M67854-18-R-1313-0002_-_GPSLP_Q&As_20180420.docx
DOCX document 34 KB Posted
- Solicitation number
- M67854-18-R-1313
- Issued by
-
United States Marine Corps
About this file
M67854-18-R-1313-0002 - GPSLP Q&As 20180420.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M67854-18-R-1313-0001_-_GPSLP_Q&As_20180413.docx | DOCX document | |
| Attachment_(4)_Past_Performance_Questionnaire_20180307.docx | DOCX document | |
| M67854-18-R-1313_-_GPSLP_Request_for_Proposal.docx | DOCX document | |
| Attachment_(5)_GPSLP_Section_B_Description_of_Supplies_Services_Pricing_20180307.xlsx | XLSX spreadsheet | |
| Exhibit_(A)_GPSLP_CDRL_List_(1423)_20180315.pdf | ||
| GPSLP_Section_C_(SOW)_Draft_6_Nov_2017.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M6785418R1313
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
QUESTIONS AND ANSWERS
Additional Questions and Answers Numbers 9 through 14 are hereby added and highlighted in yellow below.
M67854-18-R-1313 GPSLP FINAL RFP - QUESTIONS AND ANSWERS - Revised 20 April 18
| Question Number |
| Document / Section |
| Paragraph |
Question/Issue/Concern
Answers
| 1 |
| SOW |
| Section 2.4 |
| Will We be receiving down component drawings? |
Are you looking for a build-to-print proposal or an upgraded solution? (Redacted Vendors Name) would be able to produce a form, fit, and function GPSLP solution made out of composite to reduce the weight of the current part. However, we can also manufacture the part number build-to-print.
Down component drawings are available upon request. This is not a build-to-print proposal. The critical component of the GPSLP is the CCA, each vendor is responsible for coming up with their own CCA. There is not a requirement for the GPSLP solution to be made out of composite to reduce the weight of the part.
| 2 |
| Solicitation M67854-18-R-1313, dated 27 March 2018 |
Section L: Instructions, Conditions, and Notices to Offerors
| Para L-2 |
| Is it possible for a contractor to submit the two product samples referenced in Paragraph L-2 prior to submission of said contractor's proposal? If so, could you please indicate the point of contact for the shipment of these items? |
| Product samples may be submitted prior to proposal. Point of Contact is Brian Lewis, brian.lewis1@usmc.mil. Ensure separate deliveries are each marked iaw Section L-4.4. |
| 3 |
| N/A |
| N/A |
| We request that qualified (Redacted Country name) companies be added to the list of countries that can view the Distribution D data. |
| Offerors may provide Export Control Certification for foreign companies/countries. With proof of certification of qualified companies/countries, the Government will provide the offeror or awardee with an updated Performance Specification and Drawing to include revised Distribution D statement including the qualified entity. |
| 4 |
| Solicitation M67854-18-R-1313, dated 27 March 2018 |
Section L: Instructions, Conditions, and Notices to Offerors Para L-4.7.1
| Request we submit our (Redacted offeror product nomenclature) for L-4.7.1 Technical. The Offeror shall provide two product samples. Performance. |
| Bid samples other than GPSLP are not acceptable. Reference RFP section L-2, General; L-4.7.1, Technical; and M-2.1.1. "The Offeror shall provide a bid sample of the proposed GPSLP with their proposal. The bid sample shall consist of two GPSLPs that interfaces with the Gunner’s Primary Sight and the 1W104 P2 connector." |
| 5 |
| Performance Specification |
| Para 3.2.8 |
| We request information regarding protocol for the RS485. |
| Reference Performance Specification Para 3.2.8. Test Port is an objective requirement. If you decide to use this factory test port, you shall define the protocol. |
GPSLP Drawing
N/A
We request ICD if available.
ICD consists of Control Panel Assembly Drawing 13016548 and the Performance Specification, specifically Table V. GPSLP Interface Electrical Characteristics.
| 7 |
| GPSLP Drawing |
| N/A |
| Complete drawing pack to include metalwork panel build drawing. |
| Drawings are available upon request. This is not a build-to-print proposal. The critical component of the GPSLP is the CCA. Each vendor is responsible for coming up with their own CCA. |
| 8 |
| GPSLP Drawing |
| N/A |
| Please accept this submission as (Redacted-vendor name)'s formal request to obtain a Letter of Authorization (LOA) from your office in order to secure a vendor quotation for the procurement of a @-Kohm, 10-turn, sealed, wirewound potentiometer denoted by U.S. Army Part Number 12273340-3 (Bourns, Inc. Manufacturer Part No. 3540S-638-202)? Bourns, Inc. has indicated to (Redacted-vendor name) that this P/N is restricted to the U.S. Army and cannot be quoted unless an LOA has been issued. |
| Offerors needing an LOA to negotiate with Bourn, Inc. regarding U.S. Army Part Number 12273340-3 may request the LOA from MCSC by contacting Brian Lewis brian.lewis1@usmc.mil. Provide offeror name, cage, and POC information with the request. |
| 9 |
| Solicitation M67854-18-R-1313, dated 27 March 2018 |
Section L: Instructions, Conditions, and Notices to Offerors
| Section L-2 General |
| Do the two product samples have to be sent in by the due date April 30, 2018? |
| Yes, the product samples are due the same time as the written proposals. The new due date for both the written proposals and product samples is 2:00 PM, 15 May 2018. |
| 10 |
| GPSLP Drawing |
| N/A |
| Is this a modified drawing from the original Gunner’s Primary Sight Lower Panel? |
| Yes. |
| 11 |
| SOW, PSPEC and GPSLP Drawing |
| See questions 1 and 6 |
| Can you provide ICD? |
| The ICD consists of the Control Panel Assembly Drawing 13016548 and Performance Specification, specifically Table V GPSLP Interface Electrical Characteristics. Table V is called out in paragraph 3.2.5 Inputs/Outputs and identifies the GPSLP J3 connector pin information (Pin, Signal Type, Voltage or Range, Max Load or Drive, and Remarks). Also see questions 1 and 6. |
| 12 |
| Performance Spec. |
| Can you provide wiring diagram? |
| The Performance Specification addresses the pin information for the J3 connector. As addressed in the Pre-solicitation and RFP answers, this is not a build-to-print proposal. The critical component of the GPSLP is the Circuit Card Assembly (CCA) and each vendor is responsible for coming up with their own CCA. Thus, at this time the internal wiring diagram for the sub components that connect to the CCA and the CCA connection to the J3 connector is not available or known. |
| 13 |
| Performance Spec. |
| Paragraph 3.2.1 |
| Can you provide electrical spec? |
| Paragraph 3.2.1 of the Performance specification defines the main power electrical specification. Several paragraphs in section 3 of the performance specification specific electrical requirements for certain pin outs. |
| 14 |
| Solicitation M67854-18-R-1313, dated 27 March 2018 |
Section L: Instructions, Conditions, and Notices to Offerors
| Section L Clause 52.211-3 |
| Can you provide Dimensional Specs? |
| The panel specs are included in sub component drawing 12550034. Sub component drawings are available IAW Section L Clause 52.211-3. See the sub component drawings for dimensional information. For those components that are called out by Mil-Spec or MS the data sheet of those items provide dimensional information. |
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Apr-2018 02:00 PM to 15-May-2018 02:00 PM.