Attachment B-Basis of Estimate Template.pdf
PDF 105 KB Posted
- Attached to
- Construct Resiliency Center A&E
- Solicitation number
- MAHG043002CR
About this file
The document is a Basis of Estimate (BOE) Worksheet template used by the Air Force Civil Engineer Center (AFCEC) to document assumptions and methods for developing construction cost estimates. The four-page template provides a structured framework for capturing project details, including general project information, project summary, key assumptions, and estimate description. Sections include spaces to document project location, duration, facility systems, environmental considerations, cost data sources, potential cost growth responses, and supporting documentation.
The template is specifically associated with a federal contract opportunity (Solicitation MAHG043002CR) for Title I Architect and Engineer Services to develop a Planning Charrette Report for a Resiliency Center at Keesler Air Force Base. The acquisition is a 100% small business set-aside with a NAICS code of 541330 (Engineering Services), with a $25.5 million size standard. The Request for Qualifications will be posted on SAM.gov around 28 July 2025, with responses due by 11 August 2025, and a 203-day contract performance period following award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B Page 1 of 4
OPR: AFCEC/COSC Ver 2.0 12 Oct 2021
BASIS OF ESTIMATE WORKSHEET
Purpose: To document assumptions and methods used to develop cost estimates for project programmed amount or Independent Government Estimate (IGE) prior to contract solicitation; assist the independent review of construction cost estimates by government cost reviewers and evaluators; and minimize the financial risk for a given project.
Directions: IAW AFI 32-1020, provide AACEI RP 34R-05 “Basis of Estimate” or otherwise document knowledge of the project, quantities, scope and/or schedule and assumptions.
Provide concise details and a clear explanation of the project. Details or descriptions may be copied from supporting documents as appropriate. Cite sources.
1. GENERAL
Project Title:
Project Number (ABCD NN-NNNN):
Project Location (Installation/State or Country):
Project Program Year (FY):
Name/rank/role of persons in team writing the estimate:
Organization of person(s) writing the estimate:
Date of estimate (MMM-YY):
2. PROJECT SUMMARY
Time & Duration of Construction: Project Midpoint, Key Milestones:
Estimated Construction Start Date (MMM-YY):
Estimated Number of Months of Construction (MM):
Estimated Midpoint of Construction (MMM-YY):
Temporary or Swing Space Required – Gross Square Feet (GSF)/Gross Square Meters (GSM):
Purpose & Class of Estimate/Level of Design planning (Planning, Programming, Pre-Award):
Scope (separated between new and renovation work):
Facility/building type/uses:
Category Codes:
ATTACHMENT B Page 2 of 4
Floor area – GSM/GSF (Horizontal facilities M/FT):
Height – Number of stories, M/FT:
Describe facility/building systems (edit as required) A – Substructure A10 – Foundations
A40 – Slabs on Grade
B – Shell B10 – Superstructure
B20 – Exterior Walls
B30 – Roofing
C – Interiors C10 – Interior Construction
C20 – Stairs (as required)
C30 – Interior Finishes
D – Services D10 – Conveyances (as required)
D20 – Plumbing
D30 – HVAC
D40 – Fire Protection
D50 – Electrical
F – Special Construction & Demolition F20 – Selective Building Demolition (as required)
G – Building Sitework G10 – Site Preparation
G20 – Site Improvements
G30 – Site Civil/Mechanical Utilities
G40 – Site Electrical Utilities
ATTACHMENT B Page 3 of 4
AT/FP considerations and elements:
Cybersecurity:
Environmental mitigation & permits:
Extraordinary elements:
Deviations from AF standard design and/or Unified Facility Criteria corporate standards (list, narrative):
3. KEY ASSUMPTIONS
Effect on costs (summary):
Unusual schedule requirements:
Exclusions (identify what is not in the project but needed for complete work):
Exceptions (e.g., elements or features different from policy):
Demolition required:
Facility special systems, elements or items included/excluded:
Government-furnished, Contractor-installed equipment; Government-furnished, Government-installed equipment:
Extraordinary items:
4. DESCRIPTION OF ESTIMATE
Methods Used & Limitations Sources of Cost Data Used:
Area Cost Factor(s):
Changes/Markups to Default Data and Justifications:
Duration and Escalation (Justification):
Coordination:
Sustainability and Energy Measures:
Special/Unique Features:
Contracting Method:
ATTACHMENT B Page 4 of 4
Planned Responses to Potential Cost Growth:
ATTACHMENT A – Supporting Documents DD Form 1391 Statement of Work Other reference documents: (e.g., Planning Charrette Report, Smart Start Checklist, PDRI, as-built/existing conditions drawings, project drawings, pictures, etc.):