Amd 02 Atch J.5 Pricing Template MCC-08-0111-RFP-42.xls
XLS spreadsheet 274 KB Posted
- Attached to
- Capacity Building Assessment, Training and Development, and Related Short-Term Support Services Federal contract opportunity
- Solicitation number
- MCC-08-0111-RFP-42
- Issued by
- Millennium Challenge Corporation
About this file
Amendment 02 Attachment J.5 Pricing Template MCC-08-0111-RFP-42
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample PRIME IDIQ Labor Rates
| Columns with Grey Headings must equal Columns in Section B, Table 1 of RFP | Base Period - Year 1 | Instructions: Contractor to Fill-in Column B, blue-shaded cells; Column C, green-shaded cells; Columns D, E, G, I, and K, yellow-shaded cells; Column M, gray-shaded cells. | ||||||||||
| Contractor Name: Prime Vendor (123 Company) | Columns, E-J, Orange-shaded cells have formulas so do NOT fill-in; Columns K-L, Purple-shaded cells have formulas but contractor needs to manually delete for only cells with no prime adder and change to $0.00. | |||||||||||
| (a) CONTRACT LABOR CATEGORY | (b) PROPOSED LABOR CATEGORY (PRIME) | (b)(1)SUBCONTRACTOR/ AFFILIATE (Name Vendor) | YR 1 Direct Labor Rate ($) | Overhead/ Fringe | Subtotal DL + OH | G&A | Subtotal DL+ OH+G&A | Profit | Subtotal DL+OH+G&A+ Profit | Prime Adder (if any) | Subtotal Fully Burdened Rate with Profit + Prime adder | (c) BASE/ YR 1- CLIN 0001 FIXED RATE |
| PROVIDE A SEPARATE PACKAGE FOR EACH SUBCONTRACTOR/AFFILIATE FOR BREAKOUT OF DL, OH/FRINGE, G&A, PROFIT (CAN BE SEALED FROM PRIME BUT COLUMNS J-M MUST BE PROVIDED ALSO BY PRIME) | Transfer to Column B in Section B, Table 1 | Transfer to Column B in Section B, Table 1 (Insert additional rows if sub/affiliate is for same category as a prime and identify as such) | Insert Percentage Below | Insert Percentage Below | Insert Percentage Below | Prime to Insert Manually if Subs/Affiliates have submitted unloaded rates by sealed package (see dark green) | Insert Percentage Below; Must delete manually and insert 0.00% if not applicable or for prime categories | Must delete manually and insert 0.00% if for prime categories | Prime to Insert from Column J if Prime and Column L if subcontractor/affiliate; transfer to Column (c) of Table B-1 | |||
| 30.00% | 3.00% | 5.00% | 0.90% | |||||||||
| Mgmt/Supervisory Positions | ||||||||||||
| 1. Program Mgr. | Program Director | $50.00 | $15.00 | $65.00 | $1.95 | $66.95 | $3.35 | $70.30 | $0.00 | $0.00 | $70.30 | |
| 2. Project Mgr. Sr. | Project Mgr. Sr | $45.00 | $13.50 | $58.50 | $1.76 | $60.26 | $3.01 | $63.27 | $0.00 | $0.00 | $63.27 | |
| 2(a). Project Mgr. Sr. | Project Mgr. Sr. (ABC Co.) | $0.00 | $47.55 | $0.43 | $47.98 | $47.98 | ||||||
| 3. Supervisor (Instructional Area) | Managing Professor (XYZ Co.) | $0.00 | $36.00 | $0.32 | $36.32 | $36.32 | ||||||
| 4. Supervisor (Instructional Systems Design) | Managing Instructional Designer | $30.00 | $9.00 | $39.00 | $1.17 | $40.17 | $2.01 | $42.18 | $0.00 | $0.00 | $42.18 | |
| 5. Training Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 6. Training Lead (In Country) | ||||||||||||
| a. Armenia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| b. Benin | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| c. Bolivia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| d. Burkina Faso | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| e. Cape Verde | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| f. El Salvador | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| g. Georgia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| h. Ghana | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| i. Honduras | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| j. Jordan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| k. Lesotho | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| l. Madagascar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| m. Malawi | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| n. Mali | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| o. Moldova | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| p. Mongolia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| q. Morocco | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| r. Mozambique | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| s. Namibia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| t. Nicaragua | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| u. Philippines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| v. Senegal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| w. Tanzania | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| x. Timor Leste | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| y. Ukraine | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| z. Vanuatu | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Research, Assessment, and Analysis Positions | ||||||||||||
| 7. Curriculum Developer (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 8. Curriculum Developer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 9. Education Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 10. Instructional Systems Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 11. Research Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 12. Senior Consultant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Instructor Positions | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 13. Certified Instructor I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 14. Certified Instructor II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 15. Training Facilitator (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 16. Training Facilitator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Positions | ||||||||||||
| 17. Admin. Asst. I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 18. Admin. Asst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19. Industry/Funct. Area Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 20. Industry/Funct. Area Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 21. Logistics Specialist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 22. Logistics Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 23. Quality Assurance Specialist (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 24. Quality Assurance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 25. Technical Subject Matter Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 26. Tech. Subject Matter Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 27. Technical Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 28. Technical Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 29. Training Materials Coordinator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 30. Language/ Translator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 31. Language/ Interpreter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Contractor Proposed | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | |||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
&LMCC-08-0111-RFP-42, Attachment J.5, Pricing Templates
a. Armenia
b. Benin
e. Cape Verde
f. El Salvador
g. Georgia
h. Ghana
i. Honduras
k. Lesotho
l. Madagascar
n. Mali
p. Mongolia
q. Morocco
r. Mozambique
t. Nicaragua
Sample Sub-Aff IDIQ Labor Rates
| Columns with Grey Headings must equal Columns in Section B, Table 1 of RFP | Base Period - Year 1 | Instructions: Contractor to Fill-in Column B, blue-shaded cells; Column C, green-shaded cells; Columns D, E, G, I, and K, yellow-shaded cells; Column M, gray-shaded cells. | ||||||||||
| Contractor Name: Subcontractor/Affiliate Vendor (ABC Co.) | Columns, E-J, Orange-shaded cells have formulas so do NOT fill-in; Columns K-L, Purple-shaded cells have formulas but contractor needs to manually delete for only cells with no prime adder and change to $0.00. | |||||||||||
| (a) CONTRACT LABOR CATEGORY | (b) PROPOSED LABOR CATEGORY (PRIME) | (b)(1)SUBCONTRACTOR/ AFFILIATE (Name Vendor) | YR 1 Direct Labor Rate ($) | Overhead/ Fringe | Subtotal DL + OH | G&A | Subtotal DL+ OH+G&A | Profit | Subtotal DL+OH+G&A+ Profit | Prime Adder (if any) | Subtotal Fully Burdened Rate with Profit + Prime adder | (c) BASE/ YR 1- CLIN 0001 FIXED RATE |
| PROVIDE A SEPARATE PACKAGE FOR EACH SUBCONTRACTOR/AFFILIATE FOR BREAKOUT OF DL, OH/FRINGE, G&A, PROFIT (CAN BE SEALED FROM PRIME BUT COLUMN J-M MUST BE PROVIDED TO PRIME unsealed ) | Transfer to Column B in Section B, Table 1 | Transfer to Column B in Section B, Table 1 (Insert additional rows if sub/affiliate is for same category as a prime and identify as such) | Insert Percentage Below | Insert Percentage Below | Insert Percentage Below | Prime to Insert Manually if Subs/Affiliates have submitted unloaded rates by sealed package (see dark green) | Insert Percentage Below; Must delete manually and insert 0.00% if not applicable or for prime categories | Must delete manually and insert 0.00% if for prime categories | Prime to Insert from Column J if Prime and Column L if subcontractor/affiliate; transfer to Column (c) of Table B-1; Subcontractor/Affiliate to provide Column M info to Prime unsealed | |||
| 25.00% | 4.00% | 4.50% | 0.00% | |||||||||
| Mgmt/Supervisory Positions | ||||||||||||
| 1. Program Mgr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2. Project Mgr. Sr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 2(a). Project Mgr. Sr. | Project Mgr. Sr. (ABC Co.) | $35.00 | $8.75 | $43.75 | $1.75 | $45.50 | $2.05 | $47.55 | $0.00 | $47.55 | $47.55 | |
| 3. Supervisor (Instructional Area) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 4. Supervisor (Instructional Systems Design) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 5. Training Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 6. Training Lead (In Country) | ||||||||||||
| a. Armenia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| b. Benin | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| c. Bolivia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| d. Burkina Faso | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| e. Cape Verde | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| f. El Salvador | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| g. Georgia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| h. Ghana | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| i. Honduras | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| j. Jordan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| k. Lesotho | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| l. Madagascar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| m. Malawi | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| n. Mali | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| o. Moldova | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| p. Mongolia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| q. Morocco | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| r. Mozambique | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| s. Namibia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| t. Nicaragua | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| u. Philippines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| v. Senegal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| w. Tanzania | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| x. Timor Leste | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| y. Ukraine | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| z. Vanuatu | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Research, Assessment, and Analysis Positions | ||||||||||||
| 7. Curriculum Developer (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 8. Curriculum Developer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 9. Education Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 10. Instructional Systems Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 11. Research Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 12. Senior Consultant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Instructor Positions | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 13. Certified Instructor I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 14. Certified Instructor II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 15. Training Facilitator (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 16. Training Facilitator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Positions | ||||||||||||
| 17. Admin. Asst. I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 18. Admin. Asst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19. Industry/Funct. Area Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 20. Industry/Funct. Area Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 21. Logistics Specialist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 22. Logistics Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 23. Quality Assurance Specialist (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 24. Quality Assurance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 25. Technical Subject Matter Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 26. Tech. Subject Matter Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 27. Technical Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 28. Technical Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 29. Training Materials Coordinator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 30. Language/ Translator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 31. Language/ Interpreter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Contractor Proposed | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | |||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
&LMCC-08-0111-RFP-42, Attachment J.5, Pricing Templates
a. Armenia
b. Benin
e. Cape Verde
f. El Salvador
g. Georgia
h. Ghana
i. Honduras
k. Lesotho
l. Madagascar
n. Mali
p. Mongolia
q. Morocco
r. Mozambique
t. Nicaragua
IDIQ Labor Rates CLIN 0001
| Columns with Grey Headings must equal Columns in Section B, Table 1 of RFP | Base Period - Year 1 | Instructions: Contractor to Fill-in Column B, blue-shaded cells; Column C, green-shaded cells; Columns D, E, G, I, and K, yellow-shaded cells; Column M, gray-shaded cells. | ||||||||||
| Columns, E-J, Orange-shaded cells have formulas so do NOT fill-in; Columns K-L, Purple-shaded cells have formulas but contractor needs to manually delete for only cells with no prime adder and change to $0.00. | ||||||||||||
| (a) CONTRACT LABOR CATEGORY | (b) PROPOSED LABOR CATEGORY (PRIME) | (b)(1)SUBCONTRACTOR/ AFFILIATE (Name Vendor) | YR 1 Direct Labor Rate ($) | Overhead/ Fringe | Subtotal DL + OH | G&A | Subtotal DL+ OH+G&A | Profit | Subtotal DL+OH+G&A+ Profit | Prime Adder (if any) | Subtotal Fully Burdened Rate with Profit + Prime adder | (c) BASE/ YR 1- CLIN 0001 FIXED RATE |
| Transfer to Column B in Section B, Table 1 | Transfer to Column B in Section B, Table 1 (Insert additional rows if sub/affiliate is for same category as a prime and identify as such) | Insert Percentage Below | Insert Percentage Below | Insert Percentage Below | Prime to Insert Manually if Subs/Affiliates have submitted unloaded rates by sealed package (see dark green) | Insert Percentage Below; Must delete manually and insert 0.00% if not applicable or for prime categories | Must delete manually and insert 0.00% if for prime categories | Insert from Column J if Prime and Column L if subcontractor/affiliate; transfer to Column (c) of Table B-1 | ||||
| 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| Mgmt/Supervisory Positions | ||||||||||||
| 1. Program Mgr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 2. Project Mgr. Sr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3. Supervisor (Instructional Area) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 4. Supervisor (Instructional Systems Design) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 5. Training Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 6. Training Lead (In Country) | ||||||||||||
| a. Armenia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| b. Benin | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| c. Bolivia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| d. Burkina Faso | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| e. Cape Verde | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| f. El Salvador | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| g. Georgia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| h. Ghana | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| i. Honduras | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| j. Jordan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| k. Lesotho | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| l. Madagascar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| m. Malawi | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| n. Mali | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| o. Moldova | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| p. Mongolia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| q. Morocco | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| r. Mozambique | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| s. Namibia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| t. Nicaragua | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| u. Philippines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| v. Senegal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| w. Tanzania | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| x. Timor Leste | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| y. Ukraine | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| z. Vanuatu | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Research, Assessment, and Analysis Positions | ||||||||||||
| 7. Curriculum Developer (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 8. Curriculum Developer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 9. Education Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 10. Instructional Systems Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 11. Research Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 12. Senior Consultant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Instructor Positions | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 13. Certified Instructor I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 14. Certified Instructor II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 15. Training Facilitator (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 16. Training Facilitator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Positions | ||||||||||||
| 17. Admin. Asst. I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 18. Admin. Asst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19. Industry/Funct. Area Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 20. Industry/Funct. Area Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 21. Logistics Specialist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 22. Logistics Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 23. Quality Assurance Specialist (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 24. Quality Assurance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 25. Technical Subject Matter Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 26. Tech. Subject Matter Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 27. Technical Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 28. Technical Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 29. Training Materials Coordinator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 30. Language/ Translator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 31. Language/ Interpreter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Contractor Proposed | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | |||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
&LMCC-08-0111-RFP-42, Attachment J.5, Pricing Templates
a. Armenia
b. Benin
e. Cape Verde
f. El Salvador
g. Georgia
h. Ghana
i. Honduras
k. Lesotho
l. Madagascar
n. Mali
p. Mongolia
q. Morocco
r. Mozambique
t. Nicaragua
IDIQ Labor Rates Opt CLIN 1001
| Columns with Grey Headings must equal Columns in Section B, Table 1 of RFP | Option Period 1 - Year 2 | Instructions: Contractor to Fill-in Column B, blue-shaded cells; Column C, green-shaded cells; Columns D, F, H, and J, yellow-shaded cells; Column N, gray-shaded cells. | |||||||||||
| Name of Contractor: | Columns, D-K, Orange-shaded cells have formulas so do NOT fill-in; Columns L- M, Purple-shaded cells have formulas but contractor needs to manually delete for only cells with no prime adder and change to $0.00. | ||||||||||||
| (a) CONTRACT LABOR CATEGORY | (b) PROPOSED LABOR CATEGORY (PRIME) | (b)(1)SUBCONTRACTOR/ AFFILIATE (Name Vendor) | Annual Escalation $ | YR 2 Direct Labor Rate ($) | Overhead/ Fringe | Subtotal DL + OH | G&A | Subtotal DL+ OH+G&A | Profit | Subtotal DL+OH+G&A+ Profit | Prime Adder (if any) | Subtotal Fully Burdened Rate with Profit + Prime adder | (d) OPT 1/ YR 2- CLIN 1001 FIXED RATE |
| Transfer to Column B in Section B, Table 1 | Transfer to Column B in Section B, Table 1 (Insert additional rows if sub/affiliate is for same category as a prime and identify as such) | Insert Annual Escalation Percentage Below | Subtotal YR 2 DL + Annual Escalation | Insert Percentage Below | Insert Percentage Below | Insert Percentage Below | Prime to Insert Manually if Subs/Affiliates have submitted unloaded rates by sealed package (see dark green) | Insert Percentage Below; Must delete manually and insert 0.00% if not applicable or for prime categories | Must delete manually and insert 0.00% if for prime categories | Insert from Column K if Prime and Column M if subcontractor/affiliate; transfer to Column (d) of Table B-1 | |||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| Mgmt/Supervisory Positions | |||||||||||||
| 1. Program Mgr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 2. Project Mgr. Sr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3. Supervisor (Instructional Area) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 4. Supervisor (Instructional Systems Design) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 5. Training Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 6. Training Lead (In Country) | |||||||||||||
| a. Armenia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| b. Benin | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| c. Bolivia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| d. Burkina Faso | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| e. Cape Verde | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| f. El Salvador | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| g. Georgia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| h. Ghana | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| i. Honduras | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| j. Jordan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| k. Lesotho | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| l. Madagascar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| m. Malawi | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| n. Mali | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| o. Moldova | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| p. Mongolia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| q. Morocco | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| r. Mozambique | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| s. Namibia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| t. Nicaragua | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| u. Philippines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| v. Senegal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| w. Tanzania | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| x. Timor Leste | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| y. Ukraine | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| z. Vanuatu | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Research, Assessment, and Analysis Positions | |||||||||||||
| 7. Curriculum Developer (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 8. Curriculum Developer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 9. Education Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 10. Instructional Systems Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 11. Research Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 12. Senior Consultant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Instructor Positions | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 13. Certified Instructor I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 14. Certified Instructor II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 15. Training Facilitator (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 16. Training Facilitator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Positions | |||||||||||||
| 17. Admin. Asst. I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 18. Admin. Asst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19. Industry/Funct. Area Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 20. Industry/Funct. Area Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 21. Logistics Specialist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 22. Logistics Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 23. Quality Assurance Specialist (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 24. Quality Assurance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 25. Technical Subject Matter Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 26. Tech. Subject Matter Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 27. Technical Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 28. Technical Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 29. Training Materials Coordinator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 30. Language/ Translator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 31. Language/ Interpreter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Contractor Proposed | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | |||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
&LMCC-08-0111-RFP-42, Attachment J.5, Pricing Templates
a. Armenia
b. Benin
e. Cape Verde
f. El Salvador
g. Georgia
h. Ghana
i. Honduras
k. Lesotho
l. Madagascar
n. Mali
p. Mongolia
q. Morocco
r. Mozambique
t. Nicaragua
IDIQ Labor Rates Opt CLIN 2001
| Columns with Grey Headings must equal Columns in Section B, Table 1 of RFP | Option Period 2 - Year 3 | Instructions: Contractor to Fill-in Column B, blue-shaded cells; Column C, green-shaded cells; Columns D, F, H, and J, yellow-shaded cells; Column N, gray-shaded cells. | |||||||||||
| Name of Contractor: | Columns, D-K, Orange-shaded cells have formulas so do NOT fill-in; Columns L- M, Purple-shaded cells have formulas but contractor needs to manually delete for only cells with no prime adder and change to $0.00. | ||||||||||||
| (a) CONTRACT LABOR CATEGORY | (b) PROPOSED LABOR CATEGORY (PRIME) | (b)(1)SUBCONTRACTOR/ AFFILIATE (Name Vendor) | Annual Escalation $ | YR 3 Direct Labor Rate ($) | Overhead/ Fringe | Subtotal DL + OH | G&A | Subtotal DL+ OH+G&A | Profit | Subtotal DL+OH+G&A+ Profit | Prime Adder (if any) | Subtotal Fully Burdened Rate with Profit + Prime adder | (e) OPT 2/ YR 3- CLIN 2001 FIXED RATE |
| Transfer to Column B in Section B, Table 1 | Transfer to Column B in Section B, Table 1 (Insert additional rows if sub/affiliate is for same category as a prime and identify as such) | Insert Annual Escalation Percentage Below | Subtotal YR 3 DL + Annual Escalation | Insert Percentage Below | Insert Percentage Below | Insert Percentage Below | Prime to Insert Manually if Subs/Affiliates have submitted unloaded rates by sealed package (see dark green) | Insert Percentage Below; Must delete manually and insert 0.00% if not applicable or for prime categories | Must delete manually and insert 0.00% if for prime categories | Insert from Column K if Prime and Column M if subcontractor/affiliate; transfer to Column (e) of Table B-1 | |||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| Mgmt/Supervisory Positions | |||||||||||||
| 1. Program Mgr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 2. Project Mgr. Sr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3. Supervisor (Instructional Area) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 4. Supervisor (Instructional Systems Design) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 5. Training Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 6. Training Lead (In Country) | |||||||||||||
| a. Armenia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| b. Benin | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| c. Bolivia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| d. Burkina Faso | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| e. Cape Verde | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| f. El Salvador | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| g. Georgia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| h. Ghana | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| i. Honduras | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| j. Jordan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| k. Lesotho | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| l. Madagascar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| m. Malawi | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| n. Mali | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| o. Moldova | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| p. Mongolia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| q. Morocco | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| r. Mozambique | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| s. Namibia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| t. Nicaragua | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| u. Philippines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| v. Senegal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| w. Tanzania | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| x. Timor Leste | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| y. Ukraine | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| z. Vanuatu | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Research, Assessment, and Analysis Positions | |||||||||||||
| 7. Curriculum Developer (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 8. Curriculum Developer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 9. Education Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 10. Instructional Systems Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 11. Research Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 12. Senior Consultant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Instructor Positions | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 13. Certified Instructor I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 14. Certified Instructor II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 15. Training Facilitator (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 16. Training Facilitator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Positions | |||||||||||||
| 17. Admin. Asst. I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 18. Admin. Asst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19. Industry/Funct. Area Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 20. Industry/Funct. Area Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 21. Logistics Specialist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 22. Logistics Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 23. Quality Assurance Specialist (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 24. Quality Assurance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 25. Technical Subject Matter Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 26. Tech. Subject Matter Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 27. Technical Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 28. Technical Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 29. Training Materials Coordinator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 30. Language/ Translator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 31. Language/ Interpreter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Contractor Proposed | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | |||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
&LMCC-08-0111-RFP-42, Attachment J.5, Pricing Templates
a. Armenia
b. Benin
e. Cape Verde
f. El Salvador
g. Georgia
h. Ghana
i. Honduras
k. Lesotho
l. Madagascar
n. Mali
p. Mongolia
q. Morocco
r. Mozambique
t. Nicaragua
IDIQ Labor Rates Opt CLIN 3001
| Columns with Grey Headings must equal Columns in Section B, Table 1 of RFP | Option Period 3 - Year 4 | Instructions: Contractor to Fill-in Column B, blue-shaded cells; Column C, green-shaded cells; Columns D, F, H, and J, yellow-shaded cells; Column N, gray-shaded cells. | |||||||||||
| Name of Contractor: | Columns, D-K, Orange-shaded cells have formulas so do NOT fill-in; Columns L- M, Purple-shaded cells have formulas but contractor needs to manually delete for only cells with no prime adder and change to $0.00. | ||||||||||||
| (a) CONTRACT LABOR CATEGORY | (b) PROPOSED LABOR CATEGORY (PRIME) | (b)(1)SUBCONTRACTOR/ AFFILIATE (Name Vendor) | Annual Escalation $ | YR 4 Direct Labor Rate ($) | Overhead/ Fringe | Subtotal DL + OH | G&A | Subtotal DL+ OH+G&A | Profit | Subtotal DL+OH+G&A+ Profit | Prime Adder (if any) | Subtotal Fully Burdened Rate with Profit + Prime adder | (f) OPT 3/ YR 4- CLIN 3001 FIXED RATE |
| Transfer to Column B in Section B, Table 1 | Transfer to Column B in Section B, Table 1 (Insert additional rows if sub/affiliate is for same category as a prime and identify as such) | Insert Annual Escalation Percentage Below | Subtotal YR 4 DL + Annual Escalation | Insert Percentage Below | Insert Percentage Below | Insert Percentage Below | Prime to Insert Manually if Subs/Affiliates have submitted unloaded rates by sealed package (see dark green) | Insert Percentage Below; Must delete manually and insert 0.00% if not applicable or for prime categories | Must delete manually and insert 0.00% if for prime categories | Insert from Column K if Prime and Column M if subcontractor/affiliate; transfer to Column (f) of Table B-1 | |||
| 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | |||||||||
| Mgmt/Supervisory Positions | |||||||||||||
| 1. Program Mgr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 2. Project Mgr. Sr. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 3. Supervisor (Instructional Area) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 4. Supervisor (Instructional Systems Design) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 5. Training Lead | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 6. Training Lead (In Country) | |||||||||||||
| a. Armenia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| b. Benin | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| c. Bolivia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| d. Burkina Faso | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| e. Cape Verde | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| f. El Salvador | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| g. Georgia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| h. Ghana | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| i. Honduras | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| j. Jordan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| k. Lesotho | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| l. Madagascar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| m. Malawi | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| n. Mali | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| o. Moldova | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| p. Mongolia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| q. Morocco | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| r. Mozambique | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| s. Namibia | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| t. Nicaragua | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| u. Philippines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| v. Senegal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| w. Tanzania | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| x. Timor Leste | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| y. Ukraine | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| z. Vanuatu | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Research, Assessment, and Analysis Positions | |||||||||||||
| 7. Curriculum Developer (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 8. Curriculum Developer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 9. Education Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 10. Instructional Systems Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 11. Research Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 12. Senior Consultant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Instructor Positions | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 13. Certified Instructor I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 14. Certified Instructor II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 15. Training Facilitator (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 16. Training Facilitator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Positions | |||||||||||||
| 17. Admin. Asst. I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 18. Admin. Asst II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 19. Industry/Funct. Area Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 20. Industry/Funct. Area Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 21. Logistics Specialist I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 22. Logistics Specialist II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 23. Quality Assurance Specialist (Sr) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 24. Quality Assurance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 25. Technical Subject Matter Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 26. Tech. Subject Matter Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 27. Technical Writer I | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 28. Technical Writer II | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 29. Training Materials Coordinator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 30. Language/ Translator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 31. Language/ Interpreter | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Other Contractor Proposed | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | Must copy formulas from above | |||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | ||
| (fill-in) | (fill-in) | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ |
&LMCC-08-0111-RFP-42, Attachment J.5, Pricing Templates
a. Armenia
b. Benin
e. Cape Verde
f. El Salvador
g. Georgia
h. Ghana
i. Honduras
k. Lesotho
l. Madagascar
n. Mali
p. Mongolia
q. Morocco
r. Mozambique
t. Nicaragua
IDIQ Labor Rates Opt CLIN 4001
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .