M67854-21-R-1801 0001.pdf
PDF 371 KB Posted
- Attached to
- Enhanced-Combat Rubber Reconnaissance Craft Federal contract opportunity
- Solicitation number
- M67854-21-R-1801
- Issued by
- United States Marine Corps
About this file
This document is a solicitation for an Enhanced-Combat Rubber Reconnaissance Craft (E-CRRC). The Marine Corps Systems Command seeks proposals to manufacture and deliver 125 E-CRRCs over a 14-month period beginning in February 2022. Offerors must be able to deliver 10 E-CRRCs within 60 days of contract award.
The solicitation provides extensive requirements for the E-CRRC including performance specifications for fabric, puncture resistance, weight, deck design, transom, inflation methods, valves, grab lines, tie-down points, lifting points, and handles. Offerors must demonstrate in their proposals how their product meets these specifications. The solicitation also requires information on design, manufacturing quality plans, past performance, small business participation goals, and pricing through July 2022. Proposals are due by April 6, 2021 with contract award by July 29, 2022.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M67854-21-R-1801.pdf | ||
| Att 03 - Sample FACAR 5Y 8D Form.pdf | ||
| Exhibit A CDRLs.pdf | ||
| Att 02 - E CRRC PPQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this ammendment is to:
Change the solicitation closing date from 29 March 2021 to 06 April 2021 and update Section L.2.2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Mar-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M6785421R1801
X 9B. DATED (SEE ITEM 11)
25-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Mar-2021
CODE
MARINE CORPS SYSTEMS COMMAND
ATTN: ANTHONY FENNELL
2200 LESTER ST.
QUANTICO VA 22134
M67854 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M6785421R1801
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTION TO OFFERORS
L.1 GENERAL INSTRUCTIONS
To be considered for award, each Offeror shall submit its proposal in accordance with these Section L instructions.
Failing to adhere to these instructions may result in the Government removing the proposal from further consideration in the source selection process. Offerors may ONLY submit two proposals in response to this solicitation. Proposals shall not contain classified information.
L.2 PROPOSAL SUBMISSION
L.2.1 Written Proposal Delivery Address:
Marine Corps Systems Command
2201A Willis Street
Quantico, VA 22134-6050
Attn: Anthony Fennell, RFP: M67854-21-R-1801
L.2.2 Proposal Submission Date
Proposals are due no later than 12:00 PM Eastern Standard Time on 06 April 2021.
L.2.3 Package Labeling
All packages and boxes responding to this solicitation shall contain the following information on the address label:
Solicitation Number: M67854-21-R-1801 E-CRRC
A statement: "TO BE DELIVERED UNOPENED TO ANTHONY FENNELL”
The volume and copy number of the written material in each package/box
L.3 PROPOSAL PREPARATION INSTRUCTIONS
L.3.1 General Proposal Format
Offerors shall submit technical, past performance, small business participation, and business proposals as separate volumes in loose-leaf three ring binders in accordance with Table 1 – Proposal Submission Requirements. Offerors shall submit one original technical proposal, one original past performance proposal, one original small business participation proposal, and one original business proposal. Each copy shall have a cover sheet marked with the copy number (e.g. Copy 1 of 2), title (e.g. Volume I – Technical Proposal), RFP number (M67854-21-R-1801), classification (i.e., E-CRRC), and Offeror's name. Each CD shall be marked with the title, RFP number, classification, and Offeror’s name. Offerors shall apply all appropriate markings, including those prescribed in accordance with FAR 52.215-1(e), Restriction on Disclosure and Use of Data, and FAR 3.104-4, Disclosure, Protection, and Marking of Contractor Bid or Proposal Information and Source Selection Information. Offerors shall also stamp all documents “Source Selection Sensitive - See FAR 2.101 and 3.104.” Offerors shall submit all information for Government consideration in a clear, coherent, and concise manner sufficient to demonstrate an understanding of the contract requirements. Offerer’s shall clearly demonstrate the ability, resources, and experience required to perform the requirements, including the detailed procedures, plans, and methods to be used.
Additionally, the Offeror must show how the Offeror intends to accomplish the project and must include rationale and substantiation of all claims. All information shall be presented in sufficient depth for the Government to make a comprehensive evaluation of the Offeror’s understanding of the solicitation requirements and the Offeror’s capability for successful performance. The proposal should demonstrate this understanding and capability in a concise, logical manner and should not contain superfluous material not directly related to this solicitation. The
Government reserves the right to request certifications, test data, or any other documentation supporting the proposal claims, as deemed appropriate.
The Government will remove and not consider as part of the proposal any pages exceeding the specified page limits. A page printed on both sides will be counted as two pages. All pages, whether blank or with text, count against the page limit. Pages containing text shall be on 8 ½ x 11 inch paper. Drawings or other graphics should be reduced to the extent legibility is not lost. Each page shall be single-spaced with a minimum of 12 point font and one-inch margins. All pages shall contain appropriate numbering and contain the complete company name, date, and solicitation number in the header or footer. CD Requirements: Offerors shall use
Microsoft Office 2000 software or higher to create the required .xls, .ppt and .doc files as well as Adobe
Acrobat Version 7.0 or higher to create .pdf files. Table 1 below details the proposal submission requirements:
Table 1: Proposal Submission Requirements
VOLUME CONTENT SUBMISSION Page Limit
Volume I E-CRRC Technical Proposal
(Technical Performance):
Berry Amendment
Compliance
NBOE Integration
Ability to meet selected requirements of the
Performance
Specification, as provided
Design
Manufacturing and
Quality Assurance
(1) Original
(3) Duplicative Copies
(1) Electronic Copy - CD
100 pages (only the first
100 pages of the written portion of the Technical
Proposal will be considered)
Volume II Past Performance Proposal (1) Original
(1) Duplicative Copy
(1) Electronic Copy - CD
No page limit
Volume III Small Business Participation
Participation Plan
Subcontracting Plan
(1) Original
(1) Electronic Copy - CD
No page limit
Volume IV Business Proposal
(1) Original
(1) Electronic Copy - CD
No page limit
L.3.2 Specific Proposal Instructions
L.3.2.1 Volume I – Technical Proposal
The Technical Proposal shall contain NO proposal price information.
Offerors shall submit written technical information and data at a level of detail sufficient to allow the Government to properly evaluate said information in accordance with the evaluation section of this solicitation. In addition to specific information detailed in the rest of the Section:
A statement describing any single source parts and any special tools required to operate or maintain the system.
A standard set of provisioning drawings for cataloging purposes.
L.3.2.1.1 Berry Amendment Compliance (Evaluated in Section M.1 Go/No Go Criteria)
a. Offerors shall submit CoCs for all materials used in the E-CRRC end item.
b. Self-Certification: Offerors must submit the following signed self-certification in order for its offer to be compliant. The certification must be from the Offeror and must not contain any alternative wording.
I, (sign name here), in submitting this offer under solicitation number M67854-21-R-1801, affirm that only products compliant with the Berry Amendment (10 USC 2533a) will be delivered to the Government. As such, all items delivered, either as end products or components, will be grown, reprocessed, reused, or produced in the United
States (as defined in DFARS 252.225-7012(b) included by reference herein). This certification covers all materials
(including those of all components) and components supplied by subcontractors at any tier, and all labor (including that of all intervening processes), whether performed by the offeror or any of its subcontractors at any tier.
L.3.2.1.2 Production Capacity (Evaluated in Section M.1 Go/No Go Criteria)
The written proposal shall include the below information to substantiate the Offeror’s ability to deliver 10 E-CRRCs within 60 days of contract award and the ability to deliver 125 E-CRRCs within 14 months of first shipment, all conforming to PSPEC requirements in entirety.
a. Capacity available to produce 10 E-CRRCs no later than 60 days after contract award. Offerors shall illustrate this capability by providing a notional 60-day schedule with their submission.
b. Monthly maximum manufacturing capacity to produce the E-CRRC. Offerors shall be able to produce 125
E-CRRCs over a 14-month period estimated to begin in FEB 2022. Offerors shall illustrate this capability by providing a notional 14-month delivery schedule with their submission.
L.3.2.1.3 Technical Capability (Evaluated in Section M, Factor 1, Element 1)
A description of how the proposed E-CRRC meets or exceeds the E-CRRC performance requirements outlined in the Performance Specification paragraphs identified below.
Item
No.
E-CRRC
PSPEC
Reference
Title Proposal Verification
3.1.1.2,
4.3.1.2 Fabric
Provide details of the type of fabric used in construction of the E-CRRC to include base fabric, coating and weight.
3.1.1.3, 3.5.3, 4.3.1.3, 4.7.3
Puncture/
Survivability
Provide design specifications of the E-CRRC to include the number of chambers, means to isolate, interconnection valve design details as well as any testing conducted for minimized capability performance in the event of puncture. Provide material specifications and test data for puncture resistance of the material.
3.1.1.4,
4.3.1.4 Environmental
Provide details on material testing conducted to verify resistance to oil, fungal attack or exposure to sunlight.
4 3.1.2, 4.3.2 Weight Provide the empty weight of the E-CRRC and number of carry handles.
5 3.1.3, 4.3.3 Deck
Provide details on the E-CRRC deck design to include material, construction, working pressure, how the deck is removed from the E-CRRC for maintenance or replacement, and the number, location and strength of the deck equipment securing points.
6 3.1.4, 4.3.4 Transom
Provide details of the E-CRRC transom and its ability to integrate with the NBOE.
Provide horsepower rating, transom height, thickness, angle, faceplate information, pins and hole locations for securing the NBOE.
3.1.5.1, 3.11.1, 4.3.5.1, 4.13.1
Manual
Inflation
Provide details of foot pumps, how many are provided, and pressure rating. Provide time to inflate to working pressure using two foot pumps.
3.1.5.2.1, 3.1.5.2.2, 3.1.5.2.3, 4.3.5.2.1, 4.3.5.2.2, 4.3.5.2.3
SCUBA
Inflation
Provide details on the valve connection style, inflation hose assembly attachment locations, disconnect fitting type, and pressure rating. Provide details of the air volumes required at the design working pressures of the E-CRRC. Provide details on any testing performed to verify that two 100 ft3 SCUBA bottles at 3000 psi are capable of inflating the E-CRRC to design working pressure. Provide details on time to inflate the E-CRRC to working pressure using SCUBA tanks.
3.1.5.3, 4.3.5.3
Interconnection
Valves
Provide design details on the types of air transfer/isolation valves used and their operation.
10 3.1.6, 4.3.6
Inflation/
Deflation
Valves
Provide details on the inflation/deflation valves used on the E-CRRC, to include location, ability to lock open for deflation, markings used to indicate proper operation, and valve covers. Additionally, provide details on the dump valves located on both the aft main buoyancy tube chamber and on the bow.
11 3.1.7, 4.3.7 Relief Valves Provide details on the types of relief valves used, locations, relief pressure and reseating pressure.
12 3.1.8, 4.3.8 Grab Lines Provide E-CRRC interior and exterior grab line design details, to include line thickness.
13 3.1.9, 4.3.9 Tie-Down
Points
Provide E-CRRC design details for size, type and location of equipment tie-down points, pull strength, and line size that may be accommodated.
14 3.1.12, 4.3.12 Multifunctional
Lifting Points
Provide details of the E-CRRC lift points. Provide number, location, design strength, factor of safety and certification method for the load described and how the lift point locations will not interfere with the loading/distribution of equipment on the deck.
15 3.1.13, 4.3.13 Carry Handles
Provide details on the number and size of carry handles on the E-CRRC, as well as how the handles are arranged on the outside of the E-CRRC to be in compliance with all carry handles being in the same plane.
16 3.2.3, 4.4.3 Paddles Provide details on the number and type of paddles being used, as well as the number of paddle storage bags and method of securing the bags to the E-CRRC.
17 3.2.5, 4.4.5 Fuel Bladders
Provide details of fuel bladder construction and materials used. Provide details on material resistance to JP-5, JP-8 and gasoline, as well as fuel bladder certification tests.
Provide details on the number of fuel bladders required to meet the range requirement, capacity of each bladder, number of carry handles, compatible fuel types, securing method, and type of fuel fitting supplied.
18 3.2.6, 4.4.6 Fuel Line Provide details on the fuel line supplied to include length, compatible fuel types, and type of fitting on each end.
19 3.2.9, 4.4.9 Onboard Repair
Kit
Provide details on the onboard repair kit, to include quantities, parts and types of repairs that can be performed.
20 3.3.1, 4.5.1 Payload
Vendor to provide methods used to verify payload of 2400 lbs can be met. Payload is exclusive of engine, fuel, and any Basic Issue Items; payload is defined as Marines and their equipment only.
21 3.3.2, 4.5.2 Range Vendor to provide verification of speed at the required payload, fuel consumption and required fuel capacity to meet specified range (50 NM insert, loiter, 50 NM extract).
22 3.3.3, 4.5.3 Speed
Vendor to provide verification of maximum speed at the required payload, fuel consumption and required fuel capacity to meet specified range (50 NM insert, loiter, 50
NM extract).
23 3.3.4, 4.5.4 Shock Provide details of how the manufacturer intends to reduce shock loads with the E-CRRC design. Provide design details such as hull design and any testing conducted.
24 3.4, 4.6 Self-Recovery
Provide details of the bow and stern towline tie point locations and weight ratings.
Provide data verifying the combat loaded E-CRRC can tow and be towed by another combat loaded E-CRRC at 4 knots.
25 3.5.1, 4.7.1 Surf Passage Provide information detailing surf passages conducted, to include video if possible, as well as the results of the surf passage.
26 3.5.2, 4.7.2 Self-Bailing Provide design details on how the E-CRRC will self-bail. Provide the number and size of scuppers, transom height, and any testing conducted on self-bailing of the E-CRRC.
27 3.10, 4.12 Signature Provide details of the design, color and coatings of the craft and metallic components, as well as design features used to mitigate visual signature, such as spray rails.
28 3.12.2, 4.14.2 Stored
Dimensions
Provide dimensions of the E-CRRC when rolled for storage. Dimensions should be typical of a craft field rolled and stored, not as delivered from the factory.
29 3.12.3, 4.14.3 Cold Storage
Provide details on the specifications and testing of fabrics and materials used in construction of the E-CRRC when stored between air temperatures of -30°C (-22°F) to
+71°C (160°F).
30 3.17, 4.19 Transportability Provide the rolled dimensions of the E-CRRC. Rolled dimensions shall be field rolled not as delivered from the factory.
31 3.18, 4.20 Operating and
Support Cost
Provide details on estimated annual cost to perform preventative and corrective maintenance.
32 3.19, 4.21 Service and
Storage Life
Provide details on the expected operational and storage life expectancy of the E-CRRC.
Estimate may be based on analogous craft of similar materials and construction methods.
33 3.20.1, 4.22.1 Nameplate Provide details on the location of the nameplate and information that will be provided.
34 3.21, 4.23 Training and
Manuals
Provide details on training, maintenance and service materials instructions that will be provided.
Offerors shall provide an E-CRRC PSPEC Matrix, which addresses all aspects referenced above in the E-CRRC performance specification, as an Appendix to their written technical proposal using the format below. The level of performance offered shall become the threshold specification, should the Offeror be awarded the contract. This matrix does not count against the technical proposal page limit. Printed color photographs are acceptable. Any video or digital photos shall be delivered with the proposal on a Digital Versatile Disc-Recordable (DVD-R) or
Compact Disc-Recordable (CD-R) in either Moving Pictures Expert Group-4 (MP4) or Joint Photographic Experts
Group (JPEG) format; any digital photographs or videos delivered in any other format or on any other medium will not be reviewed. Photographic (digital or printed) and/or videograpic evidence delivered with the proposal will not count against the page limit.
E-CRRC PSPEC Matrix
MARCORSYSCOM OFFEROR
Item No. E-CRRC
PSPEC
Reference
Title Proposal Verification Specification Proposal Reference
3.1.1.2,
4.3.1.2 Fabric
Provide details of the type of fabric used in construction of the E-
CRRC to include base
Insert Offeror’s
PSPEC
Insert Proposal Volume, Page Number, and paragraph fabric, coating and weight.
Offerors shall also include test and qualification reports to support their system’s ability to meet the requirements of the E-CRRC Performance Specification and Statement of Work. These reports shall be provided as an Appendix to the written technical proposal and will not count against the technical proposal page limit. Photographic and videographic evidence are encouraged to provide substantiation of the claims but are not required. Printed color photographs are acceptable. Any video or digital photographs shall be delivered with the proposal on a DVD-R or
CD-R in either MP4 or JPEG format; any digital photographs or videos delivered in any other format or on any other medium will not be reviewed. Photographic (digital or printed) and/or videograpic evidence delivered with the proposal will not count against the page limit.
L.3.2.1.4 Design (Evaluated in Section M, Factor 1, Element 2)
Offerors shall provide a comprehensive overview of the design of the E-CRRC. This overview shall include at minimum: technical drawings with dimensions and data, printed color photographs (digital photographs on disc are acceptable) showing the stern, bow, port and starboard sides, keel/bottom view, and a “birds eye view” of the E-
CRRC, and a written narrative of the design and manufacturing process. Videographic evidence explaining the design is encouraged but shall be limited to 10 minutes and is not a requirement. Any video or digital photographs shall be delivered with the proposal on a DVD-R or CD-R in either MP4 or JPEG format; any digital photographs or videos delivered in any other format or on any other medium will not be reviewed. Photographic evidence (digital or printed), videograpic evidence and/or technical drawings delivered with the proposal will not count against the page limit.
L.3.2.2 Manufacturing and Quality Assurance (Evaluated in Section M, Factor 2)
Manufacturing and Quality Assurance shall include the following: The written proposal shall include the below information to substantiate the Offeror’s ability to deliver 10 E-CRRCs within 60 days of contract award and the ability to deliver 125 E-CRRCs within 14 months of contract award, all conforming to PSPEC requirements in entirety.
a. Written documentation detailing the Offeror’s Quality Management System (QMS) that complies with the requirements of ISO 9001:2015 and meets the requirements of Quality stated in FAR 52.246-11, Higher
Level Contract Quality Requirement, to ensure the products conform to contractual requirements. The
QMS shall explicitly address how the Offeror will monitor, assist, and audit each E-CRRC to be delivered to the Government during the period of performance for quality, reliability and product performance.
Additionally, the QMS shall explicitly address how the Offeror will monitor, assess, and audit raw material quality and reliability at all subcontractor and supplier facilities. The Government reserves the right to audit products and processes, as well as the QMS at any stage of contract performance. The Contractor shall make available all quality management documentation for the Government’s review upon request.
The QMS shall be in accordance with DI-QCIC-81794. The QMS may incorporate into the final contract and become a quality assurance reference. The QMS does not count against the 100-page limit for technical proposals.
b. A Manufacturing Plan, including subcontractor participation, with a detailed process flow chart of material input, output, and production steps in sequential order during E-CRRC production. The Manufacturing
Plan shall not include supplier production processes for raw materials. The Manufacturing Plan is a single document incorporating the details of relevant subcontractors’ manufacturing plans. The Manufacturing
Plan shall be in accordance with DI-MGMT-81889. The Manufacturing Plan may incorporate into the final contract and become a quality assurance reference. The Manufacturing Plan does not count against the
100-page limit for technical proposals.
c. Signed Manufacturing Agreements with first-tier subcontractors (if applicable). Include the percentage of work that each first-tier subcontractor will perform. The agreements do not count against the 100-page limit for technical proposals.
d. A Supply Chain Management chart demonstrating the use of Berry Amendment Compliant materials for constructing the E-CRRC as well as the complete physical address for each supplier. The Supply Chain
Management chart does not count against the technical proposal 100-page limit. The chart may incorporate into the final contract and become a quality assurance reference.
e. Capacity available to produce 10 E-CRRCs no later than 60 days after contract award. Offerors shall illustrate this capability by providing a notional 60-day schedule with their submission.
f. Monthly maximum manufacturing capacity to produce the E-CRRC. Offerors shall be able to produce 125
E-CRRCs over a 12-month period estimated to begin in FEB 2022. Offerors shall illustrate this capability by providing a notional 12-month delivery schedule with their submission.
L.3.2.3 Volume II – Past Performance (Evaluated in Section M, Factor 3)
Offerors shall submit up to three contracts (prime and subcontracts in performance or awarded) during the past five years that are relevant to this solicitation’s requirements. Those Offerors with fewer than three Government contracts shall provide all Government contracts.
Past performance information shall include:
(1) Section 1 – Contract Descriptions.
This section shall include the following information in the following format:
a. Contract Number and the associated Delivery Order in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements;
b. Government contracting activity, and current address, Procuring Contracting - Officer's name, email address, telephone and fax numbers;
c. The contractor’s place of performance, CAGE Code and DUNS Number. If the - Offeror performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, email address, and telephone and fax numbers);
d. The Government’s technical representative/COR, and current email address, telephone and fax numbers.
e. The Government contract administration activity and the Administrative Contracting Officer's name, and his or her current email address, telephone and fax numbers;
f. The Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time &
Materials (T&M), etc.) In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.));
g. The awarded price or cost;
h. The final or projected final price/cost;
i. The original delivery schedule, including start and completion of work dates; and
j. The final, or projected final, delivery schedule, including start and completion of work.
(2) Section 2 – Offeror’s Narrative
Offerors shall provide a narrative explanation of each contract listed in Section 1 describing the objectives with specificity and detailing how the effort is relevant to the solicitation requirements.
(3) Section 3 – Contract Performance
a. The Offeror’s narrative for each contract shall address all of the questions and information in the attached Past Performance Questionnaire.
b. For any contracts that failed to meet original schedule or technical performance requirements, provide a brief explanation of the reasons for the shortcomings and any corrective actions taken to avoid recurrence.
c. The Offerors shall also provide a copy of any Cure Notices or Show Cause Letters they received for any contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor.
d. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
e. The Offeror shall provide evidence of compliance with the requirements of FAR 52.219-8, “Utilization of Small Business Concerns,” and 52.219-9, “Small Business Subcontracting
Plan,” in prior contracts containing the clause.
NOTICE: The Government may use data provided in the Offeror’s proposal and data obtained from other sources, to include the Contractor Performance Assessment Reporting System (CPARS). Because the Government may not necessarily interview all of the sources provided by the Offerors, it is incumbent upon the Offeror to explain the relevance of the data provided. While the Government may consider data it obtains from other sources, the
Offeror maintains the burden of proving acceptable past performance.
(4) Section 4 – Past Performance Assessment Questionnaire
For all contracts identified in Section 1, Offerors shall complete Part I of the Past Performance Assessment and email the questionnaire to both the Government contracting activity and technical representative responsible for the associated contract. The Point of Contact (POC) should electronically complete Part II of the questionnaire and email the entire questionnaire to the Contract Specialist within 20 calendar days of the solicitation’s release. The
POC should send completed questionnaires via e-mail to anthony.fennell@usmc.mil. within 20 calendar days after the solicitation’s release, the Offeror shall also email the Contract Specialist a list of all the POCs to whom it sent a questionnaire. The POC list shall be in Word for Windows Table Format and include the following fields:
Solicitation Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC
Title; POC Telephone Number; POC Email Address; Date Emailed to POC (month/day). If there is a corresponding assessment in CPARS, the offeror can forego sending the questionnaire to the POC and note it in the Table submitted to the Contract Specialist.
L.3.2.4 Volume III – Small Business (SB) Participation (Evaluated in Section M, Factor 4: Small Business
Participation) The cover page for the Offeror’s Small Business Participation volume shall summarize the Offeror’s Small Business
Participation goals for the total requirement using the below format:
Table 3: Template for the Summary Table
SB Participation Plan
Total
Small Business (SB) %
Small Disadvantaged Business (SDB) %
Woman-Owned Small Business (WOSB) %
HUBZone Small Business (HUBZone SB) %
Small Disadvantaged Veteran-Owned Small Business (SDVOSB) %
All Offerors shall submit a Small Business (SB) Participation Plan presenting percentages in terms of total dollars of work for each SB category, divided by the total contract value.
The Offeror shall identify the extent and nature of participation of SBs, SDBs, WOSBs, HUBZone SBs, and
SDVOSBs in the performance of the proposed contract. Participation includes subcontractors or material suppliers to the prime contractor or subcontractors. Offerors shall include in the percentages their own participation as an SBs, SDBs, WOSB, HUBZone SB or SDVOSB.
The plan shall include:
a. The name and DUNS number (or CAGE code) of each of the firm(s) included in the plan;
b. A copy of the System for Award Management (SAM) profile for each of the firm(s) included in the plan;
c. Discussion of the specific components to be produced or services to be performed by each firm;
d. Identification of the North American Industry Classification System (NAICS) code (appropriate to the principal nature of the planned subcontract) supporting each firm’s size status;
e. The estimated total dollar value subcontracted to each firm;
mailto:anthony.fennell@usmc.mil
f. The estimated total dollar value subcontracted to each SB category;
g. The percentage of total contract value subcontracted to each firm; and
h. The percentage of total contract value subcontracted to each SB category.
i. Evidence of any enforceable commitments in place between the Offeror and the participating small businesses. Each participation percentage shall be accompanied by detailed supporting documentation regarding the individual commitments.
j. If applicable, for each category in which the Offeror’s SB Participation Plan contains goals below those described below, a detailed explanation as to why.
SB Participation Plan Objectives.
The Government’s Participation objectives for this acquisition is:
Small Business (SB): 5%
Note:
In accordance with FAR 52.219-9, all businesses other than those designated small under subject procurement’s NAICS, shall submit a subcontracting plan. Any subcontracting plan with a small disadvantaged business goal of less than 5% shall include an explanation of why 5% is not achievable.
L.3.2.5 Volume IV – Business Proposal (Evaluated in Section M, Factor 5)
Failing to provide a complete business submission may result in the Government disqualifying an Offeror’s proposal from competition. Offerors seeking any exception to the solicitation’s terms and conditions shall clearly explain the exception and its basis in their cover letter. Exceptions, however, may render the Offeror’s proposal unacceptable.
Provisions in the hard copy marked “original” in the Business Proposal govern in the case of any conflicts between the hard copy and the electronic version.
L.3.2.5.1 The Offer
The Business Proposal shall include a completed, signed copy of the entire solicitation with all appropriate “fill-in” sections completed as follows:
Section A: An official having the authority to bind the Offeror contractually must sign the SF33. If the individual is not an officer of the company, the proposal should include written evidence of the individual’s authority to bind the Offeror under contract to a particular course of action, such as a written delegation of authority signed by an officer of the company.
Section B: Follow the below instructions for particular Contract Line Item Number (CLIN) pricing:
o Offerors shall propose a single blended unit price for each of the five ordering periods for all
CLINs.
o Offerors shall include their overall proposed price at the end of the Schedule of
Supplies/Services section. The overall proposed price will be the sum of all CLIN and Sub
CLIN amounts. Failing to fill in the total price for each CLIN or failing to provide an overall proposed price may render the Offeror’s proposal non-responsive and maybe grounds for disqualification. Electronic copies in Microsoft Excel format shall include all applicable calculations in the individual cells.
o The pricing for each CLIN shall remain valid for the duration of the 60 month contract ordering period.
Section I: Complete all required fill-ins.
Section K: Complete all required certifications, representations, and acknowledgments for the prime contractor and subcontractors, as applicable.
Amendments: Offerors shall acknowledge amendments to this solicitation with signature upon a completed SF30, or appropriate annotation on the SF33, from an official having the authority to bind the Offeror contractually.
The Business Proposal shall also include a company organizational chart that includes the Name, Position Title, Address, Telephone Number, and Email Address of the Company Principals as well as all Principals supporting the
E-CRRC Program.
The Contractor shall articulate their employee turnover rate as well as mean time of employment over the past 36 months. These figures shall be expressed plainly (not in percentages) and shall clearly identify number of employees employed over past 36 months, number of employees turned over during past 36 months, and the average time of employment for all employees actively involved in the design, development, and/or production of E-CRRC and/or similar crafts. Employee turnover rate and mean time of employment shall include all full-time employees, part-time employees, contracted employees, paid consultants, and any other person directly involved in the design, development, and/or production of the E-CRRC and/or similar crafts. These figures shall not include any employees that are not directly involved with the design, development, and/or production of E-CRRC and/or similar crafts
(executives, accountants, marketing, human resources, et cetera). This information shall be articulated in Volume IV of the RFP submission.
L.4 INCORPORATION OF TECHNICAL PROPOSAL
The Government may incorporate all or part of the successful Offeror’s technical proposal in any contract resulting from this solicitation. Additionally, the E-CRRC Performance Specification in the ultimately awarded contract will reflect all above-minimum performance levels or capabilities for which the Government gave evaluation credit during source selection. Nothing contained in the successful Offeror’s technical proposal shall constitute a waiver to any other requirement within the contract. The Order of Precedence clause governs in instances of conflicts between the successful Offeror’s technical proposal and any other requirement of the contract.
The successful Offeror shall provide, as necessary, any updated technical proposal changes reflecting the results of any clarification or discussion. If the Government discovers after award that the awardee did not incorporate changes into the contract resulting from any clarification or discussion, such changes to the Contractor’s documents shall be administrative in nature, and the Government may unilaterally modify the contract accordingly at no change in contract price or other terms and conditions.
L.5 PRE-AWARD SURVEY
The Government may conduct a Pre-Award Survey to examine the Offeror's technical ability, production capacity, quality control plan, management structure, financial capability, labor resources, performance record, and ability to meet required schedules.
L.6 PRE-CONTRACT COSTS
Pre-contract costs are NOT authorized.
L.7 QUESTIONS REGARDING THE SOLICITATION
Offerors should carefully read this solicitation’s terms and conditions and refer any questions in writing to the
Contract Specialist, Anthony Fennell, via email at anthony.fennell@usmc.mil with Peggy Smith at peggy.l.smith1@usmc.mil copied no later than 12:00 PM Eastern Standard Time on 12 March 2021. The
Government may not address any questions, comments, concerns it receives after that time. The Government will post responses via published amendment to the solicitation.
L.8 OFFER ACCEPTANCE PERIOD
Offerors must hold prices firm until 29 July 2022.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .