Manzanita_Addendum 3_2025-05-13.pdf

PDF 803 KB Posted

Attached to
Request for Proposal for General Contractor
Solicitation number
S-KM2962-00013686
Issued by
Tillamook County, Mcminnville City, Oregon

About this file

Addendum #3 for the Manzanita Classic Street Connection project is a procurement document issued by the City of Manzanita, Oregon, dated May 13, 2025. The addendum modifies the original contract documents and provides clarification on technical specifications, specifically addressing a question about HDPE pipe DR rating, which is confirmed as DR13.5 (160 psi). The document requires bidders to acknowledge receipt of this addendum in their bid form and instructs them to replace several contract documents, including the Bid Form, Bid Bond, First-Tier Subcontractor Disclosure Form, Agreement, Performance Bond, Payment Bond, and Certificate of Compliance. The bid submission deadline remains May 20, 2025, at 2:00 PM, with no time extension granted.

The addendum includes detailed bid schedules for three sections: Classic Street Work, Retaining Wall Work, and Necarney County City Road Section, which outline specific line items, estimated quantities, and units for various construction activities. These activities include mobilization, traffic control, erosion control, excavation, pavement work, pipe installation, valve placement, hydrant assembly, and landscaping. Bidders must complete unit pricing for each item across the different work sections, with the total bid calculated by summing the subtotals from each schedule. The document emphasizes compliance with Oregon Revised Statutes, including prevailing wage requirements, subcontractor disclosure rules, and non-discrimination provisions. Contractors are required to submit various bonds and certifications, demonstrating financial stability, insurance compliance, and adherence to state labor and tax regulations.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Manzanita Classic Street Connection Project – Addendum #3 Page 1 of 2

CITY OF MANZANITA

Manzanita Classic Street Connection Project

Addendum Number 3

DATE: May 13, 2025

TO: Potential Bidders & Plan Holders

All proposers are hereby notiÞed of the following modiÞcations to the Contract Documents and Technical SpeciÞcations. This modiÞcation is to become a part of the contract documents for the “Manzanita Classic Street Connection Project.”

ADDENDUM 3 – THIS ADDENDUM PACKAGE CONSISTS OF 16 PAGES TOTAL

Each proposal shall include a speciÞc acknowledgement of receipt of this Addendum in the space provided within the “Bid Form Document” – Item 4.

This Addendum shall supersede all previously issued speciÞcations, and drawings wherein it contradicts the same. All other conditions remain unchanged. The following changes, modiÞcations, corrections, clariÞcations, and/or additions set forth herein shall apply to the above documents and shall be made part thereof and shall be subject to all of the requirements as though originally speciÞed and/or shown.

There will be no time extension to the current Proposal and Bidding dates and times. Bid and proposal submittals are due on May 20, 2025.

For questions, please contact Marcus Lee at mlee@windsorengineers.com.

CONTRACTOR QUESTIONS

Questions, Answers, ClariÞcations, and Revisions: The following are based on questions received after the Invitation to Bid was published on April 17, 2025.

1. Question: I have a question about the DR rating for the HDPE pipe. DR14 is not a recognizable DR for HDPE it would be either DR17 (130psi,), 13.5 (160 psi), or DR11 (200 psi) do you know which will work for this project?

Answer: DR13.5 (160 psi).

Manzanita Classic Street Connection Project – Addendum #3 Page 2 of 2

CONTRACT DOCUMENTS

Remove and replace the following with the corresponding attached forms

BID FORM – Remove and replace. (6 pages)

BID BOND – Remove and replace. (1 page)

FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM - Remove and replace. (1 page)

AGREEMENT – Remove and replace Page 1. (1 page)

PERFORMANCE BOND - Remove and replace. (2 pages)

PAYMENT BOND - Remove and replace. (2 pages)

CERTIFICATE OF COMPLIANCE – Remove and replace. (1 page)

CONTRACT DOCUMENTS- Bid Form Manzanita Classic Street Connection CD - 9 Addendum 3

BID FORM

BID OF (hereinafter called “Bidder”), organized and existing under the laws of the State of _______________, doing business as (Insert “a joint venture”, “a corporation”, “a partnership” or “an individual” as applicable.)

To City of Manzanita

[hereinafter called “Owner”]:

1. The undersigned Bidder, in compliance with your invitation for bids, including the

ADVERTISEMENT FOR BIDS and the INSTRUCTIONS TO BIDDERS, for

Manzanita Classic Street Connection Project having examined the plans and specifications with related documents and having examined the site of the project work, and being familiar with all the conditions pertaining to the construction of the project, hereby offers to furnish all labor, materials, equipment and supplies necessary to construct the project in accordance with the contract documents within the time set forth therein, and at the unit prices stated below. The prices are to cover all the costs connected with performing the work required under the contract documents, of which this bid is a part.

2. The Bidder submits the unit prices set forth herein as those at which the Bidder will perform the work involved. The extensions in the column headed “Total” are made for the sole purpose of facilitating comparison of bids and if there are any discrepancies between the unit prices and the total amounts shown, the unit prices shall govern.

3. The Bidder certifies, under penalty of perjury, by the submission of this bid, that all requirements of ORS 279C.838-840 (Prevailing Wage Rate Laws) will be complied with throughout the course of this contact. The Bidder further certifies, under penalty of perjury, that the Bidder is a resident bidder, as defined by ORS 279A.120 (1)(b), of the State of ______________. The Bidder further certifies, under penalty of perjury, that the Bidder is, to the best of the Bidder’s knowledge, not in violation of any tax laws described in ORS 305.380 (4).

4. The Bidder acknowledges receipt of the Addenda numbered ______ through _______. The Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of bid security. The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 calendar days after the scheduled closing date for receiving bids.

5. The Bidder agrees to comply with all the Federal, State and Local laws, ordinances, rules and regulations that are pertinent to construction contracts of this character even though such laws may not have been quoted or referred to in the contract documents.

6. Upon receipt of written Notice of Intent to Award, Bidder will execute the Agreement attached within 10 calendar days and deliver a Surety Bond or Bonds as required by the contract documents. The Bid Security accompanying this bid is to become the property of the Owner in the event the contract and bonds are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.

7. The Bidder agrees to commence work under this contract within 10 calendar days after issuance to the Bidder of written Notice to Proceed by the Engineer. The Bidder agrees to substantially complete the project on or before the dates or within the number of calendar days indicated in Article II of the Agreement, with such extensions of time as are provided in the General Conditions. The Bidder accepts the provisions of the Agreement regarding liquidated damages (Article III of the Agreement) in the event of failure to complete the work of the project on or before the dates or within the number of calendar days indicated in Article II of the Agreement, with such extensions of time as are provided in the General Conditions.

The Bidder declares that the only persons or parties interested in this bid are those named herein, that this bid is in all respects fair and without fraud, and that it is made without collusion

Manzanita Classic Street Connection CD - 10 Addendum 3 with any other bidder and without collusion with any representatives of the Owner. The Bidder hereby represents that no employee of the Owner, or any partnership or corporation in which an employee of the Owner has an interest, has or will receive any remuneration of any description from the Bidder, either directly or indirectly, in connection, except as specifically declared in writing.

8. The Bidder certifies that the Bidder has not discriminated and will not discriminate, in violation of subsection (1) of ORS 279A.110(1), against a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a service-disabled veteran owns or an emerging small business in awarding a subcontract.

9. The Bidder will complete the work for the following prices in accordance with the Schedule of Contract Prices found in Bid online documents.

SCHEDULE OF PRICES

SCHEDULE A1 – CLASSIC STREET WORK

Item Description Unit Estimated Quantity

Unit Price Total Price

1 MOBILIZATION LS 1 $ $

TEMPORARY PROTECTION AND DIRECTION

OF TRAFFIC LS 1 $ $

3 EROSION AND SEDIMENT CONTROL LS 1 $ $

4 CLEARING AND GRUBBING AC 0.15 $ $

5 ASPHALT PAVEMENT SAWCUTTING LF 650 $ $

6 SALVAGE AND REINSTALL HYDRANT EA 1 $ $

REMOVAL OF PAVEMENT, AC/PCC

(INCLUDING HAUL) SY 2300 $ $

8 REMOVAL OF WALK SY 31 $ $

9 REMOVAL OF CURBS LF 220 $ $

REMOVE OR PLUG-FILL AND ABANDON

EXISTING PIPE (WATER) LF 300 $ $

11 REMOVAL OF PIPE (STORM SEWER) LF 350 $ $

REMOVAL OF STRUCTURES (STORM SEWER,

CB ONLY) EA 8 $ $

13 SALVAGE EXISTING SIGNS LS 1 $ $

14 GENERAL EXCAVATION CY 750 $ $

15 TOPSOIL (SEEDED AREA) CY 130 $ $

16 BORROW EXCAVATION TN 750 $ $

17 BASE COURSE AGGREGATE CY 1000 $ $

18 LEVELING COURSE AGGREGATE CY 100 $ $

LEVEL 2 - 3/8 INCH ACP MIXTURE WEARING

COURSE (ROADWAY) TON 377 $ $

LEVEL 2 - 1/2 INCH ACP MIXTURE BASE

COURSE (ROADWAY) TON 307 $ $

21 LEVEL 2 - 3/8 INCH ACP MIXTURE (PATH) TON 102 $ $

22 2" COLD PLANE PAVEMENT REMOVAL SY 610 $ $

EXTRA FOR PEDESTRIAN LANDINGS-ADA

RAMPS EA 9 $ $

4" CONCRETE CURBS, MOUNTABLE-ROLLED

CURB & GUTTER LF 410 $ $

Manzanita Classic Street Connection CD - 11 Addendum 3

Item Description Unit Estimated Quantity

Unit Price Total Price

25 VALLEY GUTTER CONCRETE SURFACING LF 650 $ $

26 MINOR ADJUSTMENT OF MANHOLES EA 3 $ $

27 CONNECTIONS TO EXISTING WATER MAIN EA 7 $ $

28 6" PVC IPS, WATERMAIN LF 55 $ $

29 6" DI PIPE LF 7 $ $

30 8" DI PIPE LF 8 $ $

31 10" HDPE SDR 14, WATERMAIN LF 2152 $ $

32 8" DI MJ BENDS (VARIOUS ANGLES) EA 1 $ $

33 10" DI MJ BENDS (VARIOUS ANGLES) EA 10 $ $

34 10"X10"X6" DI FLG TEE EA 3 $ $

35 10"X10"X6" DI MJ TEE EA 1 $ $

36 10" DI FLG TEE EA 1 $ $

37 10" DI MJ TEE EA 1 $ $

38 10" FLG X MJ TEE EA 2 $ $

39 6" MJ GATE VALVE EA 2 $ $

40 6" FLGXMJ GATE VALVE EA 2 $ $

41 10" FLGXMJ GATE VALVE EA 12 $ $

42 10" MJ GATE VALVE EA 2 $ $

43 6" MJ LONG PATTERN SLEEVE EA 2 $ $

44 8" MJ LONG PATTERN SLEEVE EA 4 $ $

45 10" MJ LONG PATTERN SLEEVE EA 1 $ $

46 10" TO 8" MJ REDUCER EA 6 $ $

47 6" DI FLG CAP EA 1 $ $

48 2" AIR RELEASE VALVE AND VAULT EA 1 $ $

49 HYDRANT ASSEMBLY EA 2 $ $

50 CDF BACKFILL MATERIAL CY 5 $ $

51 CONNECTIONS TO EXISTING STORM SEWER EA 4 $ $

52 8 INCH HDPE PIPE, 5 FT DEPTH LF 179 $ $

53 12 INCH HDPE PIPE, 5 FT DEPTH LF 1718 $ $

54 18 INCH HDPE PIPE, 5 FT DEPTH LF 48 $ $

55 TYPE 1 CATCH BASIN EA 27 $ $

56 NYLOPLAST CATCH BASIN EA 5 $ $

57 48" STORM SEWER MANHOLE (ALL DEPTHS) EA 5 $ $

58 INFILTRATION BASIN STRUCTURE EA 1 $ $

59 CENTER LINE (YELLOW DOUBLE LINE) LF 1503 $ $

60 STOP BARS (THERMOPLASTIC) LF 90 $ $

CROSSWALK STRIPES (6 X 2

THERMOPLASTIC) EA 50 $ $

62 SPEED BUMPS EA 4 $ $

63 TEMPORARY SEED SY 2459 $ $

Manzanita Classic Street Connection CD - 12 Addendum 3

Item Description Unit Estimated Quantity

Unit Price Total Price

64 PERMANENT SEED SY 2459 $ $

65 COMPOST EROSION BLANKET SY 2459 $ $

66 LANDSCAPING LS 1 $ $

SUBTOTAL SCHEDULE A1 - CLASSIC STREET SECTION $

SCHEDULE A2 – RETAINING WALL WORK

Item Description Unit Estimated Quantity

Unit Price Total Price

67 MOBILIZATION LS 1 $ $

TEMPORARY PROTECTION AND DIRECTION

OF TRAFFIC LS 1 $ $

69 EROSION AND SEDIMENT CONTROL LS 1 $ $

70 CLEARING AND GRUBBING AC 1.25 $ $

71 ASPHALT PAVEMENT SAWCUTTING LF 55 $ $

REMOVAL OF PAVEMENT, AC/PCC

(INCLUDING HAUL) SY 2800 $ $

73 REMOVAL OF CURBS LF 20 $ $

74 REMOVAL OF PIPE (STORM SEWER) LF 8 $ $

REMOVAL OF STRUCTURES (STORM SEWER,

CB ONLY) EA 1 $ $

76 SALVAGE EXISTING SIGNS LS 2 $ $

77 GENERAL EXCAVATION CY 1000 $ $

78 TOPSOIL (SEEDED AREA) CY 330 $ $

79 BORROW EXCAVATION TN 2520 $ $

80 BASE COURSE AGGREGATE CY 1000 $ $

81 LEVELING COURSE AGGREGATE CY 110 $ $

82 RETAINING WALL LF 835 $ $

83 4 FOOT CHAIN LINK FENCE LF 860 $ $

84 W-BEAM GUARDRAIL, TYPE 2A LF 880 $ $

85 W-BEAM END TREATMENT-TYPE 5 EA 2 $ $

LEVEL 2 - 3/8 INCH ACP MIXTURE WEARING

COURSE (ROADWAY) TON 270 $ $

LEVEL 2 - 1/2 INCH ACP MIXTURE BASE

COURSE (ROADWAY) TON 270 $ $

88 LEVEL 2 - 3/8 INCH ACP MIXTURE (PATH) TON 84 $ $

89 CONSTRUCTION FABRIC SY 2333 $ $

EXTRA FOR PEDESTRIAN LANDINGS-ADA

RAMPS EA 2 $ $

91 6" CONCRETE CURBS, CURB & GUTTER LF 1050 $ $

92 VALLEY GUTTER CONCRETE SURFACING LF 25 $ $

93 CENTER LINE (YELLOW DOUBLE LINE) LF 1050 $ $

94 FOG LINE (WHITE SINGLE LINE) LF 500 $ $

Manzanita Classic Street Connection CD - 13 Addendum 3

Item Description Unit Estimated Quantity

Unit Price Total Price

95 STOP BARS (THERMOPLASTIC) LF 15 $ $

CROSSWALK STRIPES (6 X 2

THERMOPLASTIC) EA 4 $ $

97 SPEED BUMPS EA 4 $ $

98 TRAFFIC DELINEATORS EA 51 $ $

99 TEMPORARY SEED SY 2810 $ $

100 PERMANENT SEED SY 2810 $ $

101 COMPOST EROSION BLANKET SY 2810 $ $

102 LANDSCAPING LS 1 $ $

SUBTOTAL SCHEDULE A2 – TOTAL OF RETAINING WALL SECTION $

SCHEDULE B – NECARNEY COUNTY CITY ROAD SECTION

Item Item Description Unit Estimated Quantity

Unit Price

Total Price

103 8" HDPE SDR 14, WATERMAIN LF 1483 $ $

104 8" HDPE SDR 14, WATERMAIN (TRENCHLESS) LF 116 $ $

105 8" DI BENDS (VARIOUS ANGLES) EA 1 $ $

106 8"X8"X6" DI FLG TEE EA 2 $ $

107 8" DI FLG TEE EA 2 $ $

108 6" MJ GATE VALVE EA 1 $ $

109 6" FLGXMJ GATE VALVE EA 1 $ $

110 8" FLGXMJ GATE VALVE EA 9 $ $

111 8" DI MJ LONG PATTERN SLEEVE EA 2 $ $

112 8" DI MJ CAP EA 1 $ $

113 2" AIR RELEASE VALVE AND VAULT EA 1 $ $

114 HYDRANT ASSEMBLY EA 1 $ $

115 CONNECTIONS TO EXISTING WATER MAINS EA 3 $ $

SUBTOTAL SCHEDULE B – NECARNEY CITY COUNTY ROAD SECTION $

Schedule A1 Total $

Schedule A2 Total $

Schedule B Total $

Sum of Totals (A1+A2+ B) = Grand Total $

Manzanita Classic Street Connection CD - 14 Addendum 3

The following documents are attached to and made a condition of this bid:

a. The required Bid Security submitted on-line with the Bid Form.

b. The First-Tier Subcontractor Disclosure Form submitted on-line within two hours after the date and time of the bid opening.

c. The on-line vBid Schedule of Unit Prices as filled out and submitted by the Contractor.

Respectfully Submitted, Name of Firm

Address

Federal Employer I.D. No.

State Employer I.D. No.

State C.C.B. Registration No.

Telephone ( )

FAX No. ( )

By

(Signature)

Name (Please Print)

Title

(Signature)

If Corporation, Attest (Secretary of Corporation)

Dated this day of , 2025

CONTRACT DOCUMENTS – Bid Bond

Manzanita Classic Street Connection CD – 15 Addendum 3

BID BOND

We, ____________________________________________________, as “Principal,” (Name of Principal) and __________________________________, an ______________________ Corporation, (Name of Surety) authorized to transact Surety business in Oregon, as “Surety,” hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors and assigns to pay unto the City of Manzanita (“Obligee”) the sum of ($___________________________)

__________________________________________________________________ dollars.

WHEREAS, the condition of the obligation of this bond is that Principal has submitted its bid to an agency of the Obligee in response to Obligee’s project identified as:

Manzanita Classic Street Connection project which bid is made a part of this bond by reference, and Principal is required to furnish bid security in an amount equal to ten (10%) percent of the total amount of the bid pursuant to ORS 279C.365 (5) and the procurement document.

NOW, THEREFORE, if the bid submitted by Principal is accepted, and if a contract pursuant to the bid is awarded to Principal, and if Principal enters into and executes such contract within the time specified in the procurement document and executes and delivers to Obligee its good and sufficient performance and payment bonds required by Obligee within the time fixed by Obligee, then this obligation shall be void; otherwise, it shall remain in force and effect.

IN WITNESS WHEREOF, we have caused this instrument to be executed and sealed by our duly authorized legal representatives this ______________________ day of ______________________, 2025.

PRINCIPAL: __________________________ SURETY:

By BY ATTORNEY-IN-FACT:

Signature

Official Capacity Name

Attest:

Corporation Secretary Signature

City State Zip

Phone Fax

CONTRACT DOCUMENTS – First-Tier Subcontractor Disclosure Form

Manzanita Classic Street Connection CD – 17 Addendum 3

FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM

(OAR 137-049-0360)

Bids which are submitted by Bid Closing, but for which a required disclosure submittal has not been made by the required Disclosure Deadline, are not responsive and shall not be considered for Contract award

AGENCY SUPPLIED INFORMATION:

PROJECT NAME: Manzanita Classic Street Connection

Quest #: 9529255 CLOSING: Date: May 20, 2025 Time: 2:00 PM REQUIRED DISCLOSURE DEADLINE: Date: May 20, 2025 Time: 4:00 PM

Deliver Form To (Agency): City of Manzanita Designated Recipient (Person): Rick Rempfer Agency’s Address: 167 S 5th Street, Manzanita, OR 97130

INSTRUCTIONS: “Sealed bids will ONLY be received and accepted via the online electronic Bid service through www.QuestCDN.com”

The contracting agency will insert “N/A” above if the contract value is not anticipated to exceed $100,000.

Otherwise this form must be submitted either with the bid or within two (2) working hours after the advertised bid closing date and time; but no later than the DISCLOSURE DEADLINE stated above.

Unless otherwise stated in the solicitation, this document shall not be submitted by facsimile. It is the

Responsibility of bidders to submit this disclosure form and any additional sheets, with the bid number and project Name clearly marked, at the location indicated by the specified disclosure deadline. See

“Instructions to Bidders”.

List below the Name, Category of Work add Dollar Value for each first-tier subcontractor that would be furnishing labor, or labor and material, for which disclosure is required. Enter the word “NONE” if there are no first-tier subcontractors subject to disclosure. ATTACH ADDITIONAL SHEETS IF NECESSARY.

BIDDER DISCLOSURE:

SUBCONTRACTOR NAME CATEGORY OF WORK DOLLAR VALUE

1. ________________________ _____________________ _______________________

2. ________________________ _____________________ _______________________

3. ________________________ _____________________ _______________________

4. ________________________ _____________________ _______________________

The above-listed first-tier subcontractor(s) are providing labor, or labor and material, with a Dollar Value equal to or greater than:

a) 5% of the total Contract Price, but at least $15,000. [If the Dollar Value is less than $15,000 do not list the subcontractor above.] or

b) $350,000 regardless of the percentage of the total Contract Price.

Form Submitted By (Bidder Name):

Contact Name: _________________________________ Phone #:

CONTRACT DOCUMENTS

Manzanita Classic Street Connection CD – 19 Addendum 3

AGREEMENT

THIS AGREEMENT, made this day of _______, 2025 by and between

CITY OF MANZANITA

hereinafter called the Owner, and , hereinafter called the “Contractor.”

WITNESSETH, that the Contractor and the Owner, for the considerations hereinafter named, agree as follows:

ARTICLE I - Scope of the Work

The Contractor hereby agrees to furnish all labor, materials, equipment and supplies necessary for the construction and completion of the project entitled

Manzanita Classic Street Connection all in accordance with the requirements and provisions of the Contract Documents. The term “Contract Documents” means and includes the following:

a. Request for Proposal

b. Bid Form

c. This Agreement

d. General Conditions to the Agreement

e. Performance Bond

f. Payment Bond

g. Notice of Intent to Award

h. Notice to Proceed

i. All Change Orders issued after execution of this Agreement

j. Drawings prepared by Windsor MEP Engineers LLC (Windsor Engineers) and North Coast Civil

Design, and dated April 15, 2025

k. Specifications prepared or issued by Windsor MEP Engineers LLC (Windsor Engineers) with input provided by North Coast Civil Design dated April 15, 2025.

l. Addenda:

No. , dated , 2025.

No. , dated , 2025.

No. , dated , 2025.

No. , dated , 2025.

No. , dated , 2025.

All the above form the Contract, and all are as fully a part of the Contract as if attached to this Agreement or repeated herein.

ARTICLE II - Time of Completion

The Work to be performed under this Contract shall be commenced within 10 calendar days after the date of written notice by the Owner to the Contractor to proceed. The written Notice to Proceed shall be issued within 10 days following receipt of the acceptable Performance Bond, Payment Bond, and

Agreement signed by the party to whom the Agreement was awarded. Substantial Completion shall be achieved not later than November 21, 2025 with such extensions of time as are provided for in the

CONTRACT DOCUMENTS – Performance Bond Manzanita Classic Street Connection CD – 63 Addendum 3

PERFORMANCE BOND

Bond No.

Solicitation ______N/A_________________

Project Name: Manzanita Classic Street Connection

__________________(Surety #1) Bond Amount No. 1: $______________

__________________(Surety #2)* Bond Amount No. 2:* $______________

* If using multiple sureties

Total Penal Sum of Bond: $______________

We, ________________________________________________as Principal, and the above-identified Surety(ies), authorized to transact surety business in Oregon, as Surety, hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors and assigns firmly by these presents to pay unto the State of Oregon the sum of (Total Penal Sum of Bond) ___________________________________________________________________________ (Provided, that we the Sureties bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of us, and for all other purposes each Surety binds itself, jointly and severally with the Principal, for the payment of such sum only as is set forth opposite the name of such Surety), and

WHEREAS, the Principal has entered into a contract with the City of Manzanita the plans, specifications, terms and conditions of which are contained in the above-referenced Project;

WHEREAS, the terms and conditions of the contract, together with applicable plans, standard specifications, special provisions, schedule of performance, and schedule of contract prices, are made a part of this Performance Bond by reference, whether or not attached to the contract (all hereafter called “Contract”); and

WHEREAS, the Principal has agreed to perform the Contract in accordance with the terms, conditions, requirements, plans and specifications, and all authorized modifications of the Contract which increase the amount of the work, the amount of the Contract, or constitute an authorized extension of the time for performance, notice of any such modifications hereby being waived by the Surety:

NOW, THEREFORE, THE CONDITION OF THIS BOND IS SUCH that if the Principal herein shall faithfully and truly observe and comply with the terms, conditions and provisions of the Contract, in all respects, and shall well and truly and fully do and perform all matters and things undertaken by Contractor to be performed under the Contract, upon the terms set forth therein, and within the time prescribed therein, or as extended as provided in the Contract, with or without notice to the Sureties, and shall indemnify and save harmless the City of Manzanita and members thereof, its officers, employees and agents, against any direct or indirect damages or claim of every kind and description that shall be suffered or claimed to be suffered in connection with or arising out of the performance of the Contract by the Principal or its subcontractors, and shall in all respects perform said contract according to law, then this obligation is to be void; otherwise, it shall remain in full force and effect.

Nonpayment of the bond premium will not invalidate this bond nor shall the City of Manzanita be obligated for the payment of any premiums.

This bond is given and received under authority of ORS 279C.380, the provisions of which hereby are incorporated into this bond and made a part hereof.

CONTRACT DOCUMENTS – Performance Bond Manzanita Classic Street Connection CD – 64 Addendum 3

IN WITNESS WHEREOF, WE HAVE CAUSED THIS INSTRUMENT TO BE EXECUTED AND SEALED BY OUR

DULY AUTHORIZED LEGAL REPRESENTATIVES.

Dated this __________________ day of ___________________, 2025

PRINCIPAL:

By:

Official Capacity

Corporation Secretary

SURETY: _____________________________

[Add signatures for each surety if using multiple bonds]

BY ATTORNEY-IN-FACT:

[Power-of-Attorney must accompany each surety bond]

Name

CONTRACT DOCUMENTS – Payment Bond Manzanita Classic Street Connection CD – 65 Addendum 3

PAYMENT BOND

Bond No.

Solicitation N/A

Project Name Manzanita Classic Street Connection

__________________(Surety #1) Bond Amount No. 1: $___________

__________________(Surety #2)* Bond Amount No. 2:* $___________

* If using multiple sureties

Total Penal Sum of Bond: $___________

We, ________________________________________________, as Principal, and the above-identified Surety(ies), authorized to transact surety business in Oregon, as Surety, hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors and assigns firmly by these presents to pay unto the City of Manzanita the sum of (Total Penal Sum of Bond) _________________________________________________________________________ (Provided, that we the Sureties bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of us, and for all other purposes each Surety binds itself, jointly and severally with the Principal, for the payment of such sum only as is set forth opposite the name of such Surety), and

WHEREAS, the Principal has entered into a contract with the City of Manzanita the plans, specifications, terms and conditions of which are contained in above-referenced Project;

WHEREAS, the terms and conditions of the contract, together with applicable plans, standard specifications, special provisions, schedule of performance, and schedule of contract prices, are made a part of this Payment Bond by reference, whether or not attached to the contract (all hereafter called “Contract”); and

WHEREAS, the Principal has agreed to perform the Contract in accordance with the terms, conditions, requirements, plans and specifications, and schedule of contract prices which are set forth in the Contract and any attachments, and all authorized modifications of the Contract which increase the amount of the work, or the cost of the Contract, or constitute authorized extensions of time for performance of the Contract, notice of any such modifications hereby being waived by the Surety:

NOW, THEREFORE, THE CONDITION OF THIS BOND IS SUCH that if the Principal shall faithfully and truly observe and comply with the terms, conditions and provisions of the Contract, in all respects, and shall well and truly and fully do and perform all matters and things by it undertaken to be performed under said Contract and any duly authorized modifications that are made, upon the terms set forth therein, and within the time prescribed therein, or as extended therein as provided in the Contract, with or without notice to the Sureties, and shall indemnify and save harmless the City of Manzanita and members thereof, its officers, employees and agents, against any claim for direct or indirect damages of every kind and description that shall be suffered or claimed to be suffered in connection with or arising out of the performance of the Contract by the Contractor or its subcontractors, and shall promptly pay all persons supplying labor, materials or both to the Principal or its subcontractors for prosecution of the work provided in the Contract; and shall promptly pay all contributions due the State Industrial Accident Fund and the State Unemployment Compensation Fund from the Principal or its subcontractors in connection with the performance of the Contract; and shall pay over to the Oregon Department of Revenue all sums required to be deducted and retained from the wages of employees of the Principal and its subcontractors pursuant to ORS 316.167, and shall permit no lien nor claim to be filed or prosecuted against the State on account of any labor or materials furnished; and shall do all things required of the Principal by the laws of this State then this obligation shall be void; otherwise, it shall remain in full force and effect.

CONTRACT DOCUMENTS – Payment Bond Manzanita Classic Street Connection CD – 66 Addendum 3

Nonpayment of the bond premium will not invalidate this bond nor shall the City of Manzanita be obligated for the payment of any premiums.

This bond is given and received under authority of ORS 279C.380, the provisions of which hereby are incorporated into this bond and made a part hereof.

IN WITNESS WHEREOF, WE HAVE CAUSED THIS INSTRUMENT TO BE EXECUTED AND SEALED BY OUR

DULY AUTHORIZED LEGAL REPRESENTATIVES:

Dated this __________________ day of ___________________, 2025

PRINCIPAL:

By

Official Capacity

Corporation Secretary

SURETY:

[Add signatures for each surety if using multiple bonds]

BY ATTORNEY-IN-FACT:

[Power-of-Attorney must accompany each surety bond]

Name

CONTRACT DOCUMENTS – Certificate of Compliance Manzanita Classic Street Connection CD – 67 Addendum 3

CERTIFICATE OF COMPLIANCE

City of Manzanita PO Box 129 P.O. Box 250 Manzanita, OR 97130

ATTN: Rick Rempfer, Public Works Director

PROJECT NAME: Manzanita Classic Street Connection

PROJECT LOCATION: Manzanita, Oregon

I hereby certify that:

A. All Work on the above-referenced Contract has been performed and materials supplied in accordance with the Plans, Specifications, and Contract Documents for the above Work;

B. There have been no unauthorized substitutions of Subcontractors; nor have any subcontracts been entered into without the names of the Subcontractors having been submitted to and approved by the Owner prior to the start of such subcontracted Work;

C. No subcontract was assigned or transferred or performed by any Subcontractor other than the original

Subcontractor, without prior notice having been submitted to and approved by the Owner together with the names of all Subcontractors;

D. All Subcontractors performing Work described in ORS 701.005(2) (i.e., construction Work) were registered with the Construction Contractors Board or licensed by the State Landscape Contractors Board in accordance with ORS 701.026 to 701.035 before the Subcontractors commenced Work under the contract;

E. All claims for material and labor and other services performed in connection with these Specifications have been paid; and

F. All money due the State Industrial Accident Fund, the State Unemployment Compensation Trust Fund, the

State Tax Commission (in accordance with ORS 305.385 and ORS 279C.530), hospital associations and/or others have been paid.

Authorized Signature __________________________________ _________________

[Contractor] [Date]

END OF CONTRACT DOCUMENTS

Attach 1-7
1BID FORM Addendum 3
1BID FORM Addendum 3rev
3FIRST TIER Addendum 3rev
1BID FORM Addendum 3
1BID FORM Addendum 3
1BID FORM Addendum 3
1BID FORM Addendum 3
1BID FORM Addendum 3
1BID FORM Addendum 3
2BID BOND Addendum 3
3FIRST TIER Addendum 3
1BID FORM Addendum 3
3FIRST TIER Addendum 3
1BID FORM Addendum 3
4AGREEMENT Page 1 Addendum 3
1BID FORM Addendum 3
5PERFORMANCE BOND Addendum 3
1BID FORM Addendum 3
1BID FORM Addendum 3
6PAYMENT BOND Addendum 3
1BID FORM Addendum 3
1BID FORM Addendum 3
7CERTIF OF COMPLIANCE Addendum 3

File details come from the government source that posted it. Updated .