This document contains templates and guidance for proposals responding to a federal contract solicitation. The solicitation seeks proposals for Vertical Construction Multiple Award Task Order Contracts to be awarded as a Woman Owned Small Business set-aside. Up to four Design-Build firms will be selected to receive task orders for construction projects primarily within the Fort Worth District of the Army Corps of Engineers, which includes Texas, Louisiana and New Mexico. Task orders will range from $75,000 to $16 million and are expected to total approximately $116 million across all selected contractors. Common project types include military facilities like dormitories, dining halls and vehicle maintenance shops. Historically, over half of task orders under these contracts support sustainment, restoration and maintenance projects through the design-build delivery method. Proposals are due by the date specified in the solicitation issued by the Fort Worth District of the Army Corps of Engineers.

View the file

Other files

File Type Posted
NIST INFORMATION.docx DOCX document
am_1_20R0046.pdf PDF
WOSB Attachment 2 Past Performance Projects Table 17Dec20.xlsx XLSX spreadsheet
Attachment 5 IDIQ Experience Table 4Dec20.xlsx XLSX spreadsheet
Attachment 2 Past Performance Projects Table 6Jan21.xlsx XLSX spreadsheet
Attachment 6 Past Performance Questionnaire.docx DOCX document
W9126G20R0046 WOSB Vertical MATOC Solicitation.pdf PDF
Attachment 7 Projects Table 4Dec20.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE 1 - TAB A

PROPOSAL DATA SHEET

SECTION 00 22 10 - ATTACHMENT 1

Solicitation Number

Firm

Address

Phone

Fax

Email

Tax ID Number

DUNS Number

Also provide any other assigned number that identifies the member firm(s) in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must also be submitted. Provide a DUNS number for each company identified in any proposed Contractor-subcontractor association of firms. If the firm is a joint venture or contractor-subcontractor association of firms, list the individual firms and briefly describe the nature of the association. Provide DUNS for each.

Firm 1

Nature of Association

DUNS Number

Firm 2

Nature of Association

DUNS Number

Firm 3

Nature of Association

DUNS Number

Authorized Negotiators IAW FAR 52.215-11 - The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).

Name

Title

Address

Telephone

Email

SECTION 00 22 10 - ATTACHMENT 3

PAST PERFORMANCE ASSESSMENT WORKSHEET

(To be completed for each construction project submitted in Attachment 2 Past Performance Projects Table)

CONSTRUCTION OR PRIME CONTRACTOR PROJECT #_______

Offeror:

Is the Offeror part of a Joint Venture, Partnership, Teaming Arrangement, or Parent Company/subsidiary/affiliate?

If yes, identify the company who performed this project and their proposed role in the MATOC organization.

Project and Location:

Was this project performed by the division or unit of the company submitting the offer for this MATOC solicitation?

Owner:

Owner’s Point of Contact for Reference:

Telephone:

Awarded Construction Cost:
Final Construction Cost:

Explain Cost Growth, if any:

Date of Award:

Original Completion Date:
Revised Completion Date:
Percent Complete:

Explain Time Growth, if any:

General Scope of Construction and Role of the Company who performed this project:

Work Your Company Self-Performed:

Extent and Type of Work You Subcontracted Out:

Relevancy is identified in Attachment 2 Past Performance Project Table. Provide additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).

Your Performance Evaluation by Owner, if known :

SECTION 00 22 10 - ATTACHMENT 4

PAST PERFORMANCE ASSESSMENT WORKSHEET

(To be completed for each design project submitted in Attachment 2 Past Performance Projects Table)

DESIGN FIRM (OR IN-HOUSE DESIGN) PROJECT #_______

Offeror (Design Firm):

Project and Location:

Was this project performed by the division or unit of the company submitting as the design firm for this MATOC solicitation?

Owner:

Owner’s Point of Contact for Reference:

Telephone:

Estimated Construction Cost:
Actual Construction Cost (if known):

Date of Award:

Original Design Completion Date:
Revised Design Completion Date:

Explain Time Growth, if any:

General Scope of Construction and Offeror’s Role in Design:

Offeror’s Role in Design (Self-Performed Work):

Extent and Type of Work You Subcontracted Out:

Relevancy is identified in Attachment 2 Past Performance Project Table. Provide additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).

Your Performance Evaluation by Owner, if known:

File details come from the government source that posted it. Updated .