MBTA Track Material Specification 02851P.pdf
PDF 8 MB Posted
- Attached to
- IFB 126-26 Widett Layover Facility - 136 RE Rail
- Solicitation number
- BD-27-1206-40000-40000-133842
- Issued by
- Suffolk County, Massachusetts
About this file
Summary
This is a Material Specification and Track Geometry document for the Massachusetts Bay Transportation Authority (MBTA) Widett Layover Facility project, detailing the procurement and delivery requirements for 136RE head-hardened railroad running rail under Contract No. F60PS01. The project requires the furnishing and delivery of 15,000 linear feet (LF) of 136RE rail to 100 Widett Circle, Boston, MA 02118 by September 2, 2027. The 136RE rail must meet MBTA Material Specification No. 9633-A and be manufactured to head-hardened specifications with a minimum Brinell Hardness of 285 BHN. Short rails ranging from 30 to 38 feet in length will be accepted up to nine percent (9%) of the total quantity. The supplier is responsible for quality control and testing at the point of manufacture, coordinating freight and transport, providing all relevant certifications and shipping manifests at least ten business days prior to delivery, and ensuring transport vehicles are properly equipped for safe unloading. Materials will remain at the manufacturer's risk until accepted by the Authority, with rejected materials to be returned and replaced at the manufacturer's expense within one month.
The specification also addresses the continuous welded rail (CWR) fabrication work, including electric flash butt welding requirements, quality control procedures, and inspection standards. The General Contractor will be responsible for coordinating transfer and delivery of materials, handling and storage at the project site, and inspection and approval of delivered materials. Prior to manufacture, the supplier must submit complete shop drawings for each item. The 136RE rail is warranted for one year after installation to repair or replace defective materials or workmanship. All costs associated with furnishing materials, labor, transportation, handling, and storage are to be included in the Contract Unit Price payment item 0290.991P for 136RE Rail, measured in linear feet with FOB delivery terms to the project site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 126-26 Bid Document.docx | DOCX document | |
| MBTA_Minimum_Insurance_Requirements~26.pdf | ||
| IFB 126-26 Addendum 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
WIDETT LAYOVER FACILITY
Contract No.: F60PS01
136RE RAIL
Material
Summary
Item 136RE Rail
Name Railroad Running Rail
Spec No. 02851P
Quantity 15,000
Unit LF
Delivery:
• FOB to 100 Widett Circle, Boston, MA 02118
• Delivery is within the Project limits, which is defined as the MBTA owned property within Widett Circle
• Delivery: By September 2, 2027
• Materials will be at manufacturer’s risk until accepted by the Authority.
• Materials rejected for non-compliance with these specifications will be returned and replaced at Manufacturer’s expense within one month
Submittal:
• Prior to manufacture, the manufacturer shall submit complete shop drawings for each item.
F60PS01 136RE RAIL MBTA N.A.
2026 02851P - 1
SECTION 02851P
136RE RAIL
PART 1 - GENERAL
1.1 DESCRIPTION
A. This Section specifies the furnishing, and delivery of 136RE rail within Project limits. The work consists of:
1. Furnishing the 136 rail.
2. Coordinating the shipment of 136RE head hardened rail from the rail manufacturer to the Project area.
3. Delivery coordination and proper distribution of rail within project limits.
B. Related work specified elsewhere:
1. Section 02851 – RAILROAD RUNNING RAIL.
C. Project Conditions and General Requirements for 136RE Rail:
1. All 136RE Rail shall be head hardened.
2. 136RE furnished by the Supplier shall meet the MBTA’s Material Specification No. 9633-A Rail-
Head Hardened Running Rail.
1.2 PROCUREMENT INFORMATION
A. Attention is directed to the procurement requirements of the CONTRACT
B. Definitions
1. Installation Contract: The MBTA will advertise and award the project which involves the construction of the new MBTA railyard.
2. General Contractor (GC) – General Contractor who is awarded the above-mentioned project.
3. MBTA – The Massachusetts Bay Transportation Authority, owner of the railyard being constructed.
4. Supplier (vendor) – The supplier of the track materials described in this specification and the provided design documents.
C. Responsibilities
1. MBTA
a. The MBTA will be responsible for pre-purchasing the track materials and all associated components.
2026 02851P - 2
b. Coordinating ship dates with the Supplier and storage of the track materials at the manufacture’s until the GC is given an executed contract.
2. General Contractor
a. The General Contractor is responsible for coordinating the transfer/delivery, unloading, and storage of the track materials at the Widett Circle.
b. The Contractor shall be responsible for inspection and approval of all the materials that are delivered.
3. Supplier
a. The supplier is responsible for providing track materials that can meet the specifications and design documents. The supplier is responsible for coordinating submittals to the
MBTA, coordinating the delivery of the track materials from the manufacturer, and providing support through the purchase process.
1.3 SUBMITTALS
A. Submit all inspection reports required in the material specification for 136RE at the back of this section.
B. All submittals will be reviewed for general conformance with the intent of the contract documents by the
EOR. This review will not relieve the Supplier of final responsibility for the means, methods, procedures, and sequences to be utilized.
1.4 QUALITY CONTROL
A. General
1. See MBTA‘s Material Specification No. 9633-A Rail-Head Hardened Running Rail.
PART 2 - PRODUCTS
2.1 MATERIALS TO BE FURNISHED BY THE SUPPLIER.
A. Provide new 136RE Rail in standard grade with minimum Brinell Hardness of 285 BHN in accordance with the attached MBTA Commuter Rail Standard Specification No. 9633-A RAIL-HEAD HARDENED
RUNNING RAIL.
1. 2020 AREMA Manual for Railway Engineering, Chapter 4, Part 2, pages 4-2-4.5 thru 4-2-4.10, Supplementary Requirements 5-2, and Appendix 1 shall also apply.
2. Short rails, 30 foot to 38 foot in length, will be accepted up to nine percent (9%) of the total rail required.
B. Refer to material specification for 136RE at the back of this section for more details.
2026 02851P - 3
2.2 WARRANTY
A. The 136 Rail shall be warrantied for a period of one year after installation. The warranty shall repair or replace defective materials, workmanship that develop within this period.
PART 3 - EXECUTION
3.1 DELIVERY, STORAGE AND HANDLING
A. The Supplier shall be responsible for the purchase, quality control, and testing of the rails at the point of manufacture, as well as coordinating and executing all freight, transport, and delivery of the rails to the designated on-site drop-off location. Additionally, the Supplier shall provide all relevant material certifications, bills of lading, and shipping manifests to the Contractor at least ten (10) business days prior to delivery, and must ensure that all transport vehicles are properly equipped to allow for safe unloading operations by the Contractor’s personnel.
PART 4 - MEASUREMENT AND PAYMENT
4.1 MEASUREMENT
A. Measurement of Liner Foot (LF) of 136RE Rail will be made for the work of this Section. The cost for all work, furnishing all materials required; providing all labor, transportation, handling, and storage at manufacturers; and performing all work incidental to completion of work of this Section shall be included in the Contract Unit Price payment item below
4.2 PAYMENT
A. All costs of this Section as it pertains to the Supplier shall be included in the Contract Unit Price for Item
0290.991P – 136 RE Rail.
4.3 PAY ITEMS
ITEM NO. DESCRIPTION UNIT
0290.991P 136 RE Rail LF
END OF SECTION
F60PS01 RAILROAD RUNNING RAIL MBTA N.A.
2026 02851 - 1 DES REV 03/2026
SECTION 02851
RAILROAD RUNNING RAIL
PART 1 - GENERAL
1.1 DESCRIPTION
A. This Section specifies electric flash butt welding of rail into continuous welded rail (CWR) strings and delivery and distribution of CWR strings within Project limits. The work consists of:
1. Coordinating and unloading the shipment of 136RE head hardened rail from the rail Supplier to the Project area.
2. Review of the materials from the Supplier
3. Electric flash butt welding of rail into CWR strings with length in accordance with Article 3.2.A.2 of this section
4. Delivery coordination and proper distribution of rail strings within project limits.
B. Related work specified elsewhere:
1. Section 02853 - CONTINUOUS WELDED RAIL INSTALLATION; Procedures for installation, thermal adjustment, and maintenance of CWR.
C. Project Conditions and General Requirements for CWR fabrication:
1. The Contractor shall plan the work to minimize the total number of welds in completed track.
2. Head hardened rails shall be used for all new track.
1.2 SUBMITTALS
A. Prior to production welding, prepare a list of all welded rail strings, their location, required length, and their location in the string.
B. Submit welding plant or mobile unit company name.
C. Prior to production welding, submit proper certification that each weld will be warranted by the
Contractor against workmanship or alignment defects.
D. Submit the identity and qualifications of the certified independent testing laboratory that will perform sample weld inspection and testing.
E. Prior to commencement of production welding, submit certification that each sample weld has passed required tests and inspections.
F. Submit daily during periods of production welding, the following:
FOR INFORMATION ONLY
2026 02851 - 2 DES REV 03/2026
1. Log of inspections and tests made using “WELD INSPECTION LOG” form included in this
Section.
2. Number of acceptable welds made.
3. Number of rail strings completed and number and length of each string and type of rail in each string, standard or head hardened rail.
G. Upon the completion of welding CWR strings, submit recorder charts and a record documenting the production of each string of CWR. Included shall be string number; string length; heat number of each piece of rail in the string; number of welds in the string; and number of any weld which had been cut out and re-welded. Use form “Welding Plant Rail Heat Numbers” included in this Section.
H. All submittals will be reviewed for general conformance with the intent of the contract documents. This review will not relieve the Contractor of final responsibility for the means, methods, procedures, and sequences to be utilized.
1.3 QUALITY CONTROL
A. General
1. Production welds, in track after final acceptance, will be warranted by the Contractor for one full year. Any weld found to be defective during the warranty period shall be replaced by the Authority and a penalty of $5,000.00 per defective weld shall be paid by the Contractor to the Authority.
2. Perform sample and production electric flash butt weld inspection and testing at no additional cost to the Authority.
3. Sample weld inspection and testing shall be performed by the approved certified independent testing company or laboratory. The Engineer may audit operations to ensure that inspections and tests are being performed in accordance with approved procedures and in compliance with these
Specifications.
4. Production weld inspection and magnaflux testing shall be performed by the welding crew and each weld shall be certified free of defects. The Engineer may audit inspection and testing to ensure that tests are being performed in accordance with these Specifications.
5. Sample and production welds made in head hardened rail shall be air quenched.
6. Sample and production welds shall have full penetration and complete fusion with no evidence of surface or internal fissures, cracks, porosity, or slag type defects.
7. To be accepted each weld must fulfill all the requirements of these Specifications.
B. Electric Flash Butt Weld Qualification, Inspection, and Testing
1. Prior to commencement of welding, each welding machine and operator shall be qualified based on sample welds passing the tests specified in this Article 1.3.B of this Section.
a. Each welding machine and operator shall make two sample welds of each type of head hardened rail. There shall be three samples of 136RE head hardened rail to 136RE head hardened rail. There shall be three samples of 132RE head hardened rail to 132RE head
2026 02851 - 3 DES REV 03/2026
hardened rail. Each of the two samples from every set of samples shall be inspected and tested.
b. Assign each sample weld a number and mark each weld with that number and type of rail using a permanent marking device.
c. Submit with each sample weld for inspection and testing, a record of the following signed by the welding supervision:
1). Sample Weld number.
2). Welding machine identification.
3). Welding machine operator.
4). Brand, rolling date, heat number, and type of rail used on each side of the weldment.
5). Date welded.
d. The sample weld shall join two pieces of rail each a minimum of 30 inches to a maximum of 36 inches in length. Rail pieces to be used for the sample welds shall be cut from both
136RE running rail and 132RE restraining rail received for this project. Each rail shall be coded for identification and comparison with the record submitted.
2. Test each set of two sample welds as follows:
a. Perform Slow Bend Test specified in Article 1.3.B.3 of this Section on one sample weld.
b. Perform Hardness Test specified in Article 1.3.B.4 of this Section on one sample weld.
3. Slow Bend Test
a. Subject sample weld which has pass to the Slow Bend Test in accordance with the recommended practices of the current AREMA Manual for Railway Engineering (MRE), Chapter 4, Section 3.10.
b. The acceptance criteria for this test shall be a minimum deflection of 0.75 inch deflection with minimum 125,000 pounds per square inch modulus of rupture for head hardened rail.
4. Hardness Test
a. Longitudinally cut a cross-section of a second sample weld of each type of rail for a maximum distance of one foot each side of the weld and test by the Brinell Hardness or
Rockwell C Hardness Test.
b. No weld shall have hardness values greater than 400 BHN or 43 Rc. Test welded zone in accordance with the recommended practices of the current AREMA MRE Chapter 4, Section 3.10. The minimum Brinell Hardness number of parent metal is published at 310 for standard rail and a minimum of 370 for high strength rail.
c. For a weld to be acceptable the weld material and heat affected zone of each rail, not more than 6 inches from weld center line, must meet the minimum hardness above for standard or head hardened rail. Hardness within the weld shall be within plus or minus 30 BHN points or plus or minus 5 Rc of parent rails head hardness except at decarburized centerline and at the spherodized edge of the heat affected zone.
d. Inspect macro etched section for compliance with shop weld requirements of full penetration, complete fusion, and internal defects specified herein.
2026 02851 - 4 DES REV 03/2026
5. Approval of welding process, welding machine, and operator will depend upon sample welds satisfying the specified requirements. Should any sample weld fail to satisfy specified requirements, then the welding process, welding machine or both shall be altered or adjusted to produce an acceptable weld and the tests shall be repeated. Any change required correcting sample weld failure, or any change of procedure, equipment or personnel shall require additional submittals as specified in Article 1.2 of this Section.
6. Satisfactorily complete qualification testing specified herein, prior to production welding.
C. Production Welding – Inspection and Testing
1. During production welding test and inspect welds as specified herein to ensure compliance of each shop weld with requirements of these Specifications.
2. Magnaflux Testing
a. Inspect welds by the dry powder magnetic particle method in accordance with ASTM
E709.
b. Cut out welds giving fault indication in magnetic particle inspection and re-weld rails in accordance with these shop welding specifications.
3. Physical Inspection
a. Inspect welds with a three-foot certified straightedge similar to a No. 270 Starrett, along the centerline of top of rail and 5/8 inch below top of rail on gauge side of the rail head.
b. With straightedge centered over weld the gap between straightedge and rail shall not exceed the recommended practices of the current AREMA MRE of Chapter 4 for surface misalignment tolerance and gauge misalignment tolerance. The relevant data from the recommended practices of the AREMA MRE for surface alignment is shown in this
Section.
c. Cut out welds not meeting these straightness tolerances and re-weld rails in accordance with these shop welding specifications.
d. Shop or Mobile Weld Machine Performance
1). During preparation of sample welds and during production welding attach a chart recorder, with certified calibration, to each welding machine to record platen movement and current impulses during welding. Chart recorder shall be calibrated at least daily.
2). The weld will be rejected if the record indicates a performance which is not in conformance with standards submitted and approved under this Article.
4. Rejected Welds
a. Welds cut out due to not passing Magnaflux test, physical Inspection or due to improper welding machine function shall be replaced at Contractor's expense.
2026 02851 - 5 DES REV 03/2026
PART 2 - PRODUCTS
2.1 MATERIALS TO BE FURNISHED BY THE AUTHORITY
A. MBTA will provide all 136RE rail. There will be no material purchased and supplied by the Contractor for this work.
2.2 MATERIALS TO BE FURNISHED BY THE CONTRACTOR.
A. None
PART 3 - EXECUTION
3.1 DELIVERY, STORAGE AND HANDLING
A. The Contractor is responsible for reviewing for conformance with specifications material from the
Supplier.
B. The Contractor is responsible for the unloading of CWR rails from the manufacturer. The Contractor is responsible for the subsequent handling, storage, loading, unloading, and security of rail relative to the welding and distribution of CWR strings. The Contractor is responsible for scheduling associated with the movement, unloading, welding, delivery, and distribution of rail.
3.2 FABRICATION
A. Continuous Welded Rail
1. General
a. Provide continuous welded rail for running rail within work limits as indicated on Contract
Drawings.
b. Electric flash butt weld rail in accordance with the recommended practices of the current
AREMA Manual of Railway Engineering (MRE) for the Fabrication of Continuous Welded
Rail, Chapter 4, except as modified herein.
c. Weld rails with brand of each rail on same side of CWR string. All CWR strings shall have the brand on the same side throughout the Contract.
d. Make all welds by the electric flash butt welding process.
e. Straightening of welds shall be performed in a manner which minimizes the bending of rail.
f. Incomplete welds or welds that fail to pass inspections per Article 1.3 of this Section shall be cut out using a rail saw and the rails re-welded. The section cut out of rail must include heat affected zone of each rail. Use of cutting torch or other heat dependent device to cut out defective weld shall not be permitted.
2. Continuous Welded Rail String Lengths
a. The Contractor shall determine the maximum CWR string length required for the proposed work. CWR string lengths shall be a minimum of 1500 feet long. Where site constraints prevent such strings, CWR strings may be created to a minimum length of 500 feet, with
2026 02851 - 6 DES REV 03/2026
approval of the MBTA. The Contractor shall create a schedule of required strings, their location, and length, locating all field welds. Do not weld any length of rail less than 18 feet into a CWR string.
b. Using a permanent marker, in the web of standard rail, clearly mark string number on first rail in a CWR string and string number and length of string, in feet, on the last rail in the string. Use Nissen metal marker as manufactured by J. P. Nissen, Jr., Co. or approved equivalent.
c. All rails shall be head hardened.
d. If it is necessary to drill a hole in the first rail of a CWR string for handling purposes the hole shall be drilled as the second hole per MBTA Standard Plan 300. If rail is damaged at hole location, the damaged end shall be cut off at Contractor's expense.
3.3 DISTRIBUTION OF CONTINUOUS WELDED RAIL (CWR) FROM A MOBILE OR FIXED
PLANT
A. General
1. Only load continuous welded rail strings onto rail cars, or other suitable transporting equipment, specially equipped to handle CWR.
2. Handling, loading, transporting, and unloading of continuous welded rail shall be in accordance with the recommended practices of the current AREMA MRE and these Specifications.
B. Distribution
1. Distribute CWR strings within project limits where required.
a. Ends of CWR strings shall be offset and blocked to prevent buckling and the standard overlap shall be two feet.
b. Rails shall not be run out over crossings or across side track side of turnouts but shall be laid on either side of crossings and side tracks unless otherwise directed by the Engineer.
c. Rail strings shall be set on crossties removed from existing track at minimum 100 foot intervals, one-tier high.
d. Rail strings shall be moved to the approved locations by equipment designed to handle
CWR without causing damage to the rail, existing or newly constructed track. Dragging of welded strings is prohibited.
C. Rail Installation shall be as specified in Section 02853 – CWR INSTALLATION.
2026 02851 - 7 DES REV 03/2026
PART 4 - MEASUREMENT AND PAYMENT
4.1 MEASUREMENT
A. No separate measurement will be made for the work of this Section. The cost for all work, complete in place; installing all materials furnished by the MBTA, equipment and accessories required; providing all tools, labor, transportation, handling and storage; and performing all work incidental to completion of work of this Section shall be included in the Contract Unit Price payment item below
4.2 PAYMENT
A. Payment for Railroad Running Rail will be included in the Contract Unit Price for Item 0291.012 –
TRACK CONSTRUCTION and Item 0291.248 SPECIAL TRACKWORK INSTALLATION.
END OF SECTION
2026 02851 - 8 DES REV 03/2026
2026 02851 - 9 DES REV 03/2026
2026 02851 - 10 DES REV 03/2026
2026 02851 - 11 DES REV 03/2026
2026 02851 - 12 DES REV 03/2026
2026 02851 - 13 DES REV 03/2026
2026 02851 - 14 DES REV 03/2026
j l.t-..., DO NOT DRILL FIRST HOLE UNLESS
I SPECIFICALLY ORDERED. TO BE FIELD
DRILLED WHEN REQUIRED.
,,,.L.,. _Lb .
-----+-l \ . ~--·---- .. ----l'lt:J tl,.dJ
-~t.....--~~--~---6"~------------J-.· ~1-..-.----at• ______ __....._io--____________ ,.~------------..... --------~---t"~--~--~~~---J~
SECTION DRILLING
MINIMUM
Atta Sq.In.
Htod····· 4.42 Wtb···-·U& eo ........ 4,11
Totol····l2,9!5
MATHEMATICAL ATTRIBUTES
Percent 34.1 28.3
...IL.!.
100.0
Moment or lnertlo ...... - -.- .. --- 88.2 Section l'n0dulut hffd•- ..... ____ 22.s
Section modulut bo11 .... - ...... ___ 27.6
RoUo m.I. to arto-- ... ·------- 6.91 Rotlo 1,m.tltod ioorta---.. --.. - 1.74
Rotlo hth~flt to boH· -- ----.. - 1.19 CotculOttd welghf,lbt.Ptf yord- ---132.1 Net Ton• per M II• of Track - • • 232.!SO ftoU1 shall eonfOf'm fo currant A A.£'.A.
"SPtCmcotlon For°"" Heorth StHI Rollt,11
9KC&pt all rolls within 11peclul tr®tlwC>rk 8hall be fully he cat t reo ted, :::ucHUSETTS RAlLROAD ~~~· 1302 !~;~~~?NATION OPERATIONS oc t. 2.6, 1992 (2)
ISSUE OllT!: 1ss'ui"" uo .
· 13 2 LB R E RAIL
AREMA
136RE
TRACK FT_1
ELEMENT ID
L1
L2
C1
L3
ELEMENT
TANGENT
TANGENT
CURVE
TANGENT
STATION
41+69.16 41+99.16
41+99.16 46+43.12
P.C. = 46+43.12 P.T. = 49+26.32
49+26.32 56+19.28
BEARING
S31° 58' 08.19"W
S24° 48' 58.19"W
S09° 07' 14.70"E
NORTHING
2948685.672 2948660.222
2948660.222 2948257.255
P.C. = 2948257.255 P.T. = 2947980.286
2947980.286 2947296.092
EASTING
774626.149 774610.265
774610.265 774423.930
P.C. = 774423.930 P.T. = 774385.755
774385.755 774495.600
DATA
Lt = 30.00'
Lt = 443.96'
CURVE SET:
ANGLE(I) = 033°56' Dc = 011°59'
LENGTH = 283.72 R = 479.00'
PI: N = 2948124.595 E = 774362.587 Lc(CHORD) = 279.59'
PI STATION = 47+89.28 CC: N = 2948056.215 E = 774858.699
Lt = 692.96'
TRACK FT_3
ELEMENT ID
L7
L8
C3
L9
ELEMENT
TANGENT
TANGENT
CURVE
TANGENT
STATION
44+65.55 44+95.55
44+95.55 46+69.56
P.C. = 46+69.56 P.T. = 48+93.07
48+93.07 56+19.28
BEARING
S24° 48' 58.19"W
S17° 39' 48.19"W
S09° 07' 14.70"E
NORTHING
2948434.400 2948407.170
2948407.170 2948241.365
P.C. = 2948241.365 P.T. = 2948020.095
2948020.095 2947303.067
EASTING
774505.843 774493.252
774493.252 774440.454
P.C. = 774440.454 P.T. = 774423.928
774423.928 774539.043
DATA
Lt = 30.00'
Lt = 174.01'
CURVE SET:
ANGLE(I) = 026°47' Dc = 011°59'
LENGTH = 223.92 R = 479.00'
PI: N = 2948132.697 E = 774405.850 Lc(CHORD) = 221.89'
PI STATION = 47+83.60 CC: N = 2948096.024 E = 774896.871
Lt = 726.21'
TRACK FT_4
ELEMENT ID
L10
L11
C4
L12
ELEMENT
TANGENT
TANGENT
CURVE
TANGENT
STATION
45+79.73 46+09.73
46+09.73 47+05.96
P.C. = 47+05.96 P.T. = 48+69.78
48+69.78 56+19.28
BEARING
S17° 39' 48.19"W
S10° 30' 38.19"W
S09° 07' 14.70"E
NORTHING
2948332.918 2948304.332
2948304.332 2948209.722
P.C. = 2948209.722 P.T. = 2948046.415
2948046.415 2947306.396
EASTING
774469.608 774460.505
774460.505 774442.952
P.C. = 774442.952 P.T. = 774440.971
774440.971 774559.778
DATA
Lt = 30.00'
Lt = 96.22'
CURVE SET:
ANGLE(I) = 019°38' Dc = 011°59'
LENGTH = 164.12 R = 479.00'
PI: N = 2948128.240 E = 774427.834 Lc(CHORD) = 163.32'
PI STATION = 47+88.83 CC: N = 2948122.344 E = 774913.915
Lt = 749.50'
TRACK FT_5
ELEMENT ID
L13
L14
C5
L15
ELEMENT
TANGENT
TANGENT
CURVE
TANGENT
STATION
40+84.21 41+14.21
41+14.21 44+89.92
P.C. = 44+89.92 P.T. = 48+71.58
48+71.58 56+19.28
BEARING
S31° 58' 08.19"W
S24° 48' 58.19"W
S09° 07' 14.70"E
NORTHING
2948787.868 2948762.418
2948762.418 2948421.398
P.C. = 2948421.398 P.T. = 2948048.444
2948048.444 2947310.200
EASTING
774689.931 774674.047
774674.047 774516.357
P.C. = 774516.357 P.T. = 774464.953
774464.953 774583.474
DATA
Lt = 30.00'
Lt = 375.71'
CURVE SET:
ANGLE(I) = 033°56' Dc = 008°54'
LENGTH = 382.04 R = 645.00'
PI: N = 2948242.764 E = 774433.756 Lc(CHORD) = 376.48'
PI STATION = 46+86.73 CC: N = 2948150.687 E = 775101.798
Lt = 747.70'
TRACK FT_6
ELEMENT ID
L16
L17
C6
L18
ELEMENT
TANGENT
TANGENT
CURVE
TANGENT
STATION
43+86.28 44+16.28
44+16.28 46+02.57
P.C. = 46+02.57 P.T. = 48+26.08
48+26.08 56+19.28
BEARING
S24° 48' 58.19"W
S17° 39' 48.19"W
S09° 07' 14.70"E
NORTHING
2948522.546 2948495.316
2948495.316 2948317.810
P.C. = 2948317.810 P.T. = 2948096.541
2948096.541 2947313.371
EASTING
774563.129 774550.538
774550.538 774494.013
P.C. = 774494.013 P.T. = 774477.487
774477.487 774603.221
DATA
Lt = 30.00'
Lt = 186.29'
CURVE SET:
ANGLE(I) = 026°47' Dc = 011°59'
LENGTH = 223.92 R = 479.00'
PI: N = 2948209.142 E = 774459.409 Lc(CHORD) = 221.89'
PI STATION = 47+16.61 CC: N = 2948172.470 E = 774950.431
Lt = 793.20'
TRACK FT_AMTRAK MOW
ELEMENT ID
L19
L20
C7
L21
ELEMENT
TANGENT
TANGENT
CURVE
TANGENT
STATION
0+00.00 0+30.00
0+30.00 1+73.29
P.C. = 1+73.29 P.T. = 2+32.30
2+32.30 3+31.53
BEARING
S54° 58' 56.91"W
S47° 49' 46.91"W
S54° 54' 04.97"W
NORTHING
2948400.867 2948383.652
2948383.652 2948287.456
P.C. = 2948287.456 P.T. = 2948250.568
2948250.568 2948193.513
EASTING
774388.927 774364.358
774364.358 774258.158
P.C. = 774258.158 P.T. = 774212.005
774212.005 774130.820
DATA
Lt = 30.00'
Lt = 143.29'
CURVE SET:
ANGLE(I) = 007°04' Dc = 011°59'
LENGTH = 59.12 R = 479.00'
PI: N = 2948267.586 E = 774236.221 Lc(CHORD) = 59.08'
PI STATION = 2+02.89 CC: N = 2948642.468 E = 773936.587
Lt = 99.23'
TRACK FT_MBTA MOW
ELEMENT ID
L22
L23
ELEMENT
TANGENT
TANGENT
STATION
0+00.00 0+30.00
0+30.00 2+88.92
BEARING
S24° 48' 58.19"W
S17° 39' 48.19"W
NORTHING
2948701.431 2948674.201
2948674.201 2948427.488
EASTING
774645.846 774633.255
774633.255 774554.693
DATA
Lt = 30.00'
Lt = 258.92'
TRACK FT_2
ELEMENT ID
L4
L5
C2
L6
ELEMENT
TANGENT
TANGENT
CURVE
TANGENT
STATION
45+55.21 45+85.21
45+85.21 46+89.72
P.C. = 46+89.72 P.T. = 49+13.23
49+13.23 56+19.28
BEARING
S24° 48' 58.19"W
S17° 39' 48.19"W
S09° 07' 14.70"E
NORTHING
2948344.466 2948317.236
2948317.236 2948217.649
P.C. = 2948217.649 P.T. = 2947996.379
2947996.379 2947299.263
EASTING
774464.257 774451.666
774451.666 774419.954
P.C. = 774419.954 P.T. = 774403.428
774403.428 774515.347
DATA
Lt = 30.00'
Lt = 104.52'
CURVE SET:
ANGLE(I) = 026°47' Dc = 011°59'
LENGTH = 223.92 R = 479.00'
PI: N = 2948108.981 E = 774385.350 Lc(CHORD) = 221.89'
PI STATION = 48+03.77 CC: N = 2948072.308 E = 774876.372
Lt = 706.04'
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
PL
O
TT
ED
D
R
AW
IN
G
MBTA CONTRACT NO. F60PS01
BOSTON, MASSACHUSETTS
.0 3.
0:
:0
PM
WIDETT LAYOVER FACILITY
DP1 - DEMOLITION & SIX LAYOVER TRACKS
c:
\U se rs
\p al m er tg \D
C \A
C C
D oc s\ st v in co rp or at ed \4
-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\
_b im _c ad \D
P1 \0
4_ C
K_ Tr ac k\
D P1
_C K-
3(
Ta bl es ).d w g
ONE FINANCIAL CENTER,
3RD FLOOR,
BOSTON, MA 02111
(617) 482-7298 www.stvinc.com
ISSUE
BY
CHECK
BY
DESIGN
BY PLAN NO:SCALE:
DRAWN
SHEET:DATE:
MASSACHUSETTS BAY
TRANSPORTATION AUTHORITY
Director of Design and ConstructionDateProject Manager Date
APPROVED BY:
REV.
NO
DATE DESCRIPTION BY
APPROVED BY:
90% DESIGN
SUBMISSION
NOT AUTHORIZED
FOR CONSTRUCTION
CK-006
TRACK
GEOMETRY DATA TABLES
AS NOTED
PB 3/27/2026 PB JS
PUR-CK-006
90% DESIGN
SUBMISSION
PRE-PURCHASE
SUBMISSION
T
M
T
T
E
E
E
E E E
E
S
S
S
S SS
S
S
D
D
D
D
D
D
D
D
D
D
D
S
D
D
D
D
D
D
D
D
D
D
D
D
D
D DD
D
495051525354
PC +43.12
PT +26.32
49505152
545556
PI +85.21
PC +89.72
PT +13.23
4950515253545556
PI +95.55
PC +69.56
PT +93.07
4950515253545556
484950515253545556
PC +89.92
PT +71.58
484950515253545556
PI +30.00
PC +73.29
PT +32.30
TRACK FT-1
TRACK FT-2
TRACK FT-3
TRACK FT-4
TRACK FT-5
TRACK FT-6
AM
TRAK-M
O W
TRACK
AM
TRAK DRY LO
O
P TRACK
AM
TRAK W
ET LO
O
P TRACK
PS
T
O-M B-
#8
L H
ST
A.
5+
.0
(F
T- 1)
ST
A.
5+
.2
(F
T- 2)
PS
T
O- M
B-
#8 L
H
ST
A.
5+
.4
(F
T- 3)
ST
A.
5+
.7
(F
T- 4)
PS TO-MB-3 #8 LHSTA. 44+47.95 (FT-1) =STA. 44+65.54 (FT-3)
WIDETT
CIRCLE
WIDETT CIRCLE
WIDETT
CIRCLE
FOODMART
ROAD
FOODMART
ROAD
FOODMART
ROAD
FOODMART
ROAD
FOODMART ROAD
1-63
FOODMART ROAD
W
IDETT CIRCLE
W
ID
ET
T
CI
RC
LE
AMTRAK
TRAIN
WASH
PC +02.57
PT +26.08
PI +09.73
PC +05.96
PT +69.78
SOUTH BOSTON BYPASS
(OVERHEAD)
EXISTING MBTA WARMING
TRACK TO REMAIN
EXISTING MBTA WARMING
CURVE C-1
CURVE C-7
CURVE C-6
CURVE C-5
CURVE C-4
CURVE C-3
CURVE C-2
TRACK FT-6
TRACK FT-3
PS TO-MB-2 #8 LHSTA. 43+78.48 (FT-5) =STA. 43+86.28 (FT-6)
END MOW TRACK
BUMPING POST
STA. 3+31.53
END AMTRAK DRY LOOP
TRACK REHAB. STA. 15+04.59
PROPOSED BUMPING POST (TYP.)
PROPOSED BUMPING POST
BE
G
IN
A
G
AR
T R
AC
K
R
EM
O
VA
L
ST
A.
1+
EN
D
A G
AR
T R
AC
K
AN
D
A G
AR
T
R
AC
K R
EM
O
VA
L
ST
A.
0+
EXISTING MBTA WARMING
TRACK SHED TO REMAIN
EXISTING AGAR TRACK TO REMOVED
EX.AGAR TRACK
EX.AGAR 1 TRACK
EXISTING AGAR 1 TRACK TO BE REMOVED
21'-6" TRACK CENTERS
PROPOSED OCS STRUCTURE L25A
STA. 13+16 (DRY LOOP TRACK)
EXISTING OCS STRUCTURE TO BE REMOVED
BEGIN AGAR
REMOVAL ST
CK-101
TRACK
PLAN
AS NOTED
PB 3/27/2026 PB JS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
PL
O
TT
ED
D
R
AW
IN
G
MBTA CONTRACT NO. F60PS01
BOSTON, MASSACHUSETTS
.0 3.
:4 7:
P
M
WIDETT LAYOVER FACILITY
DP1 - DEMOLITION & SIX LAYOVER TRACKS
C :\U se rs
\p al m er tg \D
C \A
C C
D oc s\ st v in co rp or at ed \4
-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\
_b im _c ad \D
P1 \0
4_ C
K_ Tr ac k\
D P1
_C K-
1.
dw g
ONE FINANCIAL CENTER,
3RD FLOOR,
BOSTON, MA 02111
(617) 482-7298 www.stvinc.com
ISSUE
BY
CHECK
BY
DESIGN
BY PLAN NO:SCALE:
DRAWN
SHEET:DATE:
MASSACHUSETTS BAY
TRANSPORTATION AUTHORITY
Director of Design and ConstructionDateProject Manager Date
APPROVED BY:
REV.
NO
DATE DESCRIPTION BY
APPROVED BY:
90% DESIGN
SUBMISSION
NOT AUTHORIZED
FOR CONSTRUCTION
40'
SCALE: 1"=40'
40' 020'
N
M
AT
CH
LI
NE
SE
E
SH
EE
T
CK
-1
KEY PLAN
CK-101
N
CK-102
PUR-CK-101
90% DESIGN
SUBMISSION
PRE-PURCHASE
SUBMISSION
New 136RE Rail and Timber Ties (in green)
New 136 RE Rail and composite ties (in yellow)
S
D
D
D
D
D
D
D
D
D
D
CM
CM
PI +99.16
PC +43.12
PI +85.21
PC +89.72
PI +95.55
PC +69.56
PI +14.21
PC +89.92
PI +30.00
PI +30.00
0+00
2+88.92
PS
T
O -M
B-
#8 L
H
ST
A.
5+
.0
(F
T- 1)
ST
A.
5+
.2
(F
T-
2) PS TO-AM-3 #8 LH
STA.11+77.69 =
STA. 0+00
PS
T
O -M
B-
#8 L
H
ST
A.
5+
.4
(F
T- 3)
ST
A.
5+
.7
(F
T- 4)
PS TO-MB-3 #8 LH
STA. 44+47.95 (FT-1) =
STA. 44+65.54 (FT-3)
MBTA MOW TRACK
TRACK FT-5
TRACK FT-1
AMTRAK DRY LOOP TRACK
AMTRAK WET LOOP TRACK
PS
T
O-A M
-1
LH
ST
A.
+8
2.
(D
RY
L
OOP)
ST
A.
0+
.2
(F
T- 5)
PS
T
O-A M
-2
LH
ST
A.
+0
3.
(D
RY
L
OOP)
ST
A.
1+
.1
(F
T- 1)
PS
T
O -M
B-
#8 L
H
ST
A.
1+
.4
(F
T- 5)
ST
A.
+0
(M
O W
T
RK
BE
G
IN
A
M
TR
AK
W
ET
/D
R Y
LO
O
P
TR
AC
K R
EH
AB
. S
TA
. 0 +0
0.
EN
D
AM
TR
AK
W
ET
L
OOP
TR
AC
K
RE
HA
B.
S
TA
. 4 +5
0.
AMTRAK
TRAIN
WASH
WIDETT CIRCLE
WIDETT
CIRCLE
PI +16.28
PC +02.57
PI +09.73
EXISTING MBTA WARMING
TRACK TO REMAIN
AMTRAK LOOP TRACK TO BE REHABBED
EXISTING AMTRAK
MOW TRACKS TO
BE REMOVED
TRACK FT-6
TRACK FT-3
EN
D
AM
TR
AK
E
XI
ST
. M
OW
TR
AC
K
RE
HA
B.
S
TA
. 5 +9
1.
PS TO-MB-2 #8 LH
STA. 43+78.48 (FT-5) =
STA. 43+86.28 (FT-6)
PROPOSED BUMPING POST
BE
GIN
M
OW
T
RA
CK
RE
M
OVA
L
ST
A.
+8
EX.MOW TRK 1
EX.MOW TRK 2
BE
G
IN
M
O W
T
RA
CK
RE
M
O
VA
L
ST
A.
+6
END M
OW TRACK 1
REMOVAL S
TA. 1
0+
END M
OW TRACK 2
REMOVAL S
TA. 1
0+
BE
G
IN
A
G
AR
T R
AC
K
R
EM
O
VA
L
ST
A.
1+
END AMTRAK WORK
BEGIN MBTA WORK
STA. 41+77.04 (FT-5) =
STA. 7+74.54 (DRY LOOP)
EN
D
AM
TR
AK
W
ORK
BE
GIN
M
BT
A W
ORK
ST
A.
2+
.9
(F
T- 1)
ST
A.
+9
6.
(D
RY
L
OOP)
EXISTING TURNOUT TO REMAIN
EX
IS
TI
NG
P S
TO
R
EM
AI
N
ST
A.
+9
8.
EX
IS
TI
NG
P S
TO
R
EM
AI
N
ST
A.
+9
4.
EX
IS
TI
NG
P S
TO
R
EM
AI
N
ST
A.
+9
7.
BEGIN AGAR 1 TRACK
REMOVAL STA. 10+61
CK-102
TRACK
PLAN
AS NOTED
PB 3/27/2026 PB JS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
PL
O
TT
ED
D
R
AW
IN
G
MBTA CONTRACT NO. F60PS01
BOSTON, MASSACHUSETTS
.0 3.
:2 0:
A
M
WIDETT LAYOVER FACILITY
DP1 - DEMOLITION & SIX LAYOVER TRACKS
c:
\U se rs
\p al m er tg \D
C \A
C C
D oc s\ st v in co rp or at ed \4
-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\
_b im _c ad \D
P1 \0
4_ C
K_ Tr ac k\
D P1
_C K-
1.
dw g
ONE FINANCIAL CENTER,
3RD FLOOR,
BOSTON, MA 02111
(617) 482-7298 www.stvinc.com
ISSUE
BY
CHECK
BY
DESIGN
BY PLAN NO:SCALE:
DRAWN
SHEET:DATE:
MASSACHUSETTS BAY
TRANSPORTATION AUTHORITY
Director of Design and ConstructionDateProject Manager Date
APPROVED BY:
REV.
NO
DATE DESCRIPTION BY
APPROVED BY:
90% DESIGN
SUBMISSION
NOT AUTHORIZED
FOR CONSTRUCTION
40'
SCALE: 1"=40'
40' 020'
N
M
AT
CH
LI
NE
SE
E
SH
EE
T
CK
-1
KEY PLAN
CK-101
N
CK-102
PUR-CK-102
90% DESIGN
SUBMISSION
PRE-PURCHASE
SUBMISSION
New 136RE Rail and Timber Ties (in green)
New 136RE Rail and composite ties (in yellow)
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
PL
O
TT
ED
D
R
AW
IN
G
MBTA CONTRACT NO. F60PS01
BOSTON, MASSACHUSETTS
.0 3.
0:
:0
PM
WIDETT LAYOVER FACILITY
DP1 - DEMOLITION & SIX LAYOVER TRACKS
c:
\U se rs
\p al m er tg \D
C \A
C C
D oc s\ st v in co rp or at ed \4
-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\
_b im _c ad \D
P1 \0
4_ C
K_ Tr ac k\
D P1
_C K-
1(
Tr ac k_ D et ai ls ).d w g
ONE FINANCIAL CENTER,
3RD FLOOR,
BOSTON, MA 02111
(617) 482-7298 www.stvinc.com
ISSUE
BY
CHECK
BY
DESIGN
BY PLAN NO:SCALE:
DRAWN
SHEET:DATE:
MASSACHUSETTS BAY
TRANSPORTATION AUTHORITY
Director of Design and ConstructionDateProject Manager Date
APPROVED BY:
REV.
NO
DATE DESCRIPTION BY
APPROVED BY:
90% DESIGN
SUBMISSION
NOT AUTHORIZED
FOR CONSTRUCTION
CK-501
DETAILS
PUR-CK-501
90% DESIGN
SUBMISSION
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
PL
O
TT
ED
D
R
AW
IN
G
MBTA CONTRACT NO. F60PS01
BOSTON, MASSACHUSETTS
.0 3.
0:
:1
PM
WIDETT LAYOVER FACILITY
DP1 - DEMOLITION & SIX LAYOVER TRACKS
c:
\U se rs
\p al m er tg \D
C \A
C C
D oc s\ st v in co rp or at ed \4
-w id et t l ay ov er fa ci lit y\ pr oj ec t f ile s\
_b im _c ad \D
P1 \0
4_ C
K_ Tr ac k\
D P1
_C K-
1(
Tr ac k_ D et ai ls ).d w g
ONE FINANCIAL CENTER,
3RD FLOOR,
BOSTON, MA 02111
(617) 482-7298 www.stvinc.com
ISSUE
BY
CHECK
BY
DESIGN
BY PLAN NO:SCALE:
DRAWN
SHEET:DATE:
MASSACHUSETTS BAY
TRANSPORTATION AUTHORITY
Director of Design and ConstructionDateProject Manager Date
APPROVED BY:
REV.
NO
DATE DESCRIPTION BY
APPROVED BY:
90% DESIGN
SUBMISSION
NOT AUTHORIZED
FOR CONSTRUCTION
CK-502
DETAILS
NOTE, INSULATED JOINTS NOT NEEDED
INSULATED JOINTS NOT NEEDED
PUR-CK-502
90% DESIGN
SUBMISSION