maintenance_and_protection_of_traffic_-_temple_st_and_tunnel.pdf
PDF 27 MB Posted
- Attached to
- Fire Rescue Rotary Saws
- Solicitation number
- 2025-IFB-226
- Issued by
- New Haven County, Pennsylvania
About this file
This document is a Maintenance and Protection of Traffic (MPT) plan for the Church St Tunnel Girder Repair project in New Haven, Connecticut, prepared by the City of New Haven Department of Engineering. The project involves repairing girders, corbels, and masonry walls within the Church St Tunnel, with a planned 12-week closure for construction activities. The MPT plans detail specific traffic management strategies, including Type III barricades with warning lights, 6-foot chain link fences with visibility screens, and provisions to maintain access to the Omni Hotel's frontage doors and service areas. The documents are dated April 10, 2025 (Temple Street plan) and May 2, 2025 (Tunnel plan), with professional engineering oversight by Giovanni Zinn, P.E., and mayoral approval from Justine Elicker.
The maintenance and protection of traffic plans specify critical operational requirements, such as maintaining unimpeded sidewalk access, requiring a flagger when equipment is backing over sidewalks, and mandating that contractors apply for an obstruction permit through the city. The project involves complex traffic management around the Omni Hotel and Church St Tunnel, with specific signage indicating road closures, height restrictions, and construction zone boundaries. Contractors must erect fencing before beginning demolition work and ensure continuous access to key building entrances, demonstrating a comprehensive approach to minimizing disruption during the tunnel girder repair project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 10' 20'
Project Number
Designed By
Date
Sheet Number
Project Name and Address
Drawn By
MPT2
ZSHAPIRO
Sheet TitleTEMPLE ST MAINTENANCE
AND PROTECTION OF TRAFFIC
Professional Seal
25-091-01
Omni Hotel Port Cochere Framing
Repairs
ZSHAPIRO
CI
TY
O F
N
EW
H
AV
EN
DE
PA
RT
M
EN
T O
F
EN
G
IN
EE
RI
N G
C:
\U
SE
RS
\Z
SH
AP
IR
O \C
IT
Y
O F
N
EW
H
AV
EN
, C
T\
EN
G
IN
EE
RI
N G
D
EP
AR
TM
EN
T
- D O
CU
M
EN
TS
\P
RO
JE
CT
S\
-0
-0
CH
U
CH
S
T
TU
N N
EL
G
IR
DE
R
RE
PA
IR
\D
RA
W
IN
G S\
CH
U
RC
H
S T
TU
N
N
EL
L
AY
O U
T.
DW
G
Revision/IssueNo. Date
TH
E
H O
N O
RA
BL
E
JU
ST
IN
E
LI
CK
ER
, M
AY
O R
G
IO
VA
N
N I Z
IN
N
, P .E
CI
TY
E
N G
IN
EE
R
4/10/2025
N
TYPE III BARRICADE WITH
WARNING LIGHT
OMNI MAIN ENTRANCE
RIPPLE WELLNESS CENTER
OMNI STOREFRONT
OMNI SERVICE ACCESS
6'T CHAIN LINK FENCE
WITH VISIBILITY SCREEN
GIRDER LINE 7 GIRDER LINE 13
6'T CHAIN LINK FENCE
WITH VISIBILITY SCREEN
NOTES:
1. CONTRACTOR MUST ERECT FENCING PRIOR TO THE START OF DEMOLITION WORK.
2. SIDEWALK MUST REMAIN UNIMPEDED THROUGHOUT CONSTRUCTION, CONTRACTOR MUST HAVE
FLAGGER ONSITE DURING ALL OPERATIONS WHERE A PIECE OF EQUIPMENT IS BACKING OVER THE
SIDEWALK.
3. CONTRACTOR IS RESPONSIBLE FOR APPLYING FOR AN OBSTRUCTION PERMIT THROUGH THE CITY.
4. ACCESS TO THE FRONTAGE DOORS OF THE OMNI MUST BE MAINTAINED THROUGHOUT
CONSTRUCTION UNLESS THE CONTRACTOR CAN PROVIDE ALTERNATE ACCOMMODATIONS.
ZShapiro Text Box
TEMPLE STREET
ZShapiro Text Box
155 TEMPLE STREET
00 40' 80'
Project Number
Designed By
Date
Sheet Number
Project Name and Address
Drawn By
MPT1
ZSHAPIRO
Sheet TitleTUNNEL MAINTENANCE AND
PROTECTION OF TRAFFIC
Professional Seal
25-091-01
Omni Hotel Port Cochere Framing
Repairs
ZSHAPIRO
CI
TY
O F
N
EW
H
AV
EN
DE
PA
RT
M
EN
T O
F
EN
G
IN
EE
RI
N G
C:
\U
SE
RS
\Z
SH
AP
IR
O \C
IT
Y
O F
N
EW
H
AV
EN
, C
T\
EN
G
IN
EE
RI
N G
D
EP
AR
TM
EN
T
- D O
CU
M
EN
TS
\P
RO
JE
CT
S\
-0
-0
CH
U
CH
S
T
TU
N N
EL
G
IR
DE
R
RE
PA
IR
\D
RA
W
IN
G S\
CH
U
RC
H
S T
TU
N
N
EL
L
AY
O U
T.
DW
G
Revision/IssueNo. Date
TH
E
H O
N O
RA
BL
E
JU
ST
IN
E
LI
CK
ER
, M
AY
O R
G
IO
VA
N
N I Z
IN
N
, P .E
CI
TY
E
N G
IN
EE
R
5/2/2025
N
OMNI PORT COCHERE (SURFACE LEVEL)
TUNNEL CONSTRUCTION ZONE
R11-2
R11-3
TYPE III BARRICADE WITH
WARNING LIGHT
TYPE III BARRICADE WITH
WARNING LIGHT
CHURCH ST TUNNEL ENTRANCE
NOTE HEIGHT RESTRICTION
APPROXIMATE LIMITS OF TUNNEL
W20-1
R11-4
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
CLOSED
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
ROAD CLOSED
AutoCAD SHX Text
ROAD WORK AHEAD
AutoCAD SHX Text
ROAD CLOSED TO THRU TRAFFIC
| Sheets and Views |
| 22x34 Plan |
File details come from the government source that posted it. Updated .