McGrath_House_Kitchen_Renovations.pdf
PDF 250 KB Posted
- Attached to
- McGrath House Kitchen Renovations
- Solicitation number
- CGB02027B
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
This is an Invitation to Bid (ITB) document issued by the City of Bridgeport Department of Public Purchases for kitchen renovations and boiler replacement services at the McGrath House property. The project encompasses three residential units located at 465, 467, and 469 Summit Street, Bridgeport, Connecticut. The scope of work includes kitchen cabinet installation (Hampton Bay Shaker White wood cabinets), countertop installation with bullnose edges, luxury vinyl plank flooring with moisture-barrier underlayment, LED panel lighting fixtures, 30-inch ducted range hoods, and one high-efficiency gas boiler replacement (GWA 100-N-S3 model, 100,000 BTU capacity) in the basement. Bidders must submit responses electronically through the City's OpenGov procurement portal at https://procurement.opengov.com/portal/bridgeportct or by sealed paper submission to the Department of Public Purchases, 2nd Floor, 999 Broad Street, Bridgeport, CT 06604. The bid submission deadline is Wednesday, November 4, 2026, at 2:00 pm Eastern Standard Time. A mandatory pre-bid meeting and site walk-through is scheduled for Tuesday, October 13, 2026, at 10:00 am at the project address; bidders arriving more than ten minutes late will be deemed ineligible. The cut-off date for submitting written questions is 4:00 pm on Wednesday, October 21, 2026.
Pricing is structured using a lump-sum bid format with four line items: boiler replacement, first-floor kitchen, second-floor kitchen, and third-floor kitchen. A bid bond or certified check equivalent to 10 percent of the bid is required if the total bid amount is $100,000 or more. Upon award, the successful contractor must post a payment and performance bond equal to 100% of the contract price if the contract exceeds $100,000. Davis-Bacon prevailing wage rates apply to this project, as determined by the U.S. Secretary of Labor. The contractor must be licensed in Connecticut, obtain all required building permits and inspections at their own expense, maintain a Certificate of Insurance listing the City as an additional insured with 30 days' notice of cancellation, and comply with all applicable Connecticut Building Code and Bridgeport municipal requirements. The City is exempt from Connecticut sales tax, and no taxes should be included in the bid quotation. The contract award will be made to the responsible bidder whose bid is most advantageous to the City in terms of cost and other factors such as lead time and equipment availability.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
CGB02027B
MCGRATH HOUSE KITCHEN RENOVATIONS
CITY OF BRIDGEPORT
DEPARTMENT OF PUBLIC PURCHASES
999 BROAD STREET
BRIDGEPORT CT 06604
Submission Deadline:
Wednesday, November 4, 2026 by 2:00 pm
Table Of Contents
1. Introduction
2. Invitation to Bid
3. Bid Information
4. Scope of Work
5. Bid Sheet
6. Submission Instructions
7. Terms and Conditions
8. Vendor Questionnaire & Submission
Attachments:
A - Davis Bacon Wage_General Decision Number CT20260020 05182026
B - GENERAL CONDITIONS - FINAL REV. FEB 2026 - HIGHER LIMITS
C - HCD - Draft Agreement
D - Construction Services Insurance Rider
1. Introduction
The City of Bridgeport seeks bids for McGrath House Kitchen Renovations.
The requirements of this bid are outlined in greater detail under Bid Information & Statement of Work Section.
The selected awardee must meet all municipal, State and Federal practices and requirements.
1.1. Department of Housing and Community Development
The City of Bridgeport Department of Housing & Community Development
(HCD) developed as part of the City's broader effort to address affordable housing, neighborhood revitalization, poverty, homelessness, and deteriorating housing conditions. Its work is closely connected to federal housing and community-development programs administered through the U.S. Department of Housing and Urban Development (HUD).
2. Invitation to Bid
The City of Bridgeport's Department of Housing & Community Development (HCD) seeks bids for Kitchen Renovations and one Gas Boiler Replacement at 465, 467 & 469 Summit St, units 1, 2 and 3. The remodels consist of but not limited to, Replacement of Kitchen cabinets, countertops, flooring, lighting, rang hood and one (1) replacement of new gas boiler. The selected contractor is required to provide materials, equipment, labor and high level of competency on the designated job to meet CT State Building Code, and that of Bridgeport.
Interested firms should respond to this request on or before the time due for submission.
Submissions will be received by the City of Bridgeport, Department of Public Purchases, 2nd floor, 999 Broad Street, Bridgeport, CT 06604 until 2:00 pm on Wednesday, November 4, 2026, at which time and then at said office will be publicly opened.
PRE-BID MEETING AND SITE VISIT:
FAILURE OF A BIDDER TO ATTEND THE MANDATORY PRE-BID MEETING OR TO
ARRIVE MORE THAN TEN (10) MINUTES LATE TO THE MEETING WILL RESULT IN
INELIGIBILITY TO PARTICIPATE IN THIS PROJECT
A mandatory pre-bid meeting/walk-thru will be held on Tuesday, October 13, 2026 @ 10:00 am at 465, 467 & 469 Summit Street, Bridgeport, CT 06607. All prospective bidders must attend the schedule meeting. This meeting will begin promptly at 10:00 am. Prospective bidders arriving more than (10) minutes after the starting time will result in ineligibility to participate in this project.
3. Bid Information
3.1. Contractors Requirements and Responsibilities
Contractor must be licensed in the State of Connecticut and all employees must be properly certified and qualified to perform the work. Out of state bidder must provide the City of
Bridgeport with a Certificate of Authority to Do Business in the State of Connecticut within five days of a Notice of Intent to Award. This can be obtained from the Connecticut Secretary of
State.
The contractor will be responsible for the safety of the work site.
The contractor is responsible obtaining and paying for any and all permits as required.
This contract award will require that the successful vendor have a valid SAM, DUNS, CT and
Federal Tax ID numbers prior to commencing work.
The Contractor is prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
3.2. General Contractor Responsibilities
The Contractor shall:
• Field verify all existing dimensions, elevations, utilities, and site conditions before beginning work.
• Promptly notify the owner of any discrepancies, conflicts, or unforeseen conditions before proceeding with affected work.
• Obtain and pay for all required permits, inspections, approvals, and related fees.
• Do not commence work until all required permits and authorizations are obtained.
• Maintain a safe, secure, and orderly work area throughout construction.
• Repair or replace existing or new work damaged during construction at no additional cost to the
Owner.
• The successful bidder will be required to obtain all necessary licenses and permits necessary to perform the work.
• The contractor must, within ten days of receipt of the notice of award, submit the following insurance documentation: (a) Original certificate of insurance for General Liability in the amount by City of Bridgeport Policies.
• Always maintain a clean and safe job site. All debris shall be removed regularly and deposited off in accordance with local regulations.
• Temporary protection must be installed such as signage, barriers shall be provided to protect the public, and workers.
• All materials should be new and of a commercially graded quality. Substitution must be approved in writing to the Architect or owner.
3.3. Bid Bond
Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with bid submission if the bid is $100,000.00 or more.
3.4. Payment and Performance Bond
The successful bidder, prior to permission to proceed, will be required to post payment & performance bonds of 100% of the contract price if the contract price is $100,000 or more.
3.5. Davis-Bacon Wage Rates
Davis-Bacon wage rates apply, see attachment section copy of the wage determination.
Davis-Bacon Act. The law provides that contracts in excess of $2,000 involving the United
States or the District of Columbia for construction, alteration, or repair (including painting and decorating) of public buildings or public works within the U.S., must contain a clause (see
Federal Acquisition Regulation part 52.222-6) that no laborer or mechanic employed directly upon the site of the work shall receive less than the prevailing wage rates as determined by the
U.S. Secretary of Labor.
3.6. Certificate of Insurance (COI)
It is strongly recommended that a certificate of insurance (COI) including workers compensation with the City listed as additionally insured be included with your bid submission. Prior to award a satisfactory COI will be required. Policies listing auto and general liability insurance with endorsement of additional insure and notice of cancellation will be requested.
3.7. Minority and Buy Local
INTENTIONALLY OMITTED
3.8. Minority Business Enterprise (MBE) and, or as a City Based Business (CBB):
INTENTIONALLY OMITTED
4. Scope of Work
Services shall include but not be limited to: renovations and/or improvements, general maintenance, cleaning, miscellaneous carpentry, plumbing, electrical work, flooring, and other related work.
The Contractor shall be solely responsible for obtaining all building permits required for any work completed for this Contract and ensuring that all building inspections are successfully completed.
4.1. SCOPE OF WORK & SPECIFICATIONS
The installation of cabinets, with hardware, countertops, led panel light, laminate flooring, and supplying with ONE (1) new gas boiler and stove hoods.
Temporary protection must be installed such as signage, barriers shall be provided to protect the public, and workers.
4.2. BASEMENT
1. Gas Boiler Replacement: In the basement boiler room, remove the existing oil burner and provide and install a new high-efficiency GWA 100-N-S3 Gas boiler with a rated heating https://www.acquisition.gov/far/part-52#FAR_52_222_6 capacity of 100,000 BTU. Installation shall include all necessary connections, adjustments, testing, and commissioning in accordance with applicable manufacturer specifications and codes.
4.3. 1ST FLOOR KITCHEN
1. Cabinets: Provide and install Hampton Bay Shaker White wood cabinets for both upper and lower cabinet sections. All cabinet dimensions shall be field verified prior to fabrication and installation to ensure proper fit and alignment.
2. Bullnose Countertop: Provide and install a bullnose countertop on the Shaker White base cabinets. All countertop dimensions shall be field verified prior to fabrication and installation.
3. Range Hood: Field verify all required dimensions and provide and install a 30-inch, 380 CFM ducted wall-mount range hood above the stove. The range hood shall be properly ducted and vented to the exterior of the building in accordance with applicable building and mechanical codes.
4. Kitchen Lighting and Electrical: Remove the existing kitchen lighting fixtures. Provide and install 2-foot x 2-foot, 5,800-lumen integrated LED panel lights mounted on the ceiling. Provide all necessary electrical connections, wiring, switches, and components in accordance with applicable electrical codes.
5. Flooring Underlayment: Provide and install a moisture-barrier underlayment over the entire floor surface prior to installation of vinyl laminate flooring. Field verify all floor dimensions and quantities required for proper installation.
6. Luxury Vinyl Plank Flooring: Provide and install Grip Strip water-resistant luxury vinyl plank flooring over the moisture-barrier underlayment throughout the specified floor area. All field dimensions shall be verified prior to installation to ensure proper material quantities, layout, and fit.
4.4. 2ND FLOOR KITCHEN
1. Kitchen Cabinets: Provide and install Hampton Bay Shaker White wood cabinets for the upper and lower cabinet sections. All cabinet dimensions shall be field verified prior to fabrication and installation to ensure proper fit, alignment, and layout.
2. Bullnose Countertop: Provide and install a bullnose countertop on the Shaker White base cabinets. All countertop dimensions shall be field verified prior to fabrication and installation.
3. Range Hood: Field verify all required dimensions and provide and install a 30-inch, 380 CFM ducted wall-mount range hood above the stove. The range hood shall be properly connected and reduced as required for proper ventilation.
4. Kitchen Lighting and Electrical: Remove the existing kitchen lighting fixtures and provide and install 2-foot x 2-foot, 5,800-lumen integrated LED panel lights on the ceiling. Provide all necessary electrical connections, wiring, switches, and related components in accordance with applicable electrical codes.
5. Flooring Underlayment: Provide and install moisture-barrier underlayment over the entire specified floor area in preparation for vinyl laminate flooring. Field verify all floor dimensions prior to installation to determine the required materials and ensure proper coverage.
6. Luxury Vinyl Plank Flooring: Provide and install Grip Strip water-resistant luxury vinyl plank flooring over the moisture-barrier underlayment throughout all floor areas of the apartment. Field verify all dimensions prior to installation to ensure proper material quantities, layout, and fit.
4.5. 3RD FLOOR KITCHEN
1. Kitchen Cabinets: Provide and install Hampton Bay Shaker White wood cabinets for the upper and lower cabinet sections. All cabinet dimensions shall be field verified prior to fabrication and installation to ensure proper fit, alignment, and layout.
2. Bullnose Countertop: Provide and install a bullnose countertop on the Shaker White base cabinets. All countertop dimensions shall be field verified prior to fabrication and installation.
3. Range Hood: Field verify all required dimensions and provide and install a 30-inch, 380 CFM ducted wall-mount range hood above the stove. Provide all necessary ductwork and connections for proper ventilation to the exterior, as required by applicable codes.
4. Kitchen Lighting and Electrical: Remove the existing kitchen lighting fixtures and provide and install 2-foot x 2-foot, 5,800-lumen integrated LED panel lights on the ceiling. Provide all necessary electrical connections, wiring, switches, and related components in accordance with applicable electrical codes.
5. Flooring Underlayment: Provide and install moisture-barrier underlayment over the entire specified floor area in preparation for vinyl laminate flooring. Field verify all floor dimensions prior to installation to ensure proper coverage and material quantities.
6. Luxury Vinyl Plank Flooring: Provide and install Grip Strip water-resistant luxury vinyl plank flooring over the moisture-barrier underlayment throughout all floor areas of the apartment. Field verify all dimensions prior to installation to ensure proper material quantities, layout, and fit.
4.6. Key Deliverables
The City of Bridgeport must provide a list of key deliverables i.e. transparent & “reliable” fees, superior customer service & responsiveness, demonstrated commitment to innovation and continuous improvement.
A. BOILER REPLACEMENT
B. FLOOR REPLACEMENT
C. LIGHT INSTALLATION
D. RANGE HOOD INSTALLATION
4.7. Schedule, Timeline, and Milestone Tracking EXHIBIT B SCHEDULE OF WORK
The project timeline should be outlined here. Key milestones, including start date, major dates, and any associated milestone payment schedules, including a project completion date, should be inserted here. In the context of a project timeline, requiring milestone payments are considered project specific, and may not apply to all projects.
5. Bid Sheet
MCGRATH HOUSE KITCHEN RENOVATIONS
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 BOILER REPLACEMENT 1 LUMP SUM
2 1ST FLOOR KITCHEN 1 LUMP SUM
3 2ND FLOOR KITCHEN 1 LUMP SUM
4 3RD FLOOR KITCHEN 1 LUMP SUM
TOTAL
6. Submission Instructions
6.1. Submission Instructions
All submissions must be submitted via the procurement portal.
Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.
6.2. Contacting the City of Bridgeport
The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.
The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.
Instructions to do so are as follows:
1. Go to the procurement portal, OpenGov https://procurement.opengov.com/portal/bridgeportct https://procurement.opengov.com/portal/bridgeportct
2. Click on any bid you see. It will take you that bid’s page.
3. On the right-hand side of the page, click on Register now for free!
4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.
If you have any trouble registering, please contact OpenGov using the chat feature or send an email to procurement-support@opengov.com
General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. All answers will be published in the form of addenda on the procurement portal.
Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
6.3. Electronic Submission Instructions
THIS METHOD IS PREFERRED.
The City of Bridgeport is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup.
Once you have completed account registration, browse back to this page, click on "Submit
Response", and follow the instructions to submit the electronic bid.
6.4. Paper Submission Instructions
SPECIAL SUBMISSION CIRCUMSTANCES ONLY
SEALED ONE (1) ORIGINAL, THREE (3) COPIES AND ONE (1) ELECTRONIC VIA
THUMBDRIVE MUST BE SUBMITTED.
Bid Submission: Sealed submissions must be received and time-stamped by the Department of
Public Purchases prior to ITB closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’
Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your
ITB envelope as follows:
CGB02027B McGrath House Kitchen Renovations mailto:procurement-support@opengov.com https://procurement.opengov.com/signup
If your envelope is not marked accordingly, the City will not assume responsibility for late delivery or deliver to the incorrect location.
Mail your submissions to:
Jennifer Krajnak City of Bridgeport Department of Public Purchases 2nd floor, 999 Broad Street Bridgeport, CT 06604
ITB submissions are due:
Wednesday, November 4, 2026 no later than 2:00 pm Eastern Standard Time (EST)
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
NOTE: IF THE MARGARET E. MORTON GOVERNMENT CENTER, 999 BROAD STREET
BRIDGEPORT, CT IS CLOSED FOR ANY UNFORESEEN EVENT, BIDS WILL BE DUE AT
THE SAME TIME ON THE NEXT BUSINESS DAY THAT THE MARGARET E. MORTON
GOVERNMENT CENTER IS OPEN
6.5. Submission Compliance
Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of
Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.
No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No
Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No
Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.
Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.
Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.
Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.
6.6. Reservation of Rights
This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:
Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the
City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.
Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process
Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.
MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.
Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.
Purchase Order: No work of deliveries shall be performed under the contract award until a
Purchase Order has been issued by the Purchasing Department.
Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the
City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.
Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice. Please keep in mind dates are estimates only and are subject to change.
Liability: The City of Bridgeport is not liable to any Respondent for damages of any type, however arising.
Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.
7. Terms and Conditions
The selected awardee(s) must meet all municipal, State and Federal practices and requirements.
7.1. Terms and Conditions
All City of Bridgeport contracture terms, conditions, and requirements apply.
7.2. Payment Terms
All payments will be made in accordance with the terms and conditions set forth in the resulting
Agreement.
7.3. Warranty and Support
In addition to any warranty implied by law or fact, and any other express warranties, bidder expressly warrants all items to be free from defects in design, workmanship and materials to conform strictly to applicable specifications and to be fit and sufficient for the purpose intended to be merchantable. All warranties shall survive inspection, test, acceptance of and payment by the City.
7.4. Openness of Procurement Process
Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.
7.5. Errors and Omissions
Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.
7.6. Collusion
By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the
Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.
7.7. Suspension and Debarment
The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part
31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945.
The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.
By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:
The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.
7.8. Insurance Requirements
Prior to award a satisfactory Certificate of Insurance (COI) will be required. See attachment section for Construction Services insurance coverage.
7.9. Conflict of Interest
The proposer certifies that to the best to their knowledge or belief, no elected/appointed official or employee of the City is financially interested, directly or indirectly, in the purchase of the foods or services specified in this Request for Proposal.
Proposers are required to complete and answer the No Conflict form located in the Vendor
Questionnaire & Submission section.
7.10. City Exempt from Certain Taxes
The City is exempt from certain Connecticut sales taxes under Title 12, Chapter 219 of the
Connecticut General Statues, as amended from time to time. Services and materials for this project are exempt from State of Connecticut sales tax.
8. Vendor Questionnaire & Submission
1. Federal I.D. Number or Social Security Number:*
*Response required
2. Confirmation*
Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.
☐ Please confirm
*Response required
3. Contractor's License Number*
*Response required
4. BID BOND: *
Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with bid submission if the bid is $100,000.00 or more.
*Response required
5. Contractor's Designation of Compliance Officer*
Please download the below documents, complete, and upload.
• Contractor's_Designation_of...
*Response required
6. Contractor's Good Standing Certification*
Please download the below documents, complete, and upload.
• Contractor's_Good_Standing_...
*Response required
7. Contractor's Davis-Bacon Wage Rate Certification Form*
Please download the below documents, complete, and upload.
• Contractor's_Davis_Bacon_Wa...
https://government-project.s3.us-west-2.amazonaws.com/115403/3faa8962-fb0f-477e-9640-3d6a6e5da7b5_Contractor%27s_Designation_of_Compliance_Officer.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/c66f2928-6ed1-487c-b379-a483753f60fe_Contractor%27s_Good_Standing_Certification.pdf https://government-project.s3.us-west-2.amazonaws.com/304944/16b945eb-84b8-4f35-8cc1-5e686f135485_Contractor%27s_Davis_Bacon_Wage_Rate_Certification_Form.pdf
*Response required
8. Equal Opportunity Policy Statement*
Please download the below documents, complete, and upload.
• Equal_Opportunity_Policy_St...
*Response required
9. No Conflicts-Disclosure Form*
Please download the below documents, complete, and upload.
• NO_CONFLICTS_FORM_10-2018_a...
*Response required
10. McGrath House Schedule of Work*
Please download the below documents, complete, and upload.
• McGrath_House_Schedule_of_W...
*Response required
11. Additional Vendor Documents (optional)
Vendor can upload additional documents relevant to solicitation.
https://government-project.s3.us-west-2.amazonaws.com/115403/c3bb68fd-8bdb-4117-814f-2c90076a67e8_Equal_Opportunity_Policy_Statement_09162025REV.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/31223730-5bed-41f3-bdeb-c2f97ce250c6_NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HXD6CLXY%2F20261005%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261005T040001Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEAsaCXVzLXdlc3QtMiJHMEUCIQDApRnpCVNh8cKIpHpupKFLTUK8Eb2iSSsZbgMu%2FQkvcwIgYUgXwV8YsNu820ne9WPHvcG6bYfmW4l0OF3zBMlfoXAqlQUI0%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDADvQsXVIBCZt41a7SrpBAE9VYAnJdR661X3EdDkcSmJgjCZNfMvFtAlNFu0AAc1VaEUUxkIXIrLBUgiWLI0O%2B8NTvkvMBD3KlI0fU3YUDXjuYWOxDJmzLfgwCw%2Fvt5DYqZrl%2F9jqnAAum1ubSBEk6ceP6qxgZd1ixXhX0ggBEwq4hkTuQDhHAgqIXPXJNcZx8qoi2CvUX38D0x8e1Fzi8OGTst7MZiygbBQgwo%2FfeB%2FqKqMT9soN4DhTesx21R0WFBodirDpeW%2FXDIgaFd0Qxc%2FOGEWlgqFYGoT8Zw7x4Ae6cFs0sxskfZNAQcLTYGciirHRKd5JqMisEqbzUJE1PDhAoyk6xmwa87EZfyWbqyxO6mreefDemOo0eK%2BSUOnMqHYdrh2%2FkFlgdzptmEc%2B%2B69t2YNEhdyDlY4Yudp3OAWfk7v30U0%2F4ly8z%2BxlgTtgpYmKwvlPdRquIpV%2FNJCFO8wliVk4vTxOUsCs1Tght6pd1cJsZgeYteTac0rpPMd%2FmP5ncWuFUuIsW%2BcU63sIavSnLhYbCjagPAGaMyXbeCjzLtFcivfYTCtC0Jb%2FZMP2HP8hcufTkNvyEYrJU4z8duXdJE7Hl%2FkyzTxB4%2BPCoFjiWuKgdvcBcfh%2BSAUdmvAO8sz8VDbje1wxx%2FSTev1YxA7ZgJVmCluXrdW5nyUEV%2Bii8v9im%2F6iY5UzIdYvJMHsWdm17tGrutk2FGv%2Bw7JipKnCldgVaIIRvr6iBKIZbgfkBWJH0oKeq1p%2FXIYkwF22LQ1z868ceQcmBWIu1V%2FXsw5yl%2FNeHXRFz7H8C8guLP3MHMdFGnaSeXCRv%2BKssC5%2FtUiD%2FmmBbpjMPWWjNYGOpkBtIL5Kj0eUqFdi11pJovJfzpfIqueb4lCkak4tEXLL%2BNChhlXy4Wv4GSu9q0NRp7ki%2Fwi0ipYABFRX2%2FwWgZ0OUPS%2BEzkioyFLxDd%2FAKpnQJd5g3wne6AXt2MFSXhPUTqCAOtOb4RIy6b9%2BmWjrktnRu7uSkqzb4Tb8mDBIcg2TFQShwjHe1aIFhH6UR4vzk2MEOBXNiVdbvH&X-Amz-Signature=afe30da29801814621b9e9232c91c66b24c981c5663079da714531d7faa5bb5e&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/304944/ab20ef82-b33c-41f4-9a37-ef629a7b26f5_McGrath_House_Schedule_of_Work.pdf
| 1. Introduction |
| 1.1. Department of Housing and Community Development |
| 2. Invitation to Bid |
| 3. Bid Information |
| 3.1. Contractors Requirements and Responsibilities |
| 3.2. General Contractor Responsibilities |
| 3.3. Bid Bond |
| 3.4. Payment and Performance Bond |
| 3.5. Davis-Bacon Wage Rates |
| 3.6. Certificate of Insurance (COI) |
| 3.7. Minority and Buy Local |
| 3.8. Minority Business Enterprise (MBE) and, or as a City Based Business (CBB): |
| 4. Scope of Work |
| 4.1. SCOPE OF WORK & SPECIFICATIONS |
| 4.2. BASEMENT |
| 4.3. 1ST FLOOR KITCHEN |
| 4.4. 2ND FLOOR KITCHEN |
| 4.5. 3RD FLOOR KITCHEN |
| 4.6. Key Deliverables |
| 4.7. Schedule, Timeline, and Milestone Tracking EXHIBIT B SCHEDULE OF WORK |
| 5. Bid Sheet |
| 6. Submission Instructions |
| 6.1. Submission Instructions |
| 6.2. Contacting the City of Bridgeport |
| 6.3. Electronic Submission Instructions |
| 6.4. Paper Submission Instructions |
| 6.5. Submission Compliance |
| 6.6. Reservation of Rights |
| 7. Terms and Conditions |
| 7.1. Terms and Conditions |
| 7.2. Payment Terms |
| 7.3. Warranty and Support |
| 7.4. Openness of Procurement Process |
| 7.5. Errors and Omissions |
| 7.6. Collusion |
| 7.7. Suspension and Debarment |
| 7.8. Insurance Requirements |
| 7.9. Conflict of Interest |
| 7.10. City Exempt from Certain Taxes |
| 8. Vendor Questionnaire & Submission |
| 1. Federal I.D. Number or Social Security Number:* |
| 2. Confirmation* |
| 3. Contractor's License Number* |
| 4. BID BOND: * |
| 5. Contractor's Designation of Compliance Officer* |
| 6. Contractor's Good Standing Certification* |
| 7. Contractor's Davis-Bacon Wage Rate Certification Form* |
| 8. Equal Opportunity Policy Statement* |
| 9. No Conflicts-Disclosure Form* |
| 10. McGrath House Schedule of Work* |
| 11. Additional Vendor Documents (optional) |
File details come from the government source that posted it. Updated .