Attachment 2 Past Performance Projects Table 6Jan21.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Vertical Construction Multiple Award Task Order Contract - Women Owned Small Business Set-Aside
- Solicitation number
- W9126G20R0046
About this file
This document contains an attachment and federal contract opportunity related to construction and design services. The attachment provides a table for offerors to list relevant past performance projects for construction and design work. It requests information such as project value, type, attributes, and completion dates. The federal contract opportunity is a solicitation for multiple award task order contracts for vertical construction services set aside for woman-owned small businesses. The estimated total value for all task orders is $116 million, with a minimum of $75,000 and maximum of $16 million per task order. Services will primarily support facilities in Texas, Louisiana and New Mexico, including dormitories, dining halls, offices and other building types. Historically over half of task orders are for sustainment, restoration and maintenance projects through the design-build approach.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NIST INFORMATION.docx | DOCX document | |
| am_1_20R0046.pdf | ||
| WOSB Attachment 2 Past Performance Projects Table 17Dec20.xlsx | XLSX spreadsheet | |
| Attachment 5 IDIQ Experience Table 4Dec20.xlsx | XLSX spreadsheet | |
| MATOC Section 00 22 10 attachments 1 3 and 4 17Dec20.docx | DOCX document | |
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| W9126G20R0046 WOSB Vertical MATOC Solicitation.pdf | ||
| Attachment 7 Projects Table 4Dec20.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Past Performance Projects Table - Attachment 2 |
| Factor: Past Performance |
| Page 1 of 2 |
| For each construction project listed below, provide a Construction Past Performance Worksheet (Attachment 3). | ||||
| CONSTRUCTION | Facility Type | Project Value (*See Note) | Project Type | Project Attributes |
(Check all that apply)
| Project Number | Project Title | Contract Number | Dormitory / Barracks | Dining Facility | Classroom / Instructional Bldg / Laboratories | Chapel | Operations Center | Warehouse / Supply Support Facility | Headquarter Building / Office Building | Vehicle Maintenance Shop | Vehicle Access Control Point / Checkpoint | Child / Youth Development Center | Other | $1 million - $6.5 million | $6.5 million - $13 million | $13 million - $20 million | New Vertical Construction | Renovation | SCIF construction - new or renovation | New HVAC / | |
| HVAC Renovation | New Roof / | ||||||||||||||||||||
| Roof Replacement | New interior buildout / Interior Renovation | Life Safety / | |||||||||||||||||||
| Fire Protection | Design-Build | Contract completion date | Percent complete |
Proposal Page Number
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| * Note: Projects submitted outside of the specified project value ranges will not be considered relevant for project value but can be considered for other aspects of relevancy. |
| Past Performance Projects Table - Attachment 2 |
| Factor: Past Performance |
| Page 2 of 2 |
| For each design project listed below, provide a Design Past Performance Worksheet (Attachment 4). | ||||
| DESIGN | Facility Type | Project Value (*See Note) | Project Type | Project Attributes |
(Check all that apply)
| Project Number | Project Title | Contract Number | Dormitory / Barracks | Dining Facility | Classroom / Instructional Bldg / Laboratories | Chapel | Operations Center | Warehouse / Supply Support Facility | Headquarter Building / Office Building | Vehicle Maintenance Shop | Vehicle Access Control Point / Checkpoint | Child / Youth Development Center | Other | $1 million - $6.5 million | $6.5 million - $13 million | $13 million - $20 million | New Vertical Construction | Renovation | SCIF construction - new or renovation | New HVAC / | |
| HVAC Renovation | New Roof / | ||||||||||||||||||||
| Roof Replacement | New interior buildout / Interior Renovation | Life Safety / | |||||||||||||||||||
| Fire Protection | Design-Build | Contract completion date (provide design completion date for ongoing DB contracts) |
Proposal Page Number
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| * Note: Projects submitted outside of the specified project value ranges will not be considered relevant for project value but can be considered for other aspects of relevancy. |
File details come from the government source that posted it. Updated .