M870A4 FULL DESCRIPTION.pdf

PDF 520 KB Posted

Attached to
M870A4 Semitrailer, Lowbed, Construction Equipment Transporter (SLCET) 40 Ton
Solicitation number
W56HZV-21-R-0149
Issued by

About this file

This document contains a Request for Information from the United States Army regarding a commercially available trailer or equivalent that meets the requirements outlined in Technical Purchase Description ATPD-2395H for an M870A4 Semitrailer, Lowbed, Construction Equipment Transporter (SLCET) 40 Ton. The Army seeks information on industry capabilities to produce such a trailer, including any modifications needed to an existing commercial trailer to meet the ATPD requirements, along with associated time and cost estimates for such modifications. Responses to the RFI will help inform the Army's future acquisition strategy for the M870A4 program. Participation in the RFI is voluntary with no obligation incurred by the Government.

View the file

Other files

File Type Posted
Table 2.xlsx XLSX spreadsheet
Attachment A ATPD2395H.pdf PDF
Table 3.xlsx XLSX spreadsheet
Attachment B ATPD 2304 Rev C For FHTV4 Contract 2015 0618.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.11 General

1.12 General

1.13 General

1.14 General

# Section3.3 Information Requested by the

USG

Does the M870A4 solution(s) rely upon subcontractor support?

If yes, please identify the subcontractor( s) and the aspect of the design which is subcontracted. Describe any anticipated subcontracting arrangements.

Is your company able to do business directly with the U.S.

Government? If no, will your company be able to do so in the nex1: 6-12 months? Ifno, how is your product(s) available for purchase by the U.S.

Government?

Is your M870A4 solution available commercially? If your trailer is deemed non commercial does your company have the ability to provide a proposal in accordance with the Truth In Negotiations Act?

What is the lead time from time of contract award of your specific solution(s), to first unit delivery to the Government, include all long lead raw material, components and subsystems with their projected individual lead times. Are any

3.4 Industry

nse, Detailed cription and ce Metrics h supporting ation document .ce and/or link)

Section 3.5 Cnrrent

Commercial orNDI

Capabilities

Section 3.6 Alternative Solution Detailed Descriptioll, Major Modifications/New De,,elopment

(with su.pp()rting information document reference and/or link).

File details come from the government source that posted it. Updated .