This is a solicitation for an Enhanced-Combat Rubber Reconnaissance Craft. The Marine Corps Systems Command seeks proposals to fabricate, produce, and deliver 894 production hulls of the E-CRRC along with associated documentation and services over a five year period. Offerors must complete ten FAT articles within 60 days of award and are responsible for all costs of additional testing should FAT be disapproved. Production quantities will be delivered in lots of 10 or more per month following receipt of orders. The solicitation also includes requirements for instructor training, engineering data, and quality assurance documentation. The award date is not specified and pricing will be fixed-price with unit costs established on delivery orders. American-made components are required to comply with Berry Amendment restrictions.

View the file

Other files for this federal contract opportunity

Other files attached to Enhanced-Combat Rubber Reconnaissance Craft, newest first.
File Type Posted
M67854-21-R-1801 0001.pdf PDF
Exhibit A CDRLs.pdf PDF
Att 02 - E CRRC PPQ.pdf PDF
Att 03 - Sample FACAR 5Y 8D Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A

X B

X C X D

EX

X

G

F 49 - 64

65 - 76

H 77 - 81 anthony .fennell@usmc.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-C9 1 81

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

M67854 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ANTHONY G. FENNELL 703-432-4964

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 - 13

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

15 - 16

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 18 - 22 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror)

X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

23 - 46

PART II - CO NTRACT CLAUSES

MARINE CORPS SYSTEMS COMMAND

ATTN: ANTHONY FENNELL

2200 LESTER ST.

QUANTICO VA 22134 703-432-4964

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

47 - 48

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

25 Feb 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

M6785421R1801

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 10 Each First Article Test (FAT) Articles

FFP

Ten (10) E-CRRC Prototype Skins IAW the Statement of Work (SOW)

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: 1940

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 894 Each E-CRRC Production; Hull Only

FFP

E-CRRC Production; Hull Only (No Engines)

E-CRRC Production IAW the SOW

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

UNIT UNIT PRICE MAX AMOUNT

0003 3 Each I&KP Training Package

FFP

The Contractor shall provide Instructor & Key Personnel Training (I&KPT) for up to eight personnel. IAW paragraph 3.10 of the SOW.

UNIT UNIT PRICE MAX AMOUNT

0004 1 Lot CDRLs

FFP

Contract Data Requirement List - CDRL; IAW SOW

BERRY AMENDMENT COMPLIANCE

The Defense Appropriations and Authorizations Acts and other Statutes (including what is commonly referred to as the “Berry Amendment”) imposes restrictions on the DOD’s acquisition of foreign products and services. A preference for certain domestic commodities is required by 10 USC 2533a and DFARS 252.225-7012. These references require the Department of Defense to acquire specific end items or components that have been grown, reprocessed, reused, or produced in the United States. Items provided under this solicitation and the resulting contract shall be compliant with the above references, as applicable.

Offerors shall maintain additional documentation substantiating the claim that all materials, including components and raw materials, submitted under this solicitation and the resultant contract are Berry Amendment Compliant.

Offerors shall be able to provide this documentation to Government personnel upon request.

CONTRACT LIMITATIONS

CONTRACT MINIMUM AND MAXIMUM LIMITATIONS:

MINIMUM QUANTITY:

The Minimum Quantity shall be the quantity established on the first delivery order.

MAXIMUM QUANTITY:

The maximum quantity shall be the 894 E-CRRCs.

The maximum quantity for the Training CLIN shall be three (3).

Of note, CLIN 0004 is for Contract Data List Requirements information and is “not separately priced.”

ORDERING PERIODS

There is one 60-month ordering period for this effort.

Section C - Descriptions and Specifications

STATEMENT OF WORK

1 SCOPE. This Statement of Work (SOW) sets forth the work required to fabricate, produce and prepare associated documentation, and deliver the Enhanced-Combat Rubber Reconnaissance Craft (E-

CRRC) in accordance with the E-CRRC Performance Specification and First Article Test (FAT) Plan. The

Contractor is responsible for providing all specific material, services and necessary support documentation needed to complete the tasks identified in this SOW.

2 APPLICABLE DOCUMENTS. The following documents form a part of this SOW to the extent specified herein. All parties shall use the most recent revision of the referenced document at the time of contracting unless specified otherwise. All Government document issue dates are those listed in the Department of

Defense Index of Specifications and Standards (DoDISS). In the event of conflict between the applicable documents and this SOW, the SOW shall take precedence. While the Government has made every effort to ensure the below lists are complete, the SOW may reference documents not included below. Contractors shall meet all specified requirements cited in this SOW regardless whether an applicable document appears below.

2.1 Military Standards and Specifications - Mandatory Compliance.

DTL-17001A0029 Performance Specification for E-CRRC

MIL-STD-129P Military Marking for Shipment and Storage

MIL-STD-130N Standard Practice Identification Marking of U.S. Military-Property

MIL-STD-882E Standard Practice for System Safety

MIL-STD-2073-1 DoD Standard Practice for Military Packaging

MIL-STD-31000A Technical Data Packages

MIL-PRF-32216A Evaluation of Commercial Off-the-Shelf Manuals

MIL-PRF-29612B Training Data Product

GEIA-STD-0007 Logistics Product Data

TA-STD-0017 Product Support Analysis

DI-QCIC-81794 Quality Assurance Program Plan

DI-MGMT-81889 Diminishing Manufacturing Sources and Material Sources Implementation Plan

2.2 Military Standards and Specifications - Guidance Only.

Not Applicable.

2.3 Federal Standard - Mandatory.

FED-STD-313 w/CN #1 Material Safety Data, Transportation Data and Disposal Data for Hazardous

Materials Furnished to Government Activities

2.4 Drawings.

Not Applicable.

2.5 Handbooks - Guidance Only.

MIL-HDBK-61 Configuration Management Guidance

2.6 Non-Government Documents.

ASTM D-3951 Standard Practice for Commercial Packaging

EIA-649 National Consensus Standard for Configuration Management

3 REQUIREMENTS. The Contractor shall perform all tasks delineated in this statement of work including providing all materials, equipment, personnel, and facilities necessary to manufacture, fabricate, integrate, produce, and deliver First Article Test items, production E-CRRCs, and data item deliverables as specified by the contract, Section J attachments, and individual delivery orders.

3.1 Program and Data Management.

3.1.1 Program Management. The Contractor shall designate a single individual to serve as the primary point of contact (POC) between the Government and Contractor, who shall be responsible for coordinating all Contractor activities related to this contract. This individual shall have the authority to commit the Contractor to specific courses of action and accept direction from the Contracting Officer or the Contracting Officer's authorized representatives. This individual shall coordinate all meetings between the Government and Contractor; shall immediately bring any conflicts in the Contractor's interpretation of the contract requirements to the Contracting

Officer's attention (first by telephone verbal notification, to be followed by written notification); and shall bring to the Contracting Officer's attention any problems that could adversely affect the Contractor's ability to meet the contract quality, cost, production schedule, delivery schedule, or other performance requirements. The Contractor shall submit Progress, Status and Management Reports.

Contractor’s Progress, Status and Management Report – CDRL A001

3.1.2 Subcontractor Management. The Contractor is responsible for performing requirements delineated in this SOW and shall institute appropriate management actions for subcontractor performance.

Contractually specified requirements shall apply to subcontractor performance; however, the Contractor shall be accountable for subcontractor compliance and is ultimately responsible for ensuring all deliverable products comply with the contract requirements.

3.1.3 Data Management. The Contractor shall establish a single, centralized system for management of all data required under this contract. The Government reserves the right to review all data associated with and developed for the E-CRRC and to require delivery of any such data.

3.2 Meetings, Formal Reviews, Conferences, and Audits.

3.2.1 Post Award Conference. The Contractor shall host a Post Award Conference (PAC) at its facility no later than 30 days after contract award. The PAC shall be at the Contractor’s location where the Contractor is to demonstrate its production, quality control, and management procedures for producing the E-CRRC. The Contractor shall ensure its key operations and management personnel attend the PAC. The Contractor shall provide a meeting agenda and meeting minutes for Government approval. As a part of the PAC, the Contractor shall furnish recommended provisioning data draft as one product during the PAC, as described in Paragraph 3.9.1 of this SOW.

The Government will clarify any provisioning issues during the evolution of the data cleansing process.

Conference Agenda – CDRL A002

Conference Minutes – CDRL A003

3.2.2 Production Readiness Review. A production readiness review shall occur after FAT and prior to the start of full rate production. The review will include a review of quality management documents and processes, production lines and processes, sufficient supply, and other topics as necessary to determine the Contractor is ready to proceed into full rate production.

3.2.3 In-Process Reviews (IPRs). IPRs will occur no more than quarterly at dates and locations mutually agreed upon by the Government and the Contractor. The meetings generally occur only when the Contractor is under production to meet delivery orders under the contract. Topics such as complying with contract requirements, identifying and resolving problems, and assessing manufacturing performance could be matters that necessitate face-to-face meetings. The Contractor shall deliver meeting agendas and meeting minutes for Government approval.

Conference Agenda – CDRL A004

Conference Minutes – CDRL A005

3.3 Environment, Safety, and Occupational Health.

3.3.1 System Safety. The Contractor shall evaluate any environmental, safety, and health hazards; and define associated risk levels. The Contractor shall also establish a program that reduces the probability and severity of all hazards associated with development, use, and disposal of the E-CRRC in accordance with MIL-STD-882E.

Residual risks will be evaluated by the Government in accordance with MIL-STD-882E and accepted as appropriate prior to exposing people, equipment, or the environment to known system related Environment, Safety, and

Occupational Health (ESOH) risks. The Contractor shall make available all ESOH documentation for the

Government’s review upon request.

3.3.1.1 Health Hazard Assessment. The Contractor shall perform, document, and deliver a Health Hazard

Assessment Report (HHAR) to identify health hazards, evaluate hazardous materials, and propose protective measures to reduce the associated risk.

Health Hazard Assessment Report (HHAR) – CDRL A006

3.3.2 Safety Data Sheets. The Contractor shall deliver all Safety Data Sheets (SDSs) to the Government for review. A copy of the SDSs are required in accordance with FED-STD-313E.

SDS, Safety Data Sheets – CDRL A007

3.3.3 Environmental Considerations. The Contractor shall deliver information on the potential for any adverse environmental impacts from manufacturing, operating, maintaining, and disposing the E-CRRC. The

Government will use this information for a preliminary National Environmental Policy Act (NEPA) decision and to prepare formal NEPA documents, which include the Categorical Exclusion (CATEX), Environmental Assessment

(EA) and Environmental Impact Statement (EIS). Environmental impacts include air, soil, wetlands, water, flora, fauna, endangered species, emissions and toxic waste resulting from development, maintenance (coatings and primers), operation, disposal, etc.

Technical Report, Study/Services (Environmental Considerations) – CDRL A008

3.4 Configuration Management Process. The Contractor shall maintain a Configuration Management (CM) process for the control of raw material utilized in the E-CRRC that are approved by the Government in accordance with First Article Test requirements. The Contractor shall furnish, with each lot submitted to the government, the associated raw material traceability matrix to include raw material supplier Certificates of Conformance (CoC) and lots of raw material used in each lot presented to the Government. The principles contained in MIL-HDBK-61 may be used for guidance. The Contractor’s CM process shall consist of configuration identification and configuration control of all raw materials utilized in the production of the E-CRRC. The CM process shall interface with other acquisition requirements such as design review, quality assurance, and other program related disciplines shall be addressed.

3.4.1 Configuration Management Meetings and Audits.

3.4.1.1 Physical Configuration Audit. The Contractor and the Government shall perform a baseline Physical

Configuration Audit(s) (PCA) to verify the E-CRRC is accurate, complete, and compatible. The PCA shall also verify that E-CRRC is in accordance with the specification. The Contractor shall consolidate the results of its audits on subcontractors for configuration management of the E-CRRC. The Government and the Contractor shall conduct the system-level PCA jointly, at the Contractor’s place of performance, prior to the construction of first articles and the Government will chair the audit. The Contractor shall plan, organize, chair, and conduct audits on subcontractors, with the Government serving in a support capacity when necessary before submitting the baselined

CIs. The PCA shall verify that the patterns reflect the "as-built" configuration of all newly developed or modified portions of the system; confirm that accurate form, fit, function information is provided on control patterns for all

CIs; and confirm the patterns accurately represent the "as-built" production configuration. The Contractor shall provide a proposed schedule for conducting the PCA and identification of the CIs to be audited at first article production. The Contractor shall participate and assist the Government in developing the PCA, using the guidelines contained in MIL-HDBK-61A, Section 8. The Contractor shall document the PCA results after each audit and correct all audit discrepancies documented in the configuration audit summary reports, which are data deliverables.

In the event the Government finds that any discrepancies, the Government reserves the right to request revisions until the Contractor corrects all discrepancies and the Government approves the configuration audit summary report.

The product baseline will be established upon completion of the PCA and the resolution of any audit discrepancies.

Configuration Audit Summary Report (Physical Configuration Audit) – CDRL A009

3.4.2.1 Configuration Control. The Contractor shall implement configuration control methods and procedures to maintain the integrity and traceability of an established baseline.

Contractor’s Configuration Management Plan – CDRL A010

3.4.2.1.1 Engineering Change Proposals. The Contractor shall submit ECPs as data deliverables. MIL-HDBK-61 provides guidance concerning the classification of ECPs. After the product baseline is established, all ECPs shall be submitted and processed in accordance with the E-CRRC CM Plan incorporated as CDRL A011 to this contract.

The Government will review each ECP upon receipt and notify the Contractor in writing of approval/disapproval.

For Class I ECPs, approval of the ECP grants the Contractor the authority to proceed to testing only. Based on the test results obtained, the Government will decide whether or not to proceed with permanent implementation of the change. The Contractor will be notified of this decision via separate formal correspondence.

Engineering Change Proposal (ECP) – CDRL A011

3.4.2.1.1 ECP Required Data. If there are no costs to the Government associated with the change, the Contractor shall fill out DD Form 1692/1, Aug 96 Blocks 1-36 for Government review. If there are costs to the Government associated with the change, the Contractor shall fill out Block 51 columns a-e identifying the funding required for the engineering change. Block 51 column f will be reserved for the Government to estimate costs outside the contract (i.e. government lab testing, additional GFP, etc.). The Contractor shall submit ECPs, to include supporting documentation, to the Government PCO as a Portable Document Format (PDF). Upon ECP approval, the

Government will modify the contract to add the ECP as an attachment.

Engineering Change Proposal (ECP) – CDRL A012

3.4.2.1.2 ECP Cost Responsibility. The Contractor shall fund all ECP implementation up to its contractual responsibilities established in the Functional Baseline, Product Baselines, and this SOW. It is the Contractor’s responsibility to resource the manufacturing of test items and testing required for ECP approval at commercial testing facilities.

3.4.2.2 Requests for Variance (RFV). The Contractor shall process any RFVs from approved configuration documentation. Authorized variances are a necessary temporary departure from the specified baseline requirements and do not constitute a change in the approved baseline. The Contractor shall minimize recurring variations. For permanent changes, the Contractor shall process an ECP. EIA-649 Configuration Management for DoD provides guidance concerning the classification and processing of RFVs.

3.4.2.2.1 RFV Required Data. The Contractor shall populate a DD Form 1694, Mar 2016 (EG), filling out Blocks

1-25 for Government review. If there are costs to the Government associated with the variance, the Contractor shall specify the cost information as an attachment to the DD Form 1694. Block 19 will be reserved for the Government to estimate costs outside the contract (e.g., government lab testing, additional GFP, etc.). The Contractor shall deliver RFVs, to include supporting documentation, to the Government PCO as a PDF. Upon RFV approval, the

Government will modify the contract to add the RFV as an attachment.

Request for Variance (RFV) – CDRL A013

3.4.2.2.2 RFV Cost Responsibility. The Contractor shall fund all RFV implementation up to its contractual responsibilities established in the Functional Baseline, Product Baselines, and this statement of work. The

Contractor shall resource the manufacturing of test items and qualification testing (if required) at commercial testing facilities.

3.4.2.3 Notices of Revision. The Contractor shall generate and deliver Notices of Revisions (NORs) as well as any supporting documentation when technical documentation controlled by another Contractor or Government agency requires changes following approval of an ECP.

Notice of Revision (NOR) – CDRL A014

3.5 Testing/Verification. The Government plans to conduct testing to ensure the E-

CRRC is able to meet the performance specification requirements, as follows:

3.5.1 First Article Test. The Government will conduct FAT in accordance with FAR 52.209-4, First Article

Approval-Government Testing to verify the E-CRRC meets all Government requirements in the Performance

Specification. The Government intends to use Naval Surface Warfare Center, Carderock Division, Detachment

Norfolk (NSWCCD DN) for FAT testing. The Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of FAT. If FAT is approved, the Contractor will be authorized to proceed into production. The notice of conditional approval or disapproval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

All production quantities submitted after approval of the First Article Test shall be produced using the same raw material suppliers, materials, processes, procedures, equipment and facilities that resulted in the manufacture of the acceptable First Article Test items. This includes all raw materials and/or sub-components. Contractors desiring to make changes to approved First Article Test items, to include raw material supplier and production processes, must request in writing and receive written approval from the Contracting Officer prior to use. The Contracting Officer, along with the Government Project Officer, will determine if the request is approved or disapproved and if a new

First Article Test is required.

3.5.1.1 Conditional FAT Approval. If the Contracting Officer authorizes a Conditional FAT Approval, requirements that have been met with exceptions during FAT and any failures noted during FAT not relating to mandatory source items (e.g., workmanship issues on the E-CRRC, labeling issues) shall be corrected prior to the start of production. After receipt of a Conditional FAT approval letter detailing FAT findings, the Contractor shall deliver a Failure Analysis and Corrective Action Report (FACAR), which must be approved by the Government prior to the Contractor beginning production. All costs related to any additional FAT testing that may be required shall be borne by the Contractor. After correction of all issues, the Contracting Officer will issue a final FAT approval letter authorizing the Contractor to proceed into production.

3.5.1.2 FAT Disapproval. If the FAT is disapproved, the Contracting Officer will detail the findings in the

FAT Disapproval Letter. After receipt of a FAT Disapproval Letter, the Contractor shall deliver a FACAR addressing the findings, which must be approved by the Government prior to the Contractor beginning production.

All costs related to any additional FAT testing that may be required shall be borne by the Contractor.

Failure Analysis Corrective Action Report (FACAR) – CDRL A015

3.5.1.3 First Article Test Methods. The Government will conduct FAT in accordance with

FAR 52.209-4 First Article Approval – Government Testing (clause is included in full text in Section I of this contract), the E-CRRC Performance Specification, and the FAT Plan. The Contractor shall submit in-process manufacturing certifications of compliance.

Certificate of Compliance – CDRL A016

3.5.2 Confirmation Testing. After approval of FAT, any changes below the product baseline may require a Government approved confirmation test. Additionally, any proposed changes in equipment/tooling (hardware or software) replacement or modifications, equipment additions, and changes in equipment location will require Government approved confirmation testing. The Government will determine if additional testing is required and what that additional testing will encompass based on the scope of the change.

Contractors shall notify the Government in writing in advance of any planned changes.

3.5.3 Nonconformance of First Article. At the Contractor’s expense, the Government will return any FAT article failing to meet requirements as described in the Performance Specification and FAT Plan, to the Contractor, who shall submit plans for the corrective action or disposition to the Government for approval. Disposition will depend on the nature of the failure and the discussion in the FACAR. NSWCCD DN shall document results of the test and the retest in the test report and submit to the Government for review and approval. If the retest results in a failure, NSWCCD DN shall notify the Government immediately. In the event of a test or retest failure, the

Government will share test/retest results with the Contractor and the Contractor shall prepare a FACAR for submission to the Government.

A sample form including the elements referenced above is included as Attachment J.03 to this contract. Contractor format for the FACAR is acceptable; however, the Contractor shall also include a discussion of the following elements in the form to assure that all actions are completed and verified appropriately:

a. Problem Description – A detailed, specific description of the problem including how many items contain the problem as well as when, where, and how the problem was discovered.

b. Containment Actions – Detailed explanation of the quantity of suspect products in the failed lot at the Contractor’s facility including the method of quarantine, quarantine identification, method of certification against the problem and certification identification (e.g., if product is screened and bad product is removed, good product is re-packaged and the package has a green

“certified” label adhered to it). Specify the quantity of products in transit, including method of notification to the recipient, a proposed method of certification against the problem (e.g., return authorization, Contractor to go on-site and rework or screen product), and a method of certification identification. Detail the quantity of suspect products in the Customer’s possession, including the return authorization, details of quarantine, and certification upon receipt into the

Contractor’s facility, or details of any arrangements made for quarantine and certification at the

Customer’s facility.

c. Root Cause Analysis – An explanation of why the failure happened (the root cause) and an explanation of why the failure escaped detection prior to FAT.

d. Root Cause Verification – An explanation of what actions were taken to assure the true root cause of the failure was found (i.e. could not be something else). Explain in detail what actions were taken to assure the true root cause was found.

e. Corrective Actions / Verification of the Actions – Discuss each corrective action individually as it relates to the root cause. Discuss how each corrective action relates to non-detection of the problem. For each problem identified by the Contractor, the Contractor shall list each individual action taken, the date of action implementation, and proof that the action taken eliminates the problem. Additionally, the Contractor shall describe what quality assurance procedures would have detected the problem, the date the Contractor will implement those actions in the future, and proof the action taken eliminates non-detection of the problem. Lastly, list if any mechanisms that will help an equipment operator to avoid mistakes were implemented for this problem and provide details. If none implemented, explain why not.

f. Standardization and Control – An explanation regarding document updates such as Process

Control Plans, Process Flow Diagrams, Visual Aids, Work Instructions, Operating Procedures, Training Methods/Records, and Preventive Maintenance Plans.

g. Verification of Corrective Actions – An explanation of the methods to verify the corrective actions are effective and will remain effective in the long term. Provide the number of trials with corrections in place, measurements, inspections, etc., including data on the number inspected vs.

number of subject defects found.

Failure Analysis Corrective Action Report (FACAR) – CDRL A017

In the event of a conformance inspection failure, the Contractor shall submit a FACAR for each. The Government will not consider accepting failed lots until the Contractor resolves the failure to the Government’s satisfaction.

Government acceptance of a FACAR does not imply acceptance of a failed lot. Acceptance of failed lots is at the discretion of the Government. After lot failure, the Contractor’s production is at its own risk unless the PCO directs the Contractor in writing to discontinue production.

The Government has a right to revoke acceptance of any and all items potentially containing the root cause failure mode and to require the Contractor to replace the failed units or correct the failure mode at its expense. If the PCO approves the FACAR, the Contractor may perform any such action at destination or otherwise return the affected items to another location subject to the PCO’s approval. Transportation costs to and from the Contractor’s in this instance will be at the Contractor’s expense.

When the Contractor has shipped products from a failed lot, the Contractor shall notify the PCO in writing, with copy to the Administrative Contracting Officer (ACO) and Program Manager (PM) representative. The notification shall indicate the nature of the failure and shipments, to include consignees, date of shipments, carriers, waybill numbers, and quantity. The Government reserves the right to return the shipments or any portion thereof to the

Contractor at Contractor's expense.

3.5.4 Quality Management System. The Contractor shall have a Quality Management System (QMS) that meets the requirements of Quality stated in FAR 52.246-11, Higher Level Contract Quality Requirement, to ensure the product conform to contractual requirements. The Contractor shall monitor, assess, and audit raw material quality, product performance, and reliability at all subcontractor and supplier facilities. The Government reserves the right to audit products and processes, as well as the QMS at any stage of contract performance. The Contractor shall make available all quality management documentation for the Government’s review upon request.

The Contractor and subcontractors shall calibrate all test, inspection, measurement, and diagnostic equipment, to include all accessories and ancillary equipment in accordance with ANSI/NCSL Z540.3-2006 or equivalent. The

Contractor shall provide a Certification of Conformance (CoC) or equivalence within ten working days of the contract award.

The Contractor shall provide CoCs and supporting test data for all components and material performance as stated in the Detail Specification to DCMA at the time it presents FAT samples for Inspection and Acceptance. The

Contractor shall attach all CoCs and supporting test results to the DD1222.

3.5.4.1 Subcontractors and Suppliers. The Contractor shall be responsible for work performed by its subcontractors and suppliers, including any inspections and tests. The Contractor shall convey to its subcontractors and suppliers all applicable quality requirements; associated specifications; and all contractual requirements applicable to the component, materials, and spare parts. The Contractor shall also verify its subcontractors and suppliers’ compliance for the contracts period of performance. The Contractor shall allow the Government to enter the Contractor’s or any subcontractor or supplier facility for the purpose of audits, production surveillance, verification, and observation during contract performance. The Government’s right to audit, conduct production surveillance and verification, or observe performance does not relieve the Contractor of its contractual obligations.

3.5.4.2 Quality Manual/Quality Program Plan. The Contractor shall establish and maintain a Quality Manual compliant with the requirements of ISO 9001:2015 or higher Industry Standard for QMS. The Contractor shall submit the Quality Program Plan/Quality Manual for Government review and acceptance as specified in the CDRL.

The Quality Manual must include the scope of the QMS, the documented procedures established for the QMS, and a description of the interaction between the processes of the QMS. The contractor shall submit in entirety all procedures describing the activities for implementing the system.

Quality Program Plan (QPP) – CDRL A018

3.6 Packaging. The Contractor shall develop packaging data in accordance with MIL

STD-2073-1 and all appendices for the end item and all repairable components.

3.6.1 Preservation and Packaging. The Contractor shall preserve and package (P&P) all items scheduled for domestic shipment for immediate use in accordance with the best commercial practices of

ASTM D3951. The Contractor shall P&P items scheduled for overseas shipment for immediate use in accordance with the best commercial practices of ASTM D3951, Export Requirements. The Contractor shall P&P items scheduled for storage, as identified by the instructions provided in each specific delivery order with the Level “B” requirements of MIL-STD-2073-1, Method 31. The Contractor shall P&P spare or repairable components that are not, Electrostatic Sensitive Devices (ESD) in accordance with the best commercial practices of ASTM D3951.

3.7 Development of Marking Requirements. Marking shall be in accordance with MIL-STD-129P.

3.7.1 Engineering Changes. In the event a Government approved ECP affects packaging design requirements for previously approved data, the Contractor shall update the affected packaging data and deliver it to the Government for approval.

Preservation and Packing Data – CDRL A019

3.8 Delivery Status. The Contractor shall provide a delivery status tracking spreadsheet in excel format that it updates and emails with each delivery shipment. This cumulative document shall include current information on items shipped, lot number, quantity by size, shipment date, shipment number, invoice number, delivery destination, delivery date, tracking information, and name and contact information of the individual that signed for the shipment at destination.

Delivery Status Tracking Spreadsheet – CDRL A020

3.9 Technical Publications.

3.9.1 Commercial Manuals and Engineering Data for Provisioning (EDFP).

The Contractor shall provide EDFP. The order of precedence for EDFP shall be:

1. Data equivalent to approved product-engineering drawings.

2. Data equivalent to in-process/incomplete product engineering drawings.

3. Commercial drawings.

4. Commercial manuals, when required to provide information on a commercial assembly.

5. Catalogs or catalog descriptions.

6. Sketches or photographs with brief descriptions of dimensional, materiel, mechanical, electrical, or other descriptive characteristics. When sketches or photographs are provided for an assembly, a bill of material shall also be provided.

The Contractor shall provide Data Item Description (DID) tailored to meet Marine Corps use references GEIA-STD-

0007 Logistics Product Data and TA-STD-0017 Product Support Analysis.

The Contractor shall provide Commercial Off-the-Shelf (COTS) manual(s) for the E-CRRC in accordance with

MIL-PRF-32216, to include supplemental data as necessary. The manual(s) shall contain installation, operation, troubleshooting and maintenance (preventive and corrective) instructions. The manual(s) shall include a complete repair parts list (including exploded views of all assemblies and subassemblies) and special tools list if applicable.

Commercial Manual(s) and Engineering Data for Provisioning – CDRL A021

3.9.2 Copyright Release. The Contractor shall identify copyrighted material, if any, and shall obtain the written approval of the copyright owner. The Contractor shall furnish appropriate copyright release giving the Government permission to reproduce and use copyrighted information. When the Contractor uses a manual, which covers a vendor's component(s) or a portion thereof, and the vendor's manual contains copyrighted material, the Contractor shall be responsible for obtaining a copyright release from the vendor and providing the copyright release to the

Government.

3.10 Instructor & Key Personnel Training. The Contractor shall provide Instructor & Key Personnel Training

(I&KPT) session for up to eight personnel. Training topics shall include, but are not limited to; E-CRRC installation/assembly/disassembly, E-CRRC operations, E-CRRC Preventive Maintenance Checks and Services

(PMCS), E-CRRC user-level troubleshooting and maintenance, and E-CRRC storage procedures in accordance with

MIL-PRF-29612B. Prior to course initiation, the Contractor shall meet safety standards, which are in accordance with local, state, and federal regulations. The Contractor shall provide all training aids (e.g., Power point presentations, films, handouts, training booklets) to support the training evolution. A designated government representative shall coordinate all training requirements, locations and schedules directly with the contractor.

Section D - Packaging and Marking

PACKAGING AND MARKING

See paragraphs 3.6 and 3.7 of Section C, Statement of Work for Packaging and Marking Instructions.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Origin Government Origin Government

0002 Origin Government Origin Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996

52.246-15 Certificate of Conformance APR 1984

52.246-16 Responsibility For Supplies APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015 or higher industry standard for QMS

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

QUALITY ASSURANCE

Contractor Quality System Requirements

Source Inspection

The Government, pursuant to FAR 46.402, requires Government contract quality assurance at source. The

Government reserves the right to inspect at any location at any time. In the event of end item non-compliance, the contractor will be responsible for all costs and retests, and reporting required to achieve compliance, unless otherwise directed by the Government. Any CoC provided shall be complete with the applicable test data and traceability to materials and procedures that verify the outcome contained in the certification. The Government reserves the right to review/audit any suppliers. No review/audit of any suppliers by the Government will relieve the contractor of its responsibility for the performance and inspection of the products or services acquired by its suppliers.

Section F - Deliveries or Performance

52.242-15 Stop-Work Order AUG 1989

52.242-17 Government Delay Of Work APR 1984

52.247-34 F.O.B. Destination NOV 1991

DELIVERY AND PERFORMANCE

Delivery Schedule Compliance. Delivery information to be identified in each individual Delivery Order. In the event the Contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the

Contractor shall immediately notify, in writing, the Contracting Officer and the cognizant DCMA Office. The notice shall give the pertinent details; however such notice shall not be construed as a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.

Acceleration of Deliveries. Acceleration of deliveries is permitted at no additional cost to the Government.

CLIN 0001 – E-CRRC FAT Articles. FAT articles are due within 60 calendar days of contract award.

CLIN 0002 – Delivery quantity will be 10 or more per month following receipt of order.

CLIN 0003 – Three training will be conducted as needed, location will be specified at time of delivery order issuance.

Section G - Contract Administration Data

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC

2018)

(a) Definitions. As used in this clause--

Contract financing payment means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.

(1) Contract financing payments include--

(i) Advance payments;

(ii) Performance-based payments;

(iii) Commercial advance and interim payments;

(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress

Payments;

(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.

(2) Contract financing payments do not include--

(i) Invoice payments;

(ii) Payments for partial deliveries; or

(iii) Lease and rental payments.

Electronic form means any automated system that transmits information electronically from the initiating system to affected systems.

Invoice payment means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.

(1) Invoice payments include--

(i) Payments for partial deliveries that have been accepted by the Government;

(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;

(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-

Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price

Architect-Engineer Contracts; and

(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.

(2) Invoice payments do not include contract financing payments.

Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.

Receiving report means the data prepared in the manner and to the extent required by Appendix F, Material

Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.

(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the

Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order.

(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:

(1) Electronic Data Interchange.

(2) Secure File Transfer Protocol.

(3) Direct input through the WAWF website.

(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when-

(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and

Billing System);

(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the

TRICARE Encounter Data System; or

(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.

(e) Information regarding WAWF is available at https://wawf.eb.mil/.

(f) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

https://wawf.eb.mil/

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of

Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-

7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting

Officer.

Combo Report

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the

Contracting Officer.

Not applicable

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

https://www.sam.gov/

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC M67854

Admin DoDAAC** TBD

Inspect By DoDAAC TBD

Ship To Code TBD

Ship From Code N/A

Mark For Code N/A

Service Approver (DoDAAC) N/A

Se…

This is the start of the file's text. The full file is on GovTribe.