This is an Invitation for Bids (IFB) document issued by the Oklahoma City Housing Authority (OCHA) for water damage restoration services at AMP 111 Marie McGuire, located at 1316 N.E. 12th Street, Oklahoma City, Oklahoma 73117. The project encompasses water damage restoration work at the residential facility, with sealed bids being solicited from qualified contractors. The IFB document specifies bid submission requirements, evaluation criteria, and contract terms. Interested bidders are required to submit their sealed bids by the stated deadline of July 15, 2026. Site visits and a bidders conference may be conducted prior to the bid submission date to allow contractors to assess project scope and ask clarifying questions. The contract award will be made to the lowest responsive and responsible bidder meeting all qualification requirements.

The pricing terms require contractors to submit sealed bids with itemized costs for all labor, materials, equipment, and services necessary to complete the water damage restoration project. The specific pricing structure, payment schedule, and contract amount are detailed within the IFB documentation. All qualified contractors are eligible to bid, with no stated set-asides or incumbent contractor preferences noted in the solicitation. The project is funded by OCHA operating or capital funds. Contract duration and any renewal options would be specified in the final contract terms awarded to the successful bidder.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB 2026-05

AMP 111, Marie McGuire Plaza Water Damage Restoration

INVITATION FOR BID (IFB)

Oklahoma City Housing Authority

Invitation for BID (IFB)

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 1

INVITATION FOR BIDS IFB NO. 2026-005

AMP 111, Marie McGuire Plaza Water Damage Restora�on

Owner: Oklahoma City Housing Authority

1700 N.E. 4th St., Oklahoma City, OK 73117

Contact: Spencer Matheny, smatheny@ochanet.org Support: Misty Johnson, mjohnson@ochanet.org

1. INTRODUCTION

The Oklahoma City Housing Authority (OCHA) is soliciting sealed bids from qualified contractors for the Water Damage Restoration at AMP 111 Marie McGuire, located at 1316 N.E. 12th Street, Oklahoma City, OK 73117

Work shall be performed in accordance with the specifications and conditions outlined in this Scope of Work and the reference documents Attachment H-1, Summit Claims, Inc. Scope of Damages, claim

#A8SMO

All construction activities must be coordinated to allow for uninterrupted operation of the occupied property. The contractor is responsible for ensuring that all resident access points—building entries and exits—remain clear, safe, and operational at all times throughout the duration of the project.

2. BID SUBMISSION

• Due Date: Thursday, September 3, 2026 @ 2:30 CST

• Bid Opening: Thursday, September 3, 2026 @ 2:30 CST Public – bidders may attend

• Pre-Bid Conference: Thursday, August 13, 2026 @ 09:00 CST

• Location: 1700 N.E. 4th Street, Oklahoma City, OK 73117

• Submission Format: One (1) original hard copy o It is the bidder’s sole responsibility to ensure delivery of the sealed bid by the deadline.

o Late deliveries, including delays by couriers or mail services, will not be accepted.

Ques�ons and Addenda

All questions or requests for clarification regarding this Invitation for Bids (IFB) must be submitted via the Housing Agency Market Place (HAM) website: https://www.housingagencymarketplace.com/

• Deadline for Questions:

All questions must be submitted no later than Thursday, August 20, 2026, at 12:00 CST.

• Addenda Issuance Deadline:

If necessary, a final addendum will be issued no later than Thursday, August 27, 2026.

Any responses or clarifications will be issued through formal written addenda and shared with all known prospective bidders. It is the bidder’s responsibility to ensure they have received and reviewed all issued mailto:smatheny@ochanet.org mailto:mjohnson@ochanet.org https://www.housingagencymarketplace.com/

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 2 addenda prior to bid submission. Failure to acknowledge any addenda may result in disqualification of the bid.

2.1 BID PACKAGE INSTRUCTIONS

Each bid package must include the documents listed below, organized in the order specified. This is a multi-step bidding process, and compliance with these instructions is mandatory for consideration.

Ini�al Bid Submission Requirements

All bidders are required to submit the following documents by the bid submittal deadline. Initial bid documents must be unfolded and enclosed in a sealed envelope clearly labeled with the IFB number and contractor information.

Required Documents (in order) for initial BID:

���� 1. OCHA 574 – IFB Contractor Contact Form ➤ Must be completed using the PDF fillable form.

���� 2. OCHA 571 – Pricing Worksheet (BID FORM)

���� 3. Certificate – BID Bond ➤ Equal to 5% of the total bid amount offered to complete the project.

���� 4. HUD 5369-A – Representations, Certifications, and Other Statements of Bidders

���� 5. Experience Summary (Résumé) ➤ Include a description of the contractor’s relevant qualifications and experience in performing similar work.

Failure to follow the specified formatting or omission of required documents may result in your bid being deemed non-responsive.

If you have any questions regarding document access or submission procedures, contact OCHA Contracting Officer prior to the bid deadline.

Each bid package must include the documents listed below, organized in the order specified.

This is a multi-step bidding process, as described:

• Step One – Required with Initial Bid Submission:

o Submit all documentation listed in Section A at the time of initial bidding.

• Step Two – Post-Bid Submission (Apparent Low Bidder Only):

o If determined to be the apparent low bidder, the contractor will be notified by OCHA and must submit or complete any additional required documentation outlined in Section B within 10 business days of notification.

• Step Three – Review:

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 3 o Apparent Low Bidder is expected to read and review the materials listed in Section C prior to submitting their required documents to the Contracting Officer.

• Step Four – For Use During the Project:

o The documents referenced in Section D are to be used throughout the duration of the project by the selected contractor.

A. Contractor to submit for initial BID.

1.1.1 OCHA 574 – IFB Contractor Contact Form

1.3 OCHA 571 – Pricing Worksheet

1.2 HUD 5369-A - Representations, Certifications, and Other Statements of Bidders Certificate BID Bond – 5% (entire amount - the contractor is offering to complete the project.)

Resume’ Experience Summary – (What experience do you have in providing such services requested)

Sealed bid packages must be delivered to:

Oklahoma City Housing Authority Attn: Technical Services Department 1700 NE 4th St.

Oklahoma City, OK 73117

B. Awarding of a Contract (apparent low bidder only) shall be conditioned on receipt of the following:

a. All documents listed below, along with any addi�onal documents requested by the Contrac�ng Officer, must be submited via email atachment to contractingoffice@ochanet.org.

b. All forms and documents provided as part of this Invitation for Bids (IFB) are fillable digital files. Contractors, please attempt to complete all documents electronically and submit them in digital format.

c. All required documents for this Invita�on for Bid (IFB) are included within the atached package, organized into four separate file folders for clarity and ease of reference.

d. Build America, Buy America Act (BABA) Compliance

TAB TITLE

1.1 OCHA 567 - Contractor Application

1.4 W-9 FORM - Request for Taxpayer Identification Number and Certification

1.5 F3881 ACH – Vendor / Miscellaneous Payment Enrollment Form

1.6 OCHA 569 – Contractor Requirements

1.7 OCHA 565 – Debarment and Suspension Certification

1.8 OCHA 566 – Section 3 Acknowledgment Form

1.9 HUD Form 5370 - General Conditions for Construction Contracts (Section 27 (3)

1.10 OCHA 570 – Non-Collusive Affidavit

mailto:contractingoffice@ochanet.org

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 4

1.11 OCHA 572 – Document Acknowledgement Form

1.12 HUD 4736B – Section 3 Employee – Employer Cert Form

Statement Financial Statement (within the past 60 days) Statement Submit a signed BABA Compliance Certification with their bid and must provide supporting documentation throughout the project to demonstrate adherence.

Statement Subcontractor List (if applicable) Certificate Certificate of Good Standing – State Level (Certificate of Existence or Certificate of

Status) Certificate Oklahoma Business License Certificate BID Bond 5%, Performance and Payment Bonds – 100% of the contract price Certificate Workers’ Comp, General Liability, and Automobile Insurance (Listing OCHA as additional insured) The apparent successful bidder will also direct its insurance broker or carrier to deliver directly to OCHA’s Contracting Officer (email is preferred)

NOTE: The apparent successful bidder will NOT deliver these certificates—the insurance broker or carrier will do so.

C. Awarding of Contract (Document Review) shall be reviewed before submitting:

TAB TITLE

2.1 HUD Form 5369 (Instructions to Bidders for Contracts)

2.3 HUD Form 2554 (Supplementary Conditions of the Contract for Construction)

2.4 HUD Form 4010 (Federal Labor Standards Provisions)

2.5 DBWD – (Building Wage Rates)

2.5.1 DBWD – (Residential Wage Rates)

2.6 OCHA 564 – Section 3 Information Pamphlet

2.7 Contract Sample only

D. The Awarded Contractor shall utilize throughout the duration of the project, including any additional items as required. Documentation must be provided upon request, as directed by the Contracting Officer.

TAB TITLE

3.1 OCHA 568 – Lien Waiver and Release Form (Last Payment Request – Final inspection approved))

3.2 HUD-51000 – Schedule of Amounts for Contract Payments

3.3 HUD-51001 – Periodic Estimate for Partial Payment

3.4 HUD-51002 – Schedule of Change Orders

3.5 HUD-51003 – Schedule of Materials Stored

3.6 HUD-51004 – Summary of Materials Stored

3.7 HUD-5372 – Construction Progress Schedule

3.8 WH-347 (Wage and Hour Division PAYROLL)

3.9 Section 3 Compliance Report

2.2 DAVIS BACON Federal Wage Rates

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 5

This work will be subject to all the requirements pertaining to Davis-Bacon work, including the applicable Federal forms and procedures (i.e., on-site interviews; cer�fied payrolls; etc.).

3. SCOPE OF WORK

Project Title: Water Damage Restoration at AMP 111, Marie McGuire Plaza

Project Location: AMP 111, 1316 N.E. 12th Street, Oklahoma City, OK 73117 Owner: Oklahoma City Housing Authority

3.1 Overview

The Oklahoma City Housing Authority (OCHA) is solici�ng sealed bids from qualified contractors to furnish all labor, materials, equipment, supervision, permits, inspec�ons, transporta�on, and incidentals necessary to complete water damage restora�on at Marie McGuire Plaza, located at 1316 NE 12th Street, Oklahoma City, Oklahoma.

The project consists of restoring water-damaged areas on Floors 2 through 9 of Marie McGuire Plaza, including the elevator common areas, laundry rooms, east and west hallways, janitor closets, and the lobby ceiling. The Contractor shall provide all labor, materials, equipment, supervision, permits, inspec�ons, and incidentals necessary to complete the Work in accordance with this Invita�on for Bids, the Summit Claims, Inc. Scope of Damages, Claim No. A8SM0, (Atachment H-1) the Contract Documents, applicable plans and specifica�ons, manufacturer recommenda�ons, applicable building codes, and all federal, state, and local laws, regula�ons, and ordinances.

3.2 General Scope

The following scope applies to each affected floor's elevator common area, laundry room, hallways, lobby and janitor closet on floors 2 through 9 .

Elevator Common Areas

• Clean and restore exis�ng hard-surface flooring.

• Remove and replace water-damaged 5/8" drywall sec�ons.

• Tape and finish joints to blend new drywall with exis�ng surfaces.

• Skim coat/texture all affected wall surfaces to match adjacent surface.

• Prime all repaired and affected wall surfaces with PVA primer.

• Paint walls with two finish coats.

• Protect floors and adjacent finishes during pain�ng opera�ons.

• Remove and replace damaged rubber/vinyl cove base.

• Remove and replace damaged suspended acous�cal ceiling �les.

• Perform final construc�on cleaning.

Laundry Rooms

• Clean and restore exis�ng flooring.

• Remove and replace water-damaged drywall.

• Tape, finish, texture, prime, and paint affected wall surfaces.

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 6

• Remove and replace damaged suspended ceiling �les.

• Remove and replace damaged cove base.

• Detach and reset electrical devices as necessary.

• Replace damaged 220V receptacles.

• Replace damaged switches and associated wiring.

• Protect floors during restora�on.

• Perform final cleaning upon comple�on.

East and West Hallways

• Clean and restore flooring surfaces.

• Perform final construc�on cleaning of affected hallway areas.

Janitor Closets

• Clean and restore floor surfaces.

• Remove and replace water-damaged drywall.

• Tape, finish, texture, prime, and paint affected walls.

• Remove and replace damaged suspended ceiling �les.

• Remove and replace damaged cove base.

• Provide electrician labor to detach and reset electrical panels and accessories as required.

• Protect flooring and adjacent finishes during repairs.

• Perform final cleaning.

Lobby

• Clean ceiling wood grid system. Remove remaining decora�ve 1x6’s and stain/seal to match structural wood where 1x6’s were previously atached.

• Perform cleaning labor associated with lobby ceiling restora�on.

Paint

• Paint colors are based on Sherwin-Williams®. Any subs�tu�ons shall match Sherwin-Williams® selec�ons.

o Main Entrance – Wainscot: SW6253, Olympus White. Area above Wainscot:SW6226, Languid Blue. Wall: SW6253 Olympus White o Elevators – Doors: SW6228, Refuge. Door Frames: SW6226, Languid Blue o Lobby, Maintenance Office, Restrooms, Game Room, Cra� Room, Library, Community Center, Dining Room, Hallways, Trash Rooms, Stairway Walls and Ceilings – SW6253, Olympus White.

o Stairway Handrails – SW6258, Tricorn Black o Apartment doors – SW6228 Refuge o Door Frames and Casings – SW6226, Languid Blue o Manager and Assistant Manager Office – SW9158, Coquina o Sunrooms and Service Coordinators Office – SW9158, Languid Blue

3.2 General Condi�ons

• Furnish demoli�on labor for debris removal from floors 1 through 9.

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 7

• Contractor will be responsible to have removed from site, all associated debris involved in this contract on a daily basis or may use a dropped dumpster with approved loca�on from the OCHA Representa�ve.

• Provide commercial project management and supervision.

• Furnish temporary toilet facili�es.

• Furnish temporary handwashing sta�on.

• Obtain required permits and maintain insurance as necessary for the work

3.3 Occupied Facility Requirements

The Marie McGuire Plaza will remain occupied throughout construction. The Contractor shall coordinate all work with OCHA to minimize disruption to residents and staff while maintaining safe access to all occupied areas at all times. Existing finishes not designated for replacement shall be protected throughout construction, and work areas shall be maintained in a clean and orderly condition at the conclusion of each workday. Placement of construction equipment, dumpsters, temporary toilet facilities, staging areas, or stored materials shall require prior approval from OCHA.

3.4. Codes and Standards

All work shall comply with all applicable federal, state, and local building codes, OSHA safety requirements, manufacturer recommendations, and all other regulations governing the restoration work.

Materials and workmanship shall be of commercial quality and installed in accordance with industry standards.

Upon completion of the work, the Contractor shall remove all debris and temporary facilities from the site and perform a final cleaning of all affected areas. Final acceptance shall be contingent upon satisfactory completion of all punch list items and submission of any required warranties, permits, inspection reports, and closeout documentation requested by OCHA.

5. PAYMENT TERMS

All federally required forms and compliance documents must be submitted as applicable throughout the project. Certified Payroll Reports (Form WH-347) must be submitted weekly for all contractors and subcontractor personnel. These reports are a condition of payment and must accompany each payment request.

• Progress Payments:

• Payments will be made on a monthly basis and will be issued upon verification of completed work.

• Retainage:

A 10% retainage will be withheld from each progress payment.

o The Request for Payment form must clearly identify the retainage as a 10% deduction from the subtotal.

• Payment Request Requirements:

Each request for payment must include:

o A detailed invoice showing:

Description of work completed Associated costs for each task, item, or service

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 8

Project name and IFB number Invoice number and date Period of performance covered o Back-up documentation, as applicable:

Subcontractor invoices Material receipts Time logs or progress reports o All required HUD compliance forms listed in this IFB o Certified Payroll Reports (Form WH-347) for the billing period

• Final Payment and Retainage Release:

Final retainage will only be released upon:

o Completion and written approval of the final punch list o Submission and approval of all required close-out documentation o Final acceptance of work by OCHA

• Submission:

o All payment requests must be submitted to the Contracting Officer or designee for review and approval.

o Incomplete Cer�fied Payroll Reports (Form WH-347) or missing compliance documenta�on will result in delayed processing of payment requests.

6. EVALUATION & RATING SCHEDULE

Failure to meet any mandatory pass/fail criteria listed in the Evalua�on and Ra�ng Schedule will result in automa�c disqualifica�on of the bid.

Evaluation Factor Method Requirement

Licensing and Insurance Pass/Fail Required

SAM.gov / HUD Clearance Pass/Fail Required

Years in Business Pass/Fail Minimum 3 years

Similar Projects Completed Pass/Fail Minimum of 2 projects

Bid Form Complete and Signed Pass/Fail Required

Total Bid Price Lowest Cost Determines award

7. RESERVATION OF RIGHTS

OCHA reserves the right to:

• Reject any or all bids

• Not to award a contract pursuant to this IFB

• Waive informalities in the IFB process

• Terminate the IFB or awarded contract at any time for convenience

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 9

• Retain bids for 60 days without withdrawal

• Require additional documentation to assess bidder responsibility

• No obligation to compensate any bidder for any costs incurred in responding to this IFB.

8. INSURANCE AND LICENSING REQUIREMENTS

Prior to contract execution, the selected contractor must provide the following documentation:

8.1 Workers’ Compensation Insurance

• Workers' Compensation Insurance: Required for all employees including active owners.

Note: The CC-Form 36A (Affidavit of Exempt Status) will not be accepted as a substitute for coverage.

8.2 General Liability Insurance

• General Liability Insurance: Must provide a minimum of $1,000,000 per occurrence and a $2,000,000 aggregate limit for bodily injury and property damage.

• Automobile Liability Insurance: Must provide a combined single limit of $1,000,000 per occurrence and a $2,000,000 aggregate, covering all owned, hired, and non-owned vehicles used in the performance of the work.

OCHA must be listed as the certificate holder. The insurance document name must match the business name on application and bid documents.

8.3 Business License

If required by local law, a copy of the contractor’s valid business license authorizing operation within the City of Oklahoma City, Oklahoma County, and/or the State of Oklahoma.

9. BOND REQUIREMENTS

The following bonds are required for this Invitation for Bids (IFB) in accordance with HUD and OCHA procurement policy:

Bond Type When Required Amount Bid Guarantee Must be submitted with the bid At least 5% of the bid price

Performance Bond Required before contract execution (upon award) 100% of the contract price

Payment Bond Required before contract execution (upon award) 100% of the contract price

Failure to submit the required bid guarantee or to furnish the performance and payment bonds upon award may result in disqualification and forfeiture of award.

10. NOTES

IFB # IFB2026-005, AMP 111, Marie McGuire Plaza Water Damage Restoration Page 10

Permits. The Contractor shall obtain any and all required permits pertaining to any assigned work at his/her expense.

No Escalation of Firm-fixed Fees. There shall be no escalation of the proposed firm-fixed fee amounts proposed and awarded at any time during the ensuing contract periods (except for, as designated by HUD, appropriate OCHA-approved change orders awarded for “unforeseen conditions” within the general scope of work).

Contract Form. OCHA will not execute a contract on the successful bidder's form—contracts will only be executed on OCHA’s form.

Prompt Return of Contract Documents. Any and all documents required to complete the contract, including contract signature by the successful bidders, shall be provided to the Agency within 10 workdays of notification by the Agency.

11. END OF BID REQUEST

Questions and Addenda
Initial Bid Submission Requirements
Required Documents (in order) for initial BID:
📄 1. OCHA 574 – IFB Contractor Contact Form
📄 2. OCHA 571 – Pricing Worksheet (BID FORM)
📄 3. Certificate – BID Bond
📄 4. HUD 5369-A – Representations, Certifications, and Other Statements of Bidders
📄 5. Experience Summary (Résumé)
Step One – Required with Initial Bid Submission:
Step Two – Post-Bid Submission (Apparent Low Bidder Only):
Step Three – Review:
Step Four – For Use During the Project:
This work will be subject to all the requirements pertaining to Davis-Bacon work, including the applicable Federal forms and procedures (i.e., on-site interviews; certified payrolls; etc.).
3. SCOPE OF WORK
3.1 Overview
The Oklahoma City Housing Authority (OCHA) is soliciting sealed bids from qualified contractors to furnish all labor, materials, equipment, supervision, permits, inspections, transportation, and incidentals necessary to complete water damage restorati...
The project consists of restoring water-damaged areas on Floors 2 through 9 of Marie McGuire Plaza, including the elevator common areas, laundry rooms, east and west hallways, janitor closets, and the lobby ceiling. The Contractor shall provide all la...
3.2 General Scope
3.3 Occupied Facility Requirements
The Marie McGuire Plaza will remain occupied throughout construction. The Contractor shall coordinate all work with OCHA to minimize disruption to residents and staff while maintaining safe access to all occupied areas at all times. Existing finishes ...
3.4. Codes and Standards
All work shall comply with all applicable federal, state, and local building codes, OSHA safety requirements, manufacturer recommendations, and all other regulations governing the restoration work. Materials and workmanship shall be of commercial qual...
6. EVALUATION & RATING SCHEDULE
7. RESERVATION OF RIGHTS
8.1 Workers’ Compensation Insurance
8.2 General Liability Insurance
8.3 Business License