Hotel_at_Chapel_Square_Pt_1_AS_BUILT_FOR_REFERENCE_ONLY.pdf
PDF 660 MB Posted
- Attached to
- Fire Rescue Rotary Saws
- Solicitation number
- 2025-IFB-226
- Issued by
- New Haven County, Pennsylvania
About this file
The provided file, "Hotel_at_Chapel_Square_Pt_1_AS_BUILT_FOR_REFERENCE_ONLY.pdf", appears to be an as-built reference document related to the Hotel at Chapel Square project. However, the file's contents are not fully visible in the provided context, and the document does not directly relate to the Church St Tunnel Girder Repair contract opportunity described in the state and local contract details.
The state and local contract opportunity for the Church St Tunnel Girder Repair is located in Connecticut and involves a comprehensive infrastructure repair project. The scope includes the removal and replacement of tunnel girders, corbels, and masonry walls. The project will require a complete tunnel closure, with contractors permitted a 12-week closure for shoring activities. During construction, the tunnel ceiling slab must be shored to maintain load-bearing capacity for live, dead, and construction loads throughout the project duration. No specific pricing, funding sources, or additional contract details are provided in the given information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .