM UNIT TO WALL IN EXISTING
PIPE CHASE THEN UP TO CEILING
AND ALONG CEILING TO
THERMOSTAT IN EMT CONDUIT.
(TYPICAL)
9-4-2025 OWNER REVIEW
2-18-2026 BIDDING
DESIGNED BY JAF
DRAWN BY JAF
CHECKED BY JAF
MECHANICAL PLAN
M1.1 of 6
H
VA
C M
O D
IF
IC
A
TI
O N
S
FO
R
M O
U N
T C
LE
M
EN
S
M O
N
TE
SS
O
R I A
C A
D
EM
Y
H am pt on R d, M t C le m en s, M
I 4
AutoCAD SHX Text
GYM / PLAY AREA
AutoCAD SHX Text
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
TEACHER
AutoCAD SHX Text
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
AutoCAD SHX Text
BOOKS
AutoCAD SHX Text
AutoCAD SHX Text
GEN OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
PRINCIPAL
AutoCAD SHX Text
AutoCAD SHX Text
CUSTODIAN
AutoCAD SHX Text
AutoCAD SHX Text
STAFF RR
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
AutoCAD SHX Text
- CONNECT TO EXISTING
AutoCAD SHX Text
- ITEM TO BE REMOVED
AutoCAD SHX Text
NOTE: FOR CLARITY, VALVES ARE NOT SHOWN ON FLOOR PLAN.
AutoCAD SHX Text
PROVIDE VALVES AS SHOWN ON FLOW DIAGRAM AND WHERE NEEDED
AutoCAD SHX Text
TO FACILITATE REPAIRS AND SHUTDOWNS.
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text
JEFFREY
AutoCAD SHX Text
ALAN
AutoCAD SHX Text
FEASBY
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
SCALE: NONE
ALTERNATE 1 - HEATING WATER FLOW DIAGRAM
B-1 B-2
P-2P-1
P-3P-4
HWS
HWS
HWR/BYPASS
H W
R
H W
S H
W S
H W
R
EXISTING HW HEATING /
VENTILATING UNIT TO REMAIN. REMOVE EXISTING HEATING
WATER BOILER HOUSEKEEPING
PAD TO REMAIN.
REMOVE EXISTING HEATING
WATER PUMPS.
PROPERLY TEST FOR AND ABATE
ANY ASBESTOS PER CURRENT
REGULATIONS ON PIPING AND
FLUE TO BE REMOVED AND
REMOVE PIPING AND FLUE AS
SHOWN.
EXISTING INSULATED BOILER
FLUE
P-3
H W
S
H W
R
HEATING WATER
SECONDARY PUMPS ON
HOUSEKEEPING PAD
B-1B-2
2" NG2" NG 2 1/2" NG
P-4
SEE HW CONNECTION DETAIL
FOR PIPING SPECIALTIES AND
CONNECTION OF NEW PIPING
TO EXISTING HEATING AND
VENTILATING UNIT.
HYDRO-SEPARATOR
2 GAL SHOT FEEDER
3" HWS ABOVE 3" HWR
4" HWS ABOVE 4" HWR
CONNECT 4" HWS AND HWR TO
EXISTING (SEE FLOW DIAGRAM)
CALEFFI BRAND HYDRO SEPARATOR
2" NG DOWN TO BOILER (TYP OF 2)
MODEL NUMBER NA549102A*
WITH 4" FLANGED CONNECTIONS
H W
R
H W
S
EXISTING NATURAL GAS LINE.
VERIFY PRESSURE OF 7-14" WC
BEING DELIVERED.
1/4" = 1'-0"
ALTERNATE 1- MECHANICAL ROOM PLAN
1/4" = 1'-0"
ALTERNATE 1- MECHANICAL ROOM DEMO
REMARKS
BOILER ROOM CONDENSING 30
HEATING WATER BOILERS
MARK LOCATION
UNIT SHALL BE VENTED PER MANUFACTURER'S INSTRUCTIONS
UNIT SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS
PROVIDE WITH CONDENSATE NEUTRALIZER
TYPE
RELIEF
120/1/60 WATER KBX1000N 21 3
POWER FLUID MODEL
B-1
MBH
IN
MBH
OUT FUEL
999 969 NG
FUEL HEAT
PSI
B-2
LOCHINVAR
MANUF.
(DESIGN BASIS)
REMARKS
PUMPS
MARK LOCATION FLUID
P-1
P-2
MANUF.
(DESIGN BASIS)
GPM FT HD HPSERVICE TYPEOPERATION VOLTAGE
BOILER ROOM CONDENSING 30 120/1/60 WATER KBX1000N 21 3999 969 NG LOCHINVAR
HOT WATER
MODEL
BOILER ROOM WATER GRUNDFOS54 25 1/2 SINGLEPRIMARY INLINE 120/1/60
HOT WATER
UPS 50-60
BOILER ROOM WATER GRUNDFOS54 25 1/2 SINGLEPRIMARY INLINE 120/1/60
HOT WATER
UPS 50-60
PROVIDE WITH 1/2 HP CONSTANT SPEED PRIMARY PUMP (SEE SCHEDULE BELOW)4
P-3
P-4
HOT WATER
BOILER ROOM WATER GRUNDFOS108 45 3 PARALLELSECONDARY INLINE 230/1/60
HOT WATER
NBS 015-070/6.93
BOILER ROOM WATER GRUNDFOS108 45 3 PARALLELSECONDARY INLINE 230/1/60
HOT WATER
NBS 015-070/6.93
P-1P-22 1/2" NG
EXISTING GAS METER AND
REGULATOR SET TO DELIVER
1,660,000 BTU/HR FOR EXIST
AND NEW EQUIPMENT. NO
ADDITIONAL LOAD ADDED.
B-1B-2
CORE DRILL 6" PVC INTAKES
THRU WALL AS HIGH AS
POSSIBLE.
1/4" = 1'-0"
ALTERNATE 1- BOILER VENTING
6" CENTROTHERM VENT
6" PVC INTAKE
LONG RADIUS TURN DOWN INTAKES WITH BIRD SCREEN
ROUTE 6" CENTROTHERM INTO
EXISTING CHIMNEY AND
EXTEND UP THRU TOP OF
CHIMNEY. PROVIDE
SHEETMETAL CAP WITH PIPE
CURBS/FLASHING FOR TOP OF
CHIMNEY.
PROVIDE NEW 4" B-VENT FOR
EXISTING WATER HEATER IN
EXISTING CHIMNEY. ROUTE UP
THRU SHEETMETAL CHIMNEY
CAP WITH APPROVED PIPE
CURB AND FLASHING.
9-4-2025 OWNER REVIEW
2-18-2026 BIDDING
DESIGNED BY JAF
DRAWN BY JAF
CHECKED BY JAF
ALTERNATE 1
BOILER REPLACEMENT
M1.2
H
VA
C M
O D
IF
IC
A
TI
O N
S
FO
R
M O
U N
T C
LE
M
EN
S
M O
N
TE
SS
O
R I A
C A
D
EM
Y
H am pt on R d, M t C le m en s, M
I 4
AutoCAD SHX Text
HWS
AutoCAD SHX Text M
AutoCAD SHX Text
12" MINIMUM ANTI-THERMOSIPHON LOOP
AutoCAD SHX Text
TOTAL VOLUME = 70 GAL.
AutoCAD SHX Text
ACCEPTANCE VOLUME = 56.5 GAL.
AutoCAD SHX Text
DIAPHRAGM TYPE EXPANSION TANK GRUNDFOS GNTA-120
AutoCAD SHX Text
CONNECT TO NEAREST DCW
AutoCAD SHX Text
12 PSI
AutoCAD SHX Text
PRV SET AT
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
FULL BYPASS FOR QUICK FILL
AutoCAD SHX Text
PIPING TO FLOOR DRAIN
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text
PER ASME CODE
AutoCAD SHX Text
DRAIN VALVE SIZED
AutoCAD SHX Text
1 1/4" BLOWOFF
AutoCAD SHX Text
DRAIN (TYP OF 2)
AutoCAD SHX Text
TO FLOOR
AutoCAD SHX Text
SET AT 30 PSI (TYP OF 2)
AutoCAD SHX Text
RELIEF VALVE
AutoCAD SHX Text
TO FLOOR
AutoCAD SHX Text
DRAIN (TYP)
AutoCAD SHX Text
FLOW SWITCH (TYP)
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text
30-240%%DF
AutoCAD SHX Text
0-100 PSI
AutoCAD SHX Text
0-100 PSI
AutoCAD SHX Text
HWR
AutoCAD SHX Text
30-240%%DF
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
THERMOWELL (COORDINATE WITH T.C.)
AutoCAD SHX Text
30-240%%DF
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text
CALEFFI BRAND HYDRO SEPARATOR
AutoCAD SHX Text
MODEL NUMBER NA549102A*
AutoCAD SHX Text
30-240%%DF
AutoCAD SHX Text
30-240%%DF
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
VALVE (TYP)
AutoCAD SHX Text
TRIPLE DUTY
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
SHOT FEEDER
AutoCAD SHX Text
- ITEM TO BE REMOVED
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
AutoCAD SHX Text
- CONNECT TO EXISTING
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
EXISTING 4" HWS AND HWR
AutoCAD SHX Text
TO BE CONNECTED NEAR
AutoCAD SHX Text
LOCATION SHOWN ON PLAN
AutoCAD SHX Text
VIEW.
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
AutoCAD SHX Text
- CONNECT TO EXISTING
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text
JEFFREY
AutoCAD SHX Text
ALAN
AutoCAD SHX Text
FEASBY
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
REFRIGERATION LINESETS ON
HEF-T-FOOT BLOCKING. MAXIMUM
SPACING 4'-0" FOR BLOCKING. INSTALL
ALL REFRIGERATION PIPING PER
MANUFACTURERS RECOMMENDATIONS.
SEE EQUIPMENT SCHEDULE FOR LIQUID
AND GAS LINE SIZE.
IU-1A
N.T.S.
HEAT PUMP INSTALL DETAIL
IU-1B
INSTALL HEAT PUMP STAND ON RUBBER
HEF-T-FOOT MOUNTING BLOCKS
PIPE CURB (TYP)
HP-1
MOUNT INDOOR UNIT ON WALL PER
MANUFACTURER'S INSTRUCTIONS.
SEE PLAN FOR UNIT LOCATION.
INSULATED CONDENSATE
DRAIN COPPER WITH
PRO-PRESS FITTING.
3/4" CONDENSATE
DRAIN, SLOPE AT 1/100
INSTALL DRAIN DOWN INSIDE WALL.
ROUTE THROUGH WALL AND DISCHARGE
CONDENSATE ONTO SPLASH BLOCK
CONCRETE SPLASH BLOCK
THREADED CLEANOUT PLUG
TAP TOP OF CONDENSATE DRAIN
300RLSUPPLY 18x6 18x6 TITUS
DIFFUSER/REGISTER/GRILLES SCHEDULE
MARK FACE
SIZETYPE NECK MANUF.
(DESIGN BASIS)
MODEL REMARKS & NOTESSIZE
A
30RL-HDRETURN 24x24 26x26 TITUSB WHITE FINISH, HEAVY DUTY
WHITE FINISH, DOUBLE DEFLECTION
GAS SUPPLY LINE
GAS LINE TO EQUIPMENT,
SIZE AS INDICATED ON
FLOOR PLAN
GAS COCK
UNION
MAKE FINAL CONNECTION
TO EQUIPMENT, VERIFY
EXACT LOCATION OF EACH
PIECE OF EQUIPMENT WITH
MECHANICAL CONTRACTOR
6" DIRT LEG
CAP
SCALE: NONE
GAS CONNECTION DETAIL
SCALE: NONE
M
HWS HWR
PRESSURE INDEPENDENT
CONTROL VALVE SET TO SPECIFIED
CONNECTION (TYPICAL):
UNION OR FLANGE, SEE SPECS
ISOLATION/SHUTTOFF VALVE
(TYPICAL): BALL VALVE OR
BUTTERFLY VALVE, SEE SPECS
4 DRAIN, 12" MINIMUM
M
NO
NC
AIR FLOW
M1
PIPES AT ELBOWS
UNIT VENTILATORS AND EXISTING H&V UNIT
FLOW AT FACTORY.
INDEPENDENTLY SUPPORT
3 2
SCALE: NONE
3-WAY HEATING COIL
SCALE: NONE
SPIRAL DUCT SUPPLY REGISTER MOUNTING DETAIL
NOTES:
(1) FILL TRAP MANUALLY ON INITIAL START-UP.
(2) TRAP EACH COMPONENT DRAIN CONNECTION.
(3) PIPE SIZE SHALL NOT BE LESS THAN DRAIN PAN
CONNECTION SIZE.
(4) DRAW-THRU UNITS:
A=SP+1"
B=1
2 SP+1"
C=11
2" SP +2"
SP TO BE MAXIMUM STATIC PRESSURE (SP) ON
THE DRAIN PAN INCLUDING MAXIMUM FILTER
PRESSURE DROP AND PRESSURE DROP OF
FUTURE COMPONENTS OF UNIT IF APPLICABLE.
(5) RAISE COIL SECTION OR ENTIRE AIR HANDLING
UNIT WITH STRUCTURAL MEMBERS OR STANDS TO
PROVIDE PROPER TRAP HEIGHT.
DRAIN LINE TO BE
SLOPED 14" MIN. PER FT.
SQUARE HEAD PLUG
DRAIN
PAN
DRAIN LINE,
FLOOR DRAIN,
OR SPLASH
BLOCK
2 PIPE DIA.
C
B
A BLOW-THRU UNITS:
A=1"
B=SP+1"
C=SP+2"
SCALE: NONE
COOLING COIL CONDENSATE DRAIN TRAP PIPING
CAREFULLY REMOVE EXISTING SHELVING SYSTEM
ON LEFT END OF UNIT VENTILATOR AND RETAIN
FOR RE-INSTALL AFTER NEW UNIT VENTILATOR IS
INSTALLED.
DISCONNECT ELECTRICAL, PIPING, AND CONTROLS
AND REMOVE EXISTING UNIT VENTILATOR.
RE-INSTALL EXISTING SHELF FLUSH TO LEFT SIDE OF
PROPOSED UNIT VENTILATOR. (APPROXIMATELY 2"
TO THE LEFT OF ORIGINAL LOCATION). TRIM PIPE
CHASE TO PROVIDE CLEARANCE FOR NEW SHELF
LOCATION.
TRIM AND RE-INSTALL PIPE CHASE TO PROVIDE
CLEARANCE FOR NEW SHELF LOCATION.
CAREFULLY REMOVE EXISTING PIPE CHASE TO
FACILITATE REFRIGERANT PIPING INSTALLATION.
UV-1
ROUTE 1" HEATING WATER SUPPLY AND RETURN IN
PIPE CHASE ON BACK OF UNIT VENTILATOR.
CONNECT TO UNIT VENTILATOR COIL PER PIPING
DETAIL.
INSTALL HORIZONTAL RUN OF REFRIGERANT PIPING
IN EXISTING CHASE. PROVIDE NEW SHEETMETAL
CHASE TO ENCLOSE VERTICAL RISE OF
REFRIGERANT PIPING. ROUTE REFRIGERANT PIPING
UP THROUGH PIPE CURB ON TO ROOF. PAINT
VERTICAL ENCLOSURE TO MATCH WALL.
CU-1
INSTALL CONDENSING UNIT ON RUBBER HEF-T-KIT
MOUNTING BLOCKS MODEL FF-1000-S-KIT.ON ROOF
1/4" = 1'-0"
CLASSROOM UNIT VENTILATOR TYPICAL INSTALL DETAIL
1/4" = 1'-0"
EXTERIOR GYM ELEVATION
M1.1
4" CONCRETE SLAB.
HVAC-1HVAC-2
16x16 x1
24x24 RETURN OPENING
THRU WALL
24x24 RETURN OPENING
THRU WALL
REMOVE EXISTING FIBERGLASS WINDOW
SECTION AND CUT TO FACILITATE 16x16
DUCT. RE-INSTALL WINDOW SECTION AND
PROVIDE ALUMINUM FRAME AROUND DUCT TO
SEAL PENETRATION. (TYPICAL OF 2)
REFRIGERATION LINESETS ON
HEF-T-FOOT BLOCKING. MAXIMUM
SPACING 4'-0" FOR BLOCKING. INSTALL
ALL REFRIGERATION PIPING PER
MANUFACTURERS RECOMMENDATIONS.
SEE EQUIPMENT SCHEDULE FOR LIQUID
AND GAS LINE SIZE.
1/4" = 1'-0"
CLASSROOM UNIT VENTILATOR TYPICAL DEMO DETAIL
CORE DRILL THRU BRICK / BLOCK AND DISCHARGE
3/4" CONDENSATE DRAIN ONTO SPLASH BLOCK.
EXISTING 43x12 INTAKE LOUVER TO
REMAIN. CLEAN SCREEN ON LOUVER.
9-4-2025 OWNER REVIEW
2-18-2026 BIDDING
DESIGNED BY JAF
DRAWN BY JAF
CHECKED BY JAF
FLOW DIAGRAM
SCHEDULES, NOTES
M5.1 of 6
H
VA
C M
O D
IF
IC
A
TI
O N
S
FO
R
M O
U N
T C
LE
M
EN
S
M O
N
TE
SS
O
R I A
C A
D
EM
Y
H am pt on R d, M t C le m en s, M
I 4
AutoCAD SHX Text
4'-0" MAX
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
MANUAL DAMPER
AutoCAD SHX Text
(4-WAY)
AutoCAD SHX Text
ADJUSTABLE VANES
AutoCAD SHX Text
SUPPLY AIR DUCT
AutoCAD SHX Text
REGISTER
AutoCAD SHX Text
SUPPLY AIR
AutoCAD SHX Text
6" MAXIMUM
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
LICENSE NO.
AutoCAD SHX Text
JEFFREY
AutoCAD SHX Text
ALAN
AutoCAD SHX Text
FEASBY
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
- 22 -
OUTLINE MECHANICAL SPECIFICATIONS
PART 1 - GENERAL
A. It is intended that complete Mechanical Systems as described herein will be furnished and installed.
B. Contractor shall visit the job site and examine all existing conditions.
C. All work shall be installed in accordance with local and state codes and regulations and shall receive the approval of the inspection department having jurisdiction.
D. All work specified herein shall carry the Contractor's Warranty for workmanship and materials for a period of one year minimum from the date of final acceptance or beneficial use by the Owner, whichever occurs first. The Contractor shall remedy the defects and reimburse the Owner for all damage to other work, whether caused by the defects or the work of correcting same.
E. All work shall be done by mechanics skilled in the particular trade involved, under responsible supervision and with the best modern practices.
F. All materials shall be new and of the grade and quality specified. Only the best material of each class specified shall be used.
G. In new construction, the General Contractor will provide duct openings and pipe shaft openings where shown on the architectural or structural drawings and also where indicated and sized by this Contractor.
H. This Contractor shall do all cutting, core drilling, and patching as required for complete installation unless openings are indicated on the architectural drawings. This Contractor shall hire the General Contractor to do all patching to match existing conditions.
I. This Contractor shall provide all miscellaneous steel and hardware as required to support, hang and secure all equipment as furnished, relocated or revised by him, unless such materials are specifically called out to be provided by other Contractors.
J. Manufacturer's directions shall be followed in all cases where the manufacturers of articles used in this Contract furnish directions covering specific points not shown on the drawings or mentioned in the specifications.
K. All work installed under this contract shall be tested in the presence of and to the satisfaction of the inspecting authority having jurisdiction and the Owner's representative.
L. Mechanical shop drawings, fixture cuts, and schedules shall be submitted for review, in general before starting the work involved, and so as to cause no delay in this work or that of any other Contractor or Subcontractor. PDF copies shall be submitted and all shall bear the stamp of approval of the Contractor as evidence that the submittals have been approved by him.
M. This Contractor shall cooperate fully with the Owner in scheduling and making connections into existing service lines so as to cause the least possible inconvenience and shortest interruption of service. Contractor shall include any time and materials necessary for draining, venting, purging and refilling the existing system to permit connection of the new or removal of existing equipment, piping, etc.
N. This Contractor to remove all unused ductwork, piping, etc. from the area and remove it from the premises. The Owner shall be given the option of retaining any removed items. The Contractor shall, in general, keep the site clean and free of all debris generated by his work.
O. Before running any ducts, piping, etc. within the building, this Contractor shall assure himself that they can be installed as contemplated without trapping or interfering with columns, beams, piping, fixtures, etc. Contractor to verify all measurements and conditions at jobsite before proceeding with the work.
P. Of necessity, openings, supporting steel, field-built curbs, electrical data, space requirements, etc. were designed around specific parameters. It shall become the Contractor's responsibility to change as necessary, through the Architect and interested Contractors on the job, all required parameters, so that openings, supporting steel, curbs, electrical data, etc. will fit the equipment supplied. Any additional cost will be the sole responsibility of this Contractor.
PART 2 - SCOPE OF WORK
A. Remove existing unit ventilators and shelving, Provide and install new unit ventilators and re-install shelving as shown on drawings. Install roof mounted condensing units and associated refrigeration piping for each unit ventilator.
B. Provide and install multi-head heat pump system for two administration areas as shown on drawings.
C. Provide and install two packaged HVAC units and associated ductwork as shown on drawings D. Alternate 1: Remove existing boiler and replace with new high efficiency condensing boilers as shown on drawings.
PART 3 - ELECTRICAL
A. The Electrical Contractor will provide all power wiring, starters and disconnects unless equipment is provided with starters or disconnect switches as part of the assembly. The Mechanical Contractor shall furnish all special control items, control and interlock wiring, and motors required for the operation of all equipment provided under his sections of work.
B. In general, all motors under 1/2 horsepower will be 120/1/60. For electrical power characteristics of other motors, see the mechanical drawings and schedules.
C. Motors 1/2 HP and over will be provided with across-the-line starters with overload protection unless otherwise specified. All motors under 1/2 HP shall have integral overload protection. All motors must conform to current NEMA Standards.
D. Where electrical requirements and/or motor horsepowers for the equipment supplied varies from that shown on the mechanical drawings or as specifically called out in the mechanical specifications, the electrical drawings and specifications shall govern and be adhered to as to electrical power characteristics for the supplied equipment.
PART 4 - CONTRACT CLOSEOUT
A. Testing and Adjustment
Contractor shall operate all parts of the entire system, make any and all adjustments and repairs, and shall leave the entire work tested and ready for operation by the Owner and/or operation and final testing and balancing by the Testing and Balancing Contractor.
B. Operating Instructions:
Contractor shall provide four complete manuals in hardbacked binders, each containing all operating, servicing, lubrication, etc. information and parts lists for all equipment installed under his Contract. Where diagrams are too large for the binder, arrange manila pockets with reinforced holes to hold folded drawings. Manuals to be submitted for approval at least 30 days before completion of the work.
Contractor shall arrange for technical instruction of the Owner's maintenance personnel for such time as is reasonably required to acquaint them with their duties. Instruction period shall be after all systems are in operation, and have been tested, balanced and adjusted.
C. Record Drawings:
Contractor shall keep an accurate record of all deviations from contract drawings. He shall neatly and correctly enter, in colored pencil, any deviations on drawings affected during the progress of the project and shall keep drawings available for inspection. At completion of job and before final acceptance, make any final corrections to drawings and deliver same to the Owner's representative.
D. Adjustments and Balancing:
The Contractor shall operate all parts of the entire heating, ventilating and air conditioning system, making any and all adjustments and repairs, balance air delivery at all outlets, balancing water flows at all pumps and equipment requiring water, and leave the work tested and ready for operation.
The Contractor shall check out all controls and wiring to insure the operation of the equipment under all modes of operations.
The above tests and adjustments are made to accomplish the conditions as set forth in the drawings and specifications.
This Contractor shall provide for approval, prior to final acceptance by the Owner's representative, balancing reports. These reports shall include individual air flow measurements at all outlets, total air quantity handled, individual water flow at equipment, total water flow at pumps, motor amperage, and voltage name plate data, actual operating amperage and voltage, and a statement that the control system has been checked and verified for operation.
This Contractor shall employ an independent test and balancing agency to balance the air and water systems for this project.
Mechanical Contractor shall include the cost of balancing in his bid.
PART 5 - GENERAL REQUIREMENTS FOR PIPING INSTALLATION
A. All piping materials furnished and all procedures followed in fabrication and erection shall comply with the applicable sections of the Local Building code, applicable Pressure Piping Code, and requirement of applicable sections of “Code for Pressure Piping”, ANSI B31.1, latest revision and addenda.
B. Contractor shall furnish and install all adjustable hangers, special pipe supports spring hangers, anchors, guides, clamps, rods, miscellaneous iron supports and appurtenances as required to securely and properly hang or support the piping systems. On insulated piping, hangers to be oversized to fit on the outside of insulation with a heavy gauge protection pipe saddle or shield.
Vertical lines shall be supported by pipe clamp type supports designed for this purpose at each floor level. Hangers to be equivalent to Grinnell No. 260 clevis type.
(3)Rigid PVC Pipe (1)Steel Pipe (2) Copper Tubing (Up to 140°F)
Pipe Maximum Pipe Maximum Pipe Maximum Size Spacing Size Spacing Size Spacing
Thru 1-1/4” 7' Thru ¾” 5' Thru 1-1/4” 2-1/2' 1-1/2” 9' 1” 6' 1-1/2 & 2” 3'
2” 10' 1-1/4” 7' 2-1/2” 3-1/2' 2-1/2” 11' 1-1/2” 8' 3” 3-1/2'
3” 12' 2” 8' 4” 3-1/2” 4” 14' 2-1/2” 9' 6” 4'
3” 10' 8” 4'
C. Hanger and Rod Size Shall be as Follows:
Pipe Size Rod Size
1/4 to 2 inch inclusive 3/8” 2-1/2 to 3-1/2 inch inclusive 1/2” 4 and 5 inch 5/8”
D. Sleeves shall be installed by Contractor wherever pipes pass through wood, concrete or masonry slabs, walls, floors or ceilings. Openings around exposed and concealed pipes or in sleeves for pipes passing through floor slabs, fire-rated walls, smoke partitions, or fire rated ceilings must be sealed with a noncombustible material. Seal at both sides of wall. Insulation shall not extend through sleeve. Pack sleeve opening with Dow Corning 3_6548 RTV silicone foam, 3M Fire Barrier or GE RTV. Depth of fill material shall provide same fire rating as floor or wall penetrated. Fiberglass is not acceptable except as a backing for the above materials.
E. Where a copper pipe connects to a steel pipe, the connection shall be made with a dielectric union or flanges with dielectric bolt sets. Dielectric couplings shall not be used. When connections are made at coils or similar situations which include such items as steel or cast iron balancing cocks, valves, pumps, flow indicators, etc. it is suggested that all piping in these areas to be steel with dielectric unions or flanges when connecting to copper mains, and/or a copper header coil. Where copper pipes cross iron pipes and in all similar conditions where isolation is necessary to eliminate electrolysis, the pipe shall be isolated with a PVC sheathing.
F. Heating water piping systems shall be cleaned with an approved compound.
G. Solder used for connections in copper tubing shall be 95/5 tin antimony or 94/6 or 96/4 tin-silver solder with recommended flux.
H. Escutcheon plate for finished areas shall be chrome-plated escutcheon plates and for unfinished areas, black iron escutcheon plates are acceptable.
PART 6 - PIPING
A. Condensate Drain and Relief Valve Discharge:
Copper type “L” hard tempered with Pro-Press or soldered joints and wrought copper fittings.
B. Natural Gas Aboveground 15 PSI or Less:
Black steel, Schedule 40, ASTM A-53, screwed 1/2” through 2” with 150# malleable iron joints.
Black steel, Schedule 40, ASTM A-53, butt welded 2-1/2” and larger with forged steel Schedule 40 butt welded joints.
C. Heating Water Piping Aboveground:
Type “L” hard temper copper with soldered wrought fittings or Pro-Press fitting. Schedule 40 ASTM A-53 black steel with weld fittings (2-1/2” and larger) and screwed fittings (2” and smaller) may be used in equipment and boiler rooms.
D. Refrigerant Piping:
Type ACR hard copper with streamline fittings and Alco or Sporlan specialties. Bone-dry nitrogen shall be bled into lines while soldering. Extra care shall be taken to insure cleanliness.
System shall be pressure and vacuum tested. A good refrigeration solder such as Sil-Fos shall be used in making joints. Install purge, charging and service valves as per manufacturer's recommendations and standards. Refrigeration piping shall in all cases conform to the air conditioning equipment manufacturer's recommendations and standards. Pre-charge refrigerant piping may not be used. After start-up, replace liquid line filter driers, if necessary.
PART 7 - VALVES
A. Balance, Check - Crane, Walworth, Nibco, Stockham or Milwaukee
B. Lubricated Plug - Homestead or Nordstrom
C. Ball - Smith, Crane, Apollo,Watts, Nibco or Milwaukee
D. Butterfly - Crane, Demco, Keystone, Stockham, Milwaukee, Nibco or Grinnell
E. Check Valves 2-1/2” and larger - Muessco, Metraflex, Grinnell Mission Duo Chek
F. Heating Water_Copper Tubing:
Ball - 125 psi, bronze body, Teflon trim - Watts B_6000.
Check - 125 psi, bronze body and trim - Crane 37.
Balance - 125 psi, bronze body and trim - Crane 250.
G. Natural gas shutoff - 125 psi, screwed - semi-steel body - Nordstrom 142 or Ball Valve -screwed - bronze body - Teflon trim - Watts B_6000.
PART 10 - HEATING WATER SPECIALTIES
A. Specialties in general shall be Bell and Gossett, Armstrong, Taco, or Thrush/Amtrol.
C. Air vents shall be Maid-O-Mist Model 72.
D. Strainers shall be “Y” Type, 125 psi - 1/32” size mesh. Steel pipe - Iron body - stainless steel or Monel strainer - Mueller #11 Copper pipe - Bronze body - brass strainer - Mueller #353-1/2.
Equivalent by Webster, Sarco or Hayward.
E. Pressure gages shall be H. O. Trerice #500X with cast aluminum case, 4-1/2” diameter white dial, black embossed figures and graduations, 1/4” NPT brass bottom connected socket.
Accuracy - 1/2 percent of the scale range. Provide shutoff needle valves equal to Trerice 735 or 740. Pet cocks will not be acceptable. On hydraulic system, provide Model 872 snubbers.
On steam system, provide Trerice Model 885-1, coil siphon.
F. Thermometers shall be H. O. Trerice #BX-91403-1/2 adjustable angle industrial thermometers with 9” scale, cast aluminum case, Model 3-4F2 size 2-1/2” brass separable socket 3/4” NPT.
Thermometers shall be installed in a manner that insures that the bulbs of the thermometers will be in a flow of fluid and yet not impair the flow of the fluid. Increase pipe size at these points if required. Equivalent gages, accessories and thermometers by Ashcroft, Jay, Palmer, Weiss, Weksler or Marsh are acceptable.
PART 12 - AIR DISTRIBUTION SYSTEM
A. Sheet Metal Ductwork:
Shall be fabricated and installed in accordance with the latest ASHRAE and SMACNA recommendations and in the best practices of good workmanship. All ductwork shall be constructed of prime hot dip galvanized sheet steel. Medium pressure ductwork shall be spiral round or oval as manufactured by United Sheet Metal, Semco, Norlock or Peabody and Wind.
While the drawings are to be adhered to as closely as possible, the right is reserved to vary the run and sizes of ducts during the progress of the work as may be found necessary or desirable to avoid local interferences.
Openings around exposed or concealed ductwork passing through walls, or partitions, when not protected by fire dampers or doors properly installed, shall be sealed with a sheet metal collar on both sides of the wall.
B. Manual Balancing Damper:
In low pressure square or rectangular ductwork less than 1 s.f. in area or less than 12” high shall be Titus Model AG-35B or equivalent by Grille, Register and Diffuser Manufacturer.
Damper in square or rectangular ductwork larger than the above shall be American Warming and Ventilating Company Type VC-1 or equivalent by Vent Products, Arrow, Ruskin, Safe Air or Louver and Damper, Inc.
C. Register, Grille and Diffuser:
Shall be as shown on the drawings with each register and diffuser containing manual volume control damper. Ceiling unit to have off-white finish, sidewall unit to have white finish. Exhaust register shall be fabricated of all aluminum construction. Unit shall be by Tuttle & Bailey, Titus, Carnes, Anemostat or Krueger.
D. Flue:
Shall be of double wall construction equal to Metalbestos or Ameri-Vent Products. Provide flue supports, spacers, storm collars, counterflashing cap, etc. to insure a weatherproof and fireproof installation.
E. Internal Duct Insulation:
Internally insulate all rectangular low pressure supply, return, relief and transfer ducts.
Insulation shall be 1” thick and shall meet the Erosion Test Method described in UL Publication No. 181. All linings including coatings and adhesives when tested on a composite basis shall have a flame spread rating of 25 or less and a…