Conformed_RFP.pdf
PDF 1 MB Posted
- Attached to
- NOTM FSR Support Federal contract opportunity
- Solicitation number
- M67854-17-R-2605
- Issued by
- United States Marine Corps
About this file
Conformed Copy of RFP
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A
X B
C
D
EX
X
G
F
90 - 105
H 106
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 113
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
M67854 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3
4 - 36
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
37 - 38
39 - 42 K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 43 - 49 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror)
X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
50 - 88
PART II - CO NTRACT CLAUSES
COMMANDER, MARCORSYSCOM
ATTN: COURTNEY PRUITT
2200 LESTER STREET
QUANTICO VA 22134 703-432-9907
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
10 Jan 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
M67854-17-R-2605
Section SF 30 - BLOCK 14 CONTINUATION PAGE
CONTINUATION PAGE OF CHANGES
The purpose of Amendment 0005 is to:
1) Provide Additional Questions and Answers (#’s 38, 39, 40, 41).
2) Update Section L.1 (d).
3) Update Section L.1 (p).
4) Provide Conformed Copy of FBO Amendment 0005.
5) Provide Copy of SF-30, FBO Amendment 0005.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NOTM GCV Systems
FFP
The Contractor shall provide all labor, materials and supervision, for the NOTM
GCV Systems in accordance with the attached PWS.
NET AMT
1001AA 11 Months NOTM GCV Systems Support
FFP
PoP: 01 May 2017 to 29 Mar 2018
Location: MEF I
FOB: Destination
1001AB 6 Months NOTM GCV Systems Support
FFP
PoP: 10 Sept 2017 to 29 Mar 2018
Locations: MEF's II and III
NOTM-A Increment 1 Systems
FFP
Increment I Systems in accordance with the attached PWS.
1002AA 11 Months NOTM-A Increment I Systems Support
FFP
PoP: 01 May 2017 to 29 Mar 2018
1002AB 6 Months NOTM-A Increment I Systems Support
FFP
PoP: 10 Sept 2017 to 29 Mar 2018
Locations:MEF's II and III
OPTION NOTM-A Increment II Systems
FFP
The Contractor shall provide all labor, materials an supervision, for the NOTM
Increment II Systems, in accordance with the attached PWS.
This is a pre-priced option.
1003AA 11 Months OPTION NOTM-A Increment II Systems Support
FFP
PoP: 01 May 2017 to 29 Mar 2018
Locations: MEF I
1003AB 6 Months OPTION NOTM-A Increment II Systems Support
FFP
PoP: 10 Sept 2017 to 29 Mar 2018
Locations: MEF's II and III
OPTION Computer Based Training (CBT)
FFP
The Contractor shall perform in accordance with paragraph 5.0; Sections 5.1 and
5.2 in the PWS.
1004AA 1 Each
OPTION OPT ONE CBT
FFP
PoP: 01 May 2017 to 29 Mar 2018.
1004AB 1 Each
OPTION OPT TWO CBT
FFP
PoP: 01 May 2017 to 29 Mar 2018.
ODC/Travel/DBA
COST
ESTIMATED COST
1005AA 1 Lot ODC/Travel/DBA
COST
PoP: 01 May 2017 to 29 Mar 2018
1005AB 1 Lot ODC/Travel/DBA
COST
PoP: 10 Sept 2017 to 29 Mar 2018
Locations: MEF's II and III
OPTION NOTM GCV System
FFP
Option Year 1
2001AA 12 Months OPTION NOTM GCV Systems Support
FFP
PoP: 30 Mar 2018 to 29 Mar 2019
Locations: MEF's I, II, and III.
OPTION NOTM-A Increment I Systems
FFP
Option Year 1
2002AA 12 Months OPTION NOTM-A Increment I Systems Support
FFP
Option Year 1
PoP: 30 Mar 2018 to 29 Mar 2019
OPTION NOTM-A Increment II Systems
FFP
Option Year 1; This is a pre-priced option.
Increment II Systems in accordance with the attached PWS.
2003AA 12 Months OPTION NOTM-A Increment II Systems Support
FFP
Option Year 1; This is a pre-priced option.
PoP: 30 Mar 2018 to 29 Mar 2019
Locations: MEF's I, II and III.
OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 1; This is a pre-priced option.
The Contractor shall provide all labor, materials, and supervision for the NOTM
ITV Systems in accordance with PWS.
2004AA 12 Months OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 1; This is a pre-priced option.
PoP: 30 Mar 2018 to 29 Mar 2019
OPTION Computer Based Training (CBT)
FFP
Option Year 1; This is a pre-priced option.
The Contractor shall perform in accordance with paragraph 5.0; Sections 5.1 and
2005AA 1 Each
OPTION OPT ONE CBT
FFP
Option Year 1; This is a pre-priced option.
PoP: 30 Mar 2018 to 29 Mar 2019
2005AB 1 Each
OPTION OPT TWO CBT
FFP
Option Year 1; This is a pre-priced option.
OPTION ODC/Travel/DBA
COST
Option Year 1
Locations: MEF I, II, and III.
2006AA 1 Lot OPTION ODC/Travel/DBA
COST
Option Year 1
PoP: 30 Mar 2018 to 29 Mar 2019
OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 1; This is a pre-priced option.
PoP: 30 Mar 2018 to 29 Mar 2019
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's proposed for a period of 1 year to perform all services identified in paragraph 14.0 of the PWS.
2007AA 4 Each OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 1; This is a pre-priced option.
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's proposed for a period of 1 year to perform all services identified in paragraph 14.0
OPTION NOTM GCV Systems
FFP
Option Year 2
3001AA 12 Months OPTION NOTM GCV Systems Support
FFP
Option Year 2
PoP: 30 Mar 2019 to 29 Mar 2020
OPTION NOTM-A Increment I Systems
FFP
Option Year 2
3002AA 12 Months OPTION NOTM-A Increment I Systems Support
FFP
Option Year 2
PoP: 30 Mar 2019 to 29 Mar 2020
OPTION NOTM-A Increment II Systems
FFP
Option Year 2. This is a pre-priced option.
3003AA 12 Months OPTION NOTM-A Increment II Systems Support
FFP
Option Year 2. This is a pre-priced option.
PoP: 30 Mar 2019 to 29 Mar 2020
OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 2. This is a pre-priced option.
ITV Systems in accordance with PWS.
3004AA 12 Months OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 2. This is a pre-priced option.
PoP: 30 Mar 2019 to 29 Mar 2020
OPTION Computer Based Training (CBT)
FFP
Option Year 2. This is a pre-priced option.
3005AA 1 Each
OPTION OPT ONE CBT
FFP
Option Year 2. This is a pre-priced option.
PoP: 30 Mar 2019 to 29 Mar 2020
3005AB 1 Each
OPTION OPT TWO CBT
FFP
Option Year 2. This is a pre-priced option.
OPTION ODC/Travel/DBA
COST
Option Year 2
3006AA 1 Lot OPTION ODC/Travel/DBA
COST
Option Year 2
PoP: 30 Mar 2019 to 29 Mar 2020
OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 2. This is a pre-priced option.
PoP 30 Mar 2019 to 29 Mar 2020
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's
3007AA 4
OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 2. This is a pre-priced option.
PoP 30 Mar 2019 to 29 Mar 2020
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's proposed for a period of 1 year to perform all services identified in paragraph 14.0
OPTION NOTM GCV Systems
FFP
Option Year 3
4001AA 12 Months OPTION NOTM GCV Systems Support
FFP
PoP: 30 Mar 2020 to 29 Mar 2021
Locations: MEF's I, II, and III
OPTION NOTM-A Increment I Systems
FFP
Option Year 3
The Contractor shall provide all labor, materials and supervison, for the NOTM
4002AA 12 Months NOTM-A Increment I Systems Support
FFP
PoP: 30 Mar 2020 to 29 Mar 2021
OPTION NOTM-A Increment II Systems
FFP
Option Year 3. This is a pre-priced option.
The Contractor shall provide all labor, materials and supervison, for the NOTM
Increment II System in accordance with the attached PWS.
4003AA 12 Months OPTION NOTM-A Increment II Systems Support
FFP
Option Year 3. This is a pre-priced option.
PoP: 30 Mar 2020 to 29 Mar 2021
OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 3. This is a pre-priced option.
The Contractor shall provide all labor, materials and supervision for the NOTM
ITV Systems in accordance with the PWS.
4004AA 12 Months OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 3. This is a pre-priced option.
PoP: 30 Mar 2020 to 29 Mar 2021
OPTION Computer Based Training (CBT)
FFP
Option Year 3. This is a pre-priced option.
The Contractor shall perform in accordance with paragraph 5.0, Section 5.1 and 5.2 in the PWS.
4005AA 1 Each
OPTION OPT ONE CBT
FFP
Option Year 3. This is a pre-priced option.
PoP: 30 Mar 2020 to 29 Mar 2021
4005AB 1 Each
OPTION OPT TWO CBT
FFP
Option Year 3. This is a pre-priced option.
OPTION ODC/Travel/DBA
COST
Option Year 3
4006AA 1 Lot OPTION ODC/Travel/DBA
COST
Option Year 3
PoP: 30 Mar 2020 to 29 Mar 2021
OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 3. This is a pre-priced option.
PoP: 30 Mar 2020 to 29 Mar 2021
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's
4007AA 4 Each OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 3
PoP: 30 Mar 2020 to 29 Mar 2021
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's proposed for a period of 1 year to perform all services identified in paragraph 14.0
OPTION NOTM GCV Systems
FFP
Option Year 4
5001AA 12 Months OPTION NOTM GCV Systems Support
FFP
PoP: 30 Mar 2021 to 29 Mar 2022
OPTION NOTM Increment I Systems
FFP
Option Year 4
The Contractor shall provide all the labor, materials and supervision, for the
NOTM Increment I Systems in accordance with the attached PWS.
5002AA 12 Months OPTION NOTM Increment I Systems Support
FFP
PoP: 30 Mar 2021 to 29 Mar 2022
OPTION NOTM Increment II Systems
FFP
Option Year 4. This is a pre-priced option.
5003AA 12 Months OPTION NOTM Increment II Systems Support
FFP
Option Year 4. This is a pre-priced option.
PoP: 30 Mar 2021 to 29 Mar 2022
OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 4. This is a pre-priced option.
ITV Systems in accordance with the PWS.
5004AA 12 Months OPTION NOTM Internally Transportable Vehicle
FFP
Option Year 4. This is a pre-priced option.
PoP: 30 Mar 2021 to 29 Mar 2022
OPTION Computer Based Training (CBT)
FFP
Option Year 4. This is a pre-priced option.
5005AA 1 Each
OPTION OPT ONE CBT
FFP
Option Year 4. This is a pre-priced option.
PoP: 30 Mar 2021 to 29 Mar 2022
5005AB 1 Each
OPTION OPT TWO CBT
FFP
Option Year 4. This is a pre-priced option.
OPTION ODC/Travel/DBA
COST
Option Year 4
5006AA 1 Lot OPTION ODC/Travel/DBA
COST
Option Year 4
PoP: 30 Mar 2021 to 29 Mar 2022
OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 4. This is a pre-priced option.
PoP: 30 Mar 2021 to 29 Mar 2022
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's
5007AA 4 Each OPTION OPTIONALFSR Support for All NOTM Systems
FFP
Option Year 4. This is a pre-priced option.
PoP: 30 Mar 2021 to 29 Mar 2022
The Government reserves the right to exercise the option for 1, 2, 3, or all 4 FSR's proposed for a period of 1 year to perform all services identified in paragraph 14.0
Section E - Inspection and Acceptance
SECTION E
E-1 INSPECTION AND ACCEPTANCE CRITERIA
a. Final inspection and acceptance of all work, performance, reports, and other deliverables under this contract shall be performed at the location specified in individual task orders. Inspection and acceptance of final delivery will be accomplished by the Contracting
Officer’s Representative (COR) designated in Section G of this contract. If other inspection and acceptance criterion applies, each order will designate the individual responsible.
b. The basis for acceptance shall be in compliance with the requirements set forth in the orders; and other terms and conditions of the contract. Deliverable items rejected under resulting task orders shall be corrected in accordance with applicable clauses.
c. The Government requires a at least thirty (30) days after receipt of final delivery of item(s), for inspection and acceptance or rejection, unless otherwise specified in the Contract
Data Requirements List (CDRL).
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
1001 N/A N/A N/A N/A
1001AA N/A N/A N/A Government
1001AB N/A N/A N/A Government
1002 N/A N/A N/A N/A
1002AA N/A N/A N/A Government
1002AB N/A N/A N/A Government
1003 N/A N/A N/A N/A
1003AA N/A N/A N/A Government
1003AB N/A N/A N/A Government
1004 N/A N/A N/A N/A
1004AA N/A N/A N/A Government
1004AB N/A N/A N/A Government
1005 N/A N/A N/A N/A
1005AA N/A N/A N/A Government
1005AB N/A N/A N/A Government
2001 N/A N/A N/A N/A
2001AA N/A N/A N/A Government
2002 N/A N/A N/A N/A
2002AA N/A N/A N/A Government
2003 N/A N/A N/A N/A
2003AA N/A N/A N/A Government
2004 N/A N/A N/A N/A
2004AA N/A N/A N/A Government
2005 N/A N/A N/A N/A
2005AA N/A N/A N/A Government
2005AB N/A N/A N/A Government
2006 N/A N/A N/A N/A
2006AA N/A N/A N/A Government
2007 N/A N/A N/A N/A
2007AA N/A N/A N/A Government
3001 N/A N/A N/A N/A
3001AA N/A N/A N/A Government
3002 N/A N/A N/A N/A
3002AA N/A N/A N/A Government
3003 N/A N/A N/A N/A
3003AA N/A N/A N/A Government
3004 N/A N/A N/A N/A
3004AA N/A N/A N/A Government
3005 N/A N/A N/A N/A
3005AA N/A N/A N/A Government
3005AB N/A N/A N/A Government
3006 N/A N/A N/A N/A
3006AA N/A N/A N/A Government
3007 N/A N/A N/A N/A
3007AA N/A N/A N/A Government
4001 N/A N/A N/A N/A
4001AA N/A N/A N/A Government
4002 N/A N/A N/A N/A
4002AA N/A N/A N/A Government
4003 N/A N/A N/A N/A
4003AA N/A N/A N/A Government
4004 N/A N/A N/A N/A
4004AA N/A N/A N/A Government
4005 N/A N/A N/A N/A
4005AA N/A N/A N/A Government
4005AB N/A N/A N/A Government
4006 N/A N/A N/A N/A
4006AA N/A N/A N/A Government
4007 N/A N/A N/A N/A
4007AA N/A N/A N/A Government
5001 N/A N/A N/A N/A
5001AA N/A N/A N/A Government
5002 N/A N/A N/A N/A
5002AA N/A N/A N/A Government
5003 N/A N/A N/A N/A
5003AA N/A N/A N/A Government
5004 N/A N/A N/A N/A
5004AA N/A N/A N/A Government
5005 N/A N/A N/A N/A
5005AA N/A N/A N/A Government
5005AB N/A N/A N/A Government
5006 N/A N/A N/A N/A
5006AA N/A N/A N/A Government
5007 N/A N/A N/A N/A
5007AA N/A N/A N/A Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
1001 N/A N/A N/A N/A
1001AA POP 01-MAY-2017 TO
29-MAR-2018
N/A N/A
1001AB POP 10-SEP-2017 TO
1002 N/A N/A N/A N/A
1002AA POP 01-MAY-2017 TO
1002AB POP 10-SEP-2017 TO
1003 N/A N/A N/A N/A
1003AA POP 01-MAY-2017 TO
1003AB POP 10-SEP-2017 TO
1004 N/A N/A N/A N/A
1004AA POP 01-MAY-2017 TO
1004AB POP 01-MAY-2017 TO
1005 N/A N/A N/A N/A
1005AA POP 01-MAY-2017 TO
1005AB POP 10-SEP-2017 TO
2001 N/A N/A N/A N/A
2001AA POP 30-MAR-2018 TO
29-MAR-2019
2002 N/A N/A N/A N/A
2002AA POP 30-MAR-2018 TO
2003 N/A N/A N/A N/A
2003AA POP 30-MAR-2018 TO
2004 N/A N/A N/A N/A
2004AA POP 30-MAR-2018 TO
2005 N/A N/A N/A N/A
2005AA POP 30-MAR-2018 TO
2005AB POP 30-MAR-2017 TO
2006 N/A N/A N/A N/A
2006AA POP 30-MAR-2018 TO
2007 N/A N/A N/A N/A
2007AA POP 30-MAR-2018 TO
3001 N/A N/A N/A N/A
3001AA POP 30-MAR-2019 TO
29-MAR-2020
3002 N/A N/A N/A N/A
3002AA POP 30-MAR-2019 TO
3003 N/A N/A N/A N/A
3003AA POP 30-MAR-2019 TO
3004 N/A N/A N/A N/A
3004AA POP 30-MAR-2019 TO
3005 N/A N/A N/A N/A
3005AA POP 30-MAR-2019 TO
3005AB POP 30-MAR-2019 TO
3006 N/A N/A N/A N/A
3006AA POP 30-MAR-2019 TO
3007 N/A N/A N/A N/A
3007AA POP 30-MAR-2019 TO
4001 N/A N/A N/A N/A
4001AA POP 30-MAR-2020 TO
29-MAR-2021
4002 N/A N/A N/A N/A
4002AA POP 30-MAR-2020 TO
4003 N/A N/A N/A N/A
4003AA POP 30-MAR-2020 TO
4004 N/A N/A N/A N/A
4004AA POP 30-MAR-2020 TO
4005 N/A N/A N/A N/A
4005AA POP 30-MAR-2020 TO
4005AB POP 30-MAR-2020 TO
4006 N/A N/A N/A N/A
4006AA POP 30-MAR-2020 TO
4007 N/A N/A N/A N/A
4007AA POP 20-MAR-2020 TO
5001 N/A N/A N/A N/A
5001AA POP 30-MAR-2020 TO
5002 N/A N/A N/A N/A
5002AA POP 30-MAR-2021 TO
29-MAR-2022
5003 N/A N/A N/A N/A
5003AA POP 30-MAR-2021 TO
5004 N/A N/A N/A N/A
5004AA POP 30-MAR-2021 TO
5005 N/A N/A N/A N/A
5005AA POP 30-MAR-2021 TO
5005AB POP 30-MAR-2021 TO
5006 N/A N/A N/A N/A
5006AA POP 30-MAR-2021 TO
5007 N/A N/A N/A N/A
5007AA POP 30-MAR-2021 TO
Section G - Contract Administration Data
CONTRACT ADMINISTRATION
Section G - Contract Administration Data
CLAUSES INCORPORATED BY REFERENCE
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through
WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
TBD
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
TBD
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official HQ0338
Issue By DoDAAC M67854
Admin DoDAAC S2404A
Inspect By DoDAAC M67854 EXT PMM23
Ship To Code M67854 EXT PMM23
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) M67854 PMM23
Service Acceptor (DoDAAC) M67854 PMM23
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
Sam.c.pitts@usmc.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Scott.trauernicht@usmc.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
SECTION G
G-1 CONTRACT ADMINISTRATION
Contracting Officer Contract Specialist
Ms. Jodie Shifflett and Ms. Courtney Pruitt
Contracting Officer Contract Specialist
Phone (703) 432-9908 Phone (703) 432-9907
Jodie.Shifflett@usmc.mil Courtney.Pruitt@usmc.mil
United States Postal Service Address:
COMMANDER COMMANDER
mailto:Jodie.Shifflett@usmc.mil mailto:Courtney.Pruitt@usmc.mil
MARCORSYSCOM (CT 2.2) MARCORSYSCOM (CT 2.2)
2200 LESTER STREET 2200 LESTER STREET
ATTN: JODIE SHIFFLETT ATTN: COURTNEY PRUITT
QUANTICO, VA 22134-6050 QUANTICO, VA 22134-6050
G-2 CONTRACTING OFFICER’S REPRESENTATIVE (COR) – FUNCTIONS AND LIMITATIONS
(a) COR information will be filled in at award. Unless terminated sooner, this appointment is effective for the period of performance of the resulting contract. COR authority may not be re-delegated. No change in COR assignment shall be made without written notice by the Contracting Officer, who will modify the contract to reflect the change of COR assignment. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor via contract modification.
(b) The responsibilities and limitations of the COR are as follows:
(1) Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the Performance Work Statement. It MAY NOT be used to tell the contractor how to perform the work.
(2) Submitting interim and final Contractor Performance Assessment Reports (CPARS) at www.cpars.csd.disa.mil/cparsmain.htm.
(3) Assuring quality of services performed or deliverables made.
(4) Inspecting and accepting of services or deliverables.
(5) Ensuring that Government Furnished Property, to include any contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.
(6) Addressing security requirements on Government installations, such as the request and retrieval of personnel security badges and vehicle passes.
(7) Monitoring contractor’s performance and promptly report problems and recommendations for corrective action to the PCO.
(8) Annually, furnishing a written report on performance of the contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss that report.
(9) Attending the post award conference.
(10) Ensuring a copy of all Government technical correspondence, to include Technical Direction
Memorandums/Guidance, is forwarded to the PCO for placement in the contract file.
(11) Monitoring of funds expended.
(12) Ensuring that the Contractor does not exceed the defined performance work statement set forth in the contract.
(c) Limitations: The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or the performance work statement, a modification must be issued in writing and signed by the Contracting
Officer in order to effect such changes. No such changes shall be made without the express written prior authorization/direction of the Contracting Officer.
G-3 ACCOUNTING AND APPROPRIATION DATA
Each CLIN issued under this contract will contain the accounting and appropriation data for payment.
G-4 RELEASE OF NEWS INFORMATION
http://www.cpars.csd.disa.mil/cparsmain.htm
No news release (including photographs or films, public announcements, denial, or confirmation of same) on any part of the subject matter of this contract or any phase of any program hereunder shall be made without the prior written approval of the Contracting Officer and Public Affairs Office (PAO). See also Section I, DFARS 252.204-
7000 and Block 12 of Attachment 4, DD254.
G-5 CONTRACT ADMINISTRATION
(a) Notwithstanding the contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination between the Government and the contractor. The following provides the roles and their respective authority during the performance of the contract.
(1) Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and notwithstanding provisions contained elsewhere in this contract, said authority remains the solely in the KO. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk of the
Contractor.
All contract administration will be effected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions of the contract shall be effected without a written modification to the contract executed by the KO authorizing such changes.
(2) Contracting Officer’s Representative (COR). The KO shall designate contract level CORs during the term of this contract, DFARS clause 252.201-7000 “Contracting Officer’s Representative.” The COR will provide assistance in identification and resolution of problems, conflicts in priority, and other operations type problems.
(3) Contractor. The Contractor shall not accept any instructions issued by any person employed by the
U.S. Government or otherwise, other than the KO, or the COR acting within the limits of his or her authority.
The Contractor shall not in any way represent that he is a part of the U.S. Government or that he has the authority to contract or procure supplies for the account of the United States of America.
G-6 CONTRACTOR’S PROPOSAL
The Contractor’s Proposal, or portions thereof, may be incorporated into the contract.
G-7 CONSTRUCTIVE CHANGE ORDERS
(a) No modification, statement, or conduct of Government personnel who might visit the Contractor’s facility or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the “Changes” clause of this contract.
(b) No understanding or agreement, contract modification, change order, or other matter deviating from or constituting an alteration or change of the terms of the contract shall be effective or binding upon the
Government unless formalized by contractual documents executed by the Contracting Officer.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, not withstanding provisions contained elsewhere in the contract, this authority remains solely with the Contracting Officer. In the event that the Contractor effects any change(s) at the direction of any person other than the Contracting Officer, these change(s) will be at the Contractor’s expense. No adjustment shall be made in the contract price or other contract terms and conditions, as the Contracting Officer did not approve any consideration for the aforementioned unauthorized change. Further, should the unauthorized change be to the
Government’s detriment, the Contractor may be held financially responsible for its correction.
G-8 POTENTIAL ORGANIZATIONAL CONFLICTS OF INTEREST (OCI)
Limitation of Future Contracting. The Contracting Officer has determined that this acquisition may give rise to a potential conflict of interest. Prospective Offerors should read
FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest. This Contract may involve systems engineering and technical direction for the MC2S program that will preclude Contractor involvement in future efforts. The restrictions upon future contracting are as follows:
If the Contractor, under the terms of this Contract, or through the performance of this Contract, is required to provide systems engineering and technical direction for a system or helps to develop specifications or statements of work to be used in a competitive acquisition, the Contractor shall be ineligible to supply the system or major components of the system as a prime Contractor and shall be precluded from being a Subcontractor or consultant to a supplier of the system or any of its major components under an ensuing Government contract.
This restriction shall remain in effect for a reasonable time, sufficient to avoid unfair competitive advantage or potential bias (this time shall in no case be less than the duration of the initial production contract).
To the extent the work under this contract requires access to proprietary, business confidential, or financial data of other companies, and as long as these data remain proprietary or confidential, the Contractor shall protect the data from unauthorized use and disclosure and agrees not to use it to compete with those other companies.
(a) “ Organizational Conflict of Interest” means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. “Person” as used herein includes corporations, partnerships, joint ventures, and other business enterprises.
(b) The Contractor warrants that to the best of its knowledge and belief, and except as otherwise set forth in the contract, the Contractor does not have any organizational conflict of interest(s) as defined in paragraph (a).
(c) It is recognized that the effort to be performed by the Contractor under this contract may create a potential organizational conflict of interest on the instant contract or on a future acquisition. In order to avoid potential conflict of interest, and at the same time to avoid prejudicing the best interest of the Government, the right of the Contractor to participate in future procurement of equipment and/or services that are the subject of any work under this contract shall be limited as described below in accordance with the requirements of FAR 9.5.
(d) Disclosure of Information.
The Contractor agrees that it shall not release, disclose, or use in any way that would permit or result in disclosure to any party outside the Government any information provided to the Contractor by the Government during or as a result of performance of this contract. Such information includes, but is not limited to, information submitted to the
Government on a confidential basis by other persons.Further, the prohibition against release of Government provided information extends to cover such information whether or not in its original form, e.g., where the information has been included in Contractor generated work or where it is discernible from materials incorporating or based upon such information. This prohibition shall not expire after a given period of time.
1. The Contractor agrees that it shall not release, disclose, or use in any way that would permit or result in disclosure to any party outside the Government any information generated or derived during or as a result of performance of this contract.This prohibition shall not expire after a given period of time.
2. The prohibitions contained in subparagraphs (d)(1) and (d)(2) shall apply with equal force to any affiliate of the Contractor, any Subcontractor, consultant, or employee of the
Contractor, any joint venture involving the Contractor, any entity into or with which it may merge or affiliate, or any successor or assign of the Contractor.
3. The prohibitions contained in subparagraphs (d)(1) and (d)(2) shall apply with equal force to any affiliate of the Contractor, any Subcontractor, consultant, or employee of the
Contractor, any joint venture involving the Contractor, any entity into or with which it may merge or affiliate, or any successor or assign of the Contractor.
(e) The Contractor further agrees that during the performance of this contract and for a period of three years after completion of performance of this contract, the Contractor, any affiliate of the Contractor, any Subcontractor, consultant, or employee of the Contractor, any joint venture involving the Contractor, any entity into or with which it may subsequently merge or affiliate or any other successor or assign of the Contractor, shall not furnish to the United States
Government, either as a prime Contractor or as a Subcontractor, or as a consultant to a prime
Contractor or as a Subcontractor, any system, component or service which is the subject of the work to be performed under this contract.
The Contractor may, with the authorization of the cognizant contracting officer, participate in a subsequent procurement for the same system, component, or service.
This exclusion does not apply to any re-competition for those systems, components, or services on the basis of work statements growing out of the effort performed under this contract, from a source other than the Contractor, Subcontractor affiliate, or assign of either, during the course of performance of this contract or before the three year period following completion of this contract has lapsed.
(f) The Contractor agrees that if, after award, it discovers an actual or potential organizational conflict of interest, it shall make immediate and full disclosure in writing to the contracting officer. The notification shall include a description of the actual or potential organizational conflict of interest, a description of the action which the Contractor has taken or proposes to take to avoid, mitigate, or neutralize the conflict, and any other relevant information that would assist the contracting officer in making a determination on this matter. Notwithstanding this notification, the Government may terminate the contract for the convenience of the Government if determined to be in the best interest of the Government.
(g) Notwithstanding paragraph (f) above, if the Contractor was aware, or should have been aware, of an organizational conflict of interest prior to the award of this contract or becomes, or should become aware of an organizational conflict of interest after award of this contract and does not make an immediate and full disclosure in writing to the contracting officer, the Government may terminate this contract for default.
(h) If the contractor takes any action prohibited by this requirement or fails to take action required by this requirement, the Government may terminate this contract for default.
(i) The contracting officer's decision as to the existence or nonexistence of the actual or potential organization conflict of interest shall be final and is not subject to the clause of this contract entitled "DISPUTES" (FAR 52.233.1).
(j) Nothing in this requirement is intended to prohibit or preclude the Contractor from marketing or selling to the United States Government its product lines in existence on the effective date of this contract; nor, shall this requirement preclude the Contractor from participating in any research and development. Additionally, sale of catalog or standard commercial items are exempt from this requirement.
(k) The Contractor shall promptly notify the contracting officer, in writing, if it has been tasked to evaluate or advise the Government concerning its own products or activities or those of a competitor in order to ensure proper safeguards exist to guarantee objectivity and to protect the
Government's interest.
(l) The Contractor shall include this requirement in subcontracts of any tier which involve access to information or situations/conditions covered by the preceding paragraphs, substituting
"Subcontractor" for "contractor" where appropriate.
(m) The rights and remedies described herein shall not be exclusive and are in addition to other rights and remedies provided by law or elsewhere included in this contract.
(n) Compliance with this requirement is a material requirement of this contract.
Section I - Contract Clauses
CONTRACT CLAUSES
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5
Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions on Subcontractor Sales to the Government
SEPT2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and
Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal
Or Improper Activity
MAY 2014
52.203-11 Certification and Disclosure
Regarding Payments to Influence
Certain Federal Transactions.
SEPT2007
52.203-12 Limitation On Payments To Influence
Certain Federal Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct
OCT 2015
52.203-16 Preventing Personal Conflicts of
Interest
DEC 2011
52.203-17 Contractor Employee Whistleblower
Rights and Requirement To Inform
Employees of Whistleblower Rights
APR 2014
52.204-2 Security Requirements AUG 1996
52.204-4 Printed or Copied Double-Sided on
Postconsumer Fiber Content Paper
MAY 2011
52.204-7 System for Award Management. OCT 2016
52.204-9 Personal Identity Verification of
Contractor Personnel.
JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
52.204-13
System for Award Management
Maintenance
JUL 2013
52.204-16 Commercial and Government Entity
Code Reporting
JUL 2016
52.204-17 Ownership or Control of Offeror JUL 2016
52.204-18 Commercial and Government Entity
Code Maintenance
52.204-20 Predecessor of Offeror
52.204-21 Basic Safeguarding of Covered
Contractor Information Systems
JUN 2016
52.209-2 Prohibition on Contracting with
Inverted Domestic Corporations-
Representations
NOV 2015
52.209-5
Certification Regarding
Responsibility Matters
52.209-6
52.209-7
Protecting the Government's
Interest When Subcontracting With
Contractors Debarred, Suspended, or
Proposed for Debarment
Information Regarding JUL 2013
Responsibility Matters
52.209-10 Prohibition on Contracting With
Inverted Domestic Corporations
NOV 2015
52.209-11
Representation by Corporations
Regarding Delinquent Tax Liability or a Felony Conviction under and
Federal Law
FEB 2016
52.210-1 Market Research
APR 2011
52.215-1 Instructions to Offerors--
Competitive Acquisition Alternate I
JAN 2004
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform
Contract Format
OCT 1997
52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits (PRB)
Other than Pensions
JUL 2005
52.215-19 Notification of Ownership Changes OCT 1997
52.215-20
Requirements for Certified Cost or
Pricing Data or Information Other
Than Certified Cost or Pricing Data
OCT 2010
52.215-21 Requirements for Certified Cost or
Pricing Data and Data Other Than
Certified Cost or Pricing Data --
Modifications
OCT 2010
52.216-1 Type of Contract APR 1984
52.216-7 Allowable Cost And Payment JUN 2013
52.216-11
Cost Contract -- No Fee. APR 1984
52.217-3
Evaluation Exclusive of Options APR 1984
52.217-5
Evaluation of Options JUL 1990
52.217-8
Option to Extend Services. NOV 1999
52.217-9
Option to Extend the Term of the
Contract
MAR 2000
52.222-3 Convict Labor JUN 2003
52.222-21
Prohibition Of Segregated
Facilities
APR 2015
52.222-22
Previous Contracts and Compliance
Reports
FEB 1999
52.222-24
Preaward On-Site Equal Opportunity
Compliance Evaluation
FEB 1999
52.222-25 Affirmative Action Compliance APR 1984
52.222-26 Equal Opportunity SEP 2016
52.222-35 Equal Opportunity for Veterans OCT 2015
52.222-36 Equal Opportunity for Workers with
Disabilities
JUL 2014
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights
Under the National Labor Relations
Act
DEC 2010
52.222-41 Service Contract Labor Standards MAY 2014
52.222-43 Fair Labor Standards Act And
Service Contract Labor Standards -
Price Adjustment (Multiple Year And
Option Contracts)
MAY 2014
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-54
Employment Eligibility Verification OCT 2015
52.222-55
Minimum Wages Under Executive Order
13658
DEC 2015
52.222-56 Certification Regarding Trafficking in Persons Compliance Plan
MAR 2015
52.223-6 Drug-Free Workplace MAY 2001
52.223-18 Encouraging Contractor Policies To
Ban Text Messaging While Driving
AUG 2011
52.225-13
Restrictions on Certain Foreign
Purchases
JUN 2008
52.225-19 Contractor Personnel in a
Designated Operational Area or
Supporting a Diplomatic or Consular
Mission Outside the United States.
MAR 2008
52.225-25 Prohibition on Contracting with
Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and
Certifications.
OCT 2015
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding
Patent And Copyright Infringement
DEC 2007
52.227-11 Patent Rights--Ownership By The
Contractor
MAY 2014
52.228-3 Workers’ Compensation
Insurance(Defense Base Act)
JUL 2014
52.228-5 Insurance -- Work on a Government
Installation
JAN 1997
52.229-3 Federal, State And Local Taxes FEB 2013
52.230-2 Cost Accounting Standards OCT 2015
52.230-6 Administration of Cost Accounting
Standards
JUN 2010
52.232-1 Payments APR 1984
52.232-17 Interest MAY 2014
52.232-18 Availability Of Funds APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.232-25 Prompt Payment JUL 2013
Prompt Payment (July 2013)
Alternate I
52.232-33 Payment by Electronic Funds
Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized
Obligations
JUN 2013
52.232-40 Providing Accelerated Payments to
Small Business Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014
Disputes (May 2014) - Alternate I
52.233-2 Service Of Protest SEP 2006
52.233-3 Protest After Award AUG 1996
Protest After Award (Aug 1996) -
Alternate I
52.233-4 Applicable Law for Breach of
Contract Claim
OCT 2004
52.239-1 Privacy or Security Safeguards AUG 1996
52.242-13 Bankruptcy JUL 1995
52.243-1 Changes Fixed Price Alternate I AUG 1987
52.243-7
Notification Of Changes APR 1984
52.246-4 Inspection of Services -- Fixed-
Price
AUG 1996
52.246-25 Limitation Of Liability--Services FEB 1997
52.249-2 Termination For Convenience Of The
Government (Fixed-Price)
APR 2012
52.249-4 Termination For Convenience Of The
Government (Services) (Short Form)
APR 1984
52.249-6 Termination (Cost Reimbursement) APR 1984
52.249-8 Default (Fixed-Price Supply &
Service)
APR 1984
52.249-14
Excusable Delays APR 1984
52.252-2 Clauses Incorporated by Reference FEB 1998
52.252-4
Alterations in Contract APR 1984
52.252-5 Authorized Deviations in Provisions APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's
Representative
DEC 1991
252.203-7000 Requirements Relating to
Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of
Fraud or Other Defense-Contract-
Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of
Whistleblower Rights
SEP 2013
252.203-7996
(Dev)
Prohibition on Contracting with
Entities that Require Certain
Internal Confidentiality Agreements
- Representation (Deviation 2016-
O0003)
OCT 2015
252.203-7997
(Dev)
Prohibition on Contracting with
Entities that Require Certain
Internal Confidentiality Agreements
252.204-7000 Disclosure Of Information
AUG 2013
252.204-7002 Payment For Subline Items Not
Separately Priced
DEC 1991
252.204-7003 Control Of Government Personnel
Work Product
APR 1992
252.204-7004
Alt A
System for Award Management FEB 2014
252.204-7006 Billing Instructions
OCT 2005
252.204-7008 Compliance With Safeguarding
Covered Defense Information
Controls
OCT 2016
252.204-7009 Limitations on the Use or
Disclosure of Third-Party
Contractor Reported Cyber Incident
Information
OCT 2016
252.204-7012 Safeguarding Covered Defense
Information and Cyber Incident
Reporting.
OCT 2016
252.205-7000 Provision Of Information To
Cooperative Agreement Holders
Subcontracting With Firms That Are
Owned or Controlled By The
Government of a Country that is a
State Sponsor of Terrorism
252.209-7004
Subcontracting With Firms That Are
Owned or Controlled By The
Government of a Country that is a
State Sponsor of Terrorism
252.211-7000 Acquisition Streamlining
OCT 2010
252.211-7007 Reporting of Government-Furnished
Property
AUG 2012
252.222-7006 Restrictions on the Use of
Mandatory Arbitration Agreements
DEC 2010
252.223-7004 Drug Free Work Force SEP 1988
252.225-7012 Preference For Certain Domestic
Commodities
AUG 2016
252.225-7048 Export-Controlled Items JUN 2013
252.227-7013 Rights in Technical Data-Non-
Commercial Items
FEB 2014
252.227-7015 Technical Data-Commercial Items FEB 2014
252.227-7016 Rights in Bid or Proposal
Information
JAN 2011
252.227-7017 Identification and Assertion of
Use, Release, or Disclosure
Restrictions
JAN 2011
252.227-7025 Limitations on the Use or
Disclosure of Government-Furnished
Information Marked with Restrictive
Legends
MAY 2013
252.227-7026 Deferred Delivery of Technical Data or Computer Software
APR 1988
252.227-7027 Deferred Ordering of Technical Data or Computer Software
APR 1988
252.227-7030 Technical Data-Withholding of
Payment
MAR 2000
252.227-7037 Validation of Restrictive Markings on Technical Data
SEP 2016
252.227-7038 Patent Rights-Ownership by the
Contractor (Large Business)
JUN 2012
252.232-7007 Limitation Of Government's
Obligation
APR 2014
252.243-7001 Pricing Of Contract Modifications
252.243-7002 Requests for Equitable Adjustment
DEC 2012
252.246-7001 Warranty of Data-Basic MAR 2014
252.249-7002 Notification of Anticipated
Contract Termination or Reduction
CLAUSES INCORPORATED BY FULL TEXT
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (JULY 2013)
(a) The Contractor shall update the information in the Federal
Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award
Management database via https://www.acquisition.gov.
(b) As required by section 3010 of the Supplemental
Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments--
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by--
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some https://www.acquisition.gov/ of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of
Information Act, the Government official who posted the information must within 7 calendar days remove the posting from
FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the
Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of
6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April
15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
52.222-46 EVALUATION OF COMPENSATION FOR PROFESSIONAL
EMPLOYEES (FEB 1993)
(a) Recompetition of service contracts may in some cases result in lowering the compensation (salaries and fringe benefits) paid or furnished professional employees. This lowering can be detrimental in obtaining the quality of professional services needed for adequate contract performance. It is therefore in the
Government's…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .