MCC-16-RFQ-0220_0001_(Signed).pdf
PDF 2 MB Posted
- Attached to
- Independent Evaluation Services Federal contract opportunity
- Solicitation number
- MCC-16-RFQ-0220
- Issued by
- Millennium Challenge Corporation
About this file
Amendment 0001 provides vendor Q As and clarifies the Past Performance Questionnaire submission requirements.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NO. (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC-
KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
See Block 16C
Millennium Challenge Corporation
Contracts and Grants Management Division
1099 Fourteenth Street NW
Suite 700
Washington DC 20005
Attn: Regina Maxwell, (202) 521-7272, maxwellre@mcc.gov
Millennium Challenge Corporation
Contracts and Grants Management Division
1099 Fourteenth Street NW
Suite 700
Washington DC 20005
To all Offerors/Bidders
MCC-16-RFQ-0220
08-03-2016
X
X X
Independent Evaluation Services for the Benin II Energy Compact.
The purpose of this amendment to MCC-16-RFQ-0220 is to provide answers to vendor questions and to specify that Past
Performance Questionnaires (ref: RFQ Section L.8.11) are NOT required for MCC projects referenced as part of the requirements of L.8.10.
See Continuation Pages.
JACQUELINE H. NARANJO
Senior Contracting Officer
Attn: Regina Maxwell, (202) 521-7272, maxwellre@mcc.gov mailto:maxwellre@mcc.gov mailto:maxwellre@mcc.gov naranjoj Typewritten Text 8/29/2016
MCC-16-RFQ-0220 Amendment 0001 Page 2
Following are MCC’s responses to vendor questions regarding this solicitation:
1. Could MCC please provide a more legible version of Annex II: Estimated Timeline of Infrastructure
Evaluation Activities?
MCC Response: Please see attachment Annex II – Estimated Timeline of Infrastructure Evaluation Activities.
2. Could MCC please provide a rough calendar of the expected implementation and completion dates of the
Electricity Generation Project and the Electricity Distribution Project?
MCC Response: The Compact is currently expected to Enter into Force (EIF) in early 2017. All Compacts must be completed within 5 years from their EIF date. Final project design work is currently being procured.
With this in mind, actual dates for construction and implementation will depend upon these final designs.
However, offerors can reasonably anticipate that infrastructure components will not be completed until approximately Year 3 of the Compact (or later). However, it should be noted that different components will likely be completed at different times, so while some may be completed in Year 3, others may take until the end of the compact before they are completed. All components must be completed by the compact end date, 5 years after EIF.
3. Would MCC be willing to make available additional documentation, including the M&E Plan, a more detailed list of the specific infrastructure improvements included in the Electricity Distribution Project, ERR files with beneficiary assumptions, and findings from the survey mentioned (n=5,700) in the Compact Annex III (2)(c)?
MCC Response: The M&E Plan is not completed until closer to EIF. As such, a complete M&E Plan is not available. However, a summary of its primary components is available in Annex III of the Compact. For the
Distribution Project, in addition to the specific components detailed in Annex X of the solicitation (the RFP for the Distribution Project design work), there will also be a dispatching center and corresponding SCADA system incorporated into the Distribution Project. ERR files and the final survey data are not currently available for public dissemination. However, these files can be shared with the selected firm once the evaluation work begins.
4. Please confirm that C.4.4.3 is not part of the evaluability assessment.
MCC Response: Sections C.4.4 and C.4.5 have been revised for clarity regarding what should be included regarding program logic assumptions in the evaluability assessment vs the evaluation itself.
Section C.4.4.3. is replaced in its entirety as follows (Note: All sub-points are hereby removed):
C.4.4.3. Are the key assumptions to the program logic identified? How reasonable are those assumptions? What assumptions are missing?
Section C.4.5.7. is hereby added to the RFQ as follows:
C.4.5.7. How did the program assumptions hold up? Including (but not limited to):
C.4.5.7.1. How and to what extent have factors outside the compact (such as availability of energy imports from Ghana and Nigeria, completion of the North-South 161kv
MCC-16-RFQ-0220 Amendment 0001 Page 3 line, the role of CEB, increases in overall demand, etc.), influenced the ability of the project to meet its expected outcomes?
C.4.5.7.2. To what extent are MCC’s maintenance expectations for the new infrastructure works being met?
C.4.5.7.3. To what extent was the project implemented as designed?
Section C.4.8. is hereby inserted into the RFQ as follows (Note: All subsequent sections are renumbered accordingly, i.e., the original C.4.8. becomes C.4.9. and so forth):
C.4.8 Based on the final results of the evaluation, the Evaluator shall conduct a cost-benefit analysis of MCC’s investments, including the calculation of the Economic Rate of
Return.
5. Are the benefits of the photovoltaic and thermal generation activities expected to be primarily limited to their respective localities?
MCC Response: It has been suggested that while some benefits will be localized to the areas surrounding the generation activities, other benefits will accrue to users of the grid more broadly. However, it is not currently clear how much of the benefits will accrue locally vs to the grid more broadly, which is ultimately a technical and engineering question. But, this is a question MCC is interested in. And, given the expectation that proposed teams include substantial engineering and electricity grid technical work, MCC anticipates that the selected firm will help MCC answer this question and subsequently measure the benefits to different portions of the grid.
| 2016-08-29T13:58:17-0400 | |
| Jacqueline H. Naranjo |