MAPC 2026 Road Paint - 2 - Bid Price Sheet - Addendum 3.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
MAPC 2026 Road Paint - 2
Solicitation number
BD-26-1217-MAP03-MAP03-126119
Issued by
Massachusetts

About this file

This is a Bid Price Sheet and Addendum 3 for the MAPC 2026 Road Paint - 2 contract, issued by the Metropolitan Area Planning Council (MAPC) on behalf of ten participating municipalities and agencies: Arlington, Brookline, Chelsea, Everett, MassPort, Quincy, Salem, Somerville, Watertown, and the Massachusetts Bay Transportation Authority (MBTA). The contract covers pavement markings and line painting services to be provided through February 28, 2027. The scope of work includes thermoplastic markings, water-based paint markings, resin bonded aggregate, tape markings, and preformed plastic markings in various configurations and sizes. Specific line items include standard traffic markings in 12-inch, 8-inch, 6-inch, and 4-inch widths in both white and yellow; specialized markings such as arrows, "ONLY" designations, "BUS" designations, and bike lane markings including bike-specific arrows, bike symbols with helmets, sharrow markings, and bike detectors; resin bonded aggregate totaling 535,392 square feet (250,272 square feet for bus areas and 285,120 square feet for bike areas); and traffic marking removal services covering 53,539 square feet. Estimated quantities range from 5 to 22,308 linear feet or units depending on the marking type.

Bidders are required to submit unit prices for each line item, with the bid form organized into six subtotal categories (Thermoplastic, Water-Based Paint, Resin, Tape, Preformed Plastic, and Other) that roll up into a comprehensive Bid Total. The pricing structure requires contractors to provide both labor and materials for all pavement marking services. Bids must include per-unit pricing denominated in linear feet for line markings and per-square-foot pricing for resin bonded aggregate and removal work, with all costs extending to total line-item amounts. This addendum serves as the official bid price sheet document for the solicitation and establishes the standardized format through which all bidders must submit their pricing proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

MAPC 2026 Road Paint - 2 - Bid Price FormBidder Name: ___________________
Bidder Initials: ___________
Bid ItemEstimated QuantityxBid Price/ Unit=Total
PAVEMENT MARKINGS
Pavement Markings [Contractor provides both Labor & Materials]Bid Total (Subtotals A+B+C+D+E+F) =$
AThermoplastic$
BWater-Based$
CResin$
DTape$
EPreform Plastic$
FOther$
A. ThermoplasticSubtotal =$
1)12" White Traffic Marking (Thermoplastic) Linear Ft465x/LF=$
2)12" Yellow Traffic Marking (Thermoplastic) Linear Ft465x/LF=$
3)8" White Traffic Marking (Thermoplastic) Linear Ft1,859x/LF=$
4)8" Yellow Traffic Marking (Thermoplastic) Linear Ft1,859x/LF=$
5)6" White Traffic Marking (Thermoplastic) Linear Ft7,436x/LF=$
6)6" Yellow Traffic Marking (Thermoplastic) Linear Ft7,436x/LF=$
7)4" White Traffic Marking (Thermoplastic) Linear Ft22,308x/LF=$
8)4" Yellow Traffic Marking (Thermoplastic) Linear Ft22,308x/LF=$
9)Traffic Marking Arrow (Thermoplastic) Each8x/EA=$
10)Traffic Marking "ONLY" (Thermoplastic) Each8x/EA=$
11)6’ Traffic Marking "BUS" (Thermoplastic)6x/EA=$
12)6’ Thermoplastic Traffic Marking “BIKE”5x/EA=$
13)Thermoplastic Traffic Markings, 6' Bike Specific Arrow5x/EA=$
14)Thermoplastic Traffic Markings 8' x 4' Bike Symbol with Helmet5x/EA=$
15)Thermoplastic Traffic Markings 10' Bike Symbol with Helmet5x/EA=$
16)Thermoplastic Traffic Markings Bike Detector5x/EA=$
17)Thermoplastic Traffic Markings 7' 9" x 3' 3" SHARROW5x/EA=$
B. Water-BasedSubtotal =$
1)12" White Traffic Marking (Paint) Linear Ft465x/LF=$
2)12" Yellow Traffic Marking (Paint) Linear Ft465x/LF=$
3)8" White Traffic Marking (Paint) Linear Ft1,859x/LF=$
4)8" Yellow Traffic Marking (Paint) Linear Ft1,859x/LF=$
5)6" White Traffic Marking (Paint) Linear Ft7,436x/LF=$
6)6" Yellow Traffic Marking (Paint) Linear Ft7,436x/LF=$
7)4" White Traffic Marking (Paint) Linear Ft22,308x/LF=$
8)4" Yellow Traffic Marking (Paint) Linear Ft22,308x/LF=$
9)Traffic Marking Arrow (Paint)8x/EA=$
10)Traffic Marking "ONLY" (Paint) Each8x/EA=$
11)6’ Traffic Marking "BUS" (Paint)6x/EA=$
12)6’ Paint Traffic Marking “BIKE”5x/EA=$
13)Paint Traffic Markings, 6' Bike Specific Arrow5x/EA=$
14)Paint Traffic Markings 8' x 4' Bike Symbol with Helmet5x/EA=$
15)Paint Traffic Markings 10' Bike Symbol with Helmet5x/EA=$
16)Paint Traffic Markings Bike Detector5x/EA=$
17)Paint Traffic Markings 7' 9" x 3' 3" SHARROW5x/EA=$
C. ResinSubtotal =$
1)Resin Bonded Aggregate Sq ft - Bus250,272x/Sq Ft=$
2)Resin Bonded Aggregate Sq ft - Bike285,120x/Sq Ft=$
D. TapeSubtotal =$
1)Tape Traffic Markings, 6' Bike Specific Arrow5x/EA=$
2)Tape Traffic Markings 8' x 4' Bike Symbol with Helmet5x/EA=$
3)Tape Traffic Markings 10' Bike Symbol with Helmet5x/EA=$
4)Tape Traffic Markings Bike Detector5x/EA=$
5)Tape Traffic Markings7' 9" x 3' 3" SHARROW5x/EA=$
E. Preform PlasticSubtotal =$
1)Pre-formed Traffic Marking Arrow (Plastic)8x/EA=$
2)Pre-formed Traffic Marking "ONLY" (Plastic)8x/EA=$
3)‘Preformed Traffic Marking "BUS" (Plastic)6x/EA=$
4)6’ Preform Traffic Marking “BIKE” (Plastic)5x/EA=$
5)Pre-formed Plastic Traffic Markings, 6’ Bike Specific Arrow5x/EA=$
6)Pre-formed Plastic Traffic Markings 8' x 4' Bike Symbol with Helmet5x/EA=$
7)Pre-formed Plastic Traffic Markings 10' Bike Symbol with Helmet5x/EA=$
8)Pre-formed Plastic Traffic Markings Bike Detector5x/EA=$
9)Pre-formed Plastic Traffic Markings 7' 9" x 3' 3" SHARROW5x/EA=$
F. OtherSubtotal =$
1)Traffic Marking Removal Sq Ft53,539x/Sq Ft=$

File details come from the government source that posted it. Updated .