Annex_III_-_MCC_Evaluation_Design_Report_Outline.pdf
PDF 36 KB Posted
- Attached to
- Independent Evaluation Services Federal contract opportunity
- Solicitation number
- MCC-16-RFQ-0220
- Issued by
- Millennium Challenge Corporation
About this file
Annex III
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex III: MCC Evaluation Design Report Outline MCC Independent Evaluation Design Report Outline Template
i. List of Acronyms
ii. Table of Contents
LIST OF ACRONYMS
TABLE OF CONTENTS
1. INTRODUCTION
1.1. Background
1.1.1. Country context
1.1.2. Objectives of this report
2. OVERVIEW OF THE COMPACT AND THE INTERVENTIONS EVALUATED
2.1. Overview of the project and implementation plan
2.1.1. Program participants (who is being targeted and why)
2.1.2. Geographic coverage (where it is being implemented and why)
2.2. Key program indicators and how they lead to expected outcomes. (Here we will summarize the program logic rather than discuss its merits since the program logic assessment is coming in the assessment report.)
2.3. Link to ERR and Beneficiary Analysis
3. LITERATURE REVIEW
3.1. Summary of the existing evidence
3.2. Gaps in literature
4. EVALUATION DESIGN
4.1. Policy relevance of the evaluation
4.2. Overview of an impact evaluation that includes a quantitative impact analysis and qualitative implementation analysis
4.3. Evaluation questions
4.4. Key Outcomes
4.5. Methodology/ Impact evaluation design
4.6. Study Sample (to include required sample size, sample frame, process of selection of treatment and control groups, stratification, design omission in the sample, level of representation, strategy for absent respondents and dropouts)
4.7. Analysis Plan
4.8. Timeframe of exposure. Will include justification for survey timing relating back to program logic and when impacts are anticipated to take effect.
4.9. Limitations and Challenges. Will include strategies to minimize problems with randomization compliance and strategies to deal with deviation from assignment status.
5. DATA SOURCES AND OUTCOME DEFINITIONS
5.1. Data collection plans. (We are thinking it would be good to discuss survey rounds and when different types of data collection would take place.)
5.2. Proposal to measure implementation fidelity
5.3. Data needs
5.3.1.1. Data sources for quantitative
5.3.1.2. Data sources for qualitative
6. ADMINSTRATIVE
6.1. Summary of IRB requirements and clearances
6.2. Preparing data files for access, privacy and documentation
6.3. Dissemination Plan
6.4. Evaluation Team Roles and Responsibilities
6.5. evaluation timeline
6.6. reporting schedule
7. REFERENCES
8. ANNEXES
8.1. Stakeholder comments and Evaluator Responses
8.2. Evaluation Budget. Given sensitivities around future procurements, the budget should not be a public document. However, the evaluator and MCC M&E should have a clearly defined budget for the evaluation, including planned evaluator and data collection costs which should be tracked over time with actual evaluator and data collection costs.
File details come from the government source that posted it. Updated .