18R1305-RFP-_PC_GEN_III-_SOFT_ARMOR_INSERTS.pdf
PDF 1 MB Posted
- Attached to
- PC Gen III Soft Armor Inserts
- Solicitation number
- M67854-18-R-1305
- Issued by
-
United States Marine Corps
About this file
M67854-18-R-1305 PC Gen III Soft Armor Solicitation
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
X C X D
EX
X
G
F 38 - 42
43 - 51
H 52 - 57
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-C9 1 57
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
M67854 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 10
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
11 - 19
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
21 - 22
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 24 - 27 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror)
X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
28 - 35
PART II - CO NTRACT CLAUSES
MARCORSYSCOM
2200 LESTER STREET
QUANTICO VA 22134
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
36 - 37
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
01 Feb 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
M6785418R1305
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 30 Each FAT, Ballistic Material
FFP
First Article Test (FAT) Materials include:
- 104 15"×15" panels of the proposed ballistic package
- 8 15”x15” unsewn/unfinished panels of the proposed ballistic package
- 16 Finished Base Vest Inserts: 2 XS-S, 2 XS, 2 SM-S, 2 SM, 2 SM-L, 2 MD, 2
LG, 2 XLG
- 4 Finished Side Plate Pocket Inserts: 2 6x6, 2 6x8
- 6 Cummerbund Inserts: 2 SM, 2 MD, 2 LG
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 2,290 Each Base Vest Insert - XS
FFP
Ballistic Soft Armor Insert, Base Vest- X-Small
UNIT UNIT PRICE MAX AMOUNT
0003 4,582 Each Base Vest Insert - SS
FFP
Ballistic Soft Armor Insert, Base Vest-Small Short
UNIT UNIT PRICE MAX AMOUNT
0004 164,536 Each Base Vest Insert - S
FFP
Ballistic Soft Armor Insert, Base Vest-Small
UNIT UNIT PRICE MAX AMOUNT
0005 324,886 Each Base Vest Insert - M
FFP
Ballistic Soft Armor Insert, Base Vest-Medium
UNIT UNIT PRICE MAX AMOUNT
0006 95,816 Each Base Vest Insert - L
FFP
Ballistic Soft Armor Insert, Base Vest-Large
UNIT UNIT PRICE MAX AMOUNT
0007 63,746 Each Base Vest Insert - XL
FFP
Ballistic Soft Armor Insert, Base Vest-X-Large
UNIT UNIT PRICE MAX AMOUNT
0008 1,144 Each Base Vest Insert - XSS
FFP
Ballistic Soft Armor Insert, Base Vest-X Small-Short
UNIT UNIT PRICE MAX AMOUNT
0009 1,142 Each Base Vest Insert - S
FFP
Ballistic Soft Armor Insert, Base Vest-Small-Long
UNIT UNIT PRICE MAX AMOUNT
0010 8,016 Each Side Plate Pocket Insert - 6X6
FFP
Ballistic Soft Armor Insert, Side Plate Pocket - 6X6
UNIT UNIT PRICE MAX AMOUNT
0011 650,126 Each Side Plate Pocket Insert - 6X8
Ballistic Soft Armor Insert, Side Plate Pocket - 6X8
UNIT UNIT PRICE MAX AMOUNT
0012 1,718 Each Cummerbund Insert - S
FFP
Ballistic Insert, Soft Armor Cummerbund- Small
UNIT UNIT PRICE MAX AMOUNT
0013 3,822 Each Cummerbund Insert - M
FFP
Ballistic Insert, Soft Armor Cummerbund- Medium
UNIT UNIT PRICE MAX AMOUNT
0014 830 Each Cummerbund Insert - L
Ballistic Insert, Soft Armor Cummerbund- Large
UNIT UNIT PRICE MAX AMOUNT
0015 UNDEFINED Lot CDRLs
FFP
Contract Data Requirements List- CDRL
CONTRACT LIMITATIONS
B-1 CONTRACT LIMITATIONS
CONTRACT MINIMUM AND MAXIMUM LIMITATIONS
MINIMUM QUANTITY
The Minimum quantity shall be the quantity established on the first delivery order.
MAXIMUM QUANTITY
CLIN SUPPLIES/SERVICES SIZE UNIT MAX QUANTITY
(Total)
0001 FAT MATERIALS
LOT 30
0002 Base Vest Insert X-Small EA 658,142
0003 Base Vest Insert Small-Short EA
0004 Base Vest Insert Small EA
0005 Base Vest Insert Medium EA
0006 Base Vest Insert Large EA
0007 Base Vest Insert X-Large EA
0008 Base Vest Insert X-Small-Short EA
0009 Base Vest Insert Small-Long EA
0010 Side Plate Pocket Insert 6x6 EA 658,142
0011 Side Plate Pocket Insert 6x8 EA
0012 Cummerbund Insert Small EA 6,370
0013 Cummerbund Insert Medium EA
0014 Cummerbund Insert Large EA
0015 CDRLS (NSP) N/A LOT -
This effort establishes a maximum quantity for each item, not each size of each item. For example, the Maximum
Quantity for Base Vest Inserts is 658,142. Therefore, the sum of CLINs 0002 – 0009 shall not exceed 658,142.
ORDERING PERIODS
There is one 60 month ordering period for this effort.
BERRY AMENDMENT COMPLIANCE
B-2 BERRY AMENDMENT COMPLIANCE.
The Defense Appropriations and Authorizations Acts and other Statutes (including what is commonly referred to as the “Berry Amendment”) imposes restrictions on the DOD’s acquisition of foreign products and services. A preference for certain domestic commodities is required by 10 USC 2533a and DFARS 252.225-7012. These references require the Department of Defense to acquire specific end items or components that have been grown, reprocessed, reused, or produced in the United States. Items provided under this solicitation and the resulting contract shall be compliant with the above references. Offerors are required to complete and submit the Berry
Amendment Self-Certification located in Section K of this solicitation.
Offerors shall maintain additional documentation substantiating the claim that all materials, including components and raw materials, submitted under this solicitation and the resultant contract are Berry Amendment Compliant.
Offerors shall be able to provide this documentation to Government personnel upon request.
Section C - Descriptions and Specifications
STATEMENT OF WORK
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
SOFT ARMOR STATEMENT OF WORK
1 SCOPE. This Statement of Work (SOW) sets forth the work required to fabricate, produce and prepare associated documentation, and deliver the Plate Carrier Gen III (PC Gen III) Soft Armor in accordance with the PC
Gen III Detail Specification, First Article Test (FAT) Plan, and Lot Acceptance Test (LAT) Plan. The Contractor is responsible for providing all specific material, services and necessary support documentation needed to complete the tasks identified in this SOW. The PC Gen III Soft Armor is a Critical Safety Item (CSI) and has a criticality designation of "A" in accordance with (IAW) FAR 42.1105
2 APPLICABLE DOCUMENTS. The following documents form a part of this SOW to the extent specified herein. All parties shall use the most recent revision of the referenced document at the time of contracting unless specified otherwise. All Government document issue dates are those listed in the Department of Defense Index of
Specifications and Standards (DoDISS). In the event of conflict between the applicable documents and this SOW, the
SOW shall take precedence. While the Government has made every effort to ensure the below lists are complete, the
SOW may reference documents not included below. Contractors shall meet all specified requirements cited in this
SOW regardless whether an applicable document appears below.
2.1 Military Standards and Specifications - Mandatory Compliance.
DTL-17001A0029 Detail Specification for PC Gen III
MIL-STD-129P Military Marking for Shipment and Storage
MIL-STD-130N Standard Practice Identification Marking of U.S. Military Property
MIL-STD-882E Standard Practice for System Safety
MIL-STD-2073-1 DoD Standard Practice for Military Packaging
MIL-STD-31000A Technical Data Packages
2.2 Military Standards and Specifications - Guidance Only.
Not Applicable.
2.3 Federal Standard - Mandatory.
FED-STD-313 w/CN #1 Material Safety Data, Transportation Data and Disposal Data for
Hazardous Materials Furnished to Government Activities
2.4 Drawings.
PC Gen III Patterns -17001A0029
2.5 Handbooks - Guidance Only.
MIL-HDBK-61 Configuration Management Guidance
2.6 Non-Government Documents.
ASTM D-3951 Standard Practice for Commercial Packaging
EIA-649 National Consensus Standard for Configuration Management
3 REQUIREMENTS. The Contractor shall perform all tasks delineated in this SOW including providing all materials, equipment, hard tooling, personnel, and facilities necessary to manufacture, fabricate, integrate, produce, and deliver FAT items, production PC Gen IIIs soft armor, and data item deliverables as specified by the contract, Section J attachments, and individual delivery orders.
3.1 Program and Data Management.
3.1.1 Program Management. The Contractor shall designate a single individual to serve as the primary point of contact (POC) between the Government and Contractor, who shall be responsible for coordinating all Contractor activities related to this contract. This individual shall have the authority to commit the Contractor to specific courses of action and accept direction from the Contracting Officer or the Contracting Officer's authorized representatives.
This individual shall coordinate all meetings between the Government and Contractor; shall immediately bring any conflicts in the Contractor's interpretation of the contract requirements to the Contracting Officer's attention (first by telephone verbal notification, to be followed by written notification); and shall bring to the Contracting Officer's attention any problems that could adversely affect the Contractor's ability to meet the contract quality, cost, production schedule, delivery schedule, or other performance requirements. The Contractor shall submit Progress, Status and
Management Reports.
Contractor’s Progress, Status and Management Report – CDRL A001
3.1.2 Subcontractor Management. The Contractor is responsible for performing requirements delineated in this SOW and shall institute appropriate management actions for subcontractor performance. Contractually specified requirements shall apply to subcontractor performance; however, the Contractor shall be accountable for subcontractor compliance and is ultimately responsible for ensuring all deliverable products comply with the contract requirements.
3.1.3 Data Management. The Contractor shall establish a single, centralized system for management of all data required under this contract. The Government reserves the right to review all data associated with and developed for the PC Gen III soft armor and to require access of any such data.
3.2 Government Furnished Property/Government Furnished Information.
3.2.1 Government Furnished Information. The Government will provide the Government Furnished Information
(GFI) identified below to the Contractor:
PC Gen III Detail Specification and Pattern Package (Attachment 01)
PC Gen III Drawings (Attachment 02)
The Contractor shall secure, store, and account for the GFI. The Contractor shall inspect and inventory all GFI and report any discrepancies and deficiencies as well as any associated costs (e.g., materials, labor, and tests) to repair the
GFI to like-new conditions.
3.3 Meetings, Formal Reviews, Conferences, and Audits.
3.3.1 Post Award Conference. The Contractor shall host a Post Award Conference (PAC) at its facility no later than
30 days after contract award. The PAC is for the Contractor to demonstrate its production, quality control, and management procedures for producing the PC Gen III soft armor. The Contractor shall ensure its key operations and management personnel attend the PAC. The Contractor shall provide a meeting agenda and meeting minutes for
Government approval.
Conference Agenda – CDRL A002
Conference Minutes – CDRL A003
3.3.2 Production Readiness Review. A production readiness shall occur after FAT and prior to the start of full rate production. The review will include a review of quality management documents and processes, production lines and processes, sufficient supply, and other topics as necessary to determine the Contractor is ready to proceed into full rate production.
3.3.3 In-Process Reviews (IPRs). IPRs will occur no more than quarterly at dates and locations mutually agreed upon by the Government and the Contractor. The meetings generally occur only when the Contractor is under production to meet delivery orders under the contract. Topics such as complying with contract requirements, identifying and resolving problems, and assessing manufacturing performance, could be matters that necessitate face-to-face meetings. The Contractor shall deliver meeting agendas and meeting minutes for Government approval.
3.4 Environment, Safety, and Occupational Health.
3.4.1 System Safety. The Contractor shall evaluate any environmental, safety, and health hazards; and define associated risk levels. The Contractor shall also establish a program that reduces the probability and severity of all hazards associated with development, use, and disposal of the soft armor in accordance with MIL-STD-882E.
Residual risks will be evaluated by the Government in accordance with MIL-STD-882E and accepted as appropriate prior to exposing people, equipment, or the environment to known system related Environment, Safety, and
Occupational Health (ESOH) risks. The Contractor shall make available all ESOH documentation for the
Government’s review upon request.
3.4.1.1 Health Hazard Assessment. The Contractor shall perform, document, and deliver a Health Hazard
Assessment Report (HHAR) to identify health hazards, evaluate hazardous materials, and propose protective measures to reduce the associated risk.
Health Hazard Assessment Report (HHAR) – CDRL A004
3.4.2 Safety Data Sheets. The Contractor shall deliver all Safety Data Sheets (SDSs) to the Government for review. A copy of the SDSs are required in accordance with FED-STD-313E.
SDS, Safety Data Sheets – CDRL A005
3.4.3 Environmental Considerations. The Contractor shall deliver information on the potential for any adverse environmental impacts from manufacturing, operating, maintaining, and disposing the PC Gen III soft armor. The
Government will use this information for a preliminary National Environmental Policy Act (NEPA) decision and to prepare formal NEPA documents, which include the Categorical Exclusion (CATEX), Environmental Assessment
(EA) and Environmental Impact Statement (EIS). Environmental impacts include air, soil, wetlands, water, flora, fauna, endangered species, emissions and toxic waste resulting from development, maintenance (coatings and primers), operation, disposal, etc.
Technical Report, Study/Services (Environmental Considerations) – CDRL A006
3.5 Configuration Management Process. The Contractor shall maintain a Configuration Management (CM) process for the control of raw material utilized in the soft armor that are approved by the Government in accordance with First Article Test requirements. The Contractor shall furnish, with each lot submitted to the government, the associated raw material traceability matrix to include raw material supplier Certificates of Conformance (CoC) and lots of raw material used in each lot presented to the Government. The principles contained in MIL-HDBK-61 may be used for guidance. The Contractor’s CM process shall consist of configuration identification and configuration control of all raw materials utilized in the production of ballistic filler. The CM process shall interface with other acquisition requirements such as design review, quality assurance, and other program related disciplines shall be addressed.
3.5.1 Configuration Management Meetings and Audits.
3.5.1.1 Physical Configuration Audit. The Contractor and the Government shall perform a baseline Physical
Configuration Audit(s) (PCA) to verify the PC Gen III soft armor is accurate, complete, and compatible. The PCA shall also verify that soft armor inserts are in accordance with the specification. The Contractor shall consolidate the results of its audits on subcontractors for configuration management of the PC Gen III soft armor. The Government and the Contractor shall conduct the system-level PCA jointly, at the Contractor’s place of performance, prior to the construction of first articles and the Government will chair the audit. The Contractor shall plan, organize, chair, and conduct audits on subcontractors, with the Government serving in a support capacity when necessary before submitting the baselined Configuration Items. The PCA shall verify that the patterns reflect the "as-built" configuration of all newly developed or modified portions of the system; confirm that accurate form, fit, function information is provided on control patterns for all CIs; and confirm the patterns accurately represent the "as-built" production configuration. The Contractor shall provide a proposed schedule for conducting the PCA and identification of the CIs to be audited at first article production. The Contractor shall participate and assist the Government in developing the PCA, using the guidelines contained in MIL-HDBK-61A, Section 8. The Contractor shall document the PCA results after each audit and correct all audit discrepancies documented in the configuration audit summary reports, which are data deliverables. In the event the Government finds any discrepancies, the Government reserves the right to request revisions until the Contractor corrects all discrepancies and the Government approves the configuration audit summary report. The product baseline will be established upon completion of the PCA and the resolution of any audit discrepancies.
Configuration Audit Summary Report (Physical Configuration Audit) – CDRL A007
3.5.2 Configuration Control. The Contractor shall implement configuration control methods and procedures to maintain the integrity and traceability of an established baseline.
Contractor’s Configuration Management Plan – CDRL A008
3.5.2.1 Engineering Change Proposals. The Contractor shall submit Engineering Change Proposals as data deliverables. MIL-HDBK-61 provides guidance concerning the classification of ECPs. After the product baseline is established, all ECPs shall be submitted and processed in accordance with the PC Gen III CM Plan incorporated as
Attachment 03 to this contract. The Government will review each ECP upon receipt and notify the Contractor in writing of approval/disapproval. For Class I ECPs, approval of the ECP grants the Contractor the authority to proceed to testing only. Based on the test results obtained, the Government will decide whether or not to proceed with permanent implementation of the change. The Contractor will be notified of this decision via separate formal correspondence.
Engineering Change Proposal (ECP) – CDRL A009
3.5.2.1.1 ECP Required Data. If there are no costs to the Government associated with the change, the Contractor shall fill out DD Form 1692/1, Aug 96 Blocks 1-36 for Government review. If there are costs to the Government associated with the change, the Contractor shall fill out Block 51 columns a-e identifying the funding required for the engineering change. Block 51 column f will be reserved for the Government to estimate costs outside the contract
(i.e. government lab testing, additional GFP, etc.). The Contractor shall submit ECPs, to include supporting documentation, to the Government Contracting Officer as a Portable Document Format (PDF). Upon ECP approval, the Government will modify the contract to add the ECP as an attachment.
Engineering Change Proposal (ECP) – CDRL A009
3.5.2.1.2 ECP Cost Responsibility. The Contractor shall fund all ECP implementation up to its contractual responsibilities established in the Functional Baseline, Product Baselines, and this SOW. It is the Contractor’s responsibility to resource the manufacturing of test items and testing required for ECP approval at commercial testing facilities. Commercial testing facilities must meet the minimum criteria outlined in the LAT Plan, provided as Attachment 04 to this contract.
3.5.2.2 Requests for Variance. The Contractor shall process any Request for Variance from approved configuration documentation. Authorized variances are a necessary temporary departure from the specified baseline requirements and do not constitute a change in the approved baseline. The Contractor shall minimize recurring variations. For permanent changes, the Contractor shall process an ECP. EIA-649 Configuration Management for
DoD provides guidance concerning the classification and processing of RFVs.
3.5.2.2.1 RFV Required Data. The Contractor shall populate a DD Form 1694, Mar 2016 (EG), filling out Blocks 1-
25 for Government review. If there are costs to the Government associated with the variance, the Contractor shall specify the cost information as an attachment to the DD Form 1694. Block 19 will be reserved for the Government to estimate costs outside the contract (e.g., government lab testing, additional GFP, etc.). The Contractor shall deliver
RFVs, to include supporting documentation, to the Government Contracting Officer as a PDF. Upon RFV approval, the Government will modify the contract to add the RFV as an attachment.
Request for Variance (RFV) – CDRL A010
3.5.2.2.2 RFV Cost Responsibility. The Contractor shall fund all RFV implementation up to its contractual responsibilities established in the Functional Baseline, Product Baselines, and this statement of work. The Contractor shall resource the manufacturing of test items and qualification testing (if required) at commercial testing facilities.
Commercial testing facilities must meet the minimum criteria outlined in the LAT Plan in Attachment 04 to this contract.
3.5.2.3 Notices of Revision. The Contractor shall generate and deliver Notices of Revisions (NORs) as well as any supporting documentation when technical documentation controlled by another Contractor or Government agency requires changes following approval of an ECP.
Notice of Revision (NOR) – CDRL A011
3.6 Testing/Verification. The Government plans to conduct several stages of testing to ensure the PC Gen III soft armor is able to meet the detail specification requirements, as follows:
3.6.1 First Article Test. The Government will conduct FAT in accordance with FAR 52.209-4, First Article
Approval-Government Testing to verify the soft armor meets all Government requirements in the Detail Specification.
The contractor shall ensure that FAT manufacturing is distributed as uniformly as possible over the machinery and tooling it intends on using for lot production. The Contractor shall be responsible for costs associated with additional shootpacks that may be required for FAT beyond those shown in the FAT Event Design Plan. Additional shootpack requirements will be determined in accordance with the FAT Event Design Plan, Attachment 05, and FAT protocol provided in the PC Gen III Detail Specification provided as Attachment 01 to this contract. The Contracting Officer will notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. If FAT is approved, the Contractor will be authorized to proceed into production. The notice of conditional approval or disapproval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
All production quantities submitted after approval of the FAT shall be produced using the same raw material suppliers, materials, processes, procedures, equipment and facilities that resulted in the manufacture of the acceptable FAT items. This includes all raw materials and/or sub-components. Contractors desiring to make changes to approved FAT items, to include raw material supplier and production processes, must request in writing and receive written approval from the Contracting Officer prior to use. The Contracting Officer, along with the
Government Project Officer, will determine if the request is approved or disapproved and if a new FAT is required.
3.6.1.1 Conditional FAT Approval. If the Contracting Officer authorizes a Conditional FAT Approval, requirements that have been met with exceptions during FAT and any failures noted during FAT not relating to mandatory source items (e.g., workmanship issues on the soft armor, labeling issues) shall be corrected prior to the start of production. For failures noted relating specifically to mandatory source item quality issues, the Contractor shall submit waivers addressing those items and must receive approval of those waivers prior to beginning production. After receipt of a Conditional FAT approval letter detailing FAT findings, the Contractor shall deliver a
Failure Analysis and Corrective Action Report (FACAR) which must be approved by the Government prior to the
Contractor beginning production. All costs related to any additional FAT testing that may be required shall be borne by the Contractor. After correction of all issues, the Contracting Officer will issue a final FAT approval letter authorizing the Contractor to proceed into production.
Failure Analysis Corrective Action Report (FACAR) – CDRL A012
3.6.1.2 FAT Disapproval. If the FAT is disapproved, the Contracting Officer will detail the findings in the FAT
Disapproval Letter. After receipt of a FAT Disapproval Letter, the Contractor shall deliver a FACAR addressing the findings which must be approved by the Government prior to the Contractor beginning production. All costs related to any additional FAT testing that may be required shall be borne by the Contractor.
Failure Analysis Corrective Action Report (FACAR) – CDRL A012
3.6.1.3 FAT Methods. The Government will conduct FAT in accordance with FAR 52.209-4 First Article
Approval – Government Testing (clause is included in full text in Section I of this contract), the PC Gen III Detail
Specification, and the FAT Plan (Attachment 05). The Contractor shall submit in-process manufacturing certifications of compliance.
Certificate of Compliance – CDRL A013
3.6.2 Confirmation Testing. After approval of FAT, any changes below the product baseline may require a
Government approved confirmation test. Additionally, any proposed changes in equipment/tooling (hardware or software) replacement or modifications, equipment additions, and changes in equipment location will require
Government approved confirmation testing. The Government will determine if additional testing is required and what that additional testing will encompass based on the scope of the change. Contractors shall notify the Government in writing in advance of any planned changes.
3.6.3 Lot Acceptance Test. The Contractor shall implement the Government’s LAT procedures to demonstrate that its production processes and procedures suitably achieve the performance inherent in the design. The PC Gen III soft armor shall demonstrate the system meets all requirements identified in the detail specification through LAT testing. LAT shall be conducted in accordance with the LAT Plan provided as Attachment 04 to this contract. The
Contractor shall be responsible for costs associated with additional soft armor inserts and testing that may be required for LAT. Additional soft armor requirements will be determined in accordance with the LAT Plan provided as
Attachment 04 to this contract. The Contractor, with Defense Contract Management Agency (DCMA) surveillance, shall conduct any non-destructive tests the Contractor elects to retain internally at its own facility. The Contractor shall be responsible for conducting the destructive portions of LAT at ATC or any of the National Institute of Justice
(NIJ) certified independent commercial laboratories in accordance with the LAT Plan. During LAT, non-destructive testing on each lot shall be complete before submitting the lot for destructive testing. If a lot has met the required performance parameters for non-destructive testing as described in the PC Gen III Detail Specification and LAT Plan, it will then be submitted for destructive testing. If the DCMA representative concurs with the Government’s technical recommendation for lot approval, he or she will then provide the Contractor with notification of acceptance of the lot and authorize release of shipment via the Wide Area Workflow (WAWF) documentation process. Formal technical recommendation for approval and DCMA concurrence is required prior to shipment. The Contractor may be present during LAT. The finished soft armor insert shall conform to the quality of product established by the Detail
Specification. The Contractor shall immediately report to the Government any deviations in acceptable manufacturing procedures or material quality. Except as otherwise specified herein, repairs are not allowed to be made to the soft armor.
The Contractor shall provide the cognizant Government Quality Assurance Representative (QAR) with written notice of the time and place for each periodic LAT. This notice shall be provided at least four working days before each conformance inspection if the QAR is in residence at the Contractor’s facility or ten working days before each conformance inspection if the QAR is not in residence at the Contractor’s facility.
Test/Inspection Report – CDRL A014
3.6.3.1 LAT Testing Methods. The Contractor shall conduct LAT in accordance with the PC Gen III Detail
Specification and the LAT Plan.
3.6.4 Nonconformance of First Article and Lot Acceptance Test. At the Contractor’s expense, the Government will return any FAT or LAT article failing to meet requirements as described in the Detail Specification, FAT Plan or LAT
Plan, to the Contractor, who shall submit plans for the corrective action or disposition to the Government for approval.
Disposition will depend on the nature of the failure and the discussion in the FACAR. The Contractor shall document results of the test and the retest in the test report and submit to the Government for review and approval. If the retest results in a failure, the Contractor shall notify the Government immediately and prepare a FACAR for submission to the Government.
A sample form including the elements referenced above is included as Attachment 06 to this contract. Contractor format for the FACAR is acceptable; however, the Contractor shall also include a discussion of the following elements in the form to assure that all actions are completed and verified appropriately:
a. Problem Description – A detailed, specific description of the problem including how many items contain the problem as well as when, where, and how the problem discovered.
b. Containment Actions – Detailed explanation of the quantity of suspect products in the failed lot at the
Contractor’s facility including the method of quarantine, quarantine identification, method of certification against the problem and certification identification (e.g., if product is screened and bad product is removed, good product is re-packaged and the package has a green “certified” label adhered to it). Specify the quantity of products in transit, including method of notification to the recipient, a proposed method of certification against the problem (e.g., return authorization, Contractor to go on-site and rework or screen product), and a method of certification identification. Detail the quantity of suspect products in the
Customer’s possession, including the return authorization, details of quarantine, and certification upon receipt into the Contractor’s facility, or details of any arrangements made for quarantine and certification at the Customer’s facility.
c. Root Cause Analysis – An explanation of why the failure happened (the root cause) and an explanation of why the failure escaped detection prior to FAT or LAT.
d. Root Cause Verification – An explanation of what actions were taken to assure the true root cause of the failure was found (i.e. could not be something else). Explain in detail what actions were taken to assure the true root cause was found.
e. Corrective Actions / Verification of the Actions – Discuss each corrective action individually as it relates to the root cause. Also discuss how each corrective action relates to non-detection of the problem. For each problem identified by the Contractor, the Contractor shall list each individual action taken, the date of action implementation, and proof that the action taken eliminates the problem. Additionally, the Contractor shall describe what quality assurance procedures would have detected the problem, the date the Contractor will implement those actions in the future, and proof the action taken eliminates non-detection of the problem. Lastly, list if any mechanisms that will help an equipment operator to avoid mistakes (Poke
Yokes) were implemented for this problem and provide details. If none implemented, explain why not.
f. Standardization and Control – An explanation regarding document updates such as Process Control
Plans, Process Flow Diagrams, Visual Aids, Work Instructions, Operating Procedures, Training
Methods/Records, and Preventive Maintenance Plans.
g. Verification of Corrective Actions – An explanation of the methods to verify the corrective actions are effective and will remain effective in the long term. Provide the number of trials with corrections in place, measurements, inspections, etc., including data on the number inspected vs. number of subject defects found.
(FACAR) – CDRL A012
In the event of a conformance inspection failure, the Contractor shall submit a FACAR for each. The Government will not consider accepting failed lots until the Contractor resolves the failure to the Government’s satisfaction.
Government acceptance of a FACAR does not imply acceptance of a failed lot. Acceptance of failed lots is at the discretion of the Government. After lot failure, the Contractor’s production is at its own risk unless the Contracting
Officer directs the Contractor in writing to discontinue production.
The Government has a right to revoke acceptance of any and all items potentially containing the root cause failure mode and to require the Contractor to replace the failed units or correct the failure mode at its expense. If the
Contracting Officer approves the FACAR, the Contractor may perform any such action at destination or otherwise return the affected items to another location subject to the Contracting Officer’s approval. Transportation costs to and from the Contractor’s in this instance will be at the Contractor’s expense.
When the Contractor has shipped products from a failed lot, the Contractor shall notify the Contracting Officer in writing, with copy to the Administrative Contracting Officer (ACO) and Program Manager (PM) representative.
The notification shall indicate the nature of the failure and shipments, to include consignees, date of shipments, carriers, waybill numbers, and quantity. The Government reserves the right to return the shipments or any portion thereof to the Contractor at Contractor's expense.
3.6.5 Quality Management System. The Contractor shall have a Quality Management System (QMS) that meets the requirements of Quality stated in FAR 52.246-11, Higher Level Contract Quality Requirement, to ensure the product conform to contractual requirements. The Contractor shall monitor, assess, and audit raw material quality, product performance, and reliability at all subcontractor and supplier facilities. The Government reserves the right to audit products and processes, as well as the QMS at any stage of contract performance. The Contractor shall make available all quality management documentation for the Government’s review upon request.
The Contractor and subcontractors shall calibrate all test, inspection, measurement, and diagnostic equipment, to include all accessories and ancillary equipment in accordance with ANSI/NCSL Z540.3-2006 or equivalent. The
Contractor shall provide a Certification of Conformance (CoC) or equivalence within ten working days of the contract award.
The Contractor shall provide CoCs and supporting test data for all components and material performance as stated in the Detail Specification to DCMA at the time it presents FAT and LAT samples for Inspection and Acceptance. The
Contractor shall attach all CoCs and supporting test results to the DD1222.
3.6.5.1 Subcontractors and Suppliers. The Contractor shall be responsible for work performed by its subcontractors and suppliers, including any inspections and tests. The Contractor shall convey to its subcontractors and suppliers that all applicable quality requirements; associated specifications; and all contractual requirements applicable to the component, materials, and spare parts. The Contractor shall also verify its subcontractors’ and suppliers’ compliance for the contract’s the period of performance. The Contractor shall allow the Government to enter the Contractor’s or any subcontractor or supplier facility for the purpose of audits, production surveillance, verification, and observation during contract performance. The Government’s right to audit, conduct production surveillance and verification, or observe performance does not relieve the Contractor of its contractual obligations.
3.6.5.2 Quality Manual/Quality Program Plan. The Contractor shall establish and maintain a Quality Manual compliant with the requirements of ISO 9001:2008 or higher Industry Standard for QMS. The Contractor shall submit the Quality Program Plan/Quality Manual for Government review and acceptance as specified in the CDRL.
The Quality Manual must include: the scope of the QMS, the documented procedures established for the QMS, and a description of the interaction between the processes of the QMS. The contractor shall submit in entirety all procedures describing the activities for implementing the system.
Quality Program Plan (QPP) – CDRL A015
3.7 Packaging. The Contractor shall develop packaging data in accordance with MIL-STD-2073-1 and all appendices for the end item and all repairable components.
3.7.1 Preservation and Packaging. The Contractor shall preserve and package (P&P) all items scheduled for domestic shipment for immediate use in accordance with the best commercial practices of ASTM D3951. The
Contractor shall P&P items scheduled for overseas shipment for immediate use in accordance with the best commercial practices of ASTM D3951, Export Requirements. The Contractor shall P&P items scheduled for storage, as identified by the instructions provided in each specific delivery order with the Level “B” requirements of MIL-
STD-2073-1, Method 31. The Contractor shall P&P spare or repairable components that are not, Electrostatic
Sensitive Devices (ESD) in accordance with the best commercial practices of ASTM D3951.
3.8 Development of Marking Requirements. Marking shall be in accordance with MIL-STD-129P.
3.8.1 Engineering Changes. In the event a Government approved ECP affects packaging design requirements for previously approved data, the Contractor shall update the affected packaging data and deliver it to the Government for approval.
Preservation and Packing Data – CDRL A016
3.9 Test Article Disposal. The Contractor shall pay the expenses associated with returning test articles consumed during Government testing to the Contractor for disposal.
3.10 Delivery Status. The Contractor shall deliver a delivery status tracking spreadsheet in excel format that it updates and emails with each delivery shipment. This cumulative document shall include current information on items shipped, lot number, quantity by size, shipment date, shipment number, invoice number, delivery destination, delivery date, tracking information, and name and contact information of the individual that signed for the shipment at destination.
Delivery Status Tracking Spreadsheet – CDRL A017
3.11 Security Requirements. The information provided to the contractor will be unclassified and/or Controlled
Unclassified Information (CUI). The contractor is not required or expected to have a Facility Clearance and contractor personnel supporting this effort are not required to possess Personnel Clearance Levels. Any contractor personnel requiring access to U.S. Government CUI shall possess a completed background investigation (minimum of a T-
1/NACI) for this Public Trust Position.
Section D - Packaging and Marking
PACKAGING AND MARKING
See paragraphs 3.7 & 3.8 of Section C, Statement of Work for Packaging and Marking Instructions.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Origin Government Origin Government
0002 Origin Government Origin Government
0003 Origin Government Origin Government
0004 Origin Government Origin Government
0005 Origin Government Origin Government
0006 Origin Government Origin Government
0007 Origin Government Origin Government
0008 Origin Government Origin Government
0009 Origin Government Origin Government
0010 Origin Government Origin Government
0011 Origin Government Origin Government
0012 Origin Government Origin Government
0013 Origin Government Origin Government
0014 Origin Government Origin Government
0015 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-15 Certificate of Conformance APR 1984
52.246-16 Responsibility For Supplies APR 1984
252.246-7000 Material Inspection And Receiving Report MAR 2008
CLAUSES INCORPORATED BY FULL TEXT
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001-2008
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
QUALITY ASSURANCE
Contractor Quality System Requirements
Source Inspection
The Government, pursuant to FAR 46.402, requires Government contract quality assurance at source. The
Government reserves the right to inspect at any location at any time. In the event of end item non-compliance, the contractor will be responsible for all costs and retests, and reporting required to achieve compliance, unless otherwise directed by the Government. Any Certificate of Compliance (CoC) provided shall be complete with the applicable test data and traceability to materials and procedures that verify the outcome contained in the certification. The Government reserves the right to review/audit any suppliers. No review/audit of any suppliers by the Government will relieve the contractor of its responsibility for the performance and inspection of the products or services acquired by its suppliers.
Section F - Deliveries or Performance
DELIVERIES OR PERFORMANCE
Delivery information to be identified in each individual delivery order.
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-34 F.O.B. Destination NOV 1991
Section G - Contract Administration Data
ACCOUNTING & APPROPRIATION
Funding and associated accounting and appropriation data will be provided on each individual delivery order.
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(JUNE 2012)
(a) Definitions. As used in this clause–
(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal
Acquisition Regulation.
(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting
Officer.
(3) Payment request means any request for contract financing payment or invoice payment submitted by the
Contractor under this contract.
(4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving
Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when–
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the
Contracting Officer's determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and
Billing System);
(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in
Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo Invoice and Receiving Report
Not Fast pay format when processing invoices and receiving reports
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.