This document is a set of Questions and Answers related to a Request for Information (RFI) for the development, implementation, integration, testing, and maintenance of a comprehensive set of conceptual models (CMs) within the U.S. Marine Corps' wargaming simulation software suite.

The key details include: The RFI solicitation number is M67854-24-I-2033, and the Government has provided a list of 456 discrete CMs from which the 16 modeling capability bins were derived. Respondents are asked to provide information on the 16 bins, not individual line items. The Government is interested in both existing and new conceptual models, and is willing to discuss details to establish well-defined Rough Order of Magnitude (ROM) pricing. The intended period of performance will depend on the complexity and number of CMs being developed. The RFI indicates that the Government plans to ensure third-party model developers are aware of each other's ongoing work to enable continuous integration and testing.

View the file

Other files

File Type Posted
M6785424I2033 - Questions_Answers.docx DOCX document
Attachment 3 - CMR_BinGroupings (Informational Purposes).xlsx XLSX spreadsheet
Attachment 1 - CMR Bins.docx DOCX document
Attachment 2 - Phased Approach Task List.docx DOCX document
RFI M6785424I2033 - CMR Bins.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M6785424I2033 Questions and Answers

1. Is the list of 456 discrete CMRs, from which the 16 bins of modeling capabilities were derived, available to the respondents?

Yes. The Government has added a list of the 456 discrete CMRs. See Attachment 3. Please note, this list is provided as supplemental background information. Any questions on specific line items will only be addressed in the future as individual work efforts are performed. Respondents should provide the information requested in the RFI under the heading of the 16 bins (not providing responses line by line).

2. Do you currently have conceptual models?

There is currently only partial implementation of a number of CMRs.

a. If so, are they acceptable and you want more, or are they deficient and you want something completely different?

b. If this is a replacement of existing models, are there examples you can share or describe where they come up short?

3. Is there a notional period of performance for this effort?

No. The Government will review RFI responses to assist with developing an acquisition strategy. The period of performance will depend upon respondent timelines and would depend on complexity and number of particular CMRs being developed in a given work effort.

4. In Attachment 1 “section P” there is a note talking about a core wargaming component. Is this a proprietary system?

Yes, Pioneer proprietary system utilizing open interface standards.

a. If so, will the contractor have access to it?

During integration planning and execution, contractor access to Pioneer engineers and system integration testing would be facilitated by PM WGC, regardless of CMR bin. The CMRs detailed in Section P have been assessed to be integral to the core wargaming engine, and thus more difficult to develop and integrate via third parties. This does not preclude a vendor illustrating an approach to develop and integrate CMRs from this list.

b. If not is this core component open to reuse?

c. Can you expand on why the component is a poor candidate for third-party development if not related to the above questions?

5. Does the government intend to ensure that third-party model developers that may receive awards under this requirement are well-aware of each other ongoing model development to enable continuous integration and testing vs. late-stage testing and potential associated integration issues?

Yes

6. There are several mentions to the Lead System Integrator (LSI) in Attachment 2. Is this a stand-alone contract or something that will be awarded through the LSI.

This is a standalone contract.

7. Is a ROM merely a ‘request’ or ‘required’ as part of this RFI solicitation?

A ROM is required as this RFI solicitation. If a ROM cannot be provided, please address why one cannot be provided or provide a general estimate of a project's level of effort and cost.

8. After its assessment of RFI responses, would the government be willing to discuss specific details that establish a well-defined ROM?

Yes, the Government is willing to have follow-on exchanges to discuss specific details for a particular work effort.