Exhibit A CDRLs.pdf

PDF 2 MB Posted

Attached to
Enhanced-Combat Rubber Reconnaissance Craft Federal contract opportunity
Solicitation number
M67854-21-R-1801
Issued by
United States Marine Corps

About this file

This is a Contract Data Requirements List (CDRL) specifying nine required data items for the Enhanced-Combat Rubber Reconnaissance Craft solicitation issued by the United States Marine Corps under number M67854-21-R-1801. Key data items include monthly progress reports, conference agendas and minutes for post-award and production readiness meetings, health hazard assessment reports, safety data sheets, and a configuration audit summary report. Delivery due dates, distribution statements, and review periods are provided. The CDRL also identifies the requiring office and contracting parties.

View the file

Other files for this federal contract opportunity

Other files attached to Enhanced-Combat Rubber Reconnaissance Craft, newest first.
File Type Posted
M67854-21-R-1801 0001.pdf PDF
M67854-21-R-1801.pdf PDF
Att 02 - E CRRC PPQ.pdf PDF
Att 03 - Sample FACAR 5Y 8D Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A018 title: QUALITY PROGRAM PLAN (QPP) sub: QUALITY MANUAL/QUALITY PROGRAM PLAN auth:

ref: SOW PARA 3.5.4.2 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: D freq: ONE/R asof:

firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 15 MARCH 2019. OTHER REQUESTS SHALL BE REFERRED TO COMMANDER, MARINE CORPS SYSTEMS COMMAND (ATTN: PMM-141.2), 2200 LESTER STREET, QUANTICO, VIRGINIA, 22134-6050.

Block 12: /13 - The initial version of the E-CRRC Quality Program Plan (QPP) shall be submitted with delivery of FAT articles. Government requires 14 calendar days for review and comment. Final to be submitted within 14 calendar days of receipt of Government comments.

group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: QCIC system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A019 title: PRESERVATION AND PACKING DATA sub: ENGINEERING CHANGES auth:

ref: SOW PARA 3.7.1 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: A freq: ONE/R asof:

firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 9: Distribution Statement A: Approved for public release.

Block 12: Submit within 15 calendar days after Government approved Engineering Change Proposal (ECP) that affects packaging design requirements. The Government requires 14 calender days to review. The contractor shall submit final 7 calendar days after receipt of Government comments.

group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: PACK system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A020 title: STATUS REPORT sub: DELIVERY STATUS TRACKING SPREADSHEET auth:

ref: SOW PARA 3.8 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: A freq: ASREQ BLK 16 asof:

firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 9: Distribution Statement A: Approved for public release.

Block 10: /12/13 - Submit with each delivery made.

group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: MGMT system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A021 title: Engineering Data For Provisioning (EDFP) sub: Engineering Data For Provisioning (EDFP) auth: DI-SESS-81874 ref: SOW PARA 3.9, 3.9.1 req_ofc: PMM-141-MARCORSYSCOM dd250: N/A appcode: N/A dist: A freq: ONE/R asof:

firstsub: 30 DAC subsub: AS REQ addressee1: PMM-141-MARCORS draft1:

reg1: 1 repro1:

addressee2: Logistics Management draft2:

reg2: 1 repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16. REMARKS BLK 4- ENGINEERING DATA FOR PROVISIONING (EDFP): For provisioning purposes, EDFP order of precedence shall be:

Data equivalent to approved product-engineering drawings.

Data equivalent to in-process/incomplete product engineering drawings.

Commercial drawings.

Commercial manuals, when required to provide information on a commercial assembly. Catalogs or catalog descriptions.

Sketches or photographs with brief descriptions of dimensional, materiel, mechanical, electrical, or other descriptive characteristics. When sketches or photographs are provided for an assembly, a bill of material shall also be provided.

DID tailored to meet Marine Corps use references GEIA-STD-0007 Logistics product Data and TA-STD-0017 Product Support Analysis.

Blocks: 14. Contract deliverables shall be provided in an EXCEL spreadsheet format.

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only, Critical Technology, Export Controlled, 25 April 2019. Other requests shall be referred to Commander, MARCORSYSCOM, Program Manager, Infantry Weapons (PMM 140.2), Quantico, VA 22134 group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: MGMT system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A001 title: Contractor’s Progress, Status and Management Report sub: PROGRAM MANAGEMENT auth:

ref: SOW PARA 3.1.1 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: D freq: QUARTERLY asof:

firstsub: 45DAAWD subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Prior to the date in Block 12 above, the contractor shall provide an example of the monthly reporting and discuss the elements for review for format, content and milestones to be considered.

The contractor shall provide monthly status and plans for the next accounting period including scheduling, resources, materials required, and meetings scheduled and planned supplier reviews for materials management and processes.

Contractor format is acceptable incorporating all Data Item information required. The contractor shall include planned and updated milestones, explanations for any rework or changes in schedule, supplier resources and integration of materials, and any component or subcomponent reviews shall be provided for any changes associated with previous reporting periods.

Block 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 15 MARCH 2019. OTHER REQUESTS SHALL BE REFERRED TO COMMANDER, MARINE CORPS SYSTEMS COMMAND (ATTN: PMM-141.2), 2200 LESTER STREET, QUANTICO, VIRGINIA, 22134-6050.

Block 12: /13 - The reporting period will be from the first to last business day of each Fiscal Quarter, beginning 45 calendar days after the Contract Award. Submit 7 calendar days after last day of the reporting period. The government will review and provide comments 7 days after receipt. Contractor shall resubmit within 7 days after receipt of government comments.

group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: MGMT system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A002 title: CONFERENCE AGENDA sub: POST AWARD CONFERENCE, PRODUCTION READINESS REVIEW & IPRS auth:

ref: SOW PARA 3.2.1 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: A freq: ASREQ (See Blk 16) asof:

firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 9: Distribution Statement A: Approved for public release.

Block 10: /12/13 - Submit 7 calendar days prior to each conference, meeting, audit, or review. The government requires 3 calendar days to review. The contractor shall submit final 2 calendar days after receipt of Government comments.

group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: ADMN system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A003 title: CONFERENCE MINUTES sub: POST AWARD CONFERENCE, PRODUCTION READINESS REVIEW & IPRS auth:

ref: SOW PARA 3.2.1 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: D freq: ASREQ (See Blk 16) asof:

firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 15 MARCH 2019. OTHER REQUESTS SHALL BE REFERRED TO COMMANDER, MARINE CORPS SYSTEMS COMMAND (ATTN: PMM-141.2), 2200 LESTER STREET, QUANTICO, VIRGINIA, 22134-6050.

Block 10: /12/13 - Submit 7 calendar days after each conference, meeting, audit, or review. The government requires 3 calendar days to review. The contractor shall submit final 2 calendar days after receipt of Government comments.

Block 14: Submit a copy via e-mail to the contract specialist referenced in Section G group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: ADMN system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A004 title: CONFERENCE AGENDA sub: PRODUCTION READINESS REVIEW & IPRS auth:

ref: SOW PARA 3.2.2, 3.2.3 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: A freq: ASREQ (See Blk 16) asof:

firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 9: Distribution Statement A: Approved for public release.

Block 10: /12/13 - Submit 7 calendar days prior to each conference, meeting, audit, or review. The government requires 3 calendar days to review. The contractor shall submit final 2 calendar days after receipt of Government comments.

group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: ADMN system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A005 title: CONFERENCE MINUTES sub: PRODUCTION READINESS REVIEW & IPRS auth:

ref: SOW PARA 3.2.2, 3.2.3 req_ofc: PMM-141-MARCORSYSCOM dd250:

appcode:

dist: D freq: ASREQ (See Blk 16) asof:

firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: PMM-141-MARCORS draft1: 1 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3: DCMA draft3:

reg3:

repro3:

addressee4: ACO/TBD draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_reg: 1 total_repro: 0 remarks: Block 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY, ADMINISTRATIVE OR OPERATIONAL USE, 15 MARCH 2019. OTHER REQUESTS SHALL BE REFERRED TO COMMANDER, MARINE CORPS SYSTEMS COMMAND (ATTN: PMM-141.2), 2200 LESTER STREET, QUANTICO, VIRGINIA, 22134-6050.

Block 10: /12/13 - Submit 7 calendar days after each conference, meeting, audit, or review. The government requires 3 calendar days to review. The contractor shall submit final 2 calendar days after receipt of Government comments.

group:

total_price:

prep_name:

line_item: 0004 exhibit: A xtdp: Off xtm: Off othercat: ADMN system: E-CRRC ctr_no: M6785421R1801 contr: TBD remarksb:

Page2:

Reset:

prep_date:

app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the appropriate distribution statement on the data (ref.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .